CN208476921U - A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device - Google Patents

A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device Download PDF

Info

Publication number
CN208476921U
CN208476921U CN201820150680.9U CN201820150680U CN208476921U CN 208476921 U CN208476921 U CN 208476921U CN 201820150680 U CN201820150680 U CN 201820150680U CN 208476921 U CN208476921 U CN 208476921U
Authority
CN
China
Prior art keywords
tunnel
simulation
ponding
frozen
behind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820150680.9U
Other languages
Chinese (zh)
Inventor
郑尚峰
张慧玲
范胜利
朱勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201820150680.9U priority Critical patent/CN208476921U/en
Application granted granted Critical
Publication of CN208476921U publication Critical patent/CN208476921U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device, to provide relatively reliable test data steadily in the long term for the design in permafrost region tunnel, construction and operation phase, to better ensure that the safety and economy of permafrost region tunnel structure.Including main body chamber, environmental chamber, detection device and Frozen-thawed cycled simulation system;The environmental chamber is set in main body chamber, the setting of tunnel lining structure model is placed in environmental chamber, the local flooding simulation device in lining cutting behind is set on tunnel lining structure model outer wall, and the local flooding simulation device in lining cutting behind feeds pipeline by ponding and is connected with the ponding device for supplying hung on main body test box outer wall;In filling country rock simulation material outside tunnel lining structure model in the environmental chamber;The component of the detection device is embedded in country rock simulation material, is pasted on the inside and outside wall of tunnel lining structure model;The host of the Frozen-thawed cycled simulation system is set to outside main body chamber, and air supply device is set to the top of main body chamber side wall.

