CN206052574U - Prestress rope tensioning system - Google Patents

Prestress rope tensioning system Download PDF

Info

Publication number
CN206052574U
CN206052574U CN201620921015.6U CN201620921015U CN206052574U CN 206052574 U CN206052574 U CN 206052574U CN 201620921015 U CN201620921015 U CN 201620921015U CN 206052574 U CN206052574 U CN 206052574U
Authority
CN
China
Prior art keywords
tensioning
steel wire
anchor slab
nut
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620921015.6U
Other languages
Chinese (zh)
Inventor
李兴华
吴刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201620921015.6U priority Critical patent/CN206052574U/en
Application granted granted Critical
Publication of CN206052574U publication Critical patent/CN206052574U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of prestress rope tensioning system, including the anchor slab being fixed in architecture to be reinforced by bar planting, is provided with tensioning support in anchor slab side;Also include many main thread bars being parallel to each other, main thread bar one end connection screw thread sleeve, screw shell connecting steel wire ropes;The main thread bar other end is through after the perforate on anchor slab, fixed by bolt-nut, and branch sleeve, branch sleeve auxiliary connection threaded rod one end are set in its end, the deputy thread bar other end passes through tensioning support, and is fixed on tensioning stent outer by tensioning nut;Force transducer is additionally provided between tensioning nut and tensioning support.Many steel wire ropes can be anchored by one piece of anchor slab, the reinforcing efficiency to existing structure and effect is substantially increased.

Description

Prestress rope tensioning system
Technical field
This utility model is related to civil engineering field, specifically a kind of prestress rope tensioning system.
Background technology
Due to the impact of material aging, construction quality, nature or the factor such as artificial, existing many bridge houses cored slab Structure is suddenly to be repaired and reinforces, and countries in the world will expend huge fund every year for this.Existing structure reinforcement technique mainly has increase to cut Face method, reinforcement by sticking of sheets, stickup fibrous composite method for strengthening, setting support method for strengthening, steel strand wires mesh sheet-polymer mortar add Gu method etc..Existing reinforcement means is primarily present problems with:(1) there is Stress resort effect between reinforcement material and original component, Cooperation ability is poor, largely effects on consolidation effect;(2) reinforcement material end anchorage length not enough, easily finds anchored end Stripping damage, it is impossible to give full play to the strength of materials;(3) increase the sectional dimension of original component, increase deadweight, affect sight and Use.And prestress rope reinforcement technique is a kind of extraordinary reinforcement technique, with active reinforcing, unstressed delayed effect Should, without stripping problem, and do not increase the sectional dimension of original component.But the tensioning of existing prestress rope reinforcement technique is filled Put not mature enough with method, there is a problem of in engineer applied using inconvenience, installation difficulty, inefficiency.Therefore, it is badly in need of one Plant new prestress rope tensioning system to solve the above problems.
Utility model content
Goal of the invention:In order to overcome the deficiencies in the prior art, this utility model to provide a kind of prestress rope Tensioning system.
Technical scheme:For solve above-mentioned technical problem, a kind of prestress rope tensioning system of the present utility model, including The anchor slab being fixed in architecture to be reinforced by bar planting, is provided with tensioning support in anchor slab side;It is also mutually flat including many Capable main thread bar, main thread bar one end connection screw thread sleeve, screw shell connecting steel wire ropes;The main thread bar other end is passed through and is set After the perforate on anchor slab, fixed by bolt-nut, and branch sleeve, branch sleeve auxiliary connection threaded rod are set in its end One end, the deputy thread bar other end pass through tensioning support, and are fixed on tensioning stent outer by tensioning nut;Tensioning nut with Force transducer is additionally provided between tensioning support.
Wherein, screw shell one end is provided with longitudinal inner thread hole, and the other end is provided with horizontal unthreaded hole, longitudinal inner thread hole For being connected with threaded rod, horizontal unthreaded hole is used for connecting steel wire ropes.
Wherein, after the horizontal unthreaded hole on screw shell, its end is extruded anchor head anchoring to steel wire penetrating.
Beneficial effect:A kind of prestress rope tensioning system of the present utility model, has the advantages that:
1st, many steel wire ropes can be anchored by one piece of anchor slab, substantially increases the reinforcing efficiency to existing structure and effect Really;
2nd, can just realize applying steel wire rope prestressing force by rotating tensioning nut, and by controlling torsion reaching control The stretching force of steel wire rope processed, it is convenient to construct, it is not necessary to main equipment, and cable tensios control high precision;
3rd, tensioning nut, pad, force transducer, branch sleeve and tensioning support are detachable and reuse, great Liang Jie About reinforcement cost, and it is easy to use, install it is simple, rapidly and efficiently the characteristics of.
Description of the drawings
Unitary construction figures of the Fig. 1 for this utility model prestress rope tensioning system;
Tensioning support top views of the Fig. 2 for this utility model prestress rope tensioning system;
Tensioning support side views of the Fig. 3 for this utility model prestress rope tensioning system;
Anchor slab top views of the Fig. 4 for this utility model prestress rope tensioning system;
Anchor slab side views of the Fig. 5 for this utility model prestress rope tensioning system;
In figure:1- anchor slabs, 2- bar plantings, 3- steel wire ropes, 4- screw shells, 5- extruding anchor heads, 6- main thread bars, 7- tensioning Frame, 8- branch sleeves, 9- force transducers, 10- pads, 11- bolt-nuts, 12- tensioning nuts, 13- treat ruggedized construction, 14- pairs Threaded rod.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is further described.
Prestress rope tensioning system as shown in Figures 1 to 5, including being arranged on the bar planting 2 treated in ruggedized construction 13; Anchor slab 1 is fixed on by bar planting 2 to be treated in ruggedized construction 13;Steel wire rope 3 after the perforate for bypassing screw shell 4, with extruding anchor head 5 Anchoring;6 one end of main thread bar is connected by female thread with screw shell 4, after the other end passes through the perforate of anchor slab 1, with anchoring spiral shell Female 11 fix;Tensioning support 7 is against the both sides of anchor slab 2, and deputy thread bar 14 passes through branch sleeve through after the perforate of tensioning support 7 8 are connected with main thread bar 6;Force transducer 9, pad 10 and tensioning nut 12 are sequentially arranged on deputy thread bar 14.Extruding anchor head 5 Made by soft material, be inside provided with hole, steel wire rope 3 with the instrument extruding extruding anchor head 5, is reached through after extruding anchor head 5 The purpose of anchoring steel wire rope 3,3 other end of steel wire rope are anchored at other positions for treating ruggedized construction or are anchored at other structures On.4 one end of screw shell is provided with longitudinal inner thread hole, and the other end is provided with horizontal unthreaded hole, and longitudinal inner thread hole is used for and spiral shell Rasp bar 6 connects, and horizontal unthreaded hole is used for connecting steel wire ropes 3.Tensioning nut 12 can be tightened with instrument, to apply to steel wire rope 3 Prestressing, and by control instrument torsion come reach control steel wire rope 3 stretching force purpose.
A kind of prestress rope tensioning system of the present utility model, is implemented by following steps:
(1) punching of 13 relevant position of ruggedized construction is being treated, bar planting 2 is being installed;
(2) anchor slab 1 is fixed on by bar planting 2 and is treated in ruggedized construction 13;
(3) steel wire rope 3 is anchored with extruding anchor head 5 after the horizontal unthreaded hole for bypassing screw shell 4;
(4) by main thread bar 6 through anchor slab 1 perforate after, in the female thread of precession screw shell 5, main thread bar 6 it is another One end bolt-nut 11 is fixed;
(5) tensioning support 7 is against the side of anchor slab 1, deputy thread bar 6 is through after the perforate of tensioning support 7 by connection Sleeve 8 is connected with main thread bar 6;
(6) respectively force transducer 9, pad 10 and tensioning nut 12 are sequentially arranged on deputy thread bar 14;
(7) tensioning nut 12 is tightened with instrument, prestressing force is applied to steel wire rope 3, until the reading of force transducer 9 reaches and sets Meter stretching force;
(8) bolt-nut 11 is tightened, the tensioning to the root steel wire rope is completed;
(9) the 3rd to the 8th step is repeated in, the installation and tensioning of all steel wire ropes is completed;
(10) tensioning nut 12, pad 10, force transducer 9, branch sleeve 8 and tensioning support 7 are finally unloaded.
The above is only preferred implementation of the present utility model, it should be pointed out that:For the common skill of the art For art personnel, on the premise of without departing from this utility model principle, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (3)

1. a kind of prestress rope tensioning system, it is characterised in that:Including being fixed in architecture to be reinforced by bar planting Anchor slab, is provided with tensioning support in anchor slab side;Also include many main thread bars being parallel to each other, main thread bar one end connection spiral shell Stricture of vagina sleeve, screw shell connecting steel wire ropes;The main thread bar other end is through after the perforate on anchor slab, solid by bolt-nut It is fixed, and branch sleeve is set in its end, branch sleeve auxiliary connection threaded rod one end, the deputy thread bar other end are propped up through tensioning Frame, and tensioning stent outer is fixed on by tensioning nut;Force transducer is additionally provided between tensioning nut and tensioning support.
2. prestress rope tensioning system according to claim 1, it is characterised in that:Wherein, screw shell one end is opened Have longitudinal inner thread hole, the other end is provided with horizontal unthreaded hole, longitudinal inner thread hole for being connected with threaded rod, horizontal non-threaded Hole is used for connecting steel wire ropes.
3. prestress rope tensioning system according to claim 2, it is characterised in that:Wherein, steel wire penetrating is located at After horizontal unthreaded hole on screw shell, its end is extruded anchor head anchoring.
CN201620921015.6U 2016-08-22 2016-08-22 Prestress rope tensioning system Active CN206052574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620921015.6U CN206052574U (en) 2016-08-22 2016-08-22 Prestress rope tensioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620921015.6U CN206052574U (en) 2016-08-22 2016-08-22 Prestress rope tensioning system

Publications (1)

Publication Number Publication Date
CN206052574U true CN206052574U (en) 2017-03-29

Family

ID=58384968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620921015.6U Active CN206052574U (en) 2016-08-22 2016-08-22 Prestress rope tensioning system

Country Status (1)

Country Link
CN (1) CN206052574U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149575A (en) * 2016-08-22 2016-11-23 东南大学 Prestress rope tensioning system and method
CN108396969A (en) * 2018-05-11 2018-08-14 中国建筑科学研究院有限公司建筑机械化研究分院 Building structure strengthening steel strand wires mesh sheet tensioning fastening assembly and its application method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149575A (en) * 2016-08-22 2016-11-23 东南大学 Prestress rope tensioning system and method
CN108396969A (en) * 2018-05-11 2018-08-14 中国建筑科学研究院有限公司建筑机械化研究分院 Building structure strengthening steel strand wires mesh sheet tensioning fastening assembly and its application method
CN108396969B (en) * 2018-05-11 2023-08-15 中国建筑科学研究院有限公司建筑机械化研究分院 Steel strand mesh tensioning and fastening assembly for building structure reinforcement and application method thereof

Similar Documents

Publication Publication Date Title
CN105863145B (en) Beam-string structure, beam string and building
CN101922237B (en) Connector-type tensioning and anchoring system of reinforced concrete flexural piece with prestress steel strands
CN102587279B (en) Steel strand finished stay cable and manufacturing method thereof
CN102808517B (en) The prestress application device of the outer FRP muscle of reinforced concrete slab
CN107575257A (en) Anchor tool system and its anchoring process for fibre-reinforced high molecular material bar
CN103321430A (en) Construction method of reinforcing large-span concrete structure with prestressed carbon fiber sheet
CN102936941A (en) Composite pipe concrete composite structure
CN207079491U (en) A kind of anti-bend reinforced device of bridge prestress high-strength steel cord
CN104533018A (en) Prestress tensioning anchorage device for FRP (Fiber Reinforce Plastic) ribs
CN206052574U (en) Prestress rope tensioning system
CN106149575A (en) Prestress rope tensioning system and method
CN105735153A (en) Reinforcement structure for inclined cracks in main girder web plate of box girder bridge and construction method thereof
CN106320191A (en) Pre-tensioning steel wire and polymer mortar externally-added layer reinforcing device
CN106544962B (en) The prestress reinforced construction method of concrete structure
CN208857720U (en) A kind of prestressing force metal composite muscle reinforcement bridge structure
CN105113781B (en) Device is set up in a kind of overhanging complete pre-buried installation in side of setting a roof beam in place
CN101864827A (en) Anchor design of pre-stressed carbon fiber reinforced plastic rib group
CN106638334B (en) A kind of external prestressing strengthening device and its construction method
CN106121268B (en) The system and method for prestress rope integrative consolidation slab column
CN202826546U (en) Composite pipe concrete combination structure
CN205557349U (en) Device is changed to jib
CN206071086U (en) The system of prestress rope integrative consolidation slab column
CN206070397U (en) The system of inside and outside combination type prestressed wire cable strengthening cored slab
CN106223213B (en) The system and method for inside and outside combination type prestressed wire cable strengthening cored slab
CN204385941U (en) Prestressing force buckling restrained brace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant