CN106150540B CN201610511802.8A CN201610511802A CN106150540B CN 106150540 B CN106150540 B CN 106150540B CN 201610511802 A CN201610511802 A CN 201610511802A CN 106150540 B CN106150540 B CN 106150540B
Authority
CN
China
Prior art keywords
pressure break
extraction
drainage holes
hole
carried out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610511802.8A
Other languages
Chinese (zh)
Other versions
CN106150540A (en
Inventor
李栋
周东平
郭臣业
刘明远
黄昌文
何华
王彪
杜晓华
任梅青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Energy Technology Investment Group Co Ltd
CHONGQING NANTONG MINING INDUSTRY Co Ltd
Chongqing University
Chongqing Energy Investment Group Co Ltd
Original Assignee
CHONGQING NANTONG MINING INDUSTRY Co Ltd
Chongqing Energy Technology Investment Group Co Ltd
Chongqing University
Chongqing Energy Investment Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING NANTONG MINING INDUSTRY Co Ltd, Chongqing Energy Technology Investment Group Co Ltd, Chongqing University, Chongqing Energy Investment Group Co Ltd filed Critical CHONGQING NANTONG MINING INDUSTRY Co Ltd
Priority to CN201610511802.8A priority Critical patent/CN106150540B/en
Publication of CN106150540A publication Critical patent/CN106150540A/en
Application granted granted Critical
Publication of CN106150540B publication Critical patent/CN106150540B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Abstract

The invention discloses a kind of tunnels being progressively depressured to prevent the gas pumping method that transfinites, and after being included in hydraulic fracturing anti-reflection, carries out gas pumping by pressure break hole and continues setting time;It determines pressure break zone of influence scope and pressure break zone of influence Edge Distance and the gas joint extraction number of joint extraction at least twice is carried out with pressure break hole and drainage holes;Centered on pressure break hole, the pressure break zone of influence is divided by central circular area and multiple annuluses with increasing radius;It is applied in central circular area and bores multiple drainage holes and sealing of hole;Joint extraction is carried out with drainage holes and pressure break hole;When the joint extraction number carried out is less than setting number, with it is upper once combine to apply in the adjacent annular region in extraction region bore multiple drainage holes, and to increased drainage holes sealing of hole;Continue extraction until joint extraction terminates.The invention has the advantages that mash gas pumping drilling applies brill safety, during for coal work tunnel, tunnel gas exceeding limit hidden danger can be effectively reduced or eliminated.

Description

Prevent the gas pumping method that transfinites in a kind of tunnel being progressively depressured
Technical field
The present invention relates to a kind of coal-bed gas gas pumping method, the gas pumping that transfinites is prevented in especially a kind of tunnel being progressively depressured Mining method.
Background technology
Coal-bed gas is a kind of clear energy sources, but is even more a kind of disaster source for coal production.The coal preservation in China Complex geologic conditions rely primarily on underground mining, and with the increase of mining depth, coal seam gas-bearing capacity gradually increases, coal seam watt This pressure increases, and prominent danger increases, and protrusion-dispelling difficulty is increasing.Existing coal working face gas pumping is to pass through respectively Concordant drilling is played in transportation roadway and air return lane in this coal seam and carries out extraction.For the poor coal seam of gas permeability usually need to also into Row extraction again after row hydraulic fracturing anti-reflection.Existing pumping method is, after pressure break, is uniformly applied in the pressure break zone of influence and bores multiple pumpings It adopts hole and carries out extraction.Since the displacement for not taking into full account pressure break medium acts on so that away from pressure break hole in the pressure break zone of influence Endless belt in one distance range forms gas density and pressure is significantly higher than the gas accumulation area of original concentration and pressure.It is but existing The gas concentrated area is not accounted in the boring procedure of some pumping methods, does not consider the increased influence of gas density, because , when applying brill drainage holes, there is spray and bore and Gas Outburst danger in this.For this reason, it may be necessary to gas pumping technique is improved.
The content of the invention
The purpose of the present invention is being directed to the deficiency of existing drainage from coal seam technology, a kind of tunnel being progressively depressured is provided and prevents surpassing Gas pumping method is limited, this method is in a manner of extend outwardly centered on pressure break hole progressively drilling and extraction, gradually to drop Low accumulation regions gas density, tunnel gas exceeding limit during so as to effectively prevent through tunnel extraction, it is ensured that extraction safety.
To achieve the above object, the present invention adopts the following technical scheme that:
The gas pumping method that transfinites is prevented in a kind of tunnel being progressively depressured, and comprises the following steps:
The first step after hydraulic fracturing anti-reflection is carried out by pressure break hole, carries out gas pumping by pressure break hole, and continues extraction To the first setting time;
Second step determines that pressure break zone of influence scope and pressure break influence area edge away from pressure break hole minimum range L and with pressure break Hole and drainage holes carry out the gas joint extraction times N of joint extraction at least twice;And centered on pressure break hole, using L/N to pass Increase radius and the pressure break zone of influence is divided into central circular area and multiple annuluses;
3rd step is applied in the central circular area and bores multiple drainage holes, and multiple drainage holes are carried out by extraction requirement Sealing of hole;
4th step carries out gas joint extraction to all drainage holes and pressure break hole, and continues extraction to the second setting time;
5th step judges the joint extraction number carried out, when the joint extraction number carried out is less than N, carries out down One step;When the joint extraction number carried out is equal to N, terminate extraction;
6th step, with it is upper once combine to apply in the adjacent annular region in extraction region bore multiple drainage holes, and to increasing Drainage holes by extraction requirement carry out sealing of hole;
7th step returns to the 4th step, until joint extraction terminates.
Using the present invention of preceding solution, by the progressively widened extraction scope centered on pressure break hole, gradually take out The device in Gas in coal seam is arranged, the gas pressure and concentration for making gas Nesting Zone gradually reduce, and before each expanded scope extraction, Construction drainage holes, therefore, drainage holes apply brill and progressively the gas Nesting Zone of convergence high pressure and high concentration, can effectively eliminate Or the spray of gas Nesting Zone drilling construction is avoided to bore phenomenon, it is ensured that safety is bored in empty the applying of gas pumping.For heading extraction When, it can effectively reduce or eliminate tunnel gas exceeding limit hidden danger.
Preferably, the joint extraction times N is 3~5 natural number.To adapt to the existing anti-reflection zone of influence in most of coal seams For the needs of 30~50 meters of radius.
Preferably, the number that the setting time of the 4th step is carried out with joint extraction increases and is gradually shortened.To have Effect is avoided in the case of spray brill danger occurs, and improves extraction efficiency.
Preferably, the increasing radius is 8~12 meters.To be suitable for existing most of coal seam needs, and can effectively ensure Extraction borehole safety.
Compared with the prior art, the invention has the advantages that mash gas pumping drilling applies brill safety, for coal work lane During road, tunnel gas exceeding limit hidden danger can be effectively reduced or eliminated.
Description of the drawings
Fig. 1 is the arrangement schematic diagram of hydraulic fracturing hole and extraction borehole in the present invention.
Specific embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings, but does not therefore limit the present invention to the implementation Among scope.
Referring to Fig. 1, the gas pumping method that transfinites is prevented in a kind of tunnel being progressively depressured, and is carried out in heading, including following Step:
The first step after hydraulic fracturing anti-reflection is carried out by pressure break hole 1, carries out gas pumping by pressure break hole 1, and continues to take out It adopts to the first setting time;
Second step, determine pressure break zone of influence scope and pressure break influence area edge away from 1 minimum range L=40m of pressure break hole and Gas joint extraction times N=4 of joint extraction at least twice are carried out with pressure break hole 1 and drainage holes 2;And in pressure break hole 1 being The pressure break zone of influence is divided into central circular area and multiple annuluses by the heart using L/N=10m as increasing radius;
3rd step centered on pressure break hole 1, and is applied in the central circular area that radius is 10m and bores multiple drainage holes 2, and sealing of hole is carried out by extraction requirement to multiple drainage holes 2;
4th step carries out gas joint extraction to all drainage holes 2 and pressure break hole 1, and when continuing extraction to the second setting Between;
5th step judges the joint extraction number carried out, and when the joint extraction number carried out is less than N, i.e., joint is taken out When adopting less than 4 times, carry out in next step;When the joint extraction number carried out is equal to N, i.e., after joint extraction has reached 4 times, knot Beam extraction;
6th step, with it is upper once combine to apply in the adjacent annular region in extraction region bore multiple drainage holes 2, and to increasing Drainage holes 2 carry out sealing of hole by extraction requirement;After completing joint extraction in central circular area, in the way of gradually expanding outwardly, The construction drainage holes 2 in adjacent new annular region;
7th step returns to the 4th step, until joint extraction terminates.
In the present embodiment, properties and the pressure break zone of influence magnitude range such as breathed freely according to coal seam, wherein, joint extraction Number usually also can be selected 2,3,5 or 6 etc. repeatedly;Obviously, the increasing radius of joint extraction also may be selected in 8~12m in addition to 10m Other values.
During the joint extraction of the present embodiment, with the increase of joint extraction number, the corresponding extraction duration is suitable It is appropriate to shorten.
Although combining attached drawing above describes embodiments of the present invention, those of ordinary skill in the art can also Recognize to various changes can be made in scope of the appended claims or modification, these modifications and variations are understood as in this hair Within bright scope and intention.

Claims (4)

1. the gas pumping method that transfinites is prevented in a kind of tunnel being progressively depressured, which is characterized in that comprises the following steps:
The first step, by pressure break hole(1)After carrying out hydraulic fracturing anti-reflection, pass through pressure break hole(1)Gas pumping is carried out, and continues to take out It adopts to the first setting time;
Second step determines that pressure break zone of influence scope and pressure break influence area edge away from pressure break hole(1)Minimum range L and with pressure break Hole(1)And drainage holes(2)Carry out the gas joint extraction times N of joint extraction at least twice;And with pressure break hole(1)Centered on, The pressure break zone of influence is divided into central circular area and multiple annuluses using L/N as increasing radius;
3rd step is applied in the central circular area and bores multiple drainage holes(2), and to multiple drainage holes(2)By extraction requirement into Row sealing of hole;
4th step, to all drainage holes(2)With pressure break hole(1)When carrying out gas joint extraction, and continuing extraction to the second setting Between;
5th step judges the joint extraction number carried out, when the joint extraction number carried out is less than N, carries out in next step; When the joint extraction number carried out is equal to N, terminate extraction;
6th step, with it is upper once combine to apply in the adjacent annular region in extraction region bore multiple drainage holes(2), and to increased Drainage holes(2)Sealing of hole is carried out by extraction requirement;
7th step returns to the 4th step, until joint extraction terminates.
2. the gas pumping method that transfinites is prevented in the tunnel according to claim 1 being progressively depressured, which is characterized in that the joint Extraction times N is 3~5 natural number.
3. the gas pumping method that transfinites is prevented in the tunnel according to claim 1 being progressively depressured, which is characterized in that in the 4th step In the number that is carried out with joint extraction of the setting time increase and be gradually shortened.
4. the gas pumping method that transfinites, feature are prevented in the tunnel being progressively depressured according to any one in claims 1 to 3 It is, the increasing radius is 8~12 meters.
CN201610511802.8A 2016-07-01 2016-07-01 Prevent the gas pumping method that transfinites in a kind of tunnel being progressively depressured Active CN106150540B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610511802.8A CN106150540B (en) 2016-07-01 2016-07-01 Prevent the gas pumping method that transfinites in a kind of tunnel being progressively depressured

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610511802.8A CN106150540B (en) 2016-07-01 2016-07-01 Prevent the gas pumping method that transfinites in a kind of tunnel being progressively depressured

Publications (2)

Publication Number Publication Date
CN106150540A CN106150540A (en) 2016-11-23
CN106150540B true CN106150540B (en) 2018-05-22

Family

ID=57350984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610511802.8A Active CN106150540B (en) 2016-07-01 2016-07-01 Prevent the gas pumping method that transfinites in a kind of tunnel being progressively depressured

Country Status (1)