Description

A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring Device
Technical field
The utility model relates to traffic tunnel design and construction field of engineering technology, in particular to a kind of permafrost region tunnel lining Build local ponding Frozen-thawed cycled effect simulation behind, monitoring device.
Background technique
With building more and more with built permafrost region tunnel quantity, operation phase freezing damage in tunnel problem is also more universal.Freeze The tunnel Tu Qu operation phase freeze injury problem main forms are tunnel-liner frost heave cracking, ice is hung in infiltration, ditch is freezed.Lining cutting Frost heave cracking will cause tunnel durability, safety seriously reduces, and active time is sharply reduced;Ice is hung in infiltration, ditch freezes to ask Topic keeps accumulated ice in tunnel serious, and headroom reduces, and can not drive a vehicle.Research achievement thinks that the local ponding in lining cutting behind is anti-both at home and abroad at present Freeze thawing cyclic process is to cause one of the principal element of operation phase freezing damage in tunnel problem again.
People serve as a contrast tunnel under tunnel-liner behind different ponding position, ponding magnitude and repeated freeze-thaw cycle action condition Block structure stress feature, failure mode shortage are understood in depth, and tunnel-liner behind ponding alimentation mechanism is still not clear.Pass through Establish tunnel-liner local ponding Frozen-thawed cycled effect simulation behind, monitoring device carries out tunnel-liner local ponding freeze thawing behind Tunnel structure mechanical characteristic model test under cycling condition obtains tunnel lining structure in different ponding positions, ponding with analysis The stress characteristic of tunnel lining structure, failure mode and tunnel-liner behind ponding under the conditions of magnitude and freezing-thawing cycles Recharge Mechanism, to improving permafrost region structure design of tunnel system;Optimize permafrost region tunnel structure guarded drainage, thermal retardation form;To freeze Native area's tunnel structure problem provides test data, has a very important significance.
Existing domestic and foreign scholars study research in terms of permafrost region tunnel structure, and the method mainly used has theory deduction, number It is worth simulation, laboratory test etc..Wherein, theory deduction, method of numerical simulation are mainly in country rock Frost heaving mechanism, frost heave sheet The research of the contents such as structure model, permafrost region country rock distribution law of temperature field, for the local ponding Frozen-thawed cycled in tunnel-liner behind Effect aspect research also not system, comprehensively.Often assumed condition limits excessive theory deduction research means, and correlated variables changes Change will lead to derivation result can not explicit expression, as a result also excessively idealize, it is limited to practice of construction directive significance;Numerical simulation Although relatively reducing calculation amount, save and calculate the time, simulation process is based on theory, and there are analog results can not be with reality The deficiency that situation matches.Indoor model test is that tunnel scene is carried out reduced scale real simulation, has and coincide with actual conditions Degree is high, feature at low cost, is to study the ideal research method of permafrost region tunnel structure.
Frost heave is made under the mainly fixed moisture content wall rock condition of existing permafrost region tunnel structure frost heave action simulation system With simulation system, by adjusting country rock material moisture content, frost heave action is for tunnel under the conditions of realizing different surrounding rock grade, moisture content The influence of road structure only accounts for specific country rock moisture content by not freezing to freezing single process of frost heave for the shadow of tunnel structure It rings.Existing method and system are commonly used in permafrost area vcehicular tunnel and railway tunnel, can not consider seasonal frozen soil region tunnel Cyclic process of the road by Tunnel Lining Cracks development and change under the influence of frost heave ringing repeatedly, and integrally freeze compared to country rock Bulk value, local ponding position frost heave action magnitude is larger behind for lining cutting, and frost heave load assignment is uneven, is easier to make liner structure Generate stress concentration phenomenon, cause tunnel-liner local location crack, damage of lining form also with actual tunnel failure mode compared with It is identical.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of permafrost region tunnel-liner local ponding freeze thawing behind Ringing simulation, monitoring device, with more preferable simulation difference hydrogeologic condition and including seasonal frozen soil region, permafrost The different surrounding rock rank in area, realize under different hydrogeologic conditions tunnel-liner behind different ponding positions, ponding magnitude with And when repeated freeze-thaw cycle effect, the simulation of tunnel-liner stress characteristic, failure mode is design, the construction in permafrost region tunnel There is provided relatively reliable test data steadily in the long term with the operation phase, thus better ensure that permafrost region tunnel structure safety and Economy.
It is as follows that the utility model solves technical method used by above-mentioned technical problem:
A kind of permafrost region tunnel part ponding Frozen-thawed cycled effect simulation of the utility model, monitoring device, it is characterized in that: Including main body chamber, environmental chamber, detection device and Frozen-thawed cycled simulation system;The environmental chamber is set to main body In chamber, the setting of tunnel lining structure model is placed in environmental chamber, and lining is arranged on tunnel lining structure model outer wall Local flooding simulation device behind is built, local flooding simulation device feeds pipeline by ponding and hangs on main body examination behind for lining cutting Ponding device for supplying on tryoff outer wall is connected;In filling country rock mould outside tunnel lining structure model in the environmental chamber Quasi- material;The component of the detection device is embedded in country rock simulation material, is pasted on the inside and outside of tunnel lining structure model On wall;The host of the Frozen-thawed cycled simulation system is set to outside main body chamber, and air supply device is set to main body chamber The top of side wall.
The beneficial effects of the utility model are mainly reflected in following aspects:
(1) experimental rig can realize simulation varying environment temperature, different freezing-thawing cycles, different permafrost region types, Under the conditions of different tunnel cross-section forms and size, tunnel-liner behind ponding is special to tunnel lining structure stress at ice frost heave action Sign, failure mode.By adjusting high/low temperature difference and ascending, descending in Frozen-thawed cycled simulation system in Frozen-thawed cycled environment simulator Warm cycle-index, to realize above-mentioned simulation.
(2) according to lining cutting behind different ponding position, water accumulating volume and ponding distribution form, using high-intensitive sponge, production Tunnel-liner behind flooding simulation material, to realize lining cutting different ponding position, water accumulating volume and ponding distribution form condition behind Under, influence of the ponding at ice frost heave action to tunnel-liner stress characteristic, failure mode.
(3) different surrounding rock grade, difference can be simulated by the match ratio of country rock simulation material in modification main body chamber Under the conditions of moisture content, influence of the tunnel-liner behind ponding at ice frost heave action to tunnel-liner stress characteristic, failure mode.
(4) by adjusting the cooperation of tunnel-liner simulation material when shape, different tunnel-liner section shapes can be simulated Under the conditions of formula, different tunnel cross-section sizes, different strength of lining, tunnel-liner behind ponding is at ice frost heave action to tunnel-liner The influence of stress characteristic, failure mode.
Detailed description of the invention
This specification includes following three width attached drawing:
Fig. 1 is a kind of permafrost region tunnel-liner of the utility model local ponding Frozen-thawed cycled effect simulation behind, monitoring dress The front view set;
Fig. 2 is a kind of permafrost region tunnel-liner of the utility model local ponding Frozen-thawed cycled effect simulation behind, monitoring dress The left view set;
Fig. 3 is a kind of permafrost region tunnel-liner of the utility model local ponding Frozen-thawed cycled effect simulation behind, monitoring dress The top view set.
Main component and corresponding label: main body chamber 1, environmental chamber 2, air supply device 3, freeze thawing are shown in figure Circulating analog system 4, tunnel lining structure model 5, local flooding simulation device 6, ponding supply pipeline 7 are closed behind for lining cutting Door 8, ponding device for supplying 9, environmental chamber monitors component 10, main body chamber monitors component 11, country rock simulation material 12。
Specific embodiment
The present invention will be further described With reference to embodiment, and specific embodiment is to the utility model The further explanation of principle, does not limit the utility model in any way, and technology same or like with the utility model does not have Range beyond the utility model protection.
Referring to FIG. 1, FIG. 2 and FIG. 3, the utility model a kind of permafrost region tunnel part ponding Frozen-thawed cycled effect simulation, Monitoring device includes main body chamber 1, environmental chamber 2, detection device and Frozen-thawed cycled simulation system 4.The environmental simulation Case 2 is set in main body chamber 1, and the setting of tunnel lining structure model 5 is placed in environmental chamber 2, tunnel lining structure Lining cutting local flooding simulation device 6 behind is set on 5 outer wall of model, and local flooding simulation device 6 is mended by ponding behind for lining cutting It is connected to pipeline 7 with the ponding device for supplying 9 hung on 1 outer wall of main body chamber.In tunnel in the environmental chamber 2 Country rock simulation material 12 is loaded outside liner structure model 5.The component of the detection device is embedded in country rock simulation material 12, It is pasted on the inside and outside wall of tunnel lining structure model 5.The host of the Frozen-thawed cycled simulation system 4 is set to main body test Outside case 1, air supply device 3 is set to the top of 1 side wall of main body chamber.
The country rock simulation material 12 may be selected different material and match ratio and simulate different Grades of Surrounding Rock, country rock simulation Material 12 includes gypsum, water, quartz sand and blanc fixe etc..Mono- layer of every 15cm is allocated as being loaded at least twice when filling, often Interlayer shaving after secondary filling, avoids being layered, and then manually vibrate 20 bulk density for making country rock simulation material 12 reach demand It is required that.
The tunnel lining structure model 5 can be using different tunnel cross-section sizes and different materials cooperation production.? Select different tunnel cross-section size and material mix proportion to simulate different Tunnel structures, size, including the shape of a hoof, circle, Stalk shape, light section, middle section, big cross section, extra-large cross-section etc..The making material of tunnel lining structure model 5 include gypsum, Water, quartz sand etc., according to the shape for pouring into mold after certain match ratio mix demand being made.
Local flooding simulation device 6 is using high-intensitive sponge production behind for the lining cutting, outside tunnel lining structure model 5 Wall fits closely, to realize the simulation of simulation tunnel-liner behind different ponding position, ponding magnitude.And product is fixed in its center 7 end of water supply tube road, ponding feed and wrap up thermal insulation material outside pipeline 7.
The ponding device for supplying 9 is made of electronics water monitoring device, water tank, make-up pipe, is supervised by electronics water It surveys device and automatically records water situation of change in water tank, monitor ponding alimentation process to realize.
Referring to Fig.1, the main body chamber 1 is welded to form by steel plate, and box top and box body bolt consolidate, and facilitates folding Load country rock simulation material 12, tunnel lining structure model 5, lining cutting local flooding simulation device 6 behind.Box top is by test Monitoring, ponding supply demand open up through-hole 11, and make-up pipe, monitoring cable is facilitated to draw.2 inner wall of environmental chamber and bottom It is respectively provided with certain thickness insulating layer on wall, openable sealed door 8 is set on the side wall of side.
The host of the Frozen-thawed cycled simulation system 4 is made of large-scale program control type high/low temperature air conditioner and control system. High/low temperature by setting host controls program and heating and cooling cycle-index, is heated up, is dropped as required by air supply device 3 Warm process.
The monitoring device includes earth pressure gauge, temperature detecting sensor, strain rosette, numerical control displacement acquisition instrument, electronic water Measure monitoring device, static strain Acquisition Instrument or dynamic collecting instrument.Soil pressure is carried out by monitoring scheme inside country rock simulation material 12 The arrangement of power meter, temperature sensor carries out strain rosette, numerical control position by monitoring scheme on 5 inner wall of tunnel lining structure model, outer wall Move the arrangement of Acquisition Instrument.
By main body chamber 1, country rock simulation material 12, tunnel lining structure model 5, lining cutting, part is long-pending behind as desired After setting completed, the master of Frozen-thawed cycled simulation system 4 is arranged in water installations 6, ponding supply pipeline 7, ponding device for supplying water tank 9 The control program of machine, air supply device 3 are started to work.As 2 temperature of environmental chamber reduces, local flooding simulation is filled behind for lining cutting 6 formation ponding are set into ice process, tunnel lining structure model 5 is acted on by local ponding frost-heave force;And then with environmental simulation 2 temperature of case gradually rises, and local ponding disappears at ice position frost heave action behind for lining cutting, in ponding device for supplying water tank 9 Water feeds pipeline 7 to lining cutting local water collecting device flowing behind by ponding, generates ponding and feeds phenomenon;When environmental chamber 2 When temperature reduces again, local 6 frost heave action of flooding simulation device occurs again behind for lining cutting, so on circulate, finally It forms Frozen-thawed cycled and acts on lower lining cutting local ponding position frost heave action behind.
It compared with the conventional method can more preferable simulation difference hydrogeologic condition and include seasonal compared with, the utility model Permafrost region, permafrost area different surrounding rock rank, realize under different hydrogeologic conditions tunnel-liner different ponding behind When position, ponding magnitude and repeated freeze-thaw cycle act on, the simulation of tunnel-liner stress characteristic, failure mode is permafrost region The design in tunnel, construction and operation phase provide relatively reliable test data steadily in the long term, to better ensure that permafrost region The safety and economy of tunnel structure.
The above only explains through diagrams, and part ponding freeze thawing follows a kind of permafrost region tunnel-liner of the utility model behind Ring acts on some principles of simulation, monitoring device, is not intended to the specific structure shown in being confined to the utility model and described In the scope of application, therefore all corresponding modifications that may be utilized and equivalent, it belongs to the utility model and is applied The scope of the patents.

Claims (9)

1. a kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect simulation behind, monitoring device, it is characterized in that: including master Body chamber (1), environmental chamber (2), detection device and Frozen-thawed cycled simulation system (4);Environmental chamber (2) setting In main body chamber (1), tunnel lining structure model (5) setting is placed in environmental chamber (2), tunnel lining structure mould Lining cutting local flooding simulation device (6) behind is set on type (5) outer wall, and local flooding simulation device (6) passes through product behind for lining cutting Water supply tube road (7) is connected with the ponding device for supplying (9) hung on main body chamber (1) outer wall;The environmental simulation Country rock simulation material (12) is loaded outside in tunnel lining structure model (5) in case (2);The component of the detection device is embedded in In country rock simulation material (12), it is pasted on the inside and outside wall of tunnel lining structure model (5);The Frozen-thawed cycled simulation system (4) host is set to main body chamber (1) outside, and air supply device (3) is set to the top of main body chamber (1) side wall.
2. a kind of permafrost region tunnel-liner as described in claim 1 local ponding Frozen-thawed cycled effect simulation behind, monitoring dress Set, it is characterized in that: the country rock simulation material (12) load when every mono- layer of 15cm be allocated as being loaded at least twice, every time load After interlayer shaving, avoid being layered, the bulk density requirement for making country rock simulation material (12) reach demand of then manually vibrating 20 times.
3. a kind of permafrost region tunnel-liner as described in claim 1 local ponding Frozen-thawed cycled effect simulation behind, monitoring dress It sets, it is characterized in that: the tunnel lining structure model (5) is using different tunnel cross-section sizes and different materials cooperation production.
4. a kind of permafrost region tunnel-liner as described in claim 1 local ponding Frozen-thawed cycled effect simulation behind, monitoring dress It sets, it is characterized in that: local flooding simulation device (6) is using high-intensitive sponge production behind for the lining cutting, with tunnel lining structure Model (5) outer wall fits closely, and fixes ponding in its center and feed pipeline (7) water outlet, and ponding feeds packet outside pipeline (7) Wrap up in thermal insulation material.
5. a kind of permafrost region tunnel-liner as described in claim 1 local ponding Frozen-thawed cycled effect simulation behind, monitoring dress It sets, it is characterized in that: the ponding device for supplying (9) is made of electronics water monitoring device, water tank, make-up pipe, by electronics Water quantity monitoring device automatically records water situation of change in water tank, monitors ponding alimentation process to realize.
6. a kind of permafrost region tunnel-liner as claimed in claim 5 local ponding Frozen-thawed cycled effect simulation behind, monitoring dress It sets, it is characterized in that: the main body chamber (1) is welded to form by steel plate, box top and box body bolt are consolidated, and folding is facilitated to fill out Fill country rock simulation material (12), tunnel lining structure model (5), lining cutting local flooding simulation device (6) behind;Box top is pressed Test monitoring, ponding supply demand open up through-hole (11), and make-up pipe, monitoring cable is facilitated to draw.
7. a kind of permafrost region tunnel-liner as claimed in claim 5 local ponding Frozen-thawed cycled effect simulation behind, monitoring dress It sets, it is characterized in that: being respectively provided with certain thickness insulating layer on the environmental chamber (2) inner wall and bottom wall, is set on the side wall of side Set openable sealed door (8).
8. a kind of permafrost region tunnel-liner as described in claim 1 local ponding Frozen-thawed cycled effect simulation behind, monitoring dress It sets, it is characterized in that: the host of the Frozen-thawed cycled simulation system (4) is by large-scale program control type high/low temperature air conditioner and control system Composition.
9. a kind of permafrost region tunnel-liner as described in claim 1 local ponding Frozen-thawed cycled effect simulation behind, monitoring dress It sets, it is characterized in that: the monitoring device includes earth pressure gauge, temperature detecting sensor, strain rosette, numerical control displacement acquisition instrument, electricity Sub- water quantity monitoring device, static strain Acquisition Instrument or dynamic collecting instrument.
CN201820150680.9U 2018-01-29 2018-01-29 A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device Active CN208476921U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820150680.9U CN208476921U (en) 2018-01-29 2018-01-29 A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820150680.9U CN208476921U (en) 2018-01-29 2018-01-29 A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device

Publications (1)

Publication Number Publication Date
CN208476921U true CN208476921U (en) 2019-02-05

Family

ID=65204704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820150680.9U Active CN208476921U (en) 2018-01-29 2018-01-29 A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device

Country Status (1)

Country Link
CN (1) CN208476921U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108181446A (en) * 2018-01-29 2018-06-19 中铁二院工程集团有限责任公司 A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device
CN110108861A (en) * 2019-05-30 2019-08-09 西北农林科技大学 A kind of auxiliary hot pin indoor model test device of research canal base day heat
CN110375804A (en) * 2019-07-17 2019-10-25 昆明理工大学 A kind of monitoring device for constructing tunnel
CN111766369A (en) * 2020-07-01 2020-10-13 中国科学院地质与地球物理研究所 Visual system for simulating deep roadway deformation under underground water freeze-thaw cycle effect

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108181446A (en) * 2018-01-29 2018-06-19 中铁二院工程集团有限责任公司 A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device
CN110108861A (en) * 2019-05-30 2019-08-09 西北农林科技大学 A kind of auxiliary hot pin indoor model test device of research canal base day heat
CN110108861B (en) * 2019-05-30 2022-02-15 西北农林科技大学 Indoor model test device for researching channel-based natural auxiliary heating rod
CN110375804A (en) * 2019-07-17 2019-10-25 昆明理工大学 A kind of monitoring device for constructing tunnel
CN110375804B (en) * 2019-07-17 2021-03-02 昆明理工大学 Monitoring device for tunnel construction
CN111766369A (en) * 2020-07-01 2020-10-13 中国科学院地质与地球物理研究所 Visual system for simulating deep roadway deformation under underground water freeze-thaw cycle effect
CN111766369B (en) * 2020-07-01 2021-02-12 中国科学院地质与地球物理研究所 Visual system for simulating deep roadway deformation under underground water freeze-thaw cycle effect

Similar Documents

Publication Publication Date Title
CN208476921U (en) A kind of ponding Frozen-thawed cycled effect simulation of permafrost region tunnel-liner behind part, monitoring device
CN108181446A (en) A kind of permafrost region tunnel-liner local ponding Frozen-thawed cycled effect behind is simulated, monitoring device
CN104597222B (en) There is the large-scale frozen soil model pilot system of water supplement function and frost heave test function
CN105952461B (en) A kind of experimental rig and method for being used to simulate earth pressure balanced shield, EPBS construction sediment improvement
CN109283215B (en) Method for measuring and calculating frost heaving force of tunnel surrounding rock in cold region after repeated freeze-thaw damage
CN202562912U (en) Layered temperature controlling soil freezing and thawing cycle test device
CN102864793B (en) Test device for simulating permafrost region well heat insulation or heating
CN103091358B (en) Indoor model test apparatus for ground source heat pump rock soil thermal response testing and application thereof
CN103969282A (en) Test device for making research on soil freezing and thawing temperature field, water migration and deformation law
CN108333328A (en) Subgrade soil displacement field and the visual experimental rig of seepage field and test method under a kind of seepage flow dynamic load by vehicle
CN104569341A (en) Vacuum preloading and electroosmosis combined testing device and vacuum preloading and electroosmosis combined testing method
CN105651677A (en) Geotechnical parameter and property tester capable of simultaneously testing specific yield and osmotic coefficient
CN105784935B (en) A kind of multi-functional ice-melt snow pavement test device and evaluation method
CN111175477B (en) Saturated fine sand layer induced grouting experimental model and experimental method
CN206052685U (en) Screw thread freezing pipe
CN105544494A (en) Temperature-controllable salt leaching-adding soil test device and method for testing soil sample by using same
CN104215655B (en) A kind of frozen soil three-dimensional heat conducting coefficient measurement device and method
CN104502565B (en) Two-dimensional solid hot gas THM coupling physical simulation experiment table
CN108536200A (en) A kind of freeze-wellboring engineering based on BP neural network freezes control strategy
CN109723025B (en) Underground structure boundary seepage test device and using method thereof
Mao et al. Experimental study of soil water migration in freezing process
CN110333138A (en) It is a kind of for studying the experimental rig of ice and dam body interaction under low temperature environment
CN205557493U (en) Salt soil test device is washed - mends to controllable temperature
CN106124160A (en) A kind of Tunnel Base structure pump-absorb action analog
CN111680403B (en) Frozen wall development condition judging and early warning method based on thermo-acoustic coupling algorithm

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant