CN106125035A - 双芯电能表时钟同步的方法 - Google Patents
双芯电能表时钟同步的方法 Download PDFInfo
- Publication number
- CN106125035A CN106125035A CN201610634017.1A CN201610634017A CN106125035A CN 106125035 A CN106125035 A CN 106125035A CN 201610634017 A CN201610634017 A CN 201610634017A CN 106125035 A CN106125035 A CN 106125035A
- Authority
- CN
- China
- Prior art keywords
- module mcu
- time
- metering
- clock
- order
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
-
- G—PHYSICS
- G04—HOROLOGY
- G04G—ELECTRONIC TIME-PIECES
- G04G7/00—Synchronisation
Abstract
本发明公开了一种双芯电能表时钟同步的方法,在管理模块MCU向计量模块MCU发送“请求命令”后,计量模块MCU要在时间T1内将需处理的数据处理完毕,能够及时响应管理模块MCU的命令,可保证管理模块MCU内的软时钟和计量模块MCU内的软时钟与时钟芯片时钟同步,从而不会影响抄表,维护用户或电力公司的经济利益。
Description
技术领域
本发明涉及电能表技术领域,更确切地说涉及一种双芯电能表时钟同步的方法。
背景技术
目前,我国电能表为一体式设计,即计量部分和非计量部分不做独立工作要求。这种电能表对软件和硬件要求比较固化,一旦出现硬件或软件故障,只能采取更换整表的方式来保障电力计量工作顺利进行。且出于防止篡改电能表程序的安全考虑,不允许电能表软件在线升级。而在未来充满竞争的电力市场中,不同售电主体出于追求利益最大化的考虑,制定的多费率电价日时段划分策略更具针对性、多样性和实时性。但这对现有技术的一体式设计的电能表提出了严峻的挑战。如何在保障计量准确性及可靠性的同时又能实现计量计费方式的更新或优化,是当前急需解决的问题。同时随着用户体验观念的逐步渗透,对电能表的功能需求也越来越多,而目前若想扩展升级功能,只能采取安装新表的方式来实现,不仅造成资源的浪费,而且还增加了人力物力成本。
然而IR46标准要求电能表电子设备与组件分离计量功能与其他功能相互独立,管理部分软件在线升级不影响计量部分的准确性和稳定性。基于IR46标准的双芯电能表要求法制计量部分和管理部分分开,即计量芯和管理芯,并且计量部分可以独立工作。所述的计量部分包括计量模块MCU、计量芯片、时钟芯片等。所述的管理部分包括管理模块MCU、液晶显示、485通信等。管理模块负责时间的管理,包括时间的抄读、时间的显示、时间的设置等。而时钟芯片在计量部分,计量模块MCU直接与时钟芯片通信,管理模块MCU与时钟芯片交互,中间需要经过计量模块MCU,若计量模块MCU不及时响应的话,就会影响管理模块MCU内的软时钟和计量模块MCU内的软时钟与时钟芯片时钟同步。计量模块MCU和管理模块MCU存储数据时都依靠各自的软时钟来给数据带时标,若管理模块MCU内的软时钟和计量模块MCU内的软时钟与时钟芯片时钟不同步的话,就会影响抄表,从而给用户或电力公司带来经济损失。
发明内容
本发明要解决的技术问题是,提供一种双芯电能表时钟同步的方法,该方法能使管理模块MCU内的软时钟和计量模块MCU内的软时钟与时钟芯片时钟同步,从而不会影响抄表。
本发明的技术解决方案是,提供一种具有以下结构的双芯电能表时钟同步的方法,包括以下步骤:
S1、管理模块MCU向计量模块MCU发送“请求命令”,计量模块MCU收到“请求命令”后,在时间T1内将计量模块MCU需处理的数据处理完毕,计量模块MCU数据处理完毕后向管理模块MCU回复处于“空状态”的响应;
S2、管理模块MCU收到“空状态”回复后,在规定时间T2内,所述的管理模块MCU向计量模块MCU发出请求时间数据的命令;
S3、计量模块MCU接收时间数据的命令后作出相应的设置。
采用以上结构后,本发明的双芯电能表时钟同步的方法,与现有技术相比,具有以下优点:
由于本发明的双芯电能表时钟同步的方法,在管理模块MCU向计量模块MCU发送“请求命令”后,计量模块MCU要在时间T1内将需处理的数据处理完毕,能够及时响应管理模块MCU的命令,可保证管理模块MCU内的软时钟和计量模块MCU内的软时钟与时钟芯片时钟同步,从而不会影响抄表,维护用户或电力公司的经济利益。
作为改进,在步骤S2中,请求时间数据的命令包括设置时间TT的命令或同步时间的命令。
作为改进,在步骤S3中,计量模块MCU接收时间数据的命令为设置时间TT的命令后,包括以下步骤:计量模块MCU立即将所要设置的时间TT设置到时钟芯片中,同时计量模块MCU将自身的软时钟更改为TT,且计量模块MCU回复管理模块MCU时间为TT。采用此种结构后,设置时间较及时且准确。
作为改进,在步骤S3中,计量模块MCU接收时间数据的命令为同步时间的命令后,包括以下步骤:S31、计量模块MCU立即连续读取时钟芯片的时间TT1,当读取到的时间为TT1+1秒时,计量模块MCU立即将自身的软时钟更改为TT1+1,且计量模块MCU回复管理模块MCU时间为TT1+1;S32、管理模块MCU接收时间TT1+1后,管理模块MCU将自身的软时钟更改为TT1+1。采用此种结构后,同步时间较及时且准确。
作为改进,还包括步骤S4、计量模块MCU定时向计量模块MCU发送同步时间的命令,周期为TT2。采用此种结构后,可使管理模块MCU内的软时钟和计量模块MCU内的软时钟与时钟芯片时钟同步更加精确。
附图说明
图1是本发明的双芯电能表的电路框图。
具体实施方式
下面结合附图和具体实施例对本发明作进一步说明。
请参阅图1所示,本发明的双芯电能表时钟同步的方法,包括以下步骤:
S1、管理模块MCU向计量模块MCU发送“请求命令”,计量模块MCU收到“请求命令”后,在时间T1内将计量模块MCU需处理的数据处理完毕,需处理是指计量模块MCU正在执行的命令;计量模块MCU数据处理完毕后向管理模块MCU回复处于“空状态”(帧为N1)的响应;
S2、管理模块MCU收到“空状态”(帧为N1)回复后,在规定时间T2内,所述的管理模块MCU向计量模块MCU发出请求时间数据的命令;请求时间数据的命令包括设置时间TT的命令(帧为N2)或同步时间的命令(帧为N3)。
S3、计量模块MCU接收时间数据的命令后作出相应的设置。此步骤中,根据请求时间数据的命令的不同,有两种情况:
情况一、计量模块MCU接收时间数据的命令为设置时间TT的命令(帧为N2)后,包括以下步骤:计量模块MCU立即将所要设置的时间TT设置到时钟芯片中,同时计量模块MCU将自身的软时钟更改为TT,且计量模块MCU回复管理模块MCU时间为TT(帧为N4)。
情况二、计量模块MCU接收时间数据的命令为同步时间的命令后,包括以下步骤:
S31、计量模块MCU立即连续读取时钟芯片的时间TT1,当读取到的时间为TT1+1秒时,计量模块MCU立即将自身的软时钟更改为TT1+1,且计量模块MCU回复管理模块MCU时间为TT1+1(帧为N4);
S32、管理模块MCU接收时间TT1+1(帧为N4)后,管理模块MCU将自身的软时钟更改为TT1+1(帧为N4)。
S4、计量模块MCU定时向计量模块MCU发送同步时间的命令,周期为TT2。
Claims (5)
1.一种双芯电能表时钟同步的方法,包括以下步骤:
S1、管理模块MCU向计量模块MCU发送“请求命令”,计量模块MCU收到“请求命令”后,在时间T1内将计量模块MCU需处理的数据处理完毕,计量模块MCU数据处理完毕后向管理模块MCU回复处于“空状态”的响应;
S2、管理模块MCU收到“空状态”回复后,在规定时间T2内,所述的管理模块MCU向计量模块MCU发出请求时间数据的命令;
S3、计量模块MCU接收时间数据的命令后作出相应的设置。
2.根据权利要求1所述的双芯电能表时钟同步的方法,其特征在于:在步骤S2中,请求时间数据的命令包括设置时间TT的命令或同步时间的命令。
3.根据权利要求2所述的双芯电能表时钟同步的方法,其特征在于:在步骤S3中,计量模块MCU接收时间数据的命令为设置时间TT的命令后,包括以下步骤:计量模块MCU立即将所要设置的时间TT设置到时钟芯片中,同时计量模块MCU将自身的软时钟更改为TT,且计量模块MCU回复管理模块MCU时间为TT。
4.根据权利要求2所述的双芯电能表时钟同步的方法,其特征在于:在步骤S3中,计量模块MCU接收时间数据的命令为同步时间的命令后,包括以下步骤:
S31、计量模块MCU立即连续读取时钟芯片的时间TT1,当读取到的时间为TT1+1秒时,计量模块MCU立即将自身的软时钟更改为TT1+1,且计量模块MCU回复管理模块MCU时间为TT1+1;
S32、管理模块MCU接收时间TT1+1后,管理模块MCU将自身的软时钟更改为TT1+1。
5.根据权利要求4所述的双芯电能表时钟同步的方法,其特征在于:还包括步骤S4、计量模块MCU定时向计量模块MCU发送同步时间的命令,周期为TT2。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610634017.1A CN106125035B (zh) | 2016-08-03 | 2016-08-03 | 双芯电能表时钟同步的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610634017.1A CN106125035B (zh) | 2016-08-03 | 2016-08-03 | 双芯电能表时钟同步的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106125035A true CN106125035A (zh) | 2016-11-16 |
CN106125035B CN106125035B (zh) | 2019-05-17 |
Family
ID=57254904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610634017.1A Active CN106125035B (zh) | 2016-08-03 | 2016-08-03 | 双芯电能表时钟同步的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106125035B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414830A (zh) * | 2018-02-05 | 2018-08-17 | 国网江苏省电力有限公司苏州供电分公司 | 具有非侵入式电力线路故障判断功能的双芯智能电表 |
CN108445436A (zh) * | 2018-03-01 | 2018-08-24 | 宁波迦南智能电气股份有限公司 | 一种双芯运行状态互检的电能表 |
CN110928817A (zh) * | 2019-12-27 | 2020-03-27 | 广东电科院能源技术有限责任公司 | 用于双芯电能表的通信方法、设备及存储介质 |
CN111257608A (zh) * | 2020-02-17 | 2020-06-09 | 浙江正泰仪器仪表有限责任公司 | 多芯智能电能表的同步处理方法及多芯智能电表 |
CN111398675A (zh) * | 2020-03-26 | 2020-07-10 | 杭州电瓦特信息技术有限责任公司 | 电能表抄表方法、装置及系统 |
CN112666389A (zh) * | 2021-01-07 | 2021-04-16 | 南方电网数字电网研究院有限公司 | 双芯智能电表双芯交互方法、装置、双芯智能电表和介质 |
CN113064110A (zh) * | 2021-03-17 | 2021-07-02 | 南方电网数字电网研究院有限公司 | 双芯智能电表的同步测试方法、装置、设备和介质 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004034883A2 (en) * | 2002-10-15 | 2004-04-29 | Medtronic Inc. | Synchronization and calibration of clocks for a medical device and calibrated clock |
CN202057689U (zh) * | 2011-05-06 | 2011-11-30 | 利尔达科技有限公司 | 一种智能电能表 |
US20140075146A1 (en) * | 2008-06-06 | 2014-03-13 | Uniquify, Incorporated | Methods for operating a memory interface circuit including calibration for cas latency compensation in a plurality of byte lanes |
CN105115548A (zh) * | 2015-09-29 | 2015-12-02 | 成都秦川科技发展有限公司 | 具有阶梯计价功能的物联网智能燃气表 |
CN204964571U (zh) * | 2015-09-15 | 2016-01-13 | 国网冀北电力有限公司经济技术研究院 | 一种设置有安装支架的电量采集装置 |
CN105636158A (zh) * | 2015-12-24 | 2016-06-01 | 联想(北京)有限公司 | 一种信息配置方法及电子设备 |
-
2016
- 2016-08-03 CN CN201610634017.1A patent/CN106125035B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004034883A2 (en) * | 2002-10-15 | 2004-04-29 | Medtronic Inc. | Synchronization and calibration of clocks for a medical device and calibrated clock |
US20140075146A1 (en) * | 2008-06-06 | 2014-03-13 | Uniquify, Incorporated | Methods for operating a memory interface circuit including calibration for cas latency compensation in a plurality of byte lanes |
CN202057689U (zh) * | 2011-05-06 | 2011-11-30 | 利尔达科技有限公司 | 一种智能电能表 |
CN204964571U (zh) * | 2015-09-15 | 2016-01-13 | 国网冀北电力有限公司经济技术研究院 | 一种设置有安装支架的电量采集装置 |
CN105115548A (zh) * | 2015-09-29 | 2015-12-02 | 成都秦川科技发展有限公司 | 具有阶梯计价功能的物联网智能燃气表 |
CN105636158A (zh) * | 2015-12-24 | 2016-06-01 | 联想(北京)有限公司 | 一种信息配置方法及电子设备 |
Non-Patent Citations (3)
Title |
---|
冯博 等: "电能表时钟修改器", 《农村电气化》 * |
徐晴 等: "基于DLPTP时钟同步机制的电力用电信息采集系统对时方法研究", 《电测与仪表》 * |
黄建硕 等: "基于GPS标准时钟的智能电能表时钟同步校准技术开发和应用", 《电子测试》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414830A (zh) * | 2018-02-05 | 2018-08-17 | 国网江苏省电力有限公司苏州供电分公司 | 具有非侵入式电力线路故障判断功能的双芯智能电表 |
CN108445436A (zh) * | 2018-03-01 | 2018-08-24 | 宁波迦南智能电气股份有限公司 | 一种双芯运行状态互检的电能表 |
CN108445436B (zh) * | 2018-03-01 | 2020-04-10 | 宁波迦南智能电气股份有限公司 | 一种双芯运行状态互检的电能表 |
CN110928817A (zh) * | 2019-12-27 | 2020-03-27 | 广东电科院能源技术有限责任公司 | 用于双芯电能表的通信方法、设备及存储介质 |
CN110928817B (zh) * | 2019-12-27 | 2021-06-08 | 南方电网电力科技股份有限公司 | 用于双芯电能表的通信方法、设备及存储介质 |
CN111257608A (zh) * | 2020-02-17 | 2020-06-09 | 浙江正泰仪器仪表有限责任公司 | 多芯智能电能表的同步处理方法及多芯智能电表 |
CN111257608B (zh) * | 2020-02-17 | 2021-06-22 | 浙江正泰仪器仪表有限责任公司 | 多芯智能电能表的同步处理方法及多芯智能电表 |
CN111398675A (zh) * | 2020-03-26 | 2020-07-10 | 杭州电瓦特信息技术有限责任公司 | 电能表抄表方法、装置及系统 |
CN112666389A (zh) * | 2021-01-07 | 2021-04-16 | 南方电网数字电网研究院有限公司 | 双芯智能电表双芯交互方法、装置、双芯智能电表和介质 |
CN112666389B (zh) * | 2021-01-07 | 2022-07-29 | 南方电网数字电网研究院有限公司 | 双芯智能电表双芯交互方法、装置、双芯智能电表和介质 |
CN113064110A (zh) * | 2021-03-17 | 2021-07-02 | 南方电网数字电网研究院有限公司 | 双芯智能电表的同步测试方法、装置、设备和介质 |
CN113064110B (zh) * | 2021-03-17 | 2023-02-17 | 南方电网数字电网研究院有限公司 | 双芯智能电表的同步测试方法、装置、设备和介质 |
Also Published As
Publication number | Publication date |
---|---|
CN106125035B (zh) | 2019-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106125035A (zh) | 双芯电能表时钟同步的方法 | |
GB2565177A (en) | Electric energy meter, checking method therefor, and storage medium | |
CN203825085U (zh) | 一种基于nfc和蓝牙技术的智能电能表系统 | |
US8301931B2 (en) | Time synchronization of portable devices | |
CN106569166B (zh) | 一种双芯电能表法制计量部的测试方法 | |
MX351909B (es) | Un sistema para medir e informar el uso de un recurso. | |
CN105824232B (zh) | 一种便携式自校准授时装置及授时方法 | |
CN104574051A (zh) | 一种计费方法及装置 | |
CN203799444U (zh) | 一种基于NFC和Wi-Fi技术的智能电能表系统 | |
CN204044923U (zh) | 一种智能购电管理系统 | |
CN104242994B (zh) | 通信方法、通信装置及相应的具有nfc功能的移动终端 | |
CN201927126U (zh) | 一种用于税控系统的无线开票装置 | |
CN105118182B (zh) | 具有阶梯计价功能的ic卡智能水表 | |
CN203278857U (zh) | 基于crio平台的双路iec61850报文收发装置 | |
RU197324U1 (ru) | Интеллектуальный счетчик электрической энергии с дистанционным управлением шифрования информации | |
CN104134107A (zh) | 电商托管数据协同管理平台 | |
CN105139533A (zh) | 具有阶梯计价功能的远传智能燃气表 | |
CN105222846A (zh) | 物联网智能水表阶梯计价的实现方法 | |
CN205247514U (zh) | 具有阶梯计价功能的远传智能水表 | |
CN203278864U (zh) | 基于crio平台的iec61850报文采集板卡 | |
CN201903926U (zh) | 一种电能表 | |
Challen et al. | The mote is dead: long live the discarded smartphone! | |
CN202443257U (zh) | 电表计量校时装置 | |
CN203057529U (zh) | 移动电话安全认证系统 | |
CN202177944U (zh) | 一种投币计费式充售电系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |