CN106150544A - Tradition sand storehouse is utilized to realize the new technology of all-tailing cemented filling - Google Patents

Tradition sand storehouse is utilized to realize the new technology of all-tailing cemented filling Download PDF

Info

Publication number
CN106150544A
CN106150544A CN201610629948.2A CN201610629948A CN106150544A CN 106150544 A CN106150544 A CN 106150544A CN 201610629948 A CN201610629948 A CN 201610629948A CN 106150544 A CN106150544 A CN 106150544A
Authority
CN
China
Prior art keywords
sand
filling
tailings
distributor box
new technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610629948.2A
Other languages
Chinese (zh)
Inventor
亓中华
张勇
杨振增
刘太亮
高圣成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Hualian Mining Co Ltd
Original Assignee
Shandong Hualian Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Hualian Mining Co Ltd filed Critical Shandong Hualian Mining Co Ltd
Priority to CN201610629948.2A priority Critical patent/CN106150544A/en
Publication of CN106150544A publication Critical patent/CN106150544A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The present invention relates to a kind of utilize tradition sand storehouse to realize the new technology of all-tailing cemented filling, belong to filling technique field under mine, concrete processing step is: the crude tailings of mass concentration more than 30% 1) is diluted to mass concentration 15% 21%;2) crude tailings after dilution feeds Sha Cang top distributor box;3) flocculant is added at distributor box;4) crude tailings in distributor box is assigned to carry out tailings in two sand storehouses prepare;5) when the tailings in sand storehouse reaches the controlling level specified, two sand storehouses are with sand at present;6) the filling slurry unification prepared feeds filling industry transport pump needs filling ore deposit side to down-hole.This technique do not change former tradition sand chamber structure on the basis of, optimized production process method, it is achieved the continuous packing job of crude tailings high concentration, improve Quality of filling body.

Description

Tradition sand storehouse is utilized to realize the new technology of all-tailing cemented filling
Technical field
The present invention relates to a kind of new technology utilizing tradition sand storehouse to realize all-tailing cemented filling, belong to ore deposit filling in mine skill Art field.
Background technology
The purpose key technology of the method for mining by the way of filling utilizes casting resin to process dead zone exactly, owing to having response rate height, operation The advantages such as safety, are used widely at underground mine.Similar mine, when using tradition sand storehouse packing job, uses classification tail Sandfilling operation, overflow water runs muddy, and Filling density is on the low side and unstable, and packing job is discontinuous, and pack effectiveness is low, it is impossible to realize Tailings zero-emission industry requirement.
Summary of the invention
According to above deficiency of the prior art, the technical problem to be solved in the present invention is: provide one to utilize tradition sand Storehouse realizes the new technology of all-tailing cemented filling, on the basis of not changing former tradition sand chamber structure, and optimized production process method, Realize the continuous packing job of crude tailings high concentration, improve Quality of filling body.
The new technology utilizing tradition sand storehouse to realize all-tailing cemented filling of the present invention, including technique in detail below Step:
1) crude tailings of mass concentration more than 30% is diluted to mass concentration 15%-21%;
2) crude tailings after dilution feeds Sha Cang top distributor box;
3) flocculant is added at distributor box;
4) crude tailings in distributor box is assigned to carry out tailings in two sand storehouses prepare;
5) when the tailings in sand storehouse reaches the controlling level specified, two sand storehouses are with sand at present;
6) the filling slurry unification prepared feeds filling industry transport pump needs filling ore deposit side to down-hole.
Can not reach filling effect for former process, this technique focuses in the feed in sand storehouse, dosing, operational mode Improve, ore pulp i.e. adds pulp density dilution point, flocculant chemical feeding points, single storehouse are run and changed double storehouse into and run simultaneously.
Preferably, step 3) in the dry tailings of each ton add flocculant 20 grams.
Preferably, step 5) sand storehouse lower sand mouth at be provided with material discharging controlling device, it is achieved material turnover balance, from And ensure that Filling density.
The present invention is compared with prior art had the beneficial effect that
Utilize tradition sand storehouse to realize the new technology of all-tailing cemented filling on the basis of not changing former tradition sand storehouse, optimize Manufacturing technique method, it is achieved that the industry requirement of mine tailings zero-emission, adds the storage capacity on original debris dam, decreases Tailings Dam Maintenance cost, it is achieved that the continuous packing job of high concentration, improve Quality of filling body, pack effectiveness improves about 50%.
Detailed description of the invention
Below embodiments of the invention are described further:
Tradition sand storehouse is utilized to realize the new technology of all-tailing cemented filling, the processing step including in detail below:
1) crude tailings of mass concentration more than 30% is diluted to mass concentration 18%;
2) crude tailings after dilution feeds Sha Cang top distributor box;
3) adding flocculant at distributor box, each dry tailings adds flocculant 20 grams;
4) crude tailings in distributor box is assigned to carry out tailings in two sand storehouses prepare;
5) when the tailings in sand storehouse reaches the controlling level specified, two sand storehouses are with sand at present, at the lower sand mouth in sand storehouse It is provided with material discharging controlling device;
6) the filling slurry unification prepared feeds filling industry transport pump needs filling ore deposit side to down-hole.

Claims (3)

1. one kind utilizes the new technology that tradition sand storehouse realizes all-tailing cemented filling, it is characterised in that: include work in detail below Skill step:
1) crude tailings of mass concentration more than 30% is diluted to mass concentration 15%-21%;
2) crude tailings after dilution feeds Sha Cang top distributor box;
3) flocculant is added at distributor box;
4) crude tailings in distributor box is assigned to carry out tailings in two sand storehouses prepare;
5) when the tailings in sand storehouse reaches the controlling level specified, two sand storehouses are with sand at present;
6) the filling slurry unification prepared feeds filling industry transport pump needs filling ore deposit side to down-hole.
Tradition sand storehouse the most according to claim 1 realizes the new technology of all-tailing cemented filling, it is characterised in that: described Step 3) in the dry tailings of each ton add flocculant 20 grams.
Tradition sand storehouse the most according to claim 1 realizes the new technology of all-tailing cemented filling, it is characterised in that: described Step 5) sand storehouse lower sand mouth at be provided with material discharging controlling device.
CN201610629948.2A 2016-08-03 2016-08-03 Tradition sand storehouse is utilized to realize the new technology of all-tailing cemented filling Pending CN106150544A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610629948.2A CN106150544A (en) 2016-08-03 2016-08-03 Tradition sand storehouse is utilized to realize the new technology of all-tailing cemented filling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610629948.2A CN106150544A (en) 2016-08-03 2016-08-03 Tradition sand storehouse is utilized to realize the new technology of all-tailing cemented filling

Publications (1)

Publication Number Publication Date
CN106150544A true CN106150544A (en) 2016-11-23

Family

ID=57329115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610629948.2A Pending CN106150544A (en) 2016-08-03 2016-08-03 Tradition sand storehouse is utilized to realize the new technology of all-tailing cemented filling

Country Status (1)

Country Link
CN (1) CN106150544A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112279565A (en) * 2020-09-16 2021-01-29 中冶南方都市环保工程技术股份有限公司 Method for preparing mine filling material by using solid waste cemented heavy metal tailings in steel industry

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1202569A (en) * 1997-06-16 1998-12-23 陈隆金 High concentrate paste-filling technology and equipment in mine
CN1521388A (en) * 2003-01-29 2004-08-18 陈隆金 Process and equipment for preparing and discharging high concentration and plaster mortar
CN101215975A (en) * 2008-01-09 2008-07-09 云南驰宏锌锗股份有限公司 Whole tailings depth controllable homogeneous concentration method
CN102979571A (en) * 2012-12-08 2013-03-20 山东汇发矿业科技有限公司 All tailing sand dry discharge bonding filling system and filling method of filling system
CN202823272U (en) * 2012-11-02 2013-03-27 山东黄金矿业(莱州)有限公司三山岛金矿 Mixing station for mine filling
CN204754981U (en) * 2015-04-29 2015-11-11 北京科技大学 Stability of vertical sand silo effluent concentration is improved storage device
CN204804877U (en) * 2015-07-15 2015-11-25 飞翼股份有限公司 Vertical sand silo

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1202569A (en) * 1997-06-16 1998-12-23 陈隆金 High concentrate paste-filling technology and equipment in mine
CN1521388A (en) * 2003-01-29 2004-08-18 陈隆金 Process and equipment for preparing and discharging high concentration and plaster mortar
CN101215975A (en) * 2008-01-09 2008-07-09 云南驰宏锌锗股份有限公司 Whole tailings depth controllable homogeneous concentration method
CN202823272U (en) * 2012-11-02 2013-03-27 山东黄金矿业(莱州)有限公司三山岛金矿 Mixing station for mine filling
CN102979571A (en) * 2012-12-08 2013-03-20 山东汇发矿业科技有限公司 All tailing sand dry discharge bonding filling system and filling method of filling system
CN204754981U (en) * 2015-04-29 2015-11-11 北京科技大学 Stability of vertical sand silo effluent concentration is improved storage device
CN204804877U (en) * 2015-07-15 2015-11-25 飞翼股份有限公司 Vertical sand silo

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李辉等: "《基于尾砂沉降与流变特性的深锥浓密机压耙分析》", 《北京科技大学学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112279565A (en) * 2020-09-16 2021-01-29 中冶南方都市环保工程技术股份有限公司 Method for preparing mine filling material by using solid waste cemented heavy metal tailings in steel industry

Similar Documents

Publication Publication Date Title
CN102979571A (en) All tailing sand dry discharge bonding filling system and filling method of filling system
CN103657840A (en) Dry type discharge method of phosphorus ore tailings
CN103350037B (en) Overflow particle size control method for cyclone
US20220314233A1 (en) Underground coal hypergravity field separation system and separation process
CN102828776A (en) Mine underground filling system
CN107694743A (en) A kind of system of processing and its method that barite is separated from mine tailing
CN103567056A (en) Downhole jigging and gangue discharging method
CN101670310A (en) Dense-medium shallow-groove separating and waste-rock exhausting system used under coal mine
CN104791005B (en) A kind of storing apparatus and method improving vertical sand warehouse concentration of emission stability
CN101708482A (en) New technology for processing iron tailings
CN106150544A (en) Tradition sand storehouse is utilized to realize the new technology of all-tailing cemented filling
CN106955798A (en) A kind of tailing dam heap dam tailings method of quality control
CN204746555U (en) Colliery is two washing systems in pit
CN106186748A (en) The recycling system of a kind of industrial waste carbide slag and recoverying and utilizing method
CN114109487A (en) Coarse fraction full tailing paste filling method
CN104368527B (en) The quick wind-force coal-gangue separation device in underground
CN103817075B (en) Novel hydraulic classification two-section arc screen
CN103252286B (en) Method for using dense medium to sort coal-series kaolinite rocks in gangues
CN104208946B (en) The direct processing method of coal-face water burst and equipment
CN202970782U (en) Full tailing sand cementation filling system
CN204769204U (en) Pond method of filling out sediment thick liquid conveyor that builds a dam
CN204568495U (en) A kind of tailings filter cake feed bin
CN103334784A (en) Solid filling inclined material feeding method
CN203497637U (en) Conveying device for open-pit mining
CN206796166U (en) A kind of buried concrete and brick production line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123