CN106150085B - A kind of stiffened column Formwork Installation Method - Google Patents

A kind of stiffened column Formwork Installation Method Download PDF

Info

Publication number
CN106150085B
CN106150085B CN201510160033.7A CN201510160033A CN106150085B CN 106150085 B CN106150085 B CN 106150085B CN 201510160033 A CN201510160033 A CN 201510160033A CN 106150085 B CN106150085 B CN 106150085B
Authority
CN
China
Prior art keywords
stiffened column
stiffened
template framework
steel
column template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510160033.7A
Other languages
Chinese (zh)
Other versions
CN106150085A (en
Inventor
汪正琼
喻进宗
张雨
王仲文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201510160033.7A priority Critical patent/CN106150085B/en
Publication of CN106150085A publication Critical patent/CN106150085A/en
Application granted granted Critical
Publication of CN106150085B publication Critical patent/CN106150085B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of stiffened column Formwork Installation Method, it is characterised in that include the following steps:A makes stiffened column template framework, and stiffened column template framework connector, the support member of c in-site installation stiffened column template frameworks and d installation stiffened column template frameworks is arranged in b.The stiffened column Formwork Installation Method of the present invention has mould plate supporting device selve support intensity good, and stiffened column concrete architecture quality and impression quality are outstanding, template installation, convenient disassembly, construction efficiency height and the small advantage of stiffened column perpendicularity deviation.

Description

A kind of stiffened column Formwork Installation Method
Technical field
The present invention relates to a kind of Formwork Installation Methods of armored concrete, specifically, being a kind of stiffness column template installation Method.
Background technology
High-rise building agent structure mostly uses stiffened column, and big specification shaped steel and high strength reinforced concrete are linked to be entirety Column, that is, meet intensity requirement, also meets anti-seismic performance requirement, while structural steelwork construction is convenient, the period is short, has preferable Shock resistance advantage.Stiffness rod structure is as high-rise building core wall structure.Traditional stiffness column construction method is according to stiffness Column interface dimensions, prior prefabricated plank sheathing, then by flitch and scaffold tubes using buckle fastening installation;Or use combined steel Plate, scene are spliced, and are arranged in pairs or groups and are used with plank sheathing.But traditional stiffness column construction method has the following disadvantages:
(1)Often, and the plank sheathing number of turnover is limited for the turnovers such as template in high-rise building, using being difficult to afterwards for several times Ensure body structure surface flatness and impression quality;
(2)The fastening of template, installation holding time are long, lost labor;
(3)Combined steel formwork is used with plank sheathing collocation, is easy tod produce spillage at two kinds of material form joints, is influenced structure Quality and impression quality;
(4)Combined steel formwork is set pattern grid material, and generation time when using of arranging in pairs or groups with plank sheathing wastes.
Therefore known stiffness column construction method there are problems that it is above-mentioned various inconvenient and.
Invention content
The purpose of the present invention is to propose a kind of shortening stiffness column template installation time, improves template installation The stiffened column Formwork Installation Method of efficiency.
It is a kind of with higher support strength it is another object of the present invention to propose, stiffened column architecture quality can be improved With the stiffened column Formwork Installation Method of impression quality.
A further object of the present invention is to propose a kind of stiffness column template installation side suitable for high-rise building engineering Method.
To achieve the above object, technical solution of the invention is:
A kind of stiffened column Formwork Installation Method, it is characterised in that include the following steps:
A, stiffened column template framework is made
According to stiffened column interface dimensions, stiffened column template framework is made, stiffened column template framework is 4mm template branch by thickness The cutting of support arrangement steel plate, is welded at assembly, and the width of stiffened column template framework is consistent with stiffened column interface dimensions, height It should be highly consistent with stiffened column;Stiffened column template framework is made of two halves, and four corner angle of stiffened column template framework are respectively set 4 Reinforcing angle of the root from stiffness column bottom to top carries out reinforcement of weld, increases intensity;
B, stiffened column template framework connector is set
Stiffened column template framework divide two halves carry out field assembly, the elongated weld bolt fastening angle steel at two halves docking, And the bolt hole that several spacing are 100mm is bored, it is 300mm per a pair of bolt hole spacing, is tightened by installing fastening bolt fastening; On the lateral surface of stiffened column template framework, it is 100mm to be equivalent at the top of four lateral distances of stiffened column weld length at 500mm Angle steel bearing diagonal block angle steel;
C, in-site installation stiffened column template framework
In-site installation stiffened column template framework is set in the infrastructure concrete placings of stiffened column in stiffened column four direction The steel bar end that height is 50mm, a diameter of 20mm is set, steel bar end is perpendicular to ground;1st steel bar end is arranged in pairs apart from strength At property column side 100mm, the 2nd steel bar end is arranged in pairs at the 2000mm of stiffened column side;
D, the support member of stiffened column template framework is installed
It is installed in place in stiffened column template framework, after installation bolt fastening, by flitch by the bottom of stiffened column template framework Wedging between portion and steel bar end;Top is withstood on by the bearing diagonal block angle being welded in advance on the outside of device by bearing diagonal steel pipe again On steel, the 2nd steel bar end of ground is withstood in the bottom of bearing diagonal steel pipe, is held out against bearing diagonal steel pipe by spiral ejection pin, has support Power.
The stiffened column Formwork Installation Method of the present invention can also be further achieved by the following technical measures.
Method above-mentioned, wherein the material of the reinforcing angle is L50 angle steel.
Method above-mentioned, wherein the material of the bolt fastening angle steel is L63 angle steel.
Method above-mentioned, wherein the material of the bearing diagonal block angle steel is L63 angle steel.
After adopting the above technical scheme, the stiffened column Formwork Installation Method of the present invention has the following advantages:
1, mould plate supporting device selve support intensity is good, and stiffened column concrete architecture quality and impression quality are outstanding;
2, template installation, convenient disassembly, construction efficiency are high;
3, stiffened column perpendicularity deviation is can be controlled in 3mm.
Description of the drawings
Fig. 1 is the stiffened column formwork support structure schematic diagram of the embodiment of the present invention;
Fig. 2 is that the stiffened column shuttering supporting of the embodiment of the present invention installs sectional view;
Fig. 3 is the stiffened column mould plate supporting device sectional view of the embodiment of the present invention.
In figure:1 mould plate supporting device steel plate, 2 reinforcing angles, 3 bolt fastening angle steel, 4 fastening bolts, 5 stiffened column steel Muscle, 6 stiffened column concrete, 7 stiffened column H profile steels, 8 bearing diagonal block angle steel, 9 bearing diagonal steel pipes, 10 the 2nd steel bar ends, 11 the 1st steel Muscle head, 12 flitches, 13 bolt mandrils.
