Prior art keywords
unit
parts
tube
mould
mold frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610732398.7A
Other languages
Chinese (zh)
Other versions
CN106182391B (en
Inventor
徐建利
徐征
吴海滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Nufang Building Material Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610732398.7A priority Critical patent/CN106182391B/en
Publication of CN106182391A publication Critical patent/CN106182391A/en
Application granted granted Critical
Publication of CN106182391B publication Critical patent/CN106182391B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • B28B17/02Conditioning the material prior to shaping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B3/00Producing shaped articles from the material by using presses; Presses specially adapted therefor
    • B28B3/12Producing shaped articles from the material by using presses; Presses specially adapted therefor wherein one or more rollers exert pressure on the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/164Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes for plates, panels, or similar sheet- or disc-shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/28Cores; Mandrels
    • B28B7/285Core puller
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/10Lime cements or magnesium oxide cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/20Resistance against chemical, physical or biological attack
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/20Resistance against chemical, physical or biological attack
    • C04B2111/28Fire resistance, i.e. materials resistant to accidental fires or high temperatures
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/40Porous or lightweight materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The present invention relates to a kind of structural sheeting equipment and preparation method, particularly to a kind of Apparatus and method for preparing novel energy-conserving Light trabs, a kind of equipment preparing novel energy-conserving Light trabs, it is characterized in that: include stock shelf, blender, slip casting bucket, mould, tube unit, tube drawing unit, walking unit, molding unit, total bracing frame, stock shelf connects blender, the outlet of described blender connects slip casting bucket, slurry is injected in mould by molding unit by slip casting bucket, mould sequentially passes through tube unit, tube drawing unit, enter Chai Ban district, the bottom of mould is provided with walking unit;The invention has the beneficial effects as follows: Preparation equipment efficiency is high, lighter in weight prepared by method, comprcssive strength is high, is suitable for skyscraper and uses, and resistance to acids and bases is good, and temperature tolerance is good, fire prevention;Can recycle flyash, it is to avoid its pollution to environment, molding is fast simultaneously, and shaping efficiency is high.

Description

A kind of Apparatus and method for preparing novel energy-conserving Light trabs
Technical field
The present invention relates to a kind of structural sheeting equipment and preparation method, prepare novel energy-conserving light weight wall particularly to one The Apparatus and method for of plate.
Background technology
According to country about the regulation of building trade, government in order to promote the low-carbon environment-friendly of whole building trade, in Associated mechanisms has worked out the national standard of fire-proof partition plate, and the appearance of this standard is expected to promote the structure in building thermal insulation material market Adjusting, during 13, building energy conservation forms the overall goal of 2.16 hundred million tons of standard coal energy saving capability, promotes during relatively 12 About 20%, cities and towns new building performs to be not less than the energy conservation standard of 65%.And from the point of view of current market structure, more than seventy percent Insulation material market is organic material, wherein 75% uses polystyrene material, following SEPS will to share this tens billion of market. Along with people's environmental pollution and the outspent attention of resource, the work of energy-saving and emission-reduction have become as China a period of time from now on Emphasis.Due to conventional wall building material a large amount of consumption of natural resource during producing and using, and cause environmental pollution, red Brick waste is serious, and block strength is inadequate, pollutes and exceeds standard containing radiant matter, easily comes off, and along with China's wall changes the increasing of dynamics, explores Research and development have the novel wall construction material replacement building block that performance is low, energy consumption is big of energy-saving and environmental protection feature and have become as Building wood The developing direction of material industry advocating environmental protection, today of building a conservation-minded society, ecology, energy-conservation be that building industry is pursued Ambitious goal, the application of energy-saving wall board has become the current wallboard of fashion trend in modern architecture walling field and has typically used the mixed block of brick Becoming, the duration is longer, and the wallboard of some interior separations at present, general in the middle of use lightgage steel joist, two sides adds plasterboard, high-grade Partition wall, namely plus materials such as Sound-proof materials in the middle of the plasterboard, although and this wallboard unit weight is relatively low, but soundproof effect Not fine, heat insulation very poor, and also service life is comparatively short, runs into water and is easier to damage, unlikely does exterior wall and use, and Plasterboard wall bearing capacity is relatively low, hangs up ratio relatively hazardous.
Summary of the invention
The purpose of the present invention is aiming at the drawbacks described above that prior art exists, it is provided that one prepares novel energy-conserving light weight wall The Apparatus and method for of plate.
A kind of equipment preparing novel energy-conserving Light trabs, is characterized in that: include stock shelf, blender, slip casting bucket, mould Tool, tube unit, tube drawing unit, walking unit, molding unit, total bracing frame, stock shelf connects blender, described blender Outlet connect slip casting bucket, slurry is injected in mould by molding unit by slip casting bucket, and mould sequentially passes through tube unit, tube drawing Unit, enters Chai Ban district, and the bottom of mould is provided with walking unit, and described walking unit includes endless belt conveyer, walking dolly With sew with long stitches vehicle frame, mould is fixed in sewing with long stitches vehicle frame, tube unit, tube drawing unit are fixed by total bracing frame;
Described mould includes that the first shaping mold frame and the second shaping mold frame, the first shaping mold frame and the second shaping mold frame are rectangular Shape structure, the first shaping mold frame and the second shaping mold frame be formed around otic placode, otic placode by clamping screw by the first shaping mould Together with frame is removably attachable to the second shaping mold frame, on the short slab two ends of the first shaping mold frame and the second shaping mold frame uniformly It is provided with multiple relative semi-circular through hole, semi-circular through hole is bolted sealing ring, the first shaping mold frame and the second one-tenth Through hollow steel pipe between the semi-circular through hole of pattern frame, described hollow steel pipe is fixed by inserted link, the first described molding Framed being provided with injected hole and slurry outlet, the top of hollow steel pipe is hex union, and described semi-circular through hole is 4-7 group;
Described tube unit includes tube support, rotary electric machine, rotary gear axis, gear, and the top of tube support is fixing to be turned Galvanic electricity machine, the rotary shaft of described rotary electric machine connects rotary gear axis, and the both sides of rotary gear axis engage two groups of gears respectively, The bottom of gear connects hexagonal rotating shaft, and the hex union at hollow steel pipe top cooperates with the hexagonal rotating shaft on tube unit;
Described tube drawing unit includes tube drawing support, gripping sleeve, hydraulic lifting arm, hydraulic means, electric pushrod, controller, pulls out On pipe holder, level is provided with four groups of gripping sleeves, and described gripping sleeve includes two semicircular collar, in two semicircular collar one Individual for retainer ring, another is loose collar, and loose collar connects electric pushrod, and loose collar is provided with induction apparatus, and induction apparatus connects control Device processed, bottom, the two ends fixed hydraulic elevating lever of tube drawing support, described hydraulic lifting arm connects hydraulic means, and loose collar closes After, controller controls electric pushrod work and hydraulic means action after receiving the signal that induction apparatus transmits, hydraulic means is by hydraulic pressure Elevating lever is released, and tube drawing support is lifted, thus realizes tube drawing by hydraulic lifting arm;
Described molding unit includes slip casting machine, high-pressure pump, Grouting Pipe, and the top of slip casting machine connects high-pressure pump, going out of slip casting machine Mouth connects Grouting Pipe.
The first described shaping mold frame and the second shaping mold frame are provided with various sizes of semi-circular through hole.
A diameter of 40-70mm of described semi-circular through hole 4.5, a diameter of 40-70mm of described hollow steel pipe.
A kind of preparation method preparing novel energy-conserving Light trabs, including following parts by weight of component, magnesia cement 20-40 Part, flyash 35-50 part, Pulvis Talci 20-30 part, aluminium triphosphate 15-20 part, straw 4-9 part, glass fibre 0.5-1 part, fluorine Carbon coating 20-30 part, salt 60-90 part.
A kind of preparation method preparing novel energy-conserving Light trabs, including following parts by weight of component, magnesia cement 30 parts, powder Coal ash 40 parts, Pulvis Talci 25 parts, aluminium triphosphate 17 parts, straw 7 parts, glass fibre 0.8 part, fluorocarbon coating 25 parts, salt 75 Part.
A kind of preparation method preparing novel energy-conserving Light trabs, comprises the following steps:
(1) claim magnesia cement 30 parts, 45 parts of flyash according to above-mentioned weight ratio, by dry ball, above-mentioned raw materials is carried out ball Mill, Task-size Controlling, at 50-120 mesh, is subsequently adding straw 5 parts, 0.8 part of mixing and stirring of glass fibre;
(2) weigh Pulvis Talci 25 parts, aluminium triphosphate 17 parts, fluorocarbon coating 25 parts, 75 parts of salt according to above-mentioned weight ratio, stir Mix and uniformly obtain mixed aqueous solution;
(3) being added by the mixed material of step (1) gained in the mixed solution of step (2) gained and stir, slip stirs Time 20-25min, mixing speed is 60-90r/min;
(4) inflator inflation, the blowing pressure 0.4-0.6MPa, inflationtime 8-10min are used;
(5) join in mould, under microseism device effect, start roller press type laminator, roll-forming, quiet after casting complete Supporting 2-3 hour, after resting 2-3 hour, the material in each wall board forming region is initial set state, guarantees hollow steel during initial set The hex union at pipe top cooperates with the hexagonal rotating shaft on tube unit, by starting tube unit, on tube unit Rotary electric machine drives tube holder pivots, cannot extract hollow steel pipe after preventing solidification, and the rotary shaft of rotary electric machine connects gear Rotary shaft;
(6) by walking dolly transmission on endless belt conveyer, with elevating crane shaping mold frame sling and remove walking dolly Resting outward, walking dolly is to treat recycling next time;
(7) demoulding, after in each wall board forming region of shaping mold frame, material is fully hardened, then by tube drawing unit by hollow Steel pipe is extracted, and then mould release gets off to complete the demoulding, and dry in the sun can use after 2-3 hour.
The invention has the beneficial effects as follows: Preparation equipment efficiency is high, lighter in weight prepared by method, comprcssive strength is high, suitable Conjunction skyscraper uses, and resistance to acids and bases is good, and temperature tolerance is good, fire prevention;Flyash can be recycled, it is to avoid it is to environment simultaneously Pollution, molding is fast, and shaping efficiency is high.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of the present invention;
Accompanying drawing 2 is the fixed structure schematic diagram of mould;
Accompanying drawing 3 is the structural representation of mould;
Accompanying drawing 4 is the structural representation of tube unit;
Accompanying drawing 5 is the fixed structure schematic diagram of hollow steel pipe upper plunger;
Accompanying drawing 6 is the structural representation of tube drawing unit;
Accompanying drawing 7 is the control structure schematic diagram of gripping sleeve and hydraulic means on tube drawing unit;
In above-mentioned figure: stock shelf 1, blender 2, slip casting bucket 3, mould 4, tube unit 5, tube drawing unit 6, walking unit 7, pressing mold Unit 8, total bracing frame 9;First shaping mold frame the 4.1, second shaping mold frame 4.2, otic placode 4.3, clamping screw 4.4, semicircle are logical Hole 4.5, hollow steel pipe 4.6, inserted link 4.7, injected hole a, slurry outlet b;Tube support 5.1, rotary electric machine 5.2, rotary gear axis 5.3, gear 5.4;Tube drawing support 6.1, gripping sleeve 6.2, hydraulic lifting arm 6.3, hydraulic means 6.4, electric pushrod 6.5, control Device 6.6, retainer ring 6.2.1, loose collar 6.2.2, induction apparatus 6.2.3;Endless belt conveyer 7.1, walking dolly 7.2 and sew with long stitches vehicle frame 7.3;Slip casting machine 8.1, high-pressure pump 8.2, Grouting Pipe 8.3.
Detailed description of the invention
In conjunction with accompanying drawing 1-7, the invention will be further described:
A kind of equipment preparing novel energy-conserving Light trabs, is characterized in that: include stock shelf 1, blender 2, slip casting bucket 3, mould 4, tube unit 5, tube drawing unit 6, walking unit 7, molding unit 8, total bracing frame 9, stock shelf 1 connects blender 2, described The outlet of blender 2 connects slip casting bucket 3, and slurry is injected in mould 4 by molding unit 8 by slip casting bucket 3, and mould 4 sequentially passes through Tube unit 5, tube drawing unit 6, enter Chai Ban district, and the bottom of mould 4 is provided with walking unit 7, and described walking unit 7 includes ring Shape conveyer belt 7.1, walking dolly 7.2 and sew with long stitches vehicle frame 7.3, mould 4 be fixed on sews with long stitches in vehicle frame 7.3, tube unit 5, tube drawing unit 6 Fixed by total bracing frame 9;
Described mould 4 includes the first shaping mold frame 4.1 and the second shaping mold frame 4.2, the first shaping mold frame 4.1 and the second molding Framed 4.2 is rectangle structure, the first shaping mold frame 4.1 and the second shaping mold frame 4.2 be formed around otic placode 4.3, otic placode 4.3 Together with first shaping mold frame 4.1 being removably attachable to the second shaping mold frame 4.2 by clamping screw 4.4, the first molding Framed 4.1 be uniformly provided with multiple relative semi-circular through hole 4.5 on the short slab two ends of the second shaping mold frame 4.2, semicircle logical It is bolted sealing ring on hole 4.5, wears between the first shaping mold frame 4.1 and the semi-circular through hole of the second shaping mold frame 4.2 Crossing hollow steel pipe 4.6, described hollow steel pipe 4.6 is fixed by inserted link 4.7, and the first described shaping mold frame 4.1 is provided with note Slurry hole a and slurry outlet b, the top of hollow steel pipe 4.6 is hex union, and semi-circular through hole includes 4-7 group various structures, this enforcement Example is 4 groups with semi-circular through hole and carrys out description scheme;
Described tube unit 5 includes tube support 5.1, rotary electric machine 5.2, rotary gear axis 5.3, gear 5.4, tube support Rotary electric machine 5.2 is fixed on the top of 5.1, and the rotary shaft of described rotary electric machine 5.2 connects rotary gear axis 5.3, pinion rotation The both sides of axle 5.3 engage two groups of gears 5.4 respectively, and the bottom of gear 5.4 connects hexagonal rotating shaft, the six of hollow steel pipe 4.6 top Angle joint cooperates with the hexagonal rotating shaft on tube unit 5;
Described tube drawing unit 6 includes tube drawing support 6.1, gripping sleeve 6.2, hydraulic lifting arm 6.3, hydraulic means 6.4, electronic pushes away Bar 6.5, controller 6.6, on tube drawing support 6.1, level is provided with four groups of gripping sleeves 6.2, and described gripping sleeve 6.2 includes two and half Circular ring, in two semicircular collar, one is retainer ring 6.2.1, and another is loose collar 6.2.2, and loose collar 6.2.2 is even Connecing electric pushrod 6.5, loose collar 6.2.2 is provided with induction apparatus 6.2.3, induction apparatus 6.2.3 and connects controller 6.6, tube drawing support Bottom, the two ends fixed hydraulic elevating lever 6.3 of 6.1, described hydraulic lifting arm 6.3 connects hydraulic means 6.4, loose collar 6.2.2 After Guan Bi, controller 6.6 controls electric pushrod 6.5 work and hydraulic means 6.4 after receiving the signal that induction apparatus 6.2.3 transmits Action, hydraulic lifting arm 6.3 released by hydraulic means 6.4, and tube drawing support 6.1 is lifted by hydraulic lifting arm 6.3, thus realizes pulling out Pipe;
Described molding unit 8 includes slip casting machine 8.1, high-pressure pump 8.2, Grouting Pipe 8.3, and the top of slip casting machine 8.1 connects high pressure Pump 8.2, the outlet of slip casting machine 8.1 connects Grouting Pipe 8.3.
The first described shaping mold frame 4.1 and the second shaping mold frame 4.2 are provided with various sizes of semi-circular through hole.
A diameter of 40-70mm of described semi-circular through hole 4.5, a diameter of 40-70mm of described hollow steel pipe.
Assembly jig 4 on walking dolly, by clamping screw 4.4 by the first shaping mold frame 4.1 and the second shaping mold frame 4.2 are removably attachable to together, and hollow steel pipe 4.6 is through the first shaping mold frame 4.1 and short slab two of the second shaping mold frame 4.2 Being uniformly provided with multiple relative semi-circular through hole 4.5 on end to be fixed by inserted link 4.7, the two ends of hollow steel pipe are close by sealing ring Envelope, assembles the mould of 3-4 group same type in sewing with long stitches vehicle frame 7.3 during assembling;Two, mould 4 is pressed by molding unit 8 Mould is poured into a mould;Three, resting after casting complete 2-3 hour, after resting 2-3 hour, the material in each wall board forming region is initial set State, guarantees during initial set that the hex union at hollow steel pipe 4.6 top cooperates with the hexagonal rotating shaft on tube unit 5, By starting tube unit 5, the rotary electric machine 5.2 on tube unit 5 drives tube support 5.1 to rotate, cannot after preventing solidification Extracting hollow steel pipe, the rotary shaft of rotary electric machine 5.2 connects rotary gear axis 5.3, and rotary gear axis 5.3 drives both sides respectively Gear 5.4 rotates;Four, by walking dolly transmission on endless belt conveyer 7.1, with elevating crane, shaping mold frame is sling also Resting outside removal walking dolly, walking dolly is to treat recycling next time;Five, the demoulding, when each wallboard of shaping mold frame After material is fully hardened in forming area, then by tube drawing unit 6, hollow steel pipe is extracted, then mould release is got off; Six, with fork truck, whole buttress goods are transported to outdoor stockyard maintenance, construction building site can delivered to after 2-3 hour, Molding is fast, and shaping efficiency is high.
Embodiment 1:
A kind of preparation method preparing novel energy-conserving Light trabs, including following parts by weight of component, magnesia cement 20 parts, flyash 35 parts, Pulvis Talci 20 parts, aluminium triphosphate 15 parts, straw 4 parts, glass fibre 0.5 part, fluorocarbon coating 20 parts, 60 parts of salt;
Proportion according to above-described embodiment is equipped with the preparation method of novel energy-conserving Light trabs, comprises the following steps:
(1) claim magnesia cement 20 parts, 35 parts of flyash according to above-mentioned weight ratio, by dry ball, above-mentioned raw materials is carried out ball Mill, Task-size Controlling, at 50 mesh, is subsequently adding straw 4 parts, 0.5 part of mixing and stirring of glass fibre;
(2) weigh Pulvis Talci 20 parts, aluminium triphosphate 15 parts, fluorocarbon coating 20 parts, 60 parts of salt according to above-mentioned weight ratio, stir Mix and uniformly obtain mixed aqueous solution;
(3) being added by the mixed material of step (1) gained in the mixed solution of step (2) gained and stir, slip stirs Time 20min, mixing speed is 60r/min;
(4) inflator inflation, the blowing pressure 0.4MPa, inflationtime 8min are used;
(5) joining in mould 4, under microseism device effect, start roller press type laminator, roll-forming, after casting complete Resting 2 hours, after resting 2 hours, the material in each wall board forming region is initial set state, guarantees hollow steel pipe during initial set The hex union at 4.6 tops cooperates with the hexagonal rotating shaft on tube unit 5, by starting tube unit 5, tube unit 5 On rotary electric machine 5.2 drive tube support 5.1 to rotate, prevent solidification after cannot extract hollow steel pipe, rotary electric machine 5.2 turn Moving axis connects rotary gear axis 5.3;
(6) by walking dolly transmission on endless belt conveyer 7.1, with elevating crane shaping mold frame sling and to remove walking little Resting outside car, walking dolly is to treat recycling next time;
(7) demoulding, after in each wall board forming region of shaping mold frame, material is fully hardened, then by tube drawing unit 6 by sky Heart steel pipe is extracted, and then mould release gets off to complete the demoulding, and dry in the sun can use after 2 hours.
Embodiment 2:
A kind of preparation method preparing novel energy-conserving Light trabs, including following parts by weight of component, magnesia cement 30 parts, flyash 40 parts, Pulvis Talci 25 parts, aluminium triphosphate 17 parts, straw 7 parts, glass fibre 0.8 part, fluorocarbon coating 25 parts, 75 parts of salt;
Proportion according to above-described embodiment is equipped with the preparation method of novel energy-conserving Light trabs, comprises the following steps:
(1) claim magnesia cement 30 parts, 45 parts of flyash according to above-mentioned weight ratio, by dry ball, above-mentioned raw materials is carried out ball Mill, Task-size Controlling, at 90 mesh, is subsequently adding straw 7 parts, 0.8 part of mixing and stirring of glass fibre;
(2) weigh Pulvis Talci 25 parts, aluminium triphosphate 17 parts, fluorocarbon coating 25 parts, 75 parts of salt according to above-mentioned weight ratio, stir Mix and uniformly obtain mixed aqueous solution;
(3) being added by the mixed material of step (1) gained in the mixed solution of step (2) gained and stir, slip stirs Time 23min, mixing speed is 75r/min;
(4) inflator inflation, the blowing pressure 0.5MPa, inflationtime 9min are used;
(5) joining in mould 4, under microseism device effect, start roller press type laminator, roll-forming, after casting complete Resting 2.5 hours, after resting 2.5 hours, the material in each wall board forming region is initial set state, guarantees hollow during initial set The hex union at steel pipe 4.6 top cooperates with the hexagonal rotating shaft on tube unit 5, by starting tube unit 5, tube list Rotary electric machine 5.2 in unit 5 drives tube support 5.1 to rotate, and cannot extract hollow steel pipe, rotary electric machine 5.2 after preventing solidification Rotary shaft connect rotary gear axis 5.3;
(6) by walking dolly transmission on endless belt conveyer 7.1, with elevating crane shaping mold frame sling and to remove walking little Resting outside car, walking dolly is to treat recycling next time;
(7) demoulding, after in each wall board forming region of shaping mold frame, material is fully hardened, then by tube drawing unit 6 by sky Heart steel pipe is extracted, and then mould release gets off to complete the demoulding, and dry in the sun can use after 2.5 hours.
Embodiment 3: a kind of preparation method preparing novel energy-conserving Light trabs, including following parts by weight of component, magnesite water 40 parts of mud, 50 parts of flyash, Pulvis Talci 30 parts, aluminium triphosphate 20 parts, straw 9 parts, glass fibre 1 part, fluorocarbon coating 30 parts, 90 parts of salt;
Proportion according to above-described embodiment is equipped with the preparation method of novel energy-conserving Light trabs, comprises the following steps:
(1) claim magnesia cement 40 parts, 50 parts of flyash according to above-mentioned weight ratio, by dry ball, above-mentioned raw materials is carried out ball Mill, Task-size Controlling, at 120 mesh, is subsequently adding straw 9 parts, 1 part of mixing and stirring of glass fibre;
(2) Pulvis Talci 30 parts, aluminium triphosphate 20 parts, fluorocarbon coating 30 parts, 120 parts of salt are weighed according to above-mentioned weight ratio, It is uniformly mixing to obtain mixed aqueous solution;
(3) being added by the mixed material of step (1) gained in the mixed solution of step (2) gained and stir, slip stirs Time 25min, mixing speed is 90r/min;
(4) inflator inflation, the blowing pressure 0.6MPa, inflationtime 10min are used;
(5) joining in mould 4, under microseism device effect, start roller press type laminator, roll-forming, after casting complete Resting 3 hours, after resting 3 hours, the material in each wall board forming region is initial set state, guarantees hollow steel pipe during initial set The hex union at 4.6 tops cooperates with the hexagonal rotating shaft on tube unit 5, by starting tube unit 5, tube unit 5 On rotary electric machine 5.2 drive tube support 5.1 to rotate, prevent solidification after cannot extract hollow steel pipe, rotary electric machine 5.2 turn Moving axis connects rotary gear axis 5.3;
(6) by walking dolly transmission on endless belt conveyer 7.1, with elevating crane shaping mold frame sling and to remove walking little Resting outside car, walking dolly is to treat recycling next time;
(7) demoulding, after in each wall board forming region of shaping mold frame, material is fully hardened, then by tube drawing unit 6 by sky Heart steel pipe is extracted, and then mould release gets off to complete the demoulding, and dry in the sun can use after 3 hours.
The testing result of above-mentioned three kinds of embodiment products is as shown in table 1:
Sound damping curve detection such as table 2:
The above, be only the preferred embodiment of inventing type, and any those of ordinary skill in the art all explain possibly also with above-mentioned Inventing type is revised or is revised as the technical scheme of equivalent by the technical scheme stated.Therefore, according to the technology of inventing type Any simple modification that scheme is carried out or substitute equivalents, belong to the greatest extent the scope that inventing type is claimed.

Claims (6)

1. prepare an equipment for novel energy-conserving Light trabs, it is characterized in that: include stock shelf, blender, slip casting bucket, mould, Tube unit, tube drawing unit, walking unit, molding unit, total bracing frame, stock shelf connects blender, described blender Outlet connects slip casting bucket, and slurry is injected in mould by molding unit by slip casting bucket, and mould sequentially passes through tube unit, tube drawing list Unit, enter Chai Ban district, the bottom of mould is provided with walking unit, described walking unit include endless belt conveyer, walking dolly and Sewing with long stitches vehicle frame, mould is fixed in sewing with long stitches vehicle frame, tube unit, tube drawing unit are fixed by total bracing frame;
Described mould includes that the first shaping mold frame and the second shaping mold frame, the first shaping mold frame and the second shaping mold frame are rectangular Shape structure, the first shaping mold frame and the second shaping mold frame be formed around otic placode, otic placode by clamping screw by the first shaping mould Together with frame is removably attachable to the second shaping mold frame, on the short slab two ends of the first shaping mold frame and the second shaping mold frame uniformly It is provided with multiple relative semi-circular through hole, semi-circular through hole is bolted sealing ring, the first shaping mold frame and the second one-tenth Through hollow steel pipe between the semi-circular through hole of pattern frame, described hollow steel pipe is fixed by inserted link, the first described molding Framed being provided with injected hole and slurry outlet, the top of hollow steel pipe is hex union, and described semi-circular through hole is 4-7 group;
Described tube unit includes tube support, rotary electric machine, rotary gear axis, gear, and the top of tube support is fixing to be turned Galvanic electricity machine, the rotary shaft of described rotary electric machine connects rotary gear axis, and the both sides of rotary gear axis engage two groups of gears respectively, The bottom of gear connects hexagonal rotating shaft, and the hex union at hollow steel pipe top cooperates with the hexagonal rotating shaft on tube unit;
Described tube drawing unit includes tube drawing support, gripping sleeve, hydraulic lifting arm, hydraulic means, electric pushrod, controller, pulls out On pipe holder, level is provided with four groups of gripping sleeves, and described gripping sleeve includes two semicircular collar, in two semicircular collar one Individual for retainer ring, another is loose collar, and loose collar connects electric pushrod, and loose collar is provided with induction apparatus, and induction apparatus connects control Device processed, bottom, the two ends fixed hydraulic elevating lever of tube drawing support, described hydraulic lifting arm connects hydraulic means, and loose collar closes After, controller controls electric pushrod work and hydraulic means action after receiving the signal that induction apparatus transmits, hydraulic means is by hydraulic pressure Elevating lever is released, and tube drawing support is lifted, thus realizes tube drawing by hydraulic lifting arm;
Described molding unit includes slip casting machine, high-pressure pump, Grouting Pipe, and the top of slip casting machine connects high-pressure pump, going out of slip casting machine Mouth connects Grouting Pipe.
A kind of equipment preparing novel energy-conserving Light trabs the most according to claim 1, is characterized in that: described the first one-tenth Pattern frame and the second shaping mold frame are provided with various sizes of semi-circular through hole.
A kind of equipment preparing novel energy-conserving Light trabs the most according to claim 1, is characterized in that: described semicircle A diameter of 40-70mm of through hole, a diameter of 40-70mm of described hollow steel pipe.
A kind of preparation method preparing novel energy-conserving Light trabs the most according to claim 1, is characterized in that: include following Parts by weight of component, magnesia cement 20-40 part, flyash 35-50 part, Pulvis Talci 20-30 part, aluminium triphosphate 15-20 part, straw 4-9 part, glass fibre 0.5-1 part, fluorocarbon coating 20-30 part, salt 60-90 part.
A kind of preparation method preparing novel energy-conserving Light trabs the most according to claim 1, is characterized in that: include following Parts by weight of component, magnesia cement 30 parts, 40 parts of flyash, Pulvis Talci 25 parts, aluminium triphosphate 17 parts, straw 7 parts, glass fibre 0.8 part, fluorocarbon coating 25 parts, 75 parts of salt.
A kind of preparation method preparing novel energy-conserving Light trabs the most according to claim 1, is characterized in that: include following Step:
(1) claim magnesia cement 30 parts, 45 parts of flyash according to above-mentioned weight ratio, by dry ball, above-mentioned raw materials is carried out ball Mill, Task-size Controlling, at 50-120 mesh, is subsequently adding straw 5 parts, 0.8 part of mixing and stirring of glass fibre;
(2) weigh Pulvis Talci 25 parts, aluminium triphosphate 17 parts, fluorocarbon coating 25 parts, 75 parts of salt according to above-mentioned weight ratio, stir Mix and uniformly obtain mixed aqueous solution;
(3) being added by the mixed material of step (1) gained in the mixed solution of step (2) gained and stir, slip stirs Time 20-25min, mixing speed is 60-90r/min;
(4) inflator inflation, the blowing pressure 0.4-0.6MPa, inflationtime 8-10min are used;
(5) join in mould, under microseism device effect, start roller press type laminator, roll-forming, quiet after casting complete Supporting 2-3 hour, after resting 2-3 hour, the material in each wall board forming region is initial set state, guarantees hollow steel during initial set The hex union at pipe top cooperates with the hexagonal rotating shaft on tube unit, by starting tube unit, on tube unit Rotary electric machine drives tube holder pivots, cannot extract hollow steel pipe after preventing solidification, and the rotary shaft of rotary electric machine connects gear Rotary shaft;
(6) by walking dolly transmission on endless belt conveyer, with elevating crane shaping mold frame sling and remove walking dolly Resting outward, walking dolly is to treat recycling next time;
(7) demoulding, after in each wall board forming region of shaping mold frame, material is fully hardened, then by tube drawing unit by hollow Steel pipe is extracted, and then mould release gets off to complete the demoulding, and dry in the sun can use after 2-3 hour.
CN201610732398.7A 2016-08-27 2016-08-27 A kind of device and method preparing energy-saving light-weight wallboard Expired - Fee Related CN106182391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610732398.7A CN106182391B (en) 2016-08-27 2016-08-27 A kind of device and method preparing energy-saving light-weight wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610732398.7A CN106182391B (en) 2016-08-27 2016-08-27 A kind of device and method preparing energy-saving light-weight wallboard

Publications (2)

Publication Number Publication Date
CN106182391A true CN106182391A (en) 2016-12-07
CN106182391B CN106182391B (en) 2018-11-13

Family

ID=57526569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610732398.7A Expired - Fee Related CN106182391B (en) 2016-08-27 2016-08-27 A kind of device and method preparing energy-saving light-weight wallboard

Country Status (1)

Country Link
CN (1) CN106182391B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109605532A (en) * 2018-12-14 2019-04-12 李明清 A kind of automation straw partition plate laminator
CN111093923A (en) * 2017-09-19 2020-05-01 吉野石膏株式会社 Slurry discharge pipe of mixer and slurry discharge method
CN112936523A (en) * 2021-01-26 2021-06-11 青岛金沙滩建设集团有限公司 Pouring mold for wallboard for prefabricated building and processing technology of wallboard

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1058065A (en) * 1991-06-25 1992-01-22 田晓虹 Making integral hollow wall slab process and device
JP2005059394A (en) * 2003-08-12 2005-03-10 Katsura Kikai Seisakusho:Kk Horizontal reinforcement block and pull-out core for molding the same
CN2834850Y (en) * 2006-03-10 2006-11-08 李文国 Forming machine for hollow wall plate
CN1927560A (en) * 2006-09-16 2007-03-14 石宗利 Technology and device for manufacturing gypsum lightweight cavity wallboard and building block
CN101244610A (en) * 2007-02-15 2008-08-20 张秉新 Method for processing coal ash thin wall core tube
CA2818502A1 (en) * 2010-12-01 2012-06-07 Erik Garfinkel Automated concrete structural member fabrication system, apparatus and method
CN102581948A (en) * 2012-03-07 2012-07-18 蚌埠远程置业有限公司 Automatic production line of light partition board
US20120187602A1 (en) * 2009-06-05 2012-07-26 Ness Inventions, Inc Block mold having moveable liner
WO2013014156A1 (en) * 2011-07-27 2013-01-31 Poundfield Products Limited Manufacturing concrete
CN104227825A (en) * 2013-06-20 2014-12-24 苏州千瑞机电科技有限公司 Building wallboard producing machine

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1058065A (en) * 1991-06-25 1992-01-22 田晓虹 Making integral hollow wall slab process and device
JP2005059394A (en) * 2003-08-12 2005-03-10 Katsura Kikai Seisakusho:Kk Horizontal reinforcement block and pull-out core for molding the same
CN2834850Y (en) * 2006-03-10 2006-11-08 李文国 Forming machine for hollow wall plate
CN1927560A (en) * 2006-09-16 2007-03-14 石宗利 Technology and device for manufacturing gypsum lightweight cavity wallboard and building block
CN101244610A (en) * 2007-02-15 2008-08-20 张秉新 Method for processing coal ash thin wall core tube
US20120187602A1 (en) * 2009-06-05 2012-07-26 Ness Inventions, Inc Block mold having moveable liner
CA2818502A1 (en) * 2010-12-01 2012-06-07 Erik Garfinkel Automated concrete structural member fabrication system, apparatus and method
WO2013014156A1 (en) * 2011-07-27 2013-01-31 Poundfield Products Limited Manufacturing concrete
CN102581948A (en) * 2012-03-07 2012-07-18 蚌埠远程置业有限公司 Automatic production line of light partition board
CN104227825A (en) * 2013-06-20 2014-12-24 苏州千瑞机电科技有限公司 Building wallboard producing machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111093923A (en) * 2017-09-19 2020-05-01 吉野石膏株式会社 Slurry discharge pipe of mixer and slurry discharge method
CN109605532A (en) * 2018-12-14 2019-04-12 李明清 A kind of automation straw partition plate laminator
CN112936523A (en) * 2021-01-26 2021-06-11 青岛金沙滩建设集团有限公司 Pouring mold for wallboard for prefabricated building and processing technology of wallboard
CN112936523B (en) * 2021-01-26 2023-03-10 青岛金沙滩建设集团有限公司 Pouring mold for wallboard for assembly type building and processing technology of wallboard

Also Published As

Publication number Publication date
CN106182391B (en) 2018-11-13

Similar Documents

Publication Publication Date Title
WO2019192241A1 (en) Site heavy metal contaminated soil treatment equipment and treatment method therefor
CN100462325C (en) Sludge sintering brick process
CN105948576B (en) A variety of industrial sludge produced environment friendlies non-burning brick method and its preparation system
CN109851265B (en) Sludge residue soil-based ceramsite with adjustable pores and preparation method thereof
CN105174894A (en) Autoclaved aerated concrete brick and preparation method thereof
CN101538146B (en) Harmless utilization method of electroplating sludge and oily sludge resources
CN106182391A (en) A kind of Apparatus and method for preparing novel energy-conserving Light trabs
CN102503527B (en) Yttrium-element autoclaved aerated concrete block and preparation method thereof
CN101186472A (en) Technique for reclaiming and utilizing building garbage and industrial solid castoff
CN102765908A (en) Method capable of utilizing mine tailings to produce aerated hollow brick
CN108358540B (en) Multi-color concrete decorative plate material and preparation method thereof
CN104230285A (en) Unfired hollow brick and preparation method thereof
CN103626464A (en) Production technology for autoclaved aerated concrete building blocks
CN103864388A (en) Light compound-insulation fireproofing dry-mixed mortar and preparation method thereof
CN107098653A (en) A kind of environment-friendlyroad road face brick and preparation method thereof
CN108560806A (en) A kind of baking-free imitation of ancient blue bricks and preparation method thereof
CN102295441A (en) Aerated concrete brick produced by using tailing slags
CN110330245A (en) Resource utilization method containing heavy metal solid waste
CN103286846B (en) Manufacturing process of concrete-composited self-heat-insulating blocks
CN101935199A (en) Method for baking self-insulating & energy-saving bricks by using domestic sludge and river & lake sludge as raw materials
CN103482943A (en) Processing method for producing aerated concrete building block from fly ash
CN105294156A (en) Resource utilization method of household garbage incineration residue sorting tailing
CN109437723A (en) A kind of blocks with building refuse used for filler wall and its production technology
CN112360029A (en) Environment-friendly cavity mold box with large-volume industrial solid waste and preparation method thereof
CN205969470U (en) Apparatus for preparing novel energy -conserving light weight wallboard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180621

Address after: 257000 210 unit 4, 3 building, 432 north two road, Dongying District, Dongying, Shandong.

Applicant after: Yang Lianqin

Address before: 257091 room 2, unit 9, 9 South Road, 64 prospecting and exploration road, Dongying District, Dongying, Shandong.

Applicant before: Xu Jianli

Applicant before: Xu Zheng

Applicant before: Wu Haibin

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180921

Address after: 257000 the east side of Yuhua Road north of Heze Road, Dongying District, Dongying, Shandong.

Applicant after: Shandong nufang Building Material Co., Ltd.

Address before: 257000 210 unit 4, 3 building, 432 north two road, Dongying District, Dongying, Shandong.

Applicant before: Yang Lianqin

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181113

Termination date: 20190827