CN204769204U - Pond method of filling out sediment thick liquid conveyor that builds a dam - Google Patents
Pond method of filling out sediment thick liquid conveyor that builds a dam Download PDFInfo
- Publication number
- CN204769204U CN204769204U CN201520513122.0U CN201520513122U CN204769204U CN 204769204 U CN204769204 U CN 204769204U CN 201520513122 U CN201520513122 U CN 201520513122U CN 204769204 U CN204769204 U CN 204769204U
- Authority
- CN
- China
- Prior art keywords
- dam
- ore deposit
- swirler
- cyclone
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 239000013049 sediment Substances 0.000 title abstract 5
- 239000007788 liquid Substances 0.000 title abstract 3
- 239000004576 sand Substances 0.000 claims abstract description 27
- 239000002893 slag Substances 0.000 claims description 8
- 239000002002 slurry Substances 0.000 claims description 8
- 238000007599 discharging Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 2
- 239000002184 metal Substances 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract 1
- 238000012876 topography Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002706 hydrostatic effect Effects 0.000 description 1
Landscapes
- Separation Of Solids By Using Liquids Or Pneumatic Power (AREA)
Abstract
The utility model relates to a conveyor specifically is pond method of filling out sediment thick liquid conveyor that builds a dam, certainly include in proper order under going up for ore deposit pipe, swirler for ore deposit case, many swirler, sand setting branch ore deposit case, swirler be located the discharge gate for the ore deposit pipe for the ore deposit case, swirler passes through swirler for ore deposit bottom of the case portion to divide ore deposit case intercommunication for ore deposit pipe and swirler intercommunication, swirler lower extreme export through swirler sand sediment pipe and sand setting, sand setting branch ore deposit case communicates through sediment stuff pump and the sand setting conveyer pipe and the pond of building a dam, swirler installation swirler overflow pipe. The utility model provides a pond method of filling out sediment thick liquid conveyor that builds a dam does not need frequently to move swirler, has saved heavy construction machinery, improves build a dam efficiency and the reduction cost of building a dam, and the operation is not influenced by topography, weather etc. Is fit for being used for big, medium -sized metal mine tailing storehouse tailings to build a dam.
Description
Technical field
The utility model relates to a kind of conveying device, is specially pond filling method to build up dam slag slurry conveying device.
Background technology
It is most important one of the mode of building a dam of Tailings Dam that tailings is built a dam.At present, most domestic metal mine adopts hydrocyclone sand to build a dam, and the method needs frequent mobile a cluster cyclone and auxiliary facility thereof, drops into a large amount of manpowers and large-scale engineering machinery cooperation; Affect by sand setting concentration simultaneously, when building a dam, have a large amount of coarse sand to flow in storehouse, not only affect efficiency of building a dam, cost of also increase being built a dam.
Utility model content
For above-mentioned technical problem, the utility model provide one build a dam fast and easily slag slurry conveying device, concrete technical scheme is:
Pond filling method to build up dam slag slurry conveying device, comprise mineral-feeding pipe, cyclone from top to bottom successively to ore deposit case, multiple stage cyclone, sand setting mine-separating box, described cyclone is positioned at the discharging opening of mineral-feeding pipe to ore deposit case, cyclone is communicated with cyclone by cyclone mineral-feeding pipe to bottom the case of ore deposit, cyclone lower end outlet is communicated with sand setting mine-separating box by hydrocyclone sand pipe, sand setting mine-separating box is communicated with pond of building a dam with sand setting carrier pipe by Pulp pump, and cyclone overflow pipe installed by described cyclone.
Described cyclone is provided with accident ore drawing pipe to ore deposit case.
Ore pulp flow to cyclone to ore deposit case through mineral-feeding pipe, be given to cyclone again, after cyclone classification, low concentration fine fraction is discharged in Tailings Dam from the overflow of cyclone overflow pipe, coarse grain sand setting in sand setting mine-separating box, then through Pulp pump be delivered to dam body need build a dam build a dam in pond.
The pond filling method to build up dam slag slurry conveying device that the utility model provides, do not need frequent mobile cyclone, save large-scale engineering machinery, improve build a dam efficiency and reduction and to build a dam cost, operation does not affect by landform, weather etc., is suitable for large and medium-sized Mine Tailings storehouse tailings and builds a dam.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Accompanying drawings detailed description of the invention of the present utility model.
As shown in Figure 1, pond filling method to build up dam slag slurry conveying device, comprise mineral-feeding pipe 1, cyclone from top to bottom successively to ore deposit case 2, multiple stage cyclone 5, sand setting mine-separating box 8, described cyclone is positioned at the discharging opening of mineral-feeding pipe 1 to ore deposit case 2, cyclone is communicated with cyclone 5 by cyclone mineral-feeding pipe 4 to bottom ore deposit case 2, the outlet of cyclone 5 lower end is communicated with sand setting mine-separating box 8 by hydrocyclone sand pipe 7, sand setting mine-separating box 8 is communicated with pond 11 of building a dam with sand setting carrier pipe 10 by Pulp pump 9, and cyclone overflow pipe 6 installed by described cyclone 5.
Described cyclone is provided with accident ore drawing pipe 3 to ore deposit case 2.
During construction, cyclone is positioned over Tailings Dam higher position to ore deposit case 2, cyclone 5 is arranged on to cyclone to the position of 25 to 30 meters below ore deposit case 2, ore pulp flow to cyclone to ore deposit case 2 through mineral-feeding pipe 1, in order to prevent emitting ore deposit, at cyclone, accident ore drawing pipe 3 is set to ore deposit case 2 side, ore pulp is given to cyclone 5 under hydrostatic pressure, after classified, low concentration fine fraction is discharged in Tailings Dam from cyclone overflow pipe 6 overflow, coarse grain sand setting in sand setting mine-separating box 8, then through Pulp pump 9 be delivered to dam body need build a dam build a dam in pond 11.
Claims (2)
1. pond filling method to build up dam slag slurry conveying device, it is characterized in that: comprise mineral-feeding pipe (1) from top to bottom successively, cyclone is to ore deposit case (2), multiple stage cyclone (5), sand setting mine-separating box (8), described cyclone is positioned at the discharging opening of mineral-feeding pipe (1) to ore deposit case (2), cyclone is communicated with cyclone (5) by cyclone mineral-feeding pipe (4) to ore deposit case (2) bottom, the outlet of cyclone (5) lower end is communicated with sand setting mine-separating box (8) by hydrocyclone sand pipe (7), sand setting mine-separating box (8) is communicated with pond of building a dam (11) with sand setting carrier pipe (10) by Pulp pump (9), cyclone overflow pipe (6) installed by described cyclone (5).
2. pond filling method to build up dam slag slurry conveying device according to claim 1, is characterized in that: described cyclone is provided with accident ore drawing pipe (3) to ore deposit case (2).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520513122.0U CN204769204U (en) | 2015-07-15 | 2015-07-15 | Pond method of filling out sediment thick liquid conveyor that builds a dam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520513122.0U CN204769204U (en) | 2015-07-15 | 2015-07-15 | Pond method of filling out sediment thick liquid conveyor that builds a dam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204769204U true CN204769204U (en) | 2015-11-18 |
Family
ID=54509333
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520513122.0U Expired - Fee Related CN204769204U (en) | 2015-07-15 | 2015-07-15 | Pond method of filling out sediment thick liquid conveyor that builds a dam |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204769204U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106955798A (en) * | 2017-04-21 | 2017-07-18 | 江西铜业股份有限公司 | A kind of tailing dam heap dam tailings method of quality control |
| CN109174431A (en) * | 2018-08-15 | 2019-01-11 | 昆明市东川金水矿业有限责任公司 | It is a kind of that copper tailings is selected to prepare dephosphorization agent method |
| CN109225691A (en) * | 2018-10-23 | 2019-01-18 | 长沙矿冶研究院有限责任公司 | A kind of pressurization of ore pulp circulation is to mine system and its gives mine method |
-
2015
- 2015-07-15 CN CN201520513122.0U patent/CN204769204U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106955798A (en) * | 2017-04-21 | 2017-07-18 | 江西铜业股份有限公司 | A kind of tailing dam heap dam tailings method of quality control |
| CN109174431A (en) * | 2018-08-15 | 2019-01-11 | 昆明市东川金水矿业有限责任公司 | It is a kind of that copper tailings is selected to prepare dephosphorization agent method |
| CN109225691A (en) * | 2018-10-23 | 2019-01-18 | 长沙矿冶研究院有限责任公司 | A kind of pressurization of ore pulp circulation is to mine system and its gives mine method |
| CN109225691B (en) * | 2018-10-23 | 2024-03-22 | 长沙矿冶研究院有限责任公司 | Ore pulp circulating pressurizing ore feeding system and ore feeding method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103357212B (en) | A kind of mine tailing solid-liquid separating equipment and method | |
| CN105478225A (en) | Tailings grading and zoning high-concentration discharging system and method | |
| CN204769204U (en) | Pond method of filling out sediment thick liquid conveyor that builds a dam | |
| CN106976999A (en) | Concrete mixing plant wastewater ocean disposal system | |
| CN204161988U (en) | A kind of helix transporting device for Separation of Solid and Liquid | |
| CN202238273U (en) | Mud separating bucket | |
| CN102336428B (en) | Method for taking phosphogypsum under wet-process deslagging conditions | |
| CN210875766U (en) | Tailless mine separation and filling system based on skid-mounted all-in-one machine | |
| CN207271464U (en) | A kind of tailing dry row's equipment that can be improved efficiency and reduce cost | |
| CN102513200A (en) | Raw ore grinding, pulping and conveying system | |
| CN205925976U (en) | Improve aurin ore deposit tailing gold recovery's ore grinding ore dressing floatation device | |
| CN205361690U (en) | Hydraulic classification desliming cylinder for bauxite | |
| CN210768902U (en) | Tailing slurry collects buffering feeder | |
| CN104958949B (en) | Tailing dry row's band filter repeatedly cloth system | |
| CN204121814U (en) | A kind of enrichment facility of molybdenum ore flotation tailing pulp | |
| CN104874472B (en) | Automatic separating device for fine-sized slime in tailings conveying manifolds | |
| CN103203124B (en) | A kind of tailings dewatering technique and device | |
| CN103212223A (en) | Concentrate dehydrating technology and device | |
| CN203335388U (en) | Self-defoaming anti-sedimentating pumping system | |
| CN202620883U (en) | Dry tailing discharge device | |
| KR102287042B1 (en) | System device process for classification of various materials | |
| CN204620181U (en) | Fine fraction sludge automatic separating apparatus in the defeated tail supervisor of mine tailing | |
| CN201841049U (en) | Spiral classifier for recycling tailing of tailing storeroom | |
| CN206280101U (en) | A kind of unmanned non-cementing continuous filling system of Tailings Slurry of guard | |
| CN203507667U (en) | Magnetite ore dressing wastewater treatment and recovery device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151118 |