CN110387805A - A kind of novel pre-stressed stayed structure based on marmem - Google Patents

A kind of novel pre-stressed stayed structure based on marmem Download PDF

Info

Publication number
CN110387805A
CN110387805A CN201910747987.6A CN201910747987A CN110387805A CN 110387805 A CN110387805 A CN 110387805A CN 201910747987 A CN201910747987 A CN 201910747987A CN 110387805 A CN110387805 A CN 110387805A
Authority
CN
China
Prior art keywords
marmem
shape memory
line
reinforcing steel
drag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910747987.6A
Other languages
Chinese (zh)
Inventor
刘琛
倪永军
张雪峰
安昱昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
Original Assignee
Beijing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University filed Critical Beijing Jiaotong University
Priority to CN201910747987.6A priority Critical patent/CN110387805A/en
Publication of CN110387805A publication Critical patent/CN110387805A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/04Cable-stayed bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Abstract

The invention discloses a kind of novel pre-stressed stayed structure based on marmem, including marmem intelligence anchor cable, the marmem intelligence anchor mainly includes shape memory alloy spiral shape drag-line, marmem pipe joint, presstressed reinforcing steel, marmem fixture and spiral bar, the marmem fixture is mainly made of shape memory metal anchoring clamping plate, and shape memory metal anchoring clamping plate is inserted in anchor hole, the presstressed reinforcing steel runs through from shape memory alloy spiral shape drag-line, and presstressed reinforcing steel is connect with memorial alloy helical form drag-line by marmem pipe joint, the present invention uses marmem fixture, marmem pipe joint and shape memory alloy spiral shape drag-line, reduce prestressed loss, improve the span ability of structure, improve the mechanical property of structure, Cracking resistance and durability, the maintenance during making prestressing with bond reinforcing bar then be conducive to structure operation, improve the service life of structure.

Description

A kind of novel pre-stressed stayed structure based on marmem
Technical field
The present invention relates to technical field of bridge engineering, specially a kind of novel pre-stressed drag-line based on marmem Structure.
Background technique
Stress loss is the main problem in prestressed structure and stayed structure.
External prestressing elder generation placing component, then directly applies prestressed method on component.Common practices is mostly first Post-tensioned prestressing muscle and pore-forming bellows, distributing bar and part are disposed, then installation template and concreting.Presstressed reinforcing steel Can first threading also wear later.After equal concrete reach intensity, with jack by tension of prestressed tendon to the stress of requirement, Then with anchor clamp anchor in the both ends of beam, compressive pre-stress is transmitted to concrete members by both ends anchor clamp.
One of the cable-stayed bridge Major Diseases of suspension cable relaxation.Cable slack, it is impossible to which the internal force for bearing original length is bound to The redistribution for causing structural internal force makes structural internal force offset design internal force, accelerates the destruction of suspension cable, influences normally making for bridge With.And bridge serviceability limit stage leads to mainly being influenced by the temperature difference so that suspension cable be made to produce due to suspension cable for cable-stayed bridge relaxation Raw stress relaxation phenomenon.
The above engineering method and equipment its defect are mainly stress loss.Wherein there is mainly the deformation for having stretching end anchorage and answers in advance Loss caused by power muscle retraction;The temperature difference causes the loss of presstressed reinforcing steel and drag-line;Damage caused by deformed bar and cable slack It loses;Loss caused by concrete shrinkage and creep;Loss caused by presstressed reinforcing steel extruded concrete.
Marmem (Shape Memory Alloy, abbreviation SMA) is a kind of to have perception and driving function concurrently Metal material has the unexistent many specific physical mechanical properties of common metal material, mainly has shape memory effect, surpasses Buoyancy effect, damping effect, resistance characteristic also have the excellent characteristics such as intensity is high, plasticity is good, anticorrosive, fatigue life is long. So-called shape memory effect is that the peculiar function of one kind possessed by the alloy of thermoelastic martensitic transformation is presented, that is, at alloy Give plastic deformation when low-temperature phase, is heated to the phenomenon that critical-temperature restores its original-shape above by reverse transformation, referred to as For shape memory effect.
In view of the property of loss of prestress caused by zipper structure and presstressed reinforcing steel and anchor clamp and shape memory alloy material Energy advantage, present patent application propose a kind of novel pre-stressed muscle structure based on marmem.
Summary of the invention
The purpose of the present invention is to provide a kind of novel pre-stressed stayed structure based on marmem, by using Marmem fixture, marmem pipe joint and shape memory alloy spiral shape drag-line, reduce prestressed loss, The span ability for improving structure improves mechanical property, cracking resistance and the durability of structure, makes prestressing with bond reinforcing bar then Be conducive to the maintenance during structure operation, improve the service life of structure.
To achieve the above object, the invention provides the following technical scheme: a kind of novel based on marmem pre- answers Power stayed structure, including marmem intelligence anchor cable, the marmem intelligence anchor mainly include that shape memory closes Golden helical form drag-line, marmem pipe joint, presstressed reinforcing steel, marmem fixture and spiral bar, the shape note Recall alloy fixture to be mainly made of shape memory metal anchoring clamping plate, and shape memory metal anchoring clamping plate is inserted in anchor hole In, the presstressed reinforcing steel runs through from shape memory alloy spiral shape drag-line, and presstressed reinforcing steel and memorial alloy helical form drag-line It is connected by marmem pipe joint, the presstressed reinforcing steel side is equipped with bellows, and the spiral bar is remembered by multiple groups shape Recall alloy helical form drag-line composition, the marmem fixture is used cooperatively with anchor slab in prestressed anchor with anchor plate, The marmem pipe joint is used cooperatively with presstressed reinforcing steel and shape memory alloy spiral shape drag-line.
Marmem intelligence anchor is mainly used shape memory alloy spiral shape drag-line, marmem by the present invention Pipe fitting composition, effectively reduce prestressed loss, improve the span ability of structure, improve structure mechanical property, Cracking resistance and durability improve the service life of structure.
Preferably, the shape memory metal anchoring clamping plate is prepared with -150 DEG C of transformation temperature of TiNiFe alloy, In Tension of prestressed tendon is completed before carrying out tightening operation, by shape memory metal anchoring clamping plate by way of dry ice or immersing in liquid nitrogen Be fully cooled causes intermediate plate to reach normal anchoring clamping plate size, immediately intermediate plate is inserted into anchor hole, temperature recovery After generate irreversible deformation, intermediate plate fastens presstressed reinforcing steel.
Preferably, the marmem pipe joint is prepared with -150 DEG C of transformation temperature of TiNiFe alloy, shape memory Alloy pipe joint internal diameter ratio is small by 4% ~ 5% by adapter tube outer diameter, and marmem pipe joint makes marmem by low temperature raising Helical form drag-line is closely connect with presstressed reinforcing steel.
The present invention prepares marmem pipe joint by using TiNiFe alloy preparation and shape memory metal anchors Intermediate plate makes it have good memory performance, can have good resilience in long-term weighing process.
Preferably, the shape memory alloy spiral shape drag-line is made of CuZnAl alloy wire, the CuZnAl alloy wire Equipped with 6 groups, and CuZnAl alloy wire diameter is 2.5mm, and the shape memory alloy spiral shape drag-line both ends are equipped with crotch, institute Crotch is stated for being connected with marmem pipe joint, the CuZnAl alloy wire is equipped with 7 groups, increases robustness and resists Fragility energy.
Preferably, the shape memory alloy spiral shape drag-line diameter is greater than presstressed reinforcing steel outer diameter, and presstressed reinforcing steel is from shape It is passed through in shape memory alloys helical form drag-line and passes through marmem pipe joint for presstressed reinforcing steel and marmem spiral shell It revolves shape drag-line to be connected, presstressed reinforcing steel and shape memory alloy spiral shape drag-line is condensed.
Preferably, the shape memory alloy spiral shape drag-line original state be a compressive state, when presstressed reinforcing steel due to When there is loss of prestress, its elongation can be caused to have supplemented by way of leading to specific direct current to presstressed reinforcing steel and lost Prestressing force, what the prestressing force of supplement can be effectively protected whole structure uses and provides the service life.
The present invention provides a kind of novel pre-stressed stayed structure based on marmem has following beneficial to effect Fruit:
(1) present invention uses marmem fixture, marmem pipe joint and shape memory alloy spiral shape drag-line, Prestressed loss is reduced, the span ability of structure is improved, improves mechanical property, cracking resistance and the durability of structure, Maintenance during making prestressing with bond reinforcing bar then be conducive to structure operation, improves the service life of structure.
(2) present invention proposes its specific implementation method according to the characteristics of this new structure, i.e., by the later period to SMA anchor Rope member temperature changes to reduce the loss of prestress problem of anchor cable structure, and anchor cable structure can be greatly reduced in this method Loss of prestress problem, and then can realize concrete pre-stress bridge and Cable-Stayed Bridge Structure performance, structure design and construction mode On comprehensive optimization.
Detailed description of the invention
Fig. 1 is marmem intelligence anchor cable structure schematic diagram of the invention;
Fig. 2 is shape memory alloy spiral shape stayed structure schematic diagram of the invention;
Fig. 3 is marmem pipe joint condition of high temperature structural schematic diagram of the invention;
Fig. 4 is marmem pipe joint low-temperature condition structural schematic diagram of the invention.
In figure: 100, shape memory alloy spiral shape drag-line;101, crotch;102, CuZnAl alloy wire;200, shape is remembered Recall alloy pipe joint;300, presstressed reinforcing steel;400, marmem fixture;500, bellows;600, spiral bar;700, anchor pad Plate.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description.
Embodiment 1:
As shown in Figs 1-4, the present invention provides a kind of technical solution: a kind of novel pre-stressed drag-line knot based on marmem Structure, including marmem intelligence anchor cable, the marmem intelligence anchor mainly includes shape memory alloy spiral shape Drag-line 100, marmem pipe joint 200, presstressed reinforcing steel 300, marmem fixture 400 and spiral bar 600, it is described Marmem fixture 400 is mainly made of shape memory metal anchoring clamping plate, and shape memory metal anchoring clamping plate is inserted into In anchor hole, the presstressed reinforcing steel 300 runs through from shape memory alloy spiral shape drag-line 100, and presstressed reinforcing steel 300 and note Recall alloy helical form drag-line 100 to connect by marmem pipe joint 200,300 side of presstressed reinforcing steel is equipped with ripple Pipe 500, the spiral bar 600 are made of multiple groups shape memory alloy spiral shape drag-line 100, the marmem fixture 400 are used cooperatively with anchor slab in prestressed anchor and anchor plate 700, the marmem pipe joint 200 and presstressed reinforcing steel 300 and shape memory alloy spiral shape drag-line 100 be used cooperatively.
Implementation method: shape memory metal anchoring clamping plate is prepared with -150 DEG C of transformation temperature of TiNiFe alloy, In 300 tensioning of presstressed reinforcing steel is completed before carrying out tightening operation, and shape memory metal anchoring clamping plate is passed through dry ice or immersing in liquid nitrogen Mode, which be fully cooled, causes intermediate plate to reach normal anchoring clamping plate size, immediately intermediate plate is inserted into anchor hole, temperature Irreversible deformation is generated after rise, intermediate plate fastens presstressed reinforcing steel 300, the transformation temperature-of marmem pipe joint 200 150 DEG C of TiNiFe alloy preparation, 200 internal diameter ratio of marmem pipe joint is small by 4% ~ 5% by adapter tube outer diameter, and inside pipe wall is simultaneously carved There is screw thread, marmem pipe joint 200 makes shape memory alloy spiral shape drag-line 100 and presstressed reinforcing steel by low temperature raising 300 close connections, shape memory alloy spiral shape drag-line 100 be made of the CuZnAl alloy wire 102 of 6 groups of 2.5mm it is a branch of, in turn It is processed as a shape memory alloy spiral shape drag-line 100,100 both ends of shape memory alloy spiral shape drag-line have crotch 101, for being connected with marmem pipe joint 200,100 diameter of shape memory alloy spiral shape drag-line is greater than crotch 101 300 outer diameter of presstressed reinforcing steel, and presstressed reinforcing steel 300 is passed through from shape memory alloy spiral shape drag-line 100, and passes through shape memory Presstressed reinforcing steel 300 is connected by alloy pipe joint 200 with shape memory alloy spiral shape drag-line 100, shape memory alloy spiral shape 100 original state of drag-line is that a compressive state can be by prestressing force when presstressed reinforcing steel 300 is due to there is loss of prestress The mode that muscle 300 leads to specific direct current causes its elongation to supplement the prestressing force lost.
It should be noted that a kind of novel pre-stressed stayed structure based on marmem, at work, using- 150 DEG C of TiNiFe alloy prepares marmem fixture 400, marmem pipe joint 200 and marmem Helical form drag-line 100 can effectively reduce prestressed loss, improve the span ability of structure, improve the mechanical property of structure Energy, cracking resistance and durability, the maintenance during making prestressing with bond reinforcing bar then be conducive to structure operation, improve making for structure With the service life, the loss of prestress problem of anchor cable structure is reduced to the variation of SMA anchor cable member temperature by the later period, this method can The loss of prestress problem of anchor cable structure can be greatly reduced, and then it can realize concrete pre-stress bridge and Cable-Stayed Bridge Structure Comprehensive optimization on energy, structure design and construction mode.
Embodiment 2:
As shown in Figs 1-4, the present invention provides a kind of technical solution: a kind of novel pre-stressed drag-line knot based on marmem Structure, including marmem intelligence anchor cable, the marmem intelligence anchor mainly includes shape memory alloy spiral shape Drag-line 100, marmem pipe joint 200, presstressed reinforcing steel 300, marmem fixture 400 and spiral bar 600, it is described Marmem fixture 400 is mainly made of shape memory metal anchoring clamping plate, and shape memory metal anchoring clamping plate is inserted into In anchor hole, the presstressed reinforcing steel 300 runs through from shape memory alloy spiral shape drag-line 100, and presstressed reinforcing steel 300 and note Recall alloy helical form drag-line 100 to connect by marmem pipe joint 200,300 side of presstressed reinforcing steel is equipped with ripple Pipe 500, the spiral bar 600 are made of multiple groups shape memory alloy spiral shape drag-line 100, the marmem fixture 400 are used cooperatively with anchor slab in prestressed anchor and anchor plate 700, the marmem pipe joint 200 and presstressed reinforcing steel 300 and shape memory alloy spiral shape drag-line 100 be used cooperatively.
Implementation method: shape memory metal anchoring clamping plate is prepared with -150 DEG C of transformation temperature of TiNiFe alloy, In 300 tensioning of presstressed reinforcing steel is completed before carrying out tightening operation, and shape memory metal anchoring clamping plate is passed through dry ice or immersing in liquid nitrogen Mode, which be fully cooled, causes intermediate plate to reach normal anchoring clamping plate size, immediately intermediate plate is inserted into anchor hole, temperature Irreversible deformation is generated after rise, intermediate plate fastens presstressed reinforcing steel 300, the transformation temperature-of marmem pipe joint 200 150 DEG C of TiNiFe alloy preparation, 200 internal diameter ratio of marmem pipe joint is small by 4% ~ 5% by adapter tube outer diameter, and inside pipe wall is simultaneously carved There is screw thread, marmem pipe joint 200 makes shape memory alloy spiral shape drag-line 100 and presstressed reinforcing steel by low temperature raising 300 close connections, shape memory alloy spiral shape drag-line 100 be made of the CuZnAl alloy wire 102 of 7 groups of 2.5mm it is a branch of, in turn It is processed as a shape memory alloy spiral shape drag-line 100,100 both ends of shape memory alloy spiral shape drag-line have crotch 101, for being connected with marmem pipe joint 200,100 diameter of shape memory alloy spiral shape drag-line is greater than crotch 101 300 outer diameter of presstressed reinforcing steel, and presstressed reinforcing steel 300 is passed through from shape memory alloy spiral shape drag-line 100, and passes through shape memory Presstressed reinforcing steel 300 is connected by alloy pipe joint 200 with shape memory alloy spiral shape drag-line 100, shape memory alloy spiral shape 100 original state of drag-line is that a compressive state can be by prestressing force when presstressed reinforcing steel 300 is due to there is loss of prestress The mode that muscle 300 leads to specific direct current causes its elongation to supplement the prestressing force lost.
It should be noted that a kind of novel pre-stressed stayed structure based on marmem, at work, using- 150 DEG C of TiNiFe alloy prepares marmem fixture 400, marmem pipe joint 200 and marmem Helical form drag-line 100 can effectively reduce prestressed loss, improve the span ability of structure, improve the mechanical property of structure Energy, cracking resistance and durability, the maintenance during making prestressing with bond reinforcing bar then be conducive to structure operation, improve making for structure With the service life, the loss of prestress problem of anchor cable structure is reduced to the variation of SMA anchor cable member temperature by the later period, this method can The loss of prestress problem of anchor cable structure can be greatly reduced, and then it can realize concrete pre-stress bridge and Cable-Stayed Bridge Structure Comprehensive optimization on energy, structure design and construction mode.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of novel pre-stressed stayed structure based on marmem, including marmem intelligence anchor cable, special Sign is that the marmem intelligence anchor mainly includes shape memory alloy spiral shape drag-line (100), marmem Pipe fitting (200), presstressed reinforcing steel (300), marmem fixture (400) and spiral bar (600), the marmem Fixture (400) is mainly made of shape memory metal anchoring clamping plate, and shape memory metal anchoring clamping plate is inserted in anchor hole, The presstressed reinforcing steel (300) is run through from shape memory alloy spiral shape drag-line (100), and presstressed reinforcing steel (300) and memory are closed Golden helical form drag-line (100) is connected by marmem pipe joint (200), and presstressed reinforcing steel (300) side is equipped with wave Line pipe (500), the spiral bar (600) are made of multiple groups shape memory alloy spiral shape drag-line (100), and the shape memory closes Golden fixture (400) is used cooperatively with anchor slab in prestressed anchor and anchor plate (700), the marmem pipe joint (200) it is used cooperatively with presstressed reinforcing steel (300) and shape memory alloy spiral shape drag-line (100).
2. a kind of novel pre-stressed stayed structure based on marmem according to claim 1, it is characterised in that: The shape memory metal anchoring clamping plate is prepared with -150 DEG C of transformation temperature of TiNiFe alloy, in presstressed reinforcing steel (300) It pulls into before carrying out tightening operation, shape memory metal anchoring clamping plate is carried out by way of dry ice or immersing in liquid nitrogen sufficiently cold But cause intermediate plate to reach normal anchoring clamping plate size, immediately intermediate plate is inserted into anchor hole, generating after temperature recovery can not The deformation of reverse, intermediate plate fasten presstressed reinforcing steel (300).
3. a kind of novel pre-stressed stayed structure based on marmem according to claim 1, it is characterised in that: The marmem pipe joint (200) is prepared with -150 DEG C of transformation temperature of TiNiFe alloy, marmem pipe joint (200) internal diameter ratio is small by 4% ~ 5% by adapter tube outer diameter, and marmem pipe joint (200) makes marmem by low temperature raising Helical form drag-line (100) is closely connect with presstressed reinforcing steel (300).
4. a kind of novel pre-stressed stayed structure based on marmem according to claim 1, it is characterised in that: The shape memory alloy spiral shape drag-line (100) is made of CuZnAl alloy wire (102), the CuZnAl alloy wire (102) Equipped with 6 groups, and CuZnAl alloy wire (102) diameter is 2.5mm, and shape memory alloy spiral shape drag-line (100) both ends are equal Equipped with crotch (101), the crotch (101) with marmem pipe joint (200) for being connected.
5. a kind of novel pre-stressed stayed structure based on marmem according to claim 4, it is characterised in that: The CuZnAl alloy wire (102) is equipped with 7 groups.
6. a kind of novel pre-stressed stayed structure based on marmem according to claim 1, it is characterised in that: Shape memory alloy spiral shape drag-line (100) diameter is greater than presstressed reinforcing steel (300) outer diameter, and presstressed reinforcing steel (300) is from shape Passed through in shape memory alloys helical form drag-line (100) and by marmem pipe joint (200) by presstressed reinforcing steel (300) and Shape memory alloy spiral shape drag-line (100) is connected.
7. a kind of novel pre-stressed stayed structure based on marmem according to claim 1, it is characterised in that: Shape memory alloy spiral shape drag-line (100) original state is a compressive state, when presstressed reinforcing steel (300) is pre- due to occurring When stress loss, its elongation can be caused to have supplemented by way of leading to specific direct current to presstressed reinforcing steel (300) and lost Prestressing force.
CN201910747987.6A 2019-08-14 2019-08-14 A kind of novel pre-stressed stayed structure based on marmem Pending CN110387805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910747987.6A CN110387805A (en) 2019-08-14 2019-08-14 A kind of novel pre-stressed stayed structure based on marmem

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910747987.6A CN110387805A (en) 2019-08-14 2019-08-14 A kind of novel pre-stressed stayed structure based on marmem

Publications (1)

Publication Number Publication Date
CN110387805A true CN110387805A (en) 2019-10-29

Family

ID=68288796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910747987.6A Pending CN110387805A (en) 2019-08-14 2019-08-14 A kind of novel pre-stressed stayed structure based on marmem

Country Status (1)

Country Link
CN (1) CN110387805A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112223012A (en) * 2020-11-04 2021-01-15 江苏汇鼎光学眼镜有限公司 Grinding device is used in lens processing
CN113770949A (en) * 2021-09-29 2021-12-10 江苏罡阳股份有限公司 Hole part clamping fixture based on shape memory effect and positioning method
CN115064068A (en) * 2022-06-09 2022-09-16 武汉华星光电半导体显示技术有限公司 Flexible display module and preparation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2595512Y (en) * 2002-12-31 2003-12-31 北京海能海特石油科技发展有限公司 Super hard material and metal substrate material composite body
US20130102190A1 (en) * 2011-10-25 2013-04-25 Robert J. Chastain Coaxial Barrel Fittings and couplings with Ground Establishing Traveling Sleeves
CN204418002U (en) * 2015-01-21 2015-06-24 杨玉芝 The permanent prestressed anchor device of prefabricated units
CN209703305U (en) * 2019-01-28 2019-11-29 广西宏梧高速公路有限公司 Traction cable based on marmem

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2595512Y (en) * 2002-12-31 2003-12-31 北京海能海特石油科技发展有限公司 Super hard material and metal substrate material composite body
US20130102190A1 (en) * 2011-10-25 2013-04-25 Robert J. Chastain Coaxial Barrel Fittings and couplings with Ground Establishing Traveling Sleeves
CN204418002U (en) * 2015-01-21 2015-06-24 杨玉芝 The permanent prestressed anchor device of prefabricated units
CN209703305U (en) * 2019-01-28 2019-11-29 广西宏梧高速公路有限公司 Traction cable based on marmem

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112223012A (en) * 2020-11-04 2021-01-15 江苏汇鼎光学眼镜有限公司 Grinding device is used in lens processing
CN113770949A (en) * 2021-09-29 2021-12-10 江苏罡阳股份有限公司 Hole part clamping fixture based on shape memory effect and positioning method
CN113770949B (en) * 2021-09-29 2022-11-11 江苏罡阳股份有限公司 Hole part clamping fixture based on shape memory effect and positioning method
CN115064068A (en) * 2022-06-09 2022-09-16 武汉华星光电半导体显示技术有限公司 Flexible display module and preparation method thereof
CN115064068B (en) * 2022-06-09 2024-03-19 武汉华星光电半导体显示技术有限公司 Flexible display module and preparation method thereof

Similar Documents

Publication Publication Date Title
CN110387805A (en) A kind of novel pre-stressed stayed structure based on marmem
KR102445949B1 (en) Method for producing prestressed structures and structural parts by means of SMA tension elements, and structure and structural part equipped therewith
CN103321430B (en) Pre-stressed carbon fiber sheet material is reinforced greatly across the construction method of concrete structure
CN107575257A (en) Anchor tool system and its anchoring process for fibre-reinforced high molecular material bar
CN210420905U (en) Seismic damage pier mixed reinforcement structure based on shape memory alloy and carbon fiber cloth
CN109653531B (en) External prestress steel strand connector and matched tensioning device
Jeddi et al. Pull-out performance of a novel anchor blind bolt (TubeBolt) for beam to concrete-filled tubular (CFT) column bolted connections
CN201217777Y (en) Vertical pre-stress anchorage structure of low-retraction steel stranded wire
CN102561210A (en) Carbon fiber bar in-vitro prestressed tensioning device and using method thereof
CN114215275A (en) Prestressed concrete structure
CN104805841B (en) A kind of prestressed FRP rebar anchor pole anchor head
CN212743146U (en) Large-diameter prestressed carbon fiber reinforced plastic cable anchorage
CN107338735B (en) The damaged replaceable energy-consuming device of chain type
CN207537885U (en) The anchoring mechanism in inclined guy cable stretching stage
CN100396868C (en) Prestressed anchoring system by high tensile steel wire pretension and construction method thereof
CN206034433U (en) But compound arrangement of reinforcement pre -tensioning system prestressed concrete pile of displacement formula muffjoint
CN206052574U (en) Prestress rope tensioning system
GB2358880A (en) Method for reinforcing material
CN215107824U (en) Concrete pole with up-down segmented structure
CN212513996U (en) Concrete uniaxial tension load holding test device
CN114319073A (en) Beam-arch combined bridge stress system conversion design, construction method and construction device
CN106149575A (en) Prestress rope tensioning system and method
CN203308104U (en) Prestress tension device of fiber cloth
CN214882886U (en) Post-tensioned pre-stressed anchor lower local pressure-bearing structure based on shape memory alloy
CN2701981Y (en) High strength wire pre-tensioned prestressing anchor system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191029