CN106182391B - A kind of device and method preparing energy-saving light-weight wallboard - Google Patents

A kind of device and method preparing energy-saving light-weight wallboard Download PDF

Info

Publication number
CN106182391B
CN106182391B CN201610732398.7A CN201610732398A CN106182391B CN 106182391 B CN106182391 B CN 106182391B CN 201610732398 A CN201610732398 A CN 201610732398A CN 106182391 B CN106182391 B CN 106182391B
Authority
CN
China
Prior art keywords
unit
tube
mold frame
shaping mold
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610732398.7A
Other languages
Chinese (zh)
Other versions
CN106182391A (en
Inventor
徐建利
徐征
吴海滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong nufang Building Material Co., Ltd.
Original Assignee
Shandong Nufang Building Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Nufang Building Material Co Ltd filed Critical Shandong Nufang Building Material Co Ltd
Priority to CN201610732398.7A priority Critical patent/CN106182391B/en
Publication of CN106182391A publication Critical patent/CN106182391A/en
Application granted granted Critical
Publication of CN106182391B publication Critical patent/CN106182391B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/087Producing shaped prefabricated articles from the material by vibrating or jolting by means acting on the mould ; Fixation thereof to the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • B28B17/02Conditioning the material prior to shaping
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B3/00Producing shaped articles from the material by using presses; Presses specially adapted therefor
    • B28B3/12Producing shaped articles from the material by using presses; Presses specially adapted therefor wherein one or more rollers exert pressure on the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/164Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes for plates, panels, or similar sheet- or disc-shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/28Cores; Mandrels
    • B28B7/285Core puller
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/10Lime cements or magnesium oxide cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/20Resistance against chemical, physical or biological attack
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/20Resistance against chemical, physical or biological attack
    • C04B2111/28Fire resistance, i.e. materials resistant to accidental fires or high temperatures
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/40Porous or lightweight materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The present invention relates to a kind of structural sheeting equipment and preparation method, more particularly to a kind of device and method preparing energy-saving light-weight wallboard, a kind of equipment preparing energy-saving light-weight wallboard, it is characterized in that:Including stock shelf, blender, slip casting bucket, mold, tube unit, tube drawing unit, walking unit, molding unit, total supporting rack, stock shelf connects blender, the outlet of the blender connects slip casting bucket, slip casting bucket is injected slurry in mold by molding unit, mold passes through tube unit, tube drawing unit successively, into the areas Chai Ban, the lower part of mold is equipped with walking unit;The beneficial effects of the invention are as follows:Preparation equipment is efficient, and product quality prepared by method is light, and compression strength is high, is suitble to skyscraper to use, and resistance to acid and alkali is good, and temperature tolerance is good, fire prevention;Flyash can be recycled simultaneously, avoids its pollution to environment, molding is fast, and shaping efficiency is high.

Description

A kind of device and method preparing energy-saving light-weight wallboard
Technical field
The present invention relates to a kind of structural sheeting equipment and preparation method, more particularly to a kind of energy-saving light-weight wallboard for preparing Device and method.
Background technology
Regulation according to country about building trade, government in order to promote the low-carbon environment-friendly of whole building industry, in Associated mechanisms have worked out the national standard of fire-proof partition plate, and the appearance of the standard is expected to push the structure in building thermal insulation material market Adjustment, 13 periods, building energy conservation form the overall goal of 2.16 hundred million tons of standard coal energy saving capabilities, are promoted compared with 12 periods 20% or so, cities and towns new building executes the energy conservation standard not less than 65%.And from the point of view of current market structure, seventy percent or more Thermal insulation material market is organic material, wherein 75% uses polystyrene material, the following SEPS that will share tens billion of market. With the attention that people's environmental pollution and resource consume excessively, the work of energy-saving and emission-reduction have become China a period of time from now on Emphasis.Due to traditional wall body building material a large amount of consumption of natural resource in the production and use process, and environmental pollution is caused, it is red Brick waste is serious, and block strength is inadequate, and pollution is exceeded containing radiant matter, is easy to fall off, and as China's wall changes the increasing of dynamics, explores Research and development have the characteristics that the building block that the wall body building material substitution performance of energy-saving and environmental protection is low, energy consumption is big has become building material dealer The developing direction of industry advocate today that is environmentally protective, building a conservation-minded society, ecology, it is energy saving be magnificence that construction industry is pursued Target, the current wallboard of fashion trend that the application of energy-saving wall board has become modern architecture walling field generally use brick is mixed to be built into, Duration is longer, and the wallboard of some interior separations at present, and general intermediate using lightgage steel joist, two sides adds plasterboard, high-grade Partition wall, that is, plus the materials such as sound-proof material among plasterboard, although and this wallboard unit weight is relatively low, soundproof effect is simultaneously Very well, heat-insulated not very poor, and service life is shorter, encounters water and is easier to damage, is unlikely exterior wall use, Er Qieshi Cream board wall wall bearing capacity is relatively low, hangs up than relatively hazardous.
Invention content
The purpose of the present invention provides a kind of energy-saving light-weight wallboard for preparing aiming at drawbacks described above of the existing technology Device and method.
A kind of equipment preparing energy-saving light-weight wallboard, it is characterized in that:Including stock shelf, blender, slip casting bucket, mold, turn Pipe unit, tube drawing unit, walking unit, molding unit, total supporting rack, stock shelf connect blender, and the blender goes out Mouth connection slip casting bucket, slip casting bucket are injected slurry in mold by molding unit, and mold passes through tube unit, tube drawing list successively Member, into the areas Chai Ban, the lower part of mold is equipped with walking unit, the walking unit include endless belt conveyer, walking dolly and Sew with long stitches vehicle frame, mold be fixed on sew with long stitches in vehicle frame, tube unit, tube drawing unit are fixed by total supporting rack;
The mold includes the first shaping mold frame and the second shaping mold frame, and the first shaping mold frame and the second shaping mold frame are Rectangle structure, the first shaping mold frame and the second shaping mold frame are surrounded by otic placode, and otic placode is by clamping screw by the first one-tenth Pattern frame and the second shaping mold frame are removably attachable to together, on the short slab both ends of the first shaping mold frame and the second shaping mold frame Multiple opposite semi-circular through hole are uniformly provided with, sealing ring, the first shaping mold frame and are bolted in semi-circular through hole Hollow steel pipe, the hollow steel pipe is passed through to be fixed by inserted link between the semi-circular through hole of two shaping mold frames, described first Shaping mold frame is equipped with injected hole and slurry outlet, and the top of hollow steel pipe is hex union, and the semi-circular through hole is 4-7 Group;
The tube unit includes tube holder, rotary electric machine, rotary gear axis, gear, and the top of tube holder is solid Determine rotary electric machine, the rotation axis connection gear rotation axis of the rotary electric machine, the both sides of rotary gear axis engage two groups respectively The lower part of gear, gear connects hexagonal shaft, and the hex union at the top of hollow steel pipe and the hexagonal shaft on tube unit are mutual Cooperation;
The tube drawing unit includes tube drawing holder, gripping sleeve, hydraulic lifting arm, hydraulic device, electric pushrod, control Device, horizontal on tube drawing holder to be equipped with four groups of gripping sleeves, the gripping sleeve includes two semicircular collars, two semicircular collars In one be fixed ring, another is loose collar, and loose collar connects electric pushrod, and loose collar is equipped with inductor, and inductor connects Controller, the both ends lower part fixed hydraulic elevating lever of tube drawing holder are connect, the hydraulic lifting arm connects hydraulic device, loose collar After closure, controller receive inductor transmission signal after control electric pushrod work and hydraulic device action, hydraulic device will Hydraulic lifting arm is released, and hydraulic lifting arm lifts tube drawing holder, to realize tube drawing;
The molding unit includes slip casting machine, high-pressure pump, Grouting Pipe, and the top of slip casting machine connects high-pressure pump, slip casting machine Outlet connect Grouting Pipe.
First shaping mold frame and the second shaping mold frame is equipped with various sizes of semi-circular through hole.
A diameter of 40-70mm of the semi-circular through hole 4.5, a diameter of 40-70mm of the hollow steel pipe.
A kind of preparation method preparing energy-saving light-weight wallboard, including following parts by weight of component, 20-40 parts of magnesia cement, powder 35-50 parts of coal ash, 20-30 parts of talcum powder, 15-20 parts of aluminium triphosphate, 4-9 parts of stalk, 0.5-1 parts of glass fibre, fluorine carbon apply Expect 20-30 parts, 60-90 parts of brine.
A kind of preparation method preparing energy-saving light-weight wallboard, including following parts by weight of component, 30 parts of magnesia cement, flyash 40 parts, 25 parts of talcum powder, 17 parts of aluminium triphosphate, 7 parts of stalk, 0.8 part of glass fibre, 25 parts of fluorocarbon coating, 75 parts of brine.
A kind of preparation method preparing energy-saving light-weight wallboard, includes the following steps:
(1)According to above-mentioned weight ratio claim 30 parts of magnesia cement, 45 parts of flyash, with dry ball to above-mentioned raw materials into Then in 50-120 mesh 5 parts of stalk is added, 0.8 part of glass fibre is mixed evenly in row ball milling, granularity control;
(2)25 parts of talcum powder, 17 parts of aluminium triphosphate, 25 parts of fluorocarbon coating, brine 75 are weighed according to above-mentioned weight ratio Part, it is uniformly mixing to obtain mixed aqueous solution;
(3)By step(1)Step is added in the mixed material of gained(2)It is stirred in the mixed solution of gained, slurry Mixing time 20-25min, mixing speed 60-90r/min;
(4)It is inflated using inflator, the blowing pressure 0.4-0.6MPa, inflationtime 8-10min;
(5)It is added in mold, under the effect of microseism device, starts roller press type laminator, roll-forming, casting complete After rest 2-3 hours, the material after resting 2-3 hours in each wall board forming region is in pre-hardening state, ensures sky during initial set The hex union of heart steel pipe top cooperates with the hexagonal shaft on tube unit, by starting tube unit, tube unit On rotary electric machine drive tube holder pivots, prevent solidification after can not extract hollow steel pipe, the rotation axis connection of rotary electric machine Rotary gear axis;
(6)It is driven on endless belt conveyer by walking dolly, is sling shaping mold frame with elevating crane and removes walking It rests outside trolley, walking dolly is to wait for next recycling;
(7)Demoulding, after material is fully hardened in each wall board forming region of shaping mold frame, then will by tube drawing unit Hollow steel pipe is extracted, then mould release is got off to complete demoulding, and drying can be used after 2-3 hours.
The beneficial effects of the invention are as follows:Preparation equipment is efficient, and product quality prepared by method is light, and compression strength is high, fits It closes skyscraper to use, and resistance to acid and alkali is good, temperature tolerance is good, fire prevention;Flyash can be recycled simultaneously, avoids it to environment Pollution, molding is fast, and shaping efficiency is high.
Description of the drawings
Attached drawing 1 is the structural schematic diagram of the present invention;
Attached drawing 2 is the fixed structure schematic diagram of mold;
Attached drawing 3 is the structural schematic diagram of mold;
Attached drawing 4 is the structural schematic diagram of tube unit;
Attached drawing 5 is the fixed structure schematic diagram of hollow steel pipe upper plunger;
Attached drawing 6 is the structural schematic diagram of tube drawing unit;
Attached drawing 7 is the control structure schematic diagram of gripping sleeve and hydraulic device on tube drawing unit;
In above-mentioned figure:Stock shelf 1, blender 2, slip casting bucket 3, mold 4, tube unit 5, tube drawing unit 6, walking unit 7, Molding unit 8, total supporting rack 9;First shaping mold frame 4.1, the second shaping mold frame 4.2, otic placode 4.3, clamping screw 4.4, semicircle Shape through-hole 4.5, hollow steel pipe 4.6, inserted link 4.7, injected hole a, slurry outlet b;Tube holder 5.1, rotary electric machine 5.2, gear turn Moving axis 5.3, gear 5.4;Tube drawing holder 6.1, gripping sleeve 6.2, hydraulic lifting arm 6.3, hydraulic device 6.4, electric pushrod 6.5, Controller 6.6, fixed ring 6.2.1, loose collar 6.2.2, inductor 6.2.3;Endless belt conveyer 7.1, walking dolly 7.2 and sew with long stitches vehicle Frame 7.3;Slip casting machine 8.1, high-pressure pump 8.2, Grouting Pipe 8.3.
Specific implementation mode
In conjunction with attached drawing 1-7, the invention will be further described:
A kind of equipment preparing energy-saving light-weight wallboard, it is characterized in that:Including stock shelf 1, blender 2, slip casting bucket 3, mold 4, tube unit 5, tube drawing unit 6, walking unit 7, molding unit 8, total supporting rack 9, stock shelf 1 connects blender 2, described The outlet connection slip casting bucket 3 of blender 2, slip casting bucket 3 is injected slurry in mold 4 by molding unit 8, and mold 4 passes through successively Tube unit 5, tube drawing unit 6, into the areas Chai Ban, the lower part of mold 4 is equipped with walking unit 7, and the walking unit 7 includes ring Shape conveyer belt 7.1, walking dolly 7.2 and sew with long stitches vehicle frame 7.3, mold 4 be fixed on sew with long stitches in vehicle frame 7.3, tube unit 5, tube drawing unit 6 It is fixed by total supporting rack 9;
The mold 4 includes the first shaping mold frame 4.1 and the second shaping mold frame 4.2, the first shaping mold frame 4.1 and second Shaping mold frame 4.2 is rectangle structure, and the first shaping mold frame 4.1 and the second shaping mold frame 4.2 are surrounded by otic placode 4.3, ear First shaping mold frame 4.1 and the second shaping mold frame 4.2 are removably attachable to together by plate 4.3 by clamping screw 4.4, and first Multiple opposite semi-circular through hole 4.5, semicircle are uniformly provided on the short slab both ends of shaping mold frame 4.1 and the second shaping mold frame 4.2 Be bolted sealing ring on shape through-hole 4.5, the semi-circular through hole of the first shaping mold frame 4.1 and the second shaping mold frame 4.2 it Between pass through hollow steel pipe 4.6, the hollow steel pipe 4.6 fixed by inserted link 4.7, set on first shaping mold frame 4.1 There are injected hole a and slurry outlet b, the top of hollow steel pipe 4.6 is hex union, and semi-circular through hole includes 4-7 group various structures, this Embodiment carrys out description scheme with semi-circular through hole for 4 groups;
The tube unit 5 includes tube holder 5.1, rotary electric machine 5.2, rotary gear axis 5.3, gear 5.4, tube Rotary electric machine 5.2, the rotation axis connection gear rotation axis 5.3 of the rotary electric machine 5.2, gear are fixed in the top of holder 5.1 Two groups of teeth wheel 5.4 is engaged in the both sides of rotation axis 5.3 respectively, and the lower part of gear 5.4 connects hexagonal shaft, 4.6 top of hollow steel pipe Hex union and tube unit 5 on hexagonal shaft cooperate;
The tube drawing unit 6 includes tube drawing holder 6.1, gripping sleeve 6.2, hydraulic lifting arm 6.3, hydraulic device 6.4, electricity Push rod 6.5, controller 6.6 are moved, level is equipped with four groups of gripping sleeves 6.2 on tube drawing holder 6.1, and the gripping sleeve 6.2 includes two A semicircular collar, one is fixed ring 6.2.1 in two semicircular collars, another is loose collar 6.2.2, loose collar 6.2.2 electric pushrod 6.5 is connected, loose collar 6.2.2 is equipped with inductor 6.2.3, and inductor 6.2.3 connections controller 6.6 pulls out The both ends lower part fixed hydraulic elevating lever 6.3 of pipe holder 6.1, the hydraulic lifting arm 6.3 connect hydraulic device 6.4, activity After ring 6.2.2 is closed, controller 6.6 receives the work of control electric pushrod 6.5 and hydraulic pressure after the signal that inductor 6.2.3 is transmitted Device 6.4 acts, and hydraulic device 6.4 releases hydraulic lifting arm 6.3, and hydraulic lifting arm 6.3 lifts tube drawing holder 6.1, from And realize tube drawing;
The molding unit 8 includes slip casting machine 8.1, high-pressure pump 8.2, Grouting Pipe 8.3, the top connection of slip casting machine 8.1 The outlet of high-pressure pump 8.2, slip casting machine 8.1 connects Grouting Pipe 8.3.
First shaping mold frame 4.1 and the second shaping mold frame 4.2 is equipped with various sizes of semi-circular through hole.
A diameter of 40-70mm of the semi-circular through hole 4.5, a diameter of 40-70mm of the hollow steel pipe.
In walking dolly over-assemble mold 4, by clamping screw 4.4 by the first shaping mold frame 4.1 and the second shaping mold frame 4.2 are removably attachable to together, and hollow steel pipe 4.6 passes through the short slab two of the first shaping mold frame 4.1 and the second shaping mold frame 4.2 It is uniformly provided with multiple opposite semi-circular through hole 4.5 on end to fix by inserted link 4.7, the both ends of hollow steel pipe are close by sealing ring Envelope, in the mold for sewing with long stitches assembling 3-4 group same types in vehicle frame 7.3 when assembling;Two, mold 4 is pressed by molding unit 8 Mould is poured into a mould;Three, it rests after casting complete 2-3 hours, the material after resting 2-3 hours in each wall board forming region is in initial set State ensures that the hex union at 4.6 top of hollow steel pipe cooperates with the hexagonal shaft on tube unit 5 during initial set, By starting tube unit 5, the rotary electric machine 5.2 on tube unit 5 drives tube holder 5.1 to rotate, and preventing can not after solidifying Hollow steel pipe, the rotation axis connection gear rotation axis 5.3 of rotary electric machine 5.2 are extracted, rotary gear axis 5.3 drives both sides respectively Gear 5.4 rotates;Four, it is driven on endless belt conveyer 7.1 by walking dolly, is sling shaping mold frame simultaneously with elevating crane It removes and rests outside walking dolly, walking dolly is to wait for next recycling;Five, it demoulds, when each wallboard of shaping mold frame After material is fully hardened in forming area, then by tube drawing unit 6 hollow steel pipe is extracted, then mould release gets off; Six, whole pile product is transported to outdoor stockyard with fork truck to conserve, construction building site can be sent to after 2-3 hour, Molding is fast, and shaping efficiency is high.
Embodiment 1:
A kind of preparation method preparing energy-saving light-weight wallboard, including following parts by weight of component, 20 parts of magnesia cement, flyash 35 parts, 20 parts of talcum powder, 15 parts of aluminium triphosphate, 4 parts of stalk, 0.5 part of glass fibre, 20 parts of fluorocarbon coating, 60 parts of brine;
It is equipped with the preparation method of energy-saving light-weight wallboard according to the proportion of above-described embodiment, includes the following steps:
(1)According to above-mentioned weight ratio claim 20 parts of magnesia cement, 35 parts of flyash, with dry ball to above-mentioned raw materials into Then in 50 mesh 4 parts of stalk is added, 0.5 part of glass fibre is mixed evenly in row ball milling, granularity control;
(2)20 parts of talcum powder, 15 parts of aluminium triphosphate, 20 parts of fluorocarbon coating, brine 60 are weighed according to above-mentioned weight ratio Part, it is uniformly mixing to obtain mixed aqueous solution;
(3)By step(1)Step is added in the mixed material of gained(2)It is stirred in the mixed solution of gained, slurry Mixing time 20min, mixing speed 60r/min;
(4)It is inflated using inflator, the blowing pressure 0.4MPa, inflationtime 8min;
(5)It is added in mold 4, under the effect of microseism device, starts roller press type laminator, roll-forming pours It rests after 2 hours, the material after resting 2 hours in each wall board forming region is in pre-hardening state, is ensured during initial set hollow The hex union at 4.6 top of steel pipe cooperates with the hexagonal shaft on tube unit 5, by starting tube unit 5, tube list Rotary electric machine 5.2 in member 5 drives tube holder 5.1 to rotate, and hollow steel pipe, rotary electric machine 5.2 can not be extracted after preventing solidification Rotation axis connection gear rotation axis 5.3;
(6)It is driven on endless belt conveyer 7.1 by walking dolly, shaping mold frame is sling with elevating crane and removes row It walks and rests outside trolley, walking dolly is to wait for next recycling;
(7)Demoulding, after material is fully hardened in each wall board forming region of shaping mold frame, then passes through tube drawing unit 6 Hollow steel pipe is extracted, then mould release is got off to complete demoulding, drying can be used after 2 hours.
Embodiment 2:
A kind of preparation method preparing energy-saving light-weight wallboard, including following parts by weight of component, 30 parts of magnesia cement, flyash 40 parts, 25 parts of talcum powder, 17 parts of aluminium triphosphate, 7 parts of stalk, 0.8 part of glass fibre, 25 parts of fluorocarbon coating, 75 parts of brine;
It is equipped with the preparation method of energy-saving light-weight wallboard according to the proportion of above-described embodiment, includes the following steps:
(1)According to above-mentioned weight ratio claim 30 parts of magnesia cement, 40 parts of flyash, with dry ball to above-mentioned raw materials into Then in 90 mesh 7 parts of stalk is added, 0.8 part of glass fibre is mixed evenly in row ball milling, granularity control;
(2)25 parts of talcum powder, 17 parts of aluminium triphosphate, 25 parts of fluorocarbon coating, brine 75 are weighed according to above-mentioned weight ratio Part, it is uniformly mixing to obtain mixed aqueous solution;
(3)By step(1)Step is added in the mixed material of gained(2)It is stirred in the mixed solution of gained, slurry Mixing time 23min, mixing speed 75r/min;
(4)It is inflated using inflator, the blowing pressure 0.5MPa, inflationtime 9min;
(5)It is added in mold 4, under the effect of microseism device, starts roller press type laminator, roll-forming pours It rests after 2.5 hours, the material after resting 2.5 hours in each wall board forming region is in pre-hardening state, is ensured during initial set The hex union at 4.6 top of hollow steel pipe cooperates with the hexagonal shaft on tube unit 5, by starting tube unit 5, turns Rotary electric machine 5.2 on pipe unit 5 drives tube holder 5.1 to rotate, and hollow steel pipe, rotary electric machine can not be extracted after preventing solidification 5.2 rotation axis connection gear rotation axis 5.3;
(6)It is driven on endless belt conveyer 7.1 by walking dolly, shaping mold frame is sling with elevating crane and removes row It walks and rests outside trolley, walking dolly is to wait for next recycling;
(7)Demoulding, after material is fully hardened in each wall board forming region of shaping mold frame, then passes through tube drawing unit 6 Hollow steel pipe is extracted, then mould release is got off to complete demoulding, drying can be used after 2.5 hours.
Embodiment 3:A kind of preparation method preparing energy-saving light-weight wallboard, including following parts by weight of component, magnesia cement 40 Part, 50 parts of flyash, 30 parts of talcum powder, 20 parts of aluminium triphosphate, 9 parts of stalk, 1 part of glass fibre, 30 parts of fluorocarbon coating, brine 90 parts;
It is equipped with the preparation method of energy-saving light-weight wallboard according to the proportion of above-described embodiment, includes the following steps:
(1)According to above-mentioned weight ratio claim 40 parts of magnesia cement, 50 parts of flyash, with dry ball to above-mentioned raw materials into Then in 120 mesh 9 parts of stalk is added, 1 part of glass fibre is mixed evenly in row ball milling, granularity control;
(2)30 parts of talcum powder, 20 parts of aluminium triphosphate, 30 parts of fluorocarbon coating, brine 90 are weighed according to above-mentioned weight ratio Part, it is uniformly mixing to obtain mixed aqueous solution;
(3)By step(1)Step is added in the mixed material of gained(2)It is stirred in the mixed solution of gained, slurry Mixing time 25min, mixing speed 90r/min;
(4)It is inflated using inflator, the blowing pressure 0.6MPa, inflationtime 10min;
(5)It is added in mold 4, under the effect of microseism device, starts roller press type laminator, roll-forming pours It rests after 3 hours, the material after resting 3 hours in each wall board forming region is in pre-hardening state, is ensured during initial set hollow The hex union at 4.6 top of steel pipe cooperates with the hexagonal shaft on tube unit 5, by starting tube unit 5, tube list Rotary electric machine 5.2 in member 5 drives tube holder 5.1 to rotate, and hollow steel pipe, rotary electric machine 5.2 can not be extracted after preventing solidification Rotation axis connection gear rotation axis 5.3;
(6)It is driven on endless belt conveyer 7.1 by walking dolly, shaping mold frame is sling with elevating crane and removes row It walks and rests outside trolley, walking dolly is to wait for next recycling;
(7)Demoulding, after material is fully hardened in each wall board forming region of shaping mold frame, then passes through tube drawing unit 6 Hollow steel pipe is extracted, then mould release is got off to complete demoulding, drying can be used after 3 hours.
The testing result of above-mentioned three kinds of embodiment products is as shown in table 1:
Sound damping curve detection such as table 2:
The above is only the preferred embodiment of inventing type, and any technical person familiar with the field is possibly also with upper The technical solution for stating elaboration changes inventing type or is revised as equivalent technical solution.Therefore, according to inventing type Any simple modification or substitute equivalents that technical solution is carried out belong to the greatest extent the claimed range of inventing type.

Claims (4)

1. a kind of equipment preparing energy-saving light-weight wallboard, it is characterized in that:Including stock shelf, blender, slip casting bucket, mold, tube Unit, tube drawing unit, walking unit, molding unit, total supporting rack, stock shelf connect blender, the outlet of the blender Slip casting bucket is connected, slip casting bucket is injected slurry in mold by molding unit, and mold passes through tube unit, tube drawing unit successively, Into the areas Chai Ban, the lower part of mold is equipped with walking unit, and the walking unit includes endless belt conveyer, walking dolly and sews with long stitches vehicle Frame, mold, which is fixed on, to be sew with long stitches in vehicle frame, and tube unit, tube drawing unit are fixed by total supporting rack;
The mold includes the first shaping mold frame and the second shaping mold frame, and the first shaping mold frame and the second shaping mold frame are rectangular Shape structure, the first shaping mold frame and the second shaping mold frame are surrounded by otic placode, and otic placode is by clamping screw by the first shaping mould Frame and the second shaping mold frame are removably attachable to together, on the short slab both ends of the first shaping mold frame and the second shaping mold frame uniformly Equipped with multiple opposite semi-circular through hole, it is bolted sealing ring in semi-circular through hole, the first shaping mold frame and the second one-tenth Hollow steel pipe, the hollow steel pipe is passed through to be fixed by inserted link between the semi-circular through hole of pattern frame, the described first molding Framed to be equipped with injected hole and slurry outlet, the top of hollow steel pipe is hex union, and the semi-circular through hole is 4-7 groups;
The tube unit includes tube holder, rotary electric machine, rotary gear axis, gear, and the top of tube holder, which is fixed, to be turned Two groups of teeth wheel is engaged in dynamic motor, the rotation axis connection gear rotation axis of the rotary electric machine, the both sides of rotary gear axis respectively, The lower part of gear connects hexagonal shaft, and the hex union at the top of hollow steel pipe cooperates with the hexagonal shaft on tube unit;
The tube drawing unit includes tube drawing holder, gripping sleeve, hydraulic lifting arm, hydraulic device, electric pushrod, controller, is pulled out Horizontal on pipe holder to be equipped with four groups of gripping sleeves, the gripping sleeve includes two semicircular collars, one in two semicircular collars A is fixed ring, another is loose collar, and loose collar connects electric pushrod, and loose collar is equipped with inductor, inductor connection control Device processed, the both ends lower part fixed hydraulic elevating lever of tube drawing holder, the hydraulic lifting arm connect hydraulic device, and loose collar is closed Afterwards, controller receives the work of control electric pushrod and hydraulic device action after the signal of inductor transmission, and hydraulic device is by hydraulic pressure Elevating lever is released, and hydraulic lifting arm lifts tube drawing holder, to realize tube drawing;
The molding unit includes slip casting machine, high-pressure pump, Grouting Pipe, and the top of slip casting machine connects high-pressure pump, and slip casting machine goes out Mouth connection Grouting Pipe.
2. a kind of equipment preparing energy-saving light-weight wallboard according to claim 1, it is characterized in that:First shaping mould Frame and the second shaping mold frame are equipped with various sizes of semi-circular through hole.
3. a kind of equipment preparing energy-saving light-weight wallboard according to claim 1, it is characterized in that:The semi-circular through hole A diameter of 40-70mm, a diameter of 40-70mm of the hollow steel pipe.
4. a kind of method that energy-saving light-weight wallboard is prepared using equipment described in claim 1, it is characterized in that:Including following step Suddenly:
(1)Claim 30 parts of magnesia cement, 45 parts of flyash according to weight ratio, ball milling carried out to above-mentioned raw materials with dry ball, Then in 50-120 mesh 5 parts of stalk is added, 0.8 part of glass fibre is mixed evenly in granularity control;
(2)25 parts of talcum powder, 17 parts of aluminium triphosphate, 25 parts of fluorocarbon coating, 75 parts of brine are weighed according to weight ratio, stirring is equal It is even to obtain mixed aqueous solution;
(3)By step(1)Step is added in the mixed material of gained(2)It is stirred in the mixed solution of gained, slurry stirring Time 20-25min, mixing speed 60-90r/min;
(4)It is inflated using inflator, the blowing pressure 0.4-0.6MPa, inflationtime 8-10min;
(5)It is added in mold, under the effect of microseism device, starts roller press type laminator, roll-forming is quiet after casting complete It supports 2-3 hours, the material after resting 2-3 hours in each wall board forming region is in pre-hardening state, ensures hollow steel during initial set The hex union in tube top portion cooperates with the hexagonal shaft on tube unit, by starting tube unit, on tube unit Rotary electric machine drives tube holder pivots, and hollow steel pipe, the rotation axis connection gear of rotary electric machine can not be extracted after preventing solidification Rotation axis;
(6)It is driven on endless belt conveyer by walking dolly, shaping mold frame is sling with elevating crane and removes walking dolly Outer to rest, walking dolly is to wait for next recycling;
(7)Demoulding, after material is fully hardened in each wall board forming region of shaping mold frame, then will be hollow by tube drawing unit Steel pipe is extracted, then mould release is got off to complete demoulding, and drying can be used after 2-3 hours.
CN201610732398.7A 2016-08-27 2016-08-27 A kind of device and method preparing energy-saving light-weight wallboard Expired - Fee Related CN106182391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610732398.7A CN106182391B (en) 2016-08-27 2016-08-27 A kind of device and method preparing energy-saving light-weight wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610732398.7A CN106182391B (en) 2016-08-27 2016-08-27 A kind of device and method preparing energy-saving light-weight wallboard

Publications (2)

Publication Number Publication Date
CN106182391A CN106182391A (en) 2016-12-07
CN106182391B true CN106182391B (en) 2018-11-13

Family

ID=57526569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610732398.7A Expired - Fee Related CN106182391B (en) 2016-08-27 2016-08-27 A kind of device and method preparing energy-saving light-weight wallboard

Country Status (1)

Country Link
CN (1) CN106182391B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111093923B (en) * 2017-09-19 2021-07-09 吉野石膏株式会社 Slurry discharge pipe of mixer and slurry discharge method
CN109605532B (en) * 2018-12-14 2021-02-26 李明清 Automatic change straw partition plate system trigger
CN112936523B (en) * 2021-01-26 2023-03-10 青岛金沙滩建设集团有限公司 Pouring mold for wallboard for assembly type building and processing technology of wallboard

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1030731C (en) * 1991-06-25 1996-01-17 田晓虹 Technology and apparatus for making integral hollow wall slab
JP2005059394A (en) * 2003-08-12 2005-03-10 Katsura Kikai Seisakusho:Kk Horizontal reinforcement block and pull-out core for molding the same
CN2834850Y (en) * 2006-03-10 2006-11-08 李文国 Forming machine for hollow wall plate
CN100532040C (en) * 2006-09-16 2009-08-26 石宗利 Assembly line for automatically manufacturing gypsum lightweight cavity wallboard and building block
CN101244610A (en) * 2007-02-15 2008-08-20 张秉新 Method for processing coal ash thin wall core tube
US8113815B2 (en) * 2009-06-05 2012-02-14 Ness Inventions, Inc. Block mold having moveable liner
US9186813B2 (en) * 2010-12-01 2015-11-17 Erik Garfinkel Automated concrete structural member fabrication system, apparatus and method
EP2731766A1 (en) * 2011-07-27 2014-05-21 Poundfield Products Limited Manufacturing concrete
CN102581948A (en) * 2012-03-07 2012-07-18 蚌埠远程置业有限公司 Automatic production line of light partition board
CN104227825A (en) * 2013-06-20 2014-12-24 苏州千瑞机电科技有限公司 Building wallboard producing machine

Also Published As

Publication number Publication date
CN106182391A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN101376582B (en) Heat insulation wall integral pouring material and construction method
CN106182391B (en) A kind of device and method preparing energy-saving light-weight wallboard
CN103693928A (en) Autoclaved aerated concrete plate produced by using Yellow River sand, and production method thereof
CN101733821B (en) Processing method of novel light energy-saving environmental-protection board
CN102863189A (en) Preparation technique of waste residue composite light-weight thermal-insulation wallboard
CN109851265B (en) Sludge residue soil-based ceramsite with adjustable pores and preparation method thereof
CN103864388A (en) Light compound-insulation fireproofing dry-mixed mortar and preparation method thereof
CN103288471A (en) Plant ash autoclaved concrete aerated light block and production method thereof
CN108238811A (en) A kind of preparation method of foamed ceramic plates
CN102849996A (en) Fireproof lightweight composite thermal insulation mortar and its preparation method
CN105669146A (en) Autoclaved aerated concrete block containing neutral sodium-salt alkali activated slag concrete and preparation method of autoclaved aerated concrete block
CN105294156A (en) Resource utilization method of household garbage incineration residue sorting tailing
CN103286846B (en) Manufacturing process of concrete-composited self-heat-insulating blocks
CN201991104U (en) Structure of self-heat preservation system
CN103979997B (en) A kind of water-quenched manganese slag that utilizes prepares the method for high strength gas concrete as aggregate
CN104402325A (en) High-strength self-compaction thermal-insulation concrete
CN108275921A (en) A kind of adiabatic heat-insulation wall material and preparation method thereof
CN104557124B (en) Lightweight anti-crack concrete and preparation method thereof
CN205969470U (en) Apparatus for preparing novel energy -conserving light weight wallboard
CN102850078A (en) Lightweight autoclaved perforated brick and preparation method
CN103922652A (en) Method of preparing aerated concrete by utilizing water-quenched manganese slag
CN108793919A (en) A kind of composite heat insulation block and preparation method thereof
CN102336544B (en) Lightweight wallboard manufactured by using urban sludge and manufacturing method for lightweight wallboard
CN101654357A (en) Light building material and preparation method thereof
CN101121591A (en) Self-leveling mortar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180621

Address after: 257000 210 unit 4, 3 building, 432 north two road, Dongying District, Dongying, Shandong.

Applicant after: Yang Lianqin

Address before: 257091 room 2, unit 9, 9 South Road, 64 prospecting and exploration road, Dongying District, Dongying, Shandong.

Applicant before: Xu Jianli

Applicant before: Xu Zheng

Applicant before: Wu Haibin

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180921

Address after: 257000 the east side of Yuhua Road north of Heze Road, Dongying District, Dongying, Shandong.

Applicant after: Shandong nufang Building Material Co., Ltd.

Address before: 257000 210 unit 4, 3 building, 432 north two road, Dongying District, Dongying, Shandong.

Applicant before: Yang Lianqin

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181113

Termination date: 20190827