CN106124160A - A kind of Tunnel Base structure pump-absorb action analog - Google Patents

A kind of Tunnel Base structure pump-absorb action analog Download PDF

Info

Publication number
CN106124160A
CN106124160A CN201610659580.4A CN201610659580A CN106124160A CN 106124160 A CN106124160 A CN 106124160A CN 201610659580 A CN201610659580 A CN 201610659580A CN 106124160 A CN106124160 A CN 106124160A
Authority
CN
China
Prior art keywords
catch basin
water
main body
analog
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610659580.4A
Other languages
Chinese (zh)
Other versions
CN106124160B (en
Inventor
王明年
李自强
于丽
华阳
刘大刚
童建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201610659580.4A priority Critical patent/CN106124160B/en
Publication of CN106124160A publication Critical patent/CN106124160A/en
Application granted granted Critical
Publication of CN106124160B publication Critical patent/CN106124160B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M10/00Hydrodynamic testing; Arrangements in or on ship-testing tanks or water tunnels

Abstract

The invention discloses a kind of Tunnel Base structure pump-absorb action analog, the communicating passage arranged on the left side catch basin being fixedly installed respectively including main body proof box, both sides and right side catch basin and altogether wall, train load analog is fixed on, and water head tank is hung by pulley and water UNICOM detachable with left side catch basin;Main body proof box bottom takes up country rock simulation material, and top takes up underlying structure simulation material, and two material bonding cracks are positioned at communicating passage outlet, bury detection device in bonding crack underground.Different hydrogeologic conditions residing for the present invention preferably simulation tunnel underlying structure, including water rich strata, aquifer water-bearing stratum and anhydrous stratum;When realizing that Tunnel Base structure is at substrate country rock existing defects under different hydrogeologic conditions, the simulation of " the structure dynamic load country rock water " pump-absorb action under Train induced load effect, the research train dynamic action to Tunnel Base structure, thus better ensure that safety and the economy of Tunnel Base structure.

Description

A kind of Tunnel Base structure pump-absorb action analog
Technical field
The invention belongs to Design of Railway Tunnel and building technology field, especially belong to be applied to substrate in tunnel operation stage Structure under train effect, the model test apparatus of pump-absorb action under country rock defect and subsoil water dynamic loading.
Background technology
When pump-absorb action refers to Tunnel Base structure because being affected by the load that train is bigger, to underlying structure and country rock Between subsoil water produce dynamic action, subsoil water under the influence of Train induced load, country rock is washed away make country rock formed defect, The generation of country rock defect and development can affect stress performance and the long-term safety stability of underlying structure, make underlying structure pumping Cognitive not enough, tunnel long-term safety stability can be produced heavy duty and threaten.
The formation and development rule shortage of this Tunnel Base structure pump-absorb action is understood in depth by people.By setting up tunnel Road underlying structure pump-absorb action analog carries out underlying structure in tunnel structure operation and encloses with bottom under train dynamics effect Rock and ground water pressure inhale alternately dynamic trait model test, show that Tunnel Base structure is under different hydrogeologic conditions to analyze Existing defects, Train induced load acts on the pump-absorb action principle and country rock granule leakage and rule produced in underlying structure Rule, to the design of Tunnel Base structure, construct and run the phase experimental basis is provided steadily in the long term, there is highly important meaning Justice.
Existing Tunnel Base structure groundwater effect analog systems is mainly hydrostatic pressure analog systems, high by head Degree adjusting apparatus carries out different water pressure loading simulations to the defect country rock analog material in proof box, and it only accounts for hydrostatic Force value.Existing method and system is generally used for vcehicular tunnel and the less situation of railway tunnel bullet train dynamic load, it is impossible to Consider and simulation tunnel bears big axle weight, under underlying structure pump-absorb action during high rate of traffic flow, particularly train dynamics effect Bottom country rock and the affecting laws of subsoil water alternating action, its existing method and system more cannot run process by simulation tunnel for a long time The phenomenon that middle bottom country rock development of defects under pump-absorb action and country rock granule run off.
At present, the domestic analog still lacked about Tunnel Base structure pump-absorb action, its design and the hydrostatic simulated Pressure situation is simple, and the hydrostatic pressure form of simulation is single, simulates the pump-absorb action under the dynamic loading of underlying structure and is subject to To limiting greatly;Meanwhile, its simulation process cannot consider to underlying structure dynamic action, have ignored the heavy load of big axle The impact of train, there is difference in the dynamic action for the most domestic heavy haul railway Tunnel Base structure subsoil water greatly developed The distortion of degree;Principle and rule that in water rich strata, substrate country rock granule loses cannot be simulated with underground hydraulic current.
Summary of the invention
The present invention solves weak point of the prior art, disclose a kind of Tunnel Base structure pump-absorb action simulation dress Put, the different hydrogeologic conditions residing for this device preferably simulation tunnel underlying structure, including water rich strata, aquifer water-bearing stratum and Anhydrous stratum;When realizing that Tunnel Base structure is at substrate country rock existing defects under different hydrogeologic conditions, Train induced load The simulation of " structure-dynamic load-country rock-water " pump-absorb action under Zuo Yong, studies the train dynamic action to Tunnel Base structure, Analyze underlying structure pump-absorb action form under different hydrogeologic conditions and country rock granule loss principle, setting for tunnel Count, construct and run the test basis that the long-time stability offer of phase is relatively reliable, thus better ensure that Tunnel Base structure Safety and economy.
In order to achieve the above object, the technical solution adopted in the present invention is:
Tunnel Base structure pump-absorb action analog, it is characterised in that: include main body proof box, left side catch basin, the right side Side catch basin, train load analog, water head tank and testing stand;
Main body proof box both sides are fixedly installed left side catch basin and right side catch basin respectively, and test is fixed in main body proof box On platform, testing stand is consolidated in ground, and train load analog is fixed in main body proof box, and water head tank is hung also by pulley Water UNICOM detachable with left side catch basin;
Left side catch basin with on main body proof box common wall, right side catch basin the most all has on main body proof box common wall Along wall arrange longitudinal seam as communicating passage;
Main body proof box bottom takes up country rock simulation material, and top takes up underlying structure simulation material, country rock simulation material It is positioned at communicating passage outlet with underlying structure simulation material bonding crack, bonding crack can be buried underground the detection end member device of detection device Part.
Described country rock simulation material may select the Grades of Surrounding Rock that different materials is different with match ratio simulation, and country rock is simulated Material includes: Gypsum Fibrosum, water, sand, blanc fixe etc..During filling, every 13cm mono-layer is allocated as at least 2 times and loads, and has loaded every time Interlayer shaving after finishing, it is to avoid layering, the unit weight requirement making country rock simulation material reach demand of the most manually vibrating 20 times.
Described underlying structure simulation material may select the concrete of the different materials label different with match ratio simulation, base Bottom structure simulation material includes: Gypsum Fibrosum, water, sand, kieselguhr etc..Demand is made according to pouring into mould after certain match ratio mix Shape.
Described communicating passage is flare structure, and main body proof box end opening is more than tank entrance.
Described train load analog is scalable vibrator.
Described main body proof box, left side catch basin, right side catch basin and water head tank are the inside that transparent material is made Visual structure.
The detection device that the present invention uses includes earth pressure gauge, WG, static strain Acquisition Instrument or dynamic strain Acquisition Instrument.
Described main body proof box, left side catch basin, right side catch basin and water head tank are total enclosing structure.
Generally Tunnel Base structure is filled by the inverted arch in tunnel and inverted arch structure forms, and between bottom surface and country rock Portion void is had on contact surface;Country rock simulation material of the present invention is mixed according to different proportion by Gypsum Fibrosum, sand, Iron Ore Powder and water Matched moulds intends the country rock of different stage;Underlying structure simulation material is carried out mix by Gypsum Fibrosum, sand and water according to different proportion and makes Difformity, the heavy haul railway Tunnel Base structure of different concrete grade can be simulated.
Detection device can be the miniature earth pressure gauge of test, or test Miniature water piezometer, or both are simultaneously Use;The test components and parts of detection device are arranged between country rock simulation material and underlying structure simulation material, adopt with quiet change instrument Water pressure and the Changing Pattern of soil pressure in collection record process of the test.
Both sides catch basin can be the total enclosing catch basin made by poly (methyl methacrylate) plate, is fixedly arranged at about main body proof box two Side, is used for providing simulated groundwater for the described country rock simulation material in main body proof box and underlying structure simulation material.
On the sidewall that both sides catch basin is connected with main body proof box, at country rock simulation material and underlying structure simulation material Between the gap position left and right sides be provided with a breach as water and country rock simulation material soil particle passage.
Country rock simulation material soil particle passage uses flare structure, and the water pressure of catch basin side can be made slightly larger than main Body proof box side prevents described country rock analog material soil particle from refluxing.
Both sides catch basin, on the right side of selection or left side catch basin connects the most high-order water of high hydraulic analogue device by water pipe Groove.The opening of water pipe junction equally selects flare to make water pipe side hydraulic pressure higher than catch basin, and described country rock is similar Material soil particle does not enter water pipe.
High hydraulic analogue uses and includes that water head tank, connecting water pipe and fixed pulley structure realize, by a pulley lifting high position Tank realizes different water injection pressures.
The present invention can realize experimental simulation research under simulated high-pressure, aqueous, anhydrous condition.A water under high pressure analog i.e. high position Tank when underlying structure being carried out aquifer water-bearing stratum and anhydrous stratum simulation study, detachably need not, now, to both sides catch basin Interior water filling, utilizes law of connected vessels to simulate aquifer water-bearing stratum, or keeps described both sides catch basin to be dried the anhydrous stratum of simulation.
Train load analog selects adjustable small-sized vibrator to be simulated, and small-sized vibrator can be by motor electricity Machine and eccentric composition, the heavy haul train dynamic load that can simulate output the heaviest by regulation rotating speed is similar to underlying structure Material forms dynamic action, and then makes simulated groundwater wash away country rock analog material formation pump-absorb action.
Train load analog is fixed on end face in main body proof box.Train load analog can set as required Put multiple stage.
Compared with prior art, the invention has the beneficial effects as follows:
(1) assay device use have visual transparent configuration, it is possible to be clearly seen that country rock granule with subsoil water flowing and Bottom country rock law of development of defect under subsoil water souring.The heavy haul train dynamic load of the simulation power to underlying structure The phenomenon that effect and bottom country rock granule run off is more directly perceived,
(2) when simulating water rich strata condition, sealed cistern also connects high hydraulic pressure analog, adjusts head height energy Enough realize the environmental simulation under the conditions of water rich strata.When simulating aquifer water-bearing stratum condition, disconnect high hydraulic pressure analog, double Side catch basin injects the underground water supply under the conditions of part water conservancy law of connected vessels ensures aquifer water-bearing stratum;In simulation anhydrously During layer condition, bilateral catch basin and proof box can be kept to be dried the Train induced load simulated under anhydrous formation condition to underlying structure Impact.
(3) varying strength, difference can be simulated by shape and the similar material mixture of underlying structure in amendment proof box The underlying structure pump-absorb action of pattern.
(4) multiple stage is fixedly mounted by underlying structure analog material surface, as installed 2 train load analog bars The most coaxially can weigh and the dynamic load of heavy haul train under speed per hour with the simulation tunnel operation phase under part, it is also possible to embody heavy haul train to tunnel The dynamic action of road underlying structure;Stress condition, safety and the durability of operation tunnel underlying structure can also be analyzed, including The generation of structural cracks, the development of bottom country rock defect, thus better ensure that safety and the economy in heavy haul railway tunnel.
Accompanying drawing explanation
Fig. 1 is analog structural principle schematic diagram of the present invention;
Fig. 2 is A portion structure for amplifying schematic diagram in Fig. 1;
Fig. 3 is analog structure schematic top plan view of the present invention;
Fig. 4 is that in Fig. 3, structural representation is sent out in B portion big.
In figure, 1 is main body proof box, and 2 is left side catch basin, and 3 is right side catch basin, and 4 is train load analog, 5 Being country rock simulation material, 6 is underlying structure simulation material, and 7 is water, and 8 is connecting water pipe, and 9 is water head tank, and 10 is water tank, 11 Being pulley, 12 is laboratory table, and 13 is communicating passage, and 14 is the high-order mouth of a river.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the present invention is further described, and detailed description of the invention is to enter the principle of the invention One step explanation, limits the present invention never in any form, and technology same or like with the present invention is protected without departing from the present invention Scope.
In conjunction with Fig. 1 to Fig. 4.
As it can be seen, Tunnel Base structure pump-absorb action analog, including main body proof box 1, left side catch basin 2, the right side Side catch basin 3, train load analog 4, water head tank 9 and testing stand 12;
Main body proof box 1 both sides are fixedly installed left side catch basin 2 and right side catch basin 3 respectively, and main body proof box 1 is fixed on On testing stand 12, testing stand 12 is consolidated in ground, and train load analog 4 is fixed in main body proof box 1, water head tank 9 Hung by pulley 11 and water UNICOM detachable with left side catch basin 2;
Left side catch basin 2 with on main body proof box 1 common wall, on right side catch basin 3 and main body proof box 1 common wall respectively All have along wall arrange longitudinal seam as communicating passage 13;
Main body proof box 1 bottom takes up country rock simulation material 5, and top takes up underlying structure simulation material 6, country rock simulation material Material 5 is positioned at communicating passage 13 with underlying structure simulation material 6 bonding crack and exports, and can bury the test side of detection device in bonding crack underground Components and parts.
Country rock simulation material 5 may select the Grades of Surrounding Rock that different materials is different with match ratio simulation, and material includes: stone Cream, water, sand, blanc fixe;During filling, every 13cm mono-layer, is allocated as at least 2 times and loads, and after loading, interlayer is scraped every time Hair, it is to avoid layering, the unit weight requirement making country rock simulation material reach demand of the most manually vibrating 20 times.
Underlying structure simulation material 6 may select the concrete of the different materials label different with match ratio simulation, material Including: Gypsum Fibrosum, water, sand, kieselguhr;The shape of demand is made according to pouring into mould after certain match ratio mix.
Communicating passage 13 is flare structure, and main body proof box 1 end opening is more than tank entrance.
Train load analog 4 is scalable vibrator.
Main body proof box 1, left side catch basin 2, right side catch basin 3 and water head tank 9 are the inside that transparent material is made Visual structure.
The present invention detects device and includes earth pressure gauge, WG, static strain Acquisition Instrument and dynamic strain Acquisition Instrument.
Main body proof box 1, left side catch basin 2, right side catch basin 3 and water head tank 9 are total enclosing structure.
As it is shown in figure 1, Tunnel Base structure pump-absorb action analog, including main body proof box 1, left side catch basin 2, the right side Side catch basin 3, train load analog 4, water head tank 9 and testing stand 12;
Main body proof box 1 both sides are fixedly installed left side catch basin 2 and right side catch basin 3 respectively, and main body proof box 1 is fixed on On testing stand 12, testing stand is consolidated in ground, and train load analog 4 is fixed in main body proof box 1, water head tank 9 by Pulley 11 hangs and detachably connects with water with left side catch basin 2;
Main body proof box bottom takes up country rock simulation material, and top takes up underlying structure simulation material, country rock simulation material It is positioned at communicating passage outlet with underlying structure simulation material bonding crack, bonding crack can be buried underground the detection end member device of detection device Part.
Country rock simulation material may select the Grades of Surrounding Rock that different materials is different with match ratio simulation, country rock simulation material bag Include: Gypsum Fibrosum, water, sand, blanc fixe etc..During filling, every 13cm mono-layer is allocated as 2 times and loads, and after loading, interlayer is scraped every time Hair, it is to avoid layering, the unit weight requirement making country rock simulation material reach demand of the most manually vibrating 20 times.
Underlying structure simulation material may select the concrete of the different materials label different with match ratio simulation, and substrate is tied Structure simulation material includes: Gypsum Fibrosum, water, sand, kieselguhr etc..The shape of demand is made according to pouring into mould after certain match ratio mix Shape.
Test components and parts can be the miniature earth pressure gauge of test, or test Miniature water piezometer, or both are same Time use;Described test components and parts are arranged between described country rock analog material and underlying structure analog material, use static strain Water pressure and the Changing Pattern of soil pressure in Acquisition Instrument or dynamic strain Acquisition Instrument acquisition and recording process of the test.
As in figure 2 it is shown, left side catch basin 2 with on main body proof box 1 common wall, right side catch basin shares with main body proof box All have on wall along wall arrange longitudinal seam as water and country rock analog material soil particle passage A;
Water and country rock analog material soil particle passage A are flare structure, and main body proof box end opening is more than tank Entrance.The water pressure that can make catch basin 2 side, left side prevents described country rock analog material 5 soil particle slightly larger than main body proof box 1 side Backflow.
Water head tank 9 includes water tank 10, water pipe 8 and fixed pulley 11.Water head tank 9 is adopted by water pipe 8 with left side catch basin 2 Connect by dismountable mode.The opening B selection of described water pipe 8 junction is tubaeform makes water pipe 8 side hydraulic pressure higher than left side water-retention Groove 2, country rock analog material 5 soil particle does not enter water pipe 8.Fixed pulley 11 is used for adjusting the height of described water tank 10, can be 0~3 Between meter, regulation makes described water head tank 9 can simulate different water pressure.
As shown in Figure 4, further, water under high pressure analog is carrying out aquifer water-bearing stratum and anhydrous stratum to underlying structure 6 During simulation study, can cancel described water under high pressure analog, only in left side catch basin 2, water filling utilizes law of connected vessels to simulate Aquifer water-bearing stratum, or keep described left side catch basin 2 and right side catch basin 3 to be dried and simulate anhydrous stratum.
As it is shown on figure 3, train load analog 4 selects adjustable small-sized vibrator to be simulated, described is small-sized Vibrator is made up of motor and eccentric, can simulate, by regulation rotating speed, the Train induced load that output is the heaviest;Row Car Load Simulation device 4 is fixed on the end face of described underlying structure analog material 6, install 2 carry out difference be open to traffic right under parameter The simulation of described underlying structure analog material 6.Or described small-sized vibrator also can be carried out by direct current generator and small-sized eccentric block Make.
As desired main body proof box 1, country rock simulation material 5, underlying structure simulation material 6 and water head tank 9 are arranged After, open train load analog 4, the Train induced load of condition rotating speed output demand.And then underlying structure simulation material Material 6 produces vibration under dynamic loading thus impacts country rock simulation material 5, under power cycle repeated action, and base Water between bottom structure simulation material 6 and country rock simulation material 5 can form tank 2 and right side water on the left of the higher water pressure flow direction Groove 3 can be taken away the soil particle of country rock simulation material 5 and form pump-absorb action.

Claims (8)

1. a Tunnel Base structure pump-absorb action analog, it is characterised in that: include main body proof box (1), left side water-retention Groove (2), right side catch basin (3), train load analog (4), water head tank (9) and testing stand (12);
Main body proof box (1) both sides are fixedly installed left side catch basin (2) and right side catch basin (3) respectively, and main body proof box (1) is solid On testing stand (12), testing stand (12) is consolidated in ground, and train load analog (4) is fixed on main body proof box (1) On, water head tank (9) is hung by pulley (11) and water UNICOM detachable with left side catch basin (2);
Left side catch basin (2) with on main body proof box (1) common wall, on right side catch basin (3) and main body proof box (1) common wall The most all have along wall arrange longitudinal seam as communicating passage (13);
Main body proof box (1) bottom takes up country rock simulation material (5), and top takes up underlying structure simulation material (6), and country rock is simulated Material (5) and underlying structure simulation material (6) bonding crack are positioned at communicating passage (13) outlet, can bury detection device in bonding crack underground Test side components and parts.
Tunnel Base structure pump-absorb action analog the most according to claim 1, it is characterised in that: described country rock is simulated Material (5) selects the Grades of Surrounding Rock that different materials is different with match ratio simulation, and material includes: Gypsum Fibrosum, water, sand, blanc fixe; During filling, every 13cm mono-layer, is allocated as at least 2 times and loads, interlayer shaving after every time loading, it is to avoid layering, the most manually Vibrate 20 times the unit weight requirement making country rock simulation material reach demand.
Tunnel Base structure pump-absorb action analog the most according to claim 1, it is characterised in that: described underlying structure Simulation material (6) selects the concrete of the different label of different materials and match ratio simulation, and material includes: Gypsum Fibrosum, water, sand, Kieselguhr;The shape of demand is made according to pouring into mould after certain match ratio mix.
Tunnel Base structure pump-absorb action analog the most according to claim 1, it is characterised in that: described communicating passage (13) being flare structure, main body proof box (1) end opening is more than tank entrance.
Tunnel Base structure pump-absorb action analog the most according to claim 1, it is characterised in that: described train lotus Carrying analog (4) is scalable vibrator.
Tunnel Base structure pump-absorb action analog the most according to claim 1, it is characterised in that: described main body is tested Case (1), left side catch basin (2), right side catch basin (3) and water head tank (9) are the interior visible structure that transparent material is made.
7. according to the Tunnel Base structure pump-absorb action analog described in any one of claim 1 to 6, it is characterised in that: institute State detection device and include earth pressure gauge, WG, static strain Acquisition Instrument and dynamic strain Acquisition Instrument.
Tunnel Base structure pump-absorb action analog the most according to claim 7, it is characterised in that: described main body is tested Case (1), left side catch basin (2), right side catch basin (3) and water head tank (9) are total enclosing structure.
CN201610659580.4A 2016-08-12 2016-08-12 A kind of Tunnel Base structure pump-absorb action simulator Expired - Fee Related CN106124160B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610659580.4A CN106124160B (en) 2016-08-12 2016-08-12 A kind of Tunnel Base structure pump-absorb action simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610659580.4A CN106124160B (en) 2016-08-12 2016-08-12 A kind of Tunnel Base structure pump-absorb action simulator

Publications (2)

Publication Number Publication Date
CN106124160A true CN106124160A (en) 2016-11-16
CN106124160B CN106124160B (en) 2018-07-17

Family

ID=57259209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610659580.4A Expired - Fee Related CN106124160B (en) 2016-08-12 2016-08-12 A kind of Tunnel Base structure pump-absorb action simulator

Country Status (1)

Country Link
CN (1) CN106124160B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106959338A (en) * 2017-03-10 2017-07-18 西南交通大学 A kind of dynamic response analogue means of multi-level underground space structure and country rock
CN108426706A (en) * 2018-02-02 2018-08-21 西南交通大学 A kind of high hydraulic pressure area shield formula TBM Segments Design test-beds
CN111983191A (en) * 2020-08-20 2020-11-24 中铁二十局集团有限公司 Tunnel excavation gushing water simulation device and simulation method
CN113593380A (en) * 2021-08-20 2021-11-02 范国来 Water conservancy pump station design atress analogue means

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1932169A (en) * 2006-09-29 2007-03-21 北京交通大学 Analogue experiment stand for interreaction of tunnel structure, surrounding rock and underground water
CN101832140A (en) * 2010-04-20 2010-09-15 北京交通大学 Testing method of water pressure distribution law of subsea tunnel lining
CN101900642A (en) * 2010-04-27 2010-12-01 西安理工大学 Physical model test device and method for ground fissure earth tunnel
CN202075201U (en) * 2011-06-13 2011-12-14 云南大学 Groundwater seepage simulation test device
CN102680204A (en) * 2012-05-11 2012-09-19 河海大学 Method and device for simulating bottom sludge erosion and transmission feature in rectangular trough
CN104596737A (en) * 2015-02-15 2015-05-06 中国地质科学院水文地质环境地质研究所 Underground water level dynamic simulation test method based on underground water dynamic simulation test platform
CN104677592A (en) * 2015-03-14 2015-06-03 山西潞安环保能源开发股份有限公司 Three-dimensional dynamic simulation test stand for regional underground water flow field
JP2015127671A (en) * 2013-12-27 2015-07-09 三菱重工業株式会社 Underwater sailing body simulation system and underwater sailing body simulation method
CN205898416U (en) * 2016-08-12 2017-01-18 西南交通大学 Effect analogue means is inhaled to tunnel base structure pump

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1932169A (en) * 2006-09-29 2007-03-21 北京交通大学 Analogue experiment stand for interreaction of tunnel structure, surrounding rock and underground water
CN101832140A (en) * 2010-04-20 2010-09-15 北京交通大学 Testing method of water pressure distribution law of subsea tunnel lining
CN101900642A (en) * 2010-04-27 2010-12-01 西安理工大学 Physical model test device and method for ground fissure earth tunnel
CN202075201U (en) * 2011-06-13 2011-12-14 云南大学 Groundwater seepage simulation test device
CN102680204A (en) * 2012-05-11 2012-09-19 河海大学 Method and device for simulating bottom sludge erosion and transmission feature in rectangular trough
JP2015127671A (en) * 2013-12-27 2015-07-09 三菱重工業株式会社 Underwater sailing body simulation system and underwater sailing body simulation method
CN104596737A (en) * 2015-02-15 2015-05-06 中国地质科学院水文地质环境地质研究所 Underground water level dynamic simulation test method based on underground water dynamic simulation test platform
CN104677592A (en) * 2015-03-14 2015-06-03 山西潞安环保能源开发股份有限公司 Three-dimensional dynamic simulation test stand for regional underground water flow field
CN205898416U (en) * 2016-08-12 2017-01-18 西南交通大学 Effect analogue means is inhaled to tunnel base structure pump

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李玉杰 等: "地下水对巷道围岩稳定性影响的数值模拟", 《徐州工程学院学报(自然科学版)》 *
王明年 等: "重载铁路隧道基底围岩水土压力动力研究", 《水文地质工程地质》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106959338A (en) * 2017-03-10 2017-07-18 西南交通大学 A kind of dynamic response analogue means of multi-level underground space structure and country rock
CN108426706A (en) * 2018-02-02 2018-08-21 西南交通大学 A kind of high hydraulic pressure area shield formula TBM Segments Design test-beds
CN108426706B (en) * 2018-02-02 2023-10-17 西南交通大学 Shield type TBM tunnel segment design test bench for high water pressure area
CN111983191A (en) * 2020-08-20 2020-11-24 中铁二十局集团有限公司 Tunnel excavation gushing water simulation device and simulation method
CN113593380A (en) * 2021-08-20 2021-11-02 范国来 Water conservancy pump station design atress analogue means
CN113593380B (en) * 2021-08-20 2024-04-05 江西进亨泵业制造有限公司 Water conservancy pump station design atress analogue means

Also Published As

Publication number Publication date
CN106124160B (en) 2018-07-17

Similar Documents

Publication Publication Date Title
CN106124160B (en) A kind of Tunnel Base structure pump-absorb action simulator
CN108386179B (en) A kind of optimization method of sandstone reservoir hydraulic fracturing proppants parameter
CN105952461B (en) A kind of experimental rig and method for being used to simulate earth pressure balanced shield, EPBS construction sediment improvement
CN107831073A (en) Shield-tunneling construction synchronous grouting experimental rig and test method
CN104697742B (en) Simulation test model device for studying hyporheic exchange under drive of flood pulse and using method thereof
CN105891447A (en) Similarity test device and visualizing method for bearing fault mining activation and water bursting channel forming process
CN105043938B (en) A kind of repeatable saturated sand osmotic grouting test model utilized and its application
CN106437644A (en) Large bottom water sandstone oil reservoir development physical simulation experiment device and working method thereof
CN205263089U (en) Stratum slip casting analog system
CN110660306A (en) Experimental device capable of simulating influence of hammering vibration and flowing water on karst collapse
CN107436140A (en) The settling column test instrument and test method that vacuum preloading and piling prepressing are combined
CN106568606A (en) Tunnel stress experiment method for goaf crossing simulation
CN106959338A (en) A kind of dynamic response analogue means of multi-level underground space structure and country rock
CN208476921U (en) A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device
CN206627476U (en) A kind of dynamic response analogue means of multi-level underground space structure and country rock
CN102605738B (en) Method for monitoring change of internal force of resin mortar block during riverbed blowing up scouring period of hyper-concentration sediment flood
CN103176220A (en) Tunnel water pressure model test method
CN106504630A (en) Pass through the tunnel experiment system of karst strata
CN205898416U (en) Effect analogue means is inhaled to tunnel base structure pump
CN103912290B (en) Grouting method used for vibration isolating and denoising outside subway tunnel segments
CN202870056U (en) Test device of grouting reinforcement model for weak dam
CN110441159A (en) The simulation test device and method of borehole wall bearer properties under hydraulic coupling action
CN105862535A (en) Dredger fill solidification pile roadbed and construction method thereof
CN207813590U (en) Hydrate producing well air-water-sand three-phase artificial lift experimental system for simulating
CN105137042B (en) Method for determining construction position of water storage project on Karst slope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180717

Termination date: 20200812