Specific implementation mode
With reference to embodiments and its attached drawing illustrates further the present invention.
Embodiment 1
The stiffened column Formwork Installation Method of the present invention is used for following construction technology process:
(1)High-rise building construction in layer, stiffened column are made of formed steel construction and high strength reinforced concrete;
(2)When stiffened column is constructed, steel structure hoisting, rear progress outer reinforcement binding are first carried out;Stiffened column H profile steel structure is pacified Dress;
(3)Stiffened column mould plate supporting device is installed, is fastened by bolt between two halves;Bottom is clamped on by flitch Reserved steel bar end;The steel bar end that top is reserved by scaffold tubes, bearing diagonal to floor;
(4)Carry out stiffened column structure concrete placings;
(5)Structure maintenance is carried out, the clamping flitch of dismounting bearing diagonal scaffold tubes and bottom after intensity is reached;Unclamp template branch Support arrangement fastening bolt is removed and is completed;
(6)Mould plate supporting device removing surface is carried out, in case needed for last layer structure construction.
It is the stiffened column formwork support structure schematic diagram of the embodiment of the present invention referring now to Fig. 1-3, Fig. 1, Fig. 2 is the present invention The stiffened column shuttering supporting of embodiment installs sectional view, and Fig. 3 is the stiffened column mould plate supporting device sectional view of the embodiment of the present invention.
The stiffened column Formwork Installation Method of the present invention, it is characterised in that include the following steps:
A, stiffened column template framework is made
According to stiffened column interface dimensions, stiffened column template framework is made, stiffened column template framework is 4mm template branch by thickness The cutting of support arrangement steel plate 1, is welded at assembly, and the width of stiffened column template framework is consistent with stiffened column interface dimensions, height It should be highly consistent with stiffened column;Stiffened column template framework is made of two halves, and four corner angle of stiffened column template framework are respectively set 4 L50 reinforcing angle 2 of the root from stiffness column bottom to top carries out reinforcement of weld, increases intensity;
B, stiffened column template framework connector is set
Stiffened column template framework divides two halves to carry out field assembly, the elongated welding L63 bolt fastenings angle at two halves docking Steel 3, and the bolt hole that two spacing are 100mm is bored, it is 300mm per a pair of bolt hole spacing, is fastened by installing fastening bolt 4 It tightens;On the lateral surface of stiffened column template framework, being equivalent to weld length at four lateral distances top 500mm of stiffened column is The bearing diagonal block angle steel 8 of the L63 angle steel of 100mm;
C, in-site installation stiffened column template framework
In-site installation stiffened column template framework is set in the infrastructure concrete placings of stiffened column in stiffened column four direction The steel bar end that height is 50mm, a diameter of 20mm is set, steel bar end is perpendicular to ground;1st steel bar end 11 is arranged in pairs in distance At the 100mm of stiffened column side, the 2nd steel bar end 10 is arranged in pairs at the 2000mm of stiffened column side;
D, the support member of stiffened column template framework is installed
It is installed in place in stiffened column template framework, after installation bolt fastening, by flitch 12 by stiffened column template framework Wedging between bottom and the 1st steel bar end 11;Top is withstood on by the oblique branch being welded in advance on the outside of device by bearing diagonal steel pipe 9 again On spacer block angle steel 8, the 2nd steel bar end 10 of ground is withstood in the bottom of bearing diagonal steel pipe, by spiral ejection pin 13 by bearing diagonal steel pipe It holds out against, there is support force, complete the installation of stiffness column template.
The present invention has substantive distinguishing features and significant technological progress, and stiffened column Formwork Installation Method of the invention is due to thing First according to the prefabricated stiffness column template of column interface dimensions, implement stiffened column template assembly at the scene, therefore group is short to the time, efficiency It is high.
The stiffened column Formwork Installation Method of the present invention is built in the constructing device and construction method in the Xiamen centers Guo Jin high level It builds in engineering and is applied.The high building project is located at Xiamen City prosperity location, belongs to City complex mega project, 24341 ㎡ of project occupation of land area, overall floorage reach 138.5m up to 251618 ㎡, building height.The engineering Core Walls Structure uses strength Property rod structure, be made of the welding shaped steel of H600 × 300 × 18 × 25 and C70 strong concretes.Concrete construction at high placement rate mixes Solidifying soil internal structure quality and external impression quality require higher.
The gold centric construction proj ect main structure construction of Xiamen state uses construction in layer, after the completion of steel construction successively lifts, peace Decking fittable slackening device, because the device is in advance according to the prefabricated on-site consolidation device of column interface dimensions, therefore group is to the time It is short, efficient.After device group is to installation is complete, you can carry out floor plates bottom shuttering supporting scaffold construction.And the device is The hard protection of rigidity, impression quality is fabulous after form removal, corner angle are clearly demarcated, the mass defects such as pore-free;When recycling, applied on the inside of device Lubricating oil is smeared, form removal is rapider, perception is more excellent.
Above example is used for illustrative purposes only rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution should also belong to scope of the invention, should be limited by each claim.

Claims (4)

1. a kind of stiffened column Formwork Installation Method, it is characterised in that include the following steps:
A, stiffened column template framework is made
According to stiffened column interface dimensions, stiffened column template framework is made, stiffened column template framework is filled by thickness for 4mm shuttering supportings Set steel plate(1)Cutting, is welded at assembly, and the width of stiffened column template framework is consistent with stiffened column interface dimensions, and height is answered It is highly consistent with stiffened column;Stiffened column template framework is made of two halves, and four corner angle of stiffened column template framework are respectively set 4 Reinforcing angle from stiffness column bottom to top(2)Reinforcement of weld is carried out, intensity is increased;
B, stiffened column template framework connector is set
Stiffened column template framework divides two halves to carry out field assembly, the elongated weld bolt fastening angle steel at two halves docking(3), and The bolt hole that several spacing are 100mm is bored, is 300mm per a pair of bolt hole spacing, by installing fastening bolt(4)Fastening is twisted Tightly;On the lateral surface of stiffened column template framework, being equivalent to weld length at four lateral distances top 500mm of stiffened column is The bearing diagonal block angle steel of the angle steel of 100mm(8);
C, in-site installation stiffened column template framework
In-site installation stiffened column template framework is arranged high in the infrastructure concrete placings of stiffened column in stiffened column four direction Degree is the steel bar end of 50mm, a diameter of 20mm, and steel bar end is perpendicular to ground;1st steel bar end(11)It is arranged in pairs apart from strength At property column side 100mm, the 2nd steel bar end(10)It is arranged in pairs at the 2000mm of stiffened column side;
D, the support member of stiffened column template framework is installed
It is installed in place, after installation bolt fastening in stiffened column template framework, passes through flitch(12)By the bottom of stiffened column template framework Portion and the 1st steel bar end(11)Between wedging;Pass through bearing diagonal steel pipe again(9)By top withstand in advance be welded on it is oblique on the outside of device Support limit stop angle steel(8)On, the 2nd steel bar end of ground is withstood in the bottom of bearing diagonal steel pipe(10), pass through spiral ejection pin(13)It will be oblique Supporting steel pipe is held out against, and has support force.
2. stiffened column Formwork Installation Method as described in claim 1, which is characterized in that the reinforcing angle(2)Material be L50 angle steel.
3. stiffened column Formwork Installation Method as described in claim 1, which is characterized in that the bolt fastening angle steel(3)'s Material is L63 angle steel.
4. stiffened column Formwork Installation Method as described in claim 1, which is characterized in that the bearing diagonal block angle steel(8)'s Material is L63 angle steel.
CN201510160033.7A 2015-04-07 2015-04-07 A kind of stiffened column Formwork Installation Method Active CN106150085B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510160033.7A CN106150085B (en) 2015-04-07 2015-04-07 A kind of stiffened column Formwork Installation Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510160033.7A CN106150085B (en) 2015-04-07 2015-04-07 A kind of stiffened column Formwork Installation Method

Publications (2)

Publication Number Publication Date
CN106150085A CN106150085A (en) 2016-11-23
CN106150085B true CN106150085B (en) 2018-07-13

Family

ID=57337699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510160033.7A Active CN106150085B (en) 2015-04-07 2015-04-07 A kind of stiffened column Formwork Installation Method

Country Status (1)

Country Link
CN (1) CN106150085B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106738233B (en) * 2016-12-19 2022-12-16 席成松 Cast-in-place post of concrete and well hole assembling die and concrete mould
CN109098438B (en) * 2018-09-13 2024-04-12 北京城建十六建筑工程有限责任公司 Template for large beam column irrigation
CN110778123B (en) * 2019-11-11 2021-08-27 福建省福乾建设发展有限公司 Concrete reinforcement binding construction method
CN111622499A (en) * 2020-05-15 2020-09-04 中亿丰建设集团股份有限公司 Combined template for stiff steel column and construction method thereof
CN111927091A (en) * 2020-08-17 2020-11-13 中国十七冶集团有限公司 Self-bearing template assembly device and fixing method for large-volume H-shaped steel concrete column

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2367690Y (en) * 1999-05-26 2000-03-08 中国建筑一局第四建筑公司模板架料租赁分公司 Section-adjustable rectangular column formboard
CN202347845U (en) * 2011-08-31 2012-07-25 上海宝冶集团有限公司 Sized combined steel mould for pouring concrete column
CN102979300A (en) * 2012-11-19 2013-03-20 中国核工业华兴建设有限公司 Section-adjustable rectangular column framework assembly
CN103334586A (en) * 2013-06-09 2013-10-02 福建省二建建设集团有限公司 Wood or bamboo template beam-column joint and crossing-beam joint supporting structure and method
CN103334585A (en) * 2013-06-09 2013-10-02 福建省二建建设集团有限公司 Assembling structure for beam/column with wood or bamboo template, and assembling method thereof
CN105926936A (en) * 2016-06-14 2016-09-07 中国建筑第五工程局有限公司 Fabricated section-adjustable formwork system for square stiff pillars and construction method of fabricated section-adjustable formwork system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2367690Y (en) * 1999-05-26 2000-03-08 中国建筑一局第四建筑公司模板架料租赁分公司 Section-adjustable rectangular column formboard
CN202347845U (en) * 2011-08-31 2012-07-25 上海宝冶集团有限公司 Sized combined steel mould for pouring concrete column
CN102979300A (en) * 2012-11-19 2013-03-20 中国核工业华兴建设有限公司 Section-adjustable rectangular column framework assembly
CN103334586A (en) * 2013-06-09 2013-10-02 福建省二建建设集团有限公司 Wood or bamboo template beam-column joint and crossing-beam joint supporting structure and method
CN103334585A (en) * 2013-06-09 2013-10-02 福建省二建建设集团有限公司 Assembling structure for beam/column with wood or bamboo template, and assembling method thereof
CN105926936A (en) * 2016-06-14 2016-09-07 中国建筑第五工程局有限公司 Fabricated section-adjustable formwork system for square stiff pillars and construction method of fabricated section-adjustable formwork system

Also Published As

Publication number Publication date
CN106150085A (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN106150085B (en) A kind of stiffened column Formwork Installation Method
CN105888108B (en) Built-in positioning prefabricated component reinforced concrete shear wall and construction method
CN108505433B (en) Pier structure and construction method thereof
CN107964948B (en) Super-large-diameter assembled hollow pile and splicing method thereof
CN108561156B (en) Separated tunnel arch-changing supporting structure and construction method thereof
CN102619331B (en) Once molding construction method of beam-type conversion layer of high-rise building by steel pipe supporting and laminated pouring
CN110439125B (en) Beam joint template process
KR101227099B1 (en) Hybrid Column Composed of Centrifugal Concrete Cylinder with Steel Skeleton & Steel Bars
WO2020098278A1 (en) Super-large load bearing capacity wall-attached system for integrated scaffolding and formwork equipment with steel platform, and construction method therefor
CN103603494B (en) A kind of ultra-thin steel truss sloping core construction method and formwork structure
CN112502714B (en) Assembled shaft barrel structure and design and construction method
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN111395356A (en) Prestressed anchor cable assembly type steel waist beam and construction method thereof
CN214993171U (en) Bridge bent cap construction is with assembled sectional shelf-unit platform
CN213951970U (en) Pier stud template
CN106320183A (en) Assembly type bent cap formwork system
CN212866842U (en) Frame structure type building scaffold
CN210917394U (en) Foundation pit support pile
CN109972536B (en) Construction method of hollow slab beam reinforcing and strengthening structure
CN112252197A (en) Pier column template and pier column construction method
CN104947804B (en) A kind of steel bracket and the construction method that beam-column node structure is built using it
CN114622492B (en) Ultrahigh hollow thin-wall pier large-section diaphragm plate and construction method
CN103132640A (en) Detachable steel-concrete composite floor
CN214739867U (en) Assembled detachable steel bar truss floor support plate template system
CN108930406A (en) Construction method for large-formwork narrow-space wall based on integral assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant