CN106149575A - Prestress rope tensioning system and method - Google Patents

Prestress rope tensioning system and method Download PDF

Info

Publication number
CN106149575A
CN106149575A CN201610700587.6A CN201610700587A CN106149575A CN 106149575 A CN106149575 A CN 106149575A CN 201610700587 A CN201610700587 A CN 201610700587A CN 106149575 A CN106149575 A CN 106149575A
Authority
CN
China
Prior art keywords
stretch
draw
steel wire
anchor slab
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610700587.6A
Other languages
Chinese (zh)
Inventor
李兴华
吴刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201610700587.6A priority Critical patent/CN106149575A/en
Publication of CN106149575A publication Critical patent/CN106149575A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0237Increasing or restoring the load-bearing capacity of building construction elements of storey floors

Abstract

The invention discloses a kind of prestress rope tensioning system, including the anchor slab being fixed in architecture to be reinforced by bar planting, anchor slab side is provided with stretch-draw support;Also including the many main thread bars being parallel to each other, main thread bar one end connects screw shell, screw shell connecting steel wire ropes;After the main thread bar other end passes the perforate being located on anchor slab, fixed by anchoring nut, and branch sleeve is set in its end, branch sleeve auxiliary connection threaded rod one end, the deputy thread bar other end passes stretch-draw support, and is fixed on stretch-draw stent outer by tensioning nut;It is additionally provided with force transducer between tensioning nut and stretch-draw support.Many steel wire ropes can be anchored by one piece of anchor slab, substantially increase the reinforcing efficiency to existing structure and effect.

Description

Prestress rope tensioning system and method
Technical field
The present invention relates to civil engineering field, specifically a kind of prestress rope tensioning system and method.
Background technology
Due to material aging, construction quality, nature or the impact of the factor such as artificial, existing a lot of bridge houses cored slab Structure is anxious to be repaired and reinforces, and countries in the world will expend huge fund every year for this.Existing structure reinforcement technique mainly has increase to cut Face method, reinforcement by sticking of sheets, stickup fibrous composite method for strengthening, setting support method for strengthening, steel strand wires mesh sheet-polymer mortar add Gu method etc..Existing reinforcement means is primarily present problems with: there is Stress resort effect between (1) reinforcement material and original component, Cooperation ability is poor, largely effects on consolidation effect;(2) reinforcement material end anchorage length is inadequate, easily finds anchored end Stripping damage, it is impossible to give full play to the strength of materials;(3) increase the sectional dimension of original component, increase deadweight, impact sight and Use.And prestress rope reinforcement technique is a kind of extraordinary reinforcement technique, there is actively reinforcing, unstressed delayed effect Answer, nothing is peeled off problem, and is not increased the sectional dimension of original component.But the stretch-draw of existing prestress rope reinforcement technique fills Put not mature enough with method, exist in engineer applied and use inconvenience, installation difficulty, the problem of inefficiency.Therefore, one it is badly in need of Plant new prestress rope tensioning system and method to solve the problems referred to above.
Summary of the invention
Goal of the invention: in order to overcome the deficiencies in the prior art, the present invention provides a kind of prestress rope stretch-draw System and method.
Technical scheme: for solving above-mentioned technical problem, a kind of prestress rope tensioning system of the present invention, including passing through The anchor slab in architecture to be reinforced is fixed in bar planting, and anchor slab side is provided with stretch-draw support;Also include that many pieces are parallel to each other Main thread bar, main thread bar one end connects screw shell, screw shell connecting steel wire ropes;The main thread bar other end is through being located at anchor After perforate on plate, fixed by anchoring nut, and branch sleeve is set in its end, branch sleeve auxiliary connection threaded rod one End, the deputy thread bar other end passes stretch-draw support, and is fixed on stretch-draw stent outer by tensioning nut;Tensioning nut with Draw and between support, be additionally provided with force transducer.
Wherein, screw shell one end has longitudinal inner thread hole, and the other end has horizontal unthreaded hole, longitudinal inner thread hole For being connected with threaded rod, horizontal unthreaded hole is used for connecting steel wire ropes.
Wherein, after the horizontal unthreaded hole that steel wire penetrating is located on screw shell, its end is extruded anchor head anchoring.
A kind of prestress rope method for stretching, comprises the following steps:
(1) treating to punch in ruggedized construction relevant position, bar planting is being installed;
(2) anchor slab is fixed on by bar planting treats in ruggedized construction;
(3) steel wire rope is after the perforate walking around screw shell, with extruding anchor head anchoring;
(4), after main thread bar is passed the perforate of anchor slab, in the female thread of precession screw shell, and fix with anchoring nut In anchor slab side;
(5) stretch-draw support is against anchor slab side, deputy thread bar through stretch-draw support rear by branch sleeve with above Main thread bar be connected;
(6) respectively force transducer, pad and tensioning nut are sequentially arranged on deputy thread bar;
(7) tensioning nut is tightened with instrument, to steel wire rope Shi Hanzhang, until the reading of force transducer reaches design Pulling force;
(8) tighten anchoring nut, complete the stretch-draw to steel wire rope;
(9) it is repeated in the 3rd to the 8th step, completes installation and the stretch-draw of all steel wire ropes;
(10) tensioning nut, pad, force transducer, branch sleeve, deputy thread bar and stretch-draw support are finally unloaded.
Beneficial effect: a kind of prestress rope tensioning system of the present invention and method, has the advantages that
1, many steel wire ropes can be anchored by one piece of anchor slab, substantially increase the reinforcing efficiency to existing structure and effect Really;
2, just can be realized steel wire rope Shi Hanzhang by rotation tensioning nut, and reach control by controlling torsion The stretching force of steel wire rope processed, constructs convenient, it is not necessary to main equipment, and cable tensios control precision is high;
3, tensioning nut, pad, force transducer, branch sleeve and stretch-draw support are all detachable and reuse, great Liang Jie About reinforcement cost, and easy to use, feature simply, rapidly and efficiently is installed.
Accompanying drawing explanation
Fig. 1 is the unitary construction figure of prestress rope tensioning system of the present invention;
Fig. 2 is the stretch-draw support top view of prestress rope tensioning system of the present invention;
Fig. 3 is the stretch-draw bracket side view of prestress rope tensioning system of the present invention;
Fig. 4 is the anchor slab top view of prestress rope tensioning system of the present invention;
Fig. 5 is the anchor slab side view of prestress rope tensioning system of the present invention;
In figure: 1-anchor slab, 2-bar planting, 3-steel wire rope, 4-screw shell, 5-extrudes anchor head, 6-main thread bar, and 7-stretch-draw is propped up Frame, 8-branch sleeve, 9-force transducer, 10-pad, 11-anchors nut, 12-tensioning nut, and 13-treats ruggedized construction, and 14-is secondary Threaded rod.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is further described.
Prestress rope tensioning system as shown in Figures 1 to 5, including being arranged on the bar planting 2 treated in ruggedized construction 13; Anchor slab 1 is fixed on by bar planting 2 to be treated in ruggedized construction 13;Steel wire rope 3 is after the perforate walking around screw shell 4, with extruding anchor head 5 Anchoring;Main thread bar 6 one end is connected by female thread with screw shell 4, after the other end passes the perforate of anchor slab 1, with anchoring spiral shell Female 11 fix;Stretch-draw support 7 is against the both sides of anchor slab 2, and deputy thread bar 14 passes through branch sleeve after the perforate of stretch-draw support 7 8 are connected with main thread bar 6;Force transducer 9, pad 10 and tensioning nut 12 are sequentially arranged on deputy thread bar 14.Extruding anchor head 5 Made by soft material, inside have hole, after steel wire rope 3 passes extruding anchor head 5, extrude described extruding anchor head 5 with instrument, reach The purpose of anchoring steel wire rope 3, steel wire rope 3 other end is anchored to be treated other positions of ruggedized construction or is anchored at other structures On.Screw shell 4 one end has longitudinal inner thread hole, and the other end has horizontal unthreaded hole, and longitudinal inner thread hole is used for and spiral shell Rasp bar 6 connects, and horizontal unthreaded hole is used for connecting steel wire ropes 3.Tensioning nut 12 can be tightened with instrument, executes steel wire rope 3 Prestressing, and the purpose of the stretching force of steel wire rope 3 is reached to control by controlling the torsion of instrument.
The present invention also provides for a kind of prestress rope method for stretching, comprises the following steps:
(1) treating to punch in ruggedized construction 13 relevant position, bar planting 2 is being installed;
(2) anchor slab 1 is fixed on by bar planting 2 treats in ruggedized construction 13;
(3) steel wire rope 3 is after walking around the horizontal unthreaded hole of screw shell 4, anchors with extruding anchor head 5;
(4) by main thread bar 6 through after the perforate of anchor slab 1, in the female thread of precession screw shell 5, main thread bar 6 another One end anchoring nut 11 is fixed;
(5) stretch-draw support 7 is against the side of anchor slab 1, and deputy thread bar 6 passes through to connect after the perforate of stretch-draw support 7 Sleeve 8 is connected with main thread bar 6;
(6) respectively force transducer 9, pad 10 and tensioning nut 12 are sequentially arranged on deputy thread bar 14;
(7) tensioning nut 12 is tightened with instrument, to steel wire rope 3 Shi Hanzhang, until the reading of force transducer 9 reaches to set Meter stretching force;
(8) tighten anchoring nut 11, complete the stretch-draw to this root steel wire rope;
(9) it is repeated in the 3rd to the 8th step, completes installation and the stretch-draw of all steel wire ropes;
(10) tensioning nut 12, pad 10, force transducer 9, branch sleeve 8 and stretch-draw support 7 are finally unloaded.
The above is only the preferred embodiment of the present invention, it should be pointed out that: for the ordinary skill people of the art For Yuan, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (4)

1. a prestress rope tensioning system, it is characterised in that: include being fixed in architecture to be reinforced by bar planting Anchor slab, is provided with stretch-draw support in anchor slab side;Also including the many main thread bars being parallel to each other, main thread bar one end connects spiral shell Stricture of vagina sleeve, screw shell connecting steel wire ropes;After the main thread bar other end passes the perforate being located on anchor slab, solid by anchoring nut Fixed, and branch sleeve is set in its end, branch sleeve auxiliary connection threaded rod one end, the deputy thread bar other end props up through stretch-draw Frame, and it is fixed on stretch-draw stent outer by tensioning nut;It is additionally provided with force transducer between tensioning nut and stretch-draw support.
Prestress rope tensioning system the most according to claim 1, it is characterised in that: wherein, screw shell one end is opened Having longitudinal inner thread hole, the other end has horizontal unthreaded hole, and longitudinal inner thread hole is used for being connected with threaded rod, horizontal non-threaded Hole is used for connecting steel wire ropes.
Prestress rope tensioning system the most according to claim 2, it is characterised in that: wherein, steel wire penetrating is located at After horizontal unthreaded hole on screw shell, its end is extruded anchor head anchoring.
4. a prestress rope method for stretching, it is characterised in that comprise the following steps:
(1) treating to punch in ruggedized construction relevant position, bar planting is being installed;
(2) anchor slab is fixed on by bar planting treats in ruggedized construction;
(3) steel wire rope is after the perforate walking around screw shell, with extruding anchor head anchoring;
(4), after main thread bar is passed the perforate of anchor slab, in the female thread of precession screw shell, and it is fixed on anchor with anchoring nut Plate side;
(5) stretch-draw support being against anchor slab side, deputy thread bar passes through branch sleeve and main spiral shell above after stretch-draw support Rasp bar is connected;
(6) respectively force transducer, pad and tensioning nut are sequentially arranged on deputy thread bar;
(7) tensioning nut is tightened with instrument, to steel wire rope Shi Hanzhang, until the reading of force transducer reaches to design stretch-draw Power;
(8) tighten anchoring nut, complete the stretch-draw to steel wire rope;
(9) it is repeated in the 3rd to the 8th step, completes installation and the stretch-draw of all steel wire ropes;
(10) tensioning nut, pad, force transducer, branch sleeve, deputy thread bar and stretch-draw support are finally unloaded.
CN201610700587.6A 2016-08-22 2016-08-22 Prestress rope tensioning system and method Pending CN106149575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610700587.6A CN106149575A (en) 2016-08-22 2016-08-22 Prestress rope tensioning system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610700587.6A CN106149575A (en) 2016-08-22 2016-08-22 Prestress rope tensioning system and method

Publications (1)

Publication Number Publication Date
CN106149575A true CN106149575A (en) 2016-11-23

Family

ID=57342118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610700587.6A Pending CN106149575A (en) 2016-08-22 2016-08-22 Prestress rope tensioning system and method

Country Status (1)

Country Link
CN (1) CN106149575A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951428A (en) * 2018-08-30 2018-12-07 湖北科技学院 A kind of bridge prestress tensioning equipment
CN109853853A (en) * 2019-02-15 2019-06-07 广东庆余堂建筑科技有限公司 A kind of prestress wire anchor
CN112962977A (en) * 2021-03-17 2021-06-15 安徽工业大学 Intelligent adjusting device and method for tension consistency of steel wire rope

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86209683U (en) * 1986-11-29 1987-11-11 付敏华 Prestressed stretching device suitable for box steel beam
CN2583360Y (en) * 2002-11-18 2003-10-29 新汶矿业集团有限责任公司汶南煤矿 Prestressed steel rope roofbolt
JP2003328561A (en) * 2002-05-14 2003-11-19 Dps Bridge Works Co Ltd Reinforcing method for concrete member and tensioning device for tendon used therein
KR100653629B1 (en) * 2006-01-18 2006-12-05 한국건설기술연구원 Jack apparatus for near surface mounted reinforcements
CN102561210A (en) * 2012-01-17 2012-07-11 武汉大学 Carbon fiber bar in-vitro prestressed tensioning device and using method thereof
CN102808517A (en) * 2012-08-27 2012-12-05 郑州大学 Pre-stress applying device for fiber reinforced polymer (FRP) bars outside reinforced concrete slab
CN104074368A (en) * 2014-06-27 2014-10-01 湖南省交通科学研究院 Concrete structure reinforcing method, self-anchored prestress assembly, assembled tensioning assembly
CN206052574U (en) * 2016-08-22 2017-03-29 东南大学 Prestress rope tensioning system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86209683U (en) * 1986-11-29 1987-11-11 付敏华 Prestressed stretching device suitable for box steel beam
JP2003328561A (en) * 2002-05-14 2003-11-19 Dps Bridge Works Co Ltd Reinforcing method for concrete member and tensioning device for tendon used therein
CN2583360Y (en) * 2002-11-18 2003-10-29 新汶矿业集团有限责任公司汶南煤矿 Prestressed steel rope roofbolt
KR100653629B1 (en) * 2006-01-18 2006-12-05 한국건설기술연구원 Jack apparatus for near surface mounted reinforcements
CN102561210A (en) * 2012-01-17 2012-07-11 武汉大学 Carbon fiber bar in-vitro prestressed tensioning device and using method thereof
CN102808517A (en) * 2012-08-27 2012-12-05 郑州大学 Pre-stress applying device for fiber reinforced polymer (FRP) bars outside reinforced concrete slab
CN104074368A (en) * 2014-06-27 2014-10-01 湖南省交通科学研究院 Concrete structure reinforcing method, self-anchored prestress assembly, assembled tensioning assembly
CN206052574U (en) * 2016-08-22 2017-03-29 东南大学 Prestress rope tensioning system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951428A (en) * 2018-08-30 2018-12-07 湖北科技学院 A kind of bridge prestress tensioning equipment
CN109853853A (en) * 2019-02-15 2019-06-07 广东庆余堂建筑科技有限公司 A kind of prestress wire anchor
CN112962977A (en) * 2021-03-17 2021-06-15 安徽工业大学 Intelligent adjusting device and method for tension consistency of steel wire rope

Similar Documents

Publication Publication Date Title
CN105863145B (en) Beam-string structure, beam string and building
CN106149575A (en) Prestress rope tensioning system and method
CN104533018A (en) Prestress tensioning anchorage device for FRP (Fiber Reinforce Plastic) ribs
CN109653531A (en) A kind of external prestressing steel strand connector and mating tensioning equipment
JP4920621B2 (en) Shape memory alloy turnbuckle and rod axial force introduction method using the same
CN206052574U (en) Prestress rope tensioning system
CN106320191A (en) Pre-tensioning steel wire and polymer mortar externally-added layer reinforcing device
CN209760863U (en) External prestress steel strand connector and matched tensioning device
CN208857720U (en) A kind of prestressing force metal composite muscle reinforcement bridge structure
CN110387805A (en) A kind of novel pre-stressed stayed structure based on marmem
CN104963300B (en) A kind of external prestressing multi-point-anchoring reinforcement means of bridge structure
CN109750599B (en) Slow-bonding low-retraction prestressed short cable system and calculation and tensioning methods
CN104805841B (en) A kind of prestressed FRP rebar anchor pole anchor head
CN106121268B (en) The system and method for prestress rope integrative consolidation slab column
CN205557349U (en) Device is changed to jib
CN204385941U (en) Prestressing force buckling restrained brace
CN106436587A (en) Chain link type automatic synchronous tensioning system and method for prestressed wire ropes
CN107100091A (en) The method of prestress steel twist gauze polymer mortar reinforced steel concrete ribbed arch bridge
CN204357005U (en) Pre-stress FRP bar stretching and anchoring device
CN107893538B (en) Tensioning method of in-vivo prestressed glued wood beam
CN206071086U (en) The system of prestress rope integrative consolidation slab column
CN104806031A (en) Wood structure reinforcement construction method
CN106223213B (en) The system and method for inside and outside combination type prestressed wire cable strengthening cored slab
CN206070397U (en) The system of inside and outside combination type prestressed wire cable strengthening cored slab
CN206173820U (en) Push -pull system is opened to endless chain formula prestressed wire rope automatic synchronization

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123