Country Link
CN (1) CN106150540B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676126B (en) * 2017-10-16 2019-01-29 重庆大学 It is a kind of to utilize the concordant region hydraulic fracturing method for intercepting control
CN109577934A (en) * 2018-11-29 2019-04-05 中国矿业大学(北京) A kind of coal seam anti-reflection method using anaerobic methane oxidation bacterium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101403314A (en) * 2008-11-18 2009-04-08 河南理工大学 Coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique
CN101666241A (en) * 2009-09-05 2010-03-10 中国矿业大学 Integrated drilling-blasting-pressurizing-drawing protrusion preventing method for regional gas control
RU2395690C1 (en) * 2009-03-05 2010-07-27 Владимир Александрович Зуев Method for control of gas release from stripped area
CN103397900A (en) * 2013-07-15 2013-11-20 中国矿业大学 Porous collaborative fracturing and extracting integrated gas extraction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101403314A (en) * 2008-11-18 2009-04-08 河南理工大学 Coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique
RU2395690C1 (en) * 2009-03-05 2010-07-27 Владимир Александрович Зуев Method for control of gas release from stripped area
CN101666241A (en) * 2009-09-05 2010-03-10 中国矿业大学 Integrated drilling-blasting-pressurizing-drawing protrusion preventing method for regional gas control
CN103397900A (en) * 2013-07-15 2013-11-20 中国矿业大学 Porous collaborative fracturing and extracting integrated gas extraction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
穿层钻孔煤巷条带水力压裂防突技术及应用;袁志刚等;《重庆大学学报》;20160229;第39卷(第1期);72-77 *

Also Published As

Publication number Publication date
CN106150540A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN101915083B (en) Method for extracting coalbed gases from coal mines by upper and lower combination
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
WO2016206618A1 (en) Longwall mine construction method n00
CN104879159B (en) A kind of devices and methods therefor of weak seam stope anti-reflection mash gas extraction
CN106988778B (en) A kind of low preservation, the high gas gushed out divide source partition solid administering method
CN101666241B (en) Integrated drilling-blasting-pressurizing-drawing protrusion preventing method for regional gas control
CN108331609B (en) Concordant drilling slot release anti-reflection method
CN102619552A (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN105089493B (en) Ground vertical well combines pressure released seam gas pumping method with underground layer-through drilling
CN109209472A (en) The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple
CN108468561A (en) The method that coal and gas power phenomenon improves drilling well mash gas extraction concentration and preventing mine fire
CN103883293A (en) Hydraulic jet radial drilling and fracturing integrating method
CN103147734A (en) Method for multi-section hydraulic fracture along coal layer of underground coal mine
CN102425418A (en) Method for controlling rock burst in artificial defect body of coal mine structural area
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN105909225A (en) Fully mechanized caving face inter-frame oriented hydraulic fracturing top-coal weakening method
CN103306714A (en) Gas control method for triple-purpose use of drilled holes in coal floor of close distance seam group
CN102678092A (en) Method for commonly extracting coal and coal bed gas by up-hole and down-hole joint construction
CN102777180A (en) Method for actively and regionally preventing and controlling rock burst in coal mines
CN103899348A (en) Method for fast extracting gas on coalface
CN203822359U (en) Distribution structure for gas extraction holes of coal face
CN108086901A (en) A kind of netted slot anti-reflection method of layer-through drilling
CN106089292A (en) A kind of high gas layer major diameter control hole leads control hydraulic fracturing anti-reflection outburst elimination method
CN106150540B (en) Prevent the gas pumping method that transfinites in a kind of tunnel being progressively depressured
CN108316964A (en) A kind of low air permeability coal seam pressure relief gas pumping mining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Dong

Inventor after: Zhou Dongping

Inventor after: Guo Chenye

Inventor after: Liu Mingyuan

Inventor after: Huang Changwen

Inventor after: He Hua

Inventor after: Wang Biao

Inventor after: Du Xiaohua

Inventor after: Ren Meiqing

Inventor before: Zhou Dongping

Inventor before: Guo Chenye

Inventor before: Li Dong

Inventor before: Liu Mingyuan

Inventor before: Huang Changwen

Inventor before: He Hua

Inventor before: Wang Biao

Inventor before: Du Xiaohua

Inventor before: Ren Meiqing

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180320

Address after: Nanbin road 400060 Chongqing Nan'an District No. 162 Building 2 floor 12

Applicant after: Chongqing Energy Technology Investment Group Co., Ltd.

Applicant after: CHONGQING ENERGY INVESTMENT GROUP CO., LTD.

Applicant after: CHONGQING NANTONG MINING INDUSTRY CO., LTD.

Applicant after: Chongqing University

Address before: Nanbin road 400060 Chongqing Nan'an District No. 162 Building 2 floor 12

Applicant before: Chongqing Energy Technology Investment Group Co., Ltd.

Applicant before: CHONGQING ENERGY INVESTMENT GROUP CO., LTD.

Applicant before: CHONGQING NANTONG MINING INDUSTRY CO., LTD.