CN106121033A - 一种实心楼盖梁柱体系的叠合装配整体式地下室 - Google Patents

一种实心楼盖梁柱体系的叠合装配整体式地下室 Download PDF

Info

Publication number
CN106121033A
CN106121033A CN201610659635.1A CN201610659635A CN106121033A CN 106121033 A CN106121033 A CN 106121033A CN 201610659635 A CN201610659635 A CN 201610659635A CN 106121033 A CN106121033 A CN 106121033A
Authority
CN
China
Prior art keywords
cast
basement
overlapping
place
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610659635.1A
Other languages
English (en)
Inventor
张剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Broad Homes Industrial Group Co Ltd
Original Assignee
Changsha Broad Homes Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Broad Homes Industrial Group Co Ltd filed Critical Changsha Broad Homes Industrial Group Co Ltd
Priority to CN201610659635.1A priority Critical patent/CN106121033A/zh
Publication of CN106121033A publication Critical patent/CN106121033A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • E04B1/0015Cellars constructed from prefabricated units

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

一种实心楼盖梁柱体系的叠合装配整体式地下室,地下室底板为全现浇混凝土底板或预制叠合底板,地下室侧墙为预制叠合夹心墙,地下室中间设有若干现浇柱,现浇柱上安装有叠合梁,地下室顶板和负n层采用预制叠合实心楼板,其中n为自然数,预制叠合实心楼板与侧墙的预制叠合夹心墙顶部和现浇柱上的叠合梁通过现浇连接成整体。本发明充分发挥工厂预制质量好、速度快、效率高、环保性能好和现浇整体性好、结构强度高的优势,克服两者的缺点,扬长避短,实现现场无模块化施工,土方量小,人工成本和材料成本低,建设速度快,质量可控,无环境污染,技术性能优良。

Description

一种实心楼盖梁柱体系的叠合装配整体式地下室
技术领域
本发明属于建筑工程技术领域,具体涉及一种实心楼盖梁柱体系的叠合装配整体式地下室。
背景技术
众所周知,传统建筑地下室工程全部采用现浇混凝土结构,这就需要开挖足够大的地下基坑,以保证现场原材料堆放、混凝土运输、支模、浇筑、振捣、养护、折模等大规模施工操作空间,因此土方挖量大,回填量也大。由于所有工作都是在现场完成,所有墙板及顶板均要配置模板,且模板要在混凝土完全达到强度后才能拆除,因此,模板、脚手架需求量大,施工周期长,人工多,所有原材料均以散装形式运到现场,污染环境,造成原材料浪费,人工成本高,而且混凝土现场浇注人工振捣操作难度大,要求高,稍有振捣不实,就会留下漏水隐患。此外,现场浇注混凝土质量不可控,养护条件差,混凝土出现微裂纹的可能性大,后期雨水会通过微裂纹渗漏,影响建筑质量。
发明内容
本发明所要解决的技术问题是:解决上述现有技术存在的问题,而提供一种实心楼盖梁柱体系的叠合装配整体式地下室,充分发挥工厂预制质量好、速度快、效率高、环保性能好和现浇整体性好、结构强度高的优势,克服两者的缺点,扬长避短,实现现场无模块化施工,土方量小,人工成本和材料成本低,建设速度快,质量可控,无环境污染,技术性能优良。
本发明采用的技术方案是:一种实心楼盖梁柱体系的叠合装配整体式地下室,地下室底板为全现浇混凝土底板或预制叠合底板,地下室侧墙为预制叠合夹心墙,地下室中间设有若干现浇柱,现浇柱上安装有叠合梁,地下室顶板和负n层采用预制叠合实心楼板,其中n为自然数,预制叠合实心楼板与侧墙的预制叠合夹心墙顶部和现浇柱上的叠合梁通过现浇连接成整体。
上述技术方案中,所述的叠合梁包括预制梁部分和现浇梁部分。
上述技术方案中,所述预制叠合实心楼板包括叠合楼板预制层和叠合楼板现浇层,预制叠合实心楼板的端头搭接在叠合梁的预制梁部分上,并连接有拼缝钢筋和/或构造钢筋,预制叠合实心楼板的叠合楼板现浇层与叠合梁的现浇梁部分一起通过现浇混凝土整体连接成型。
上述技术方案中,所述的叠合梁采用明梁或/和暗梁。
上述技术方案中,所述的预制叠合底板包括底板预制层和底板现浇层。
上述技术方案中,所述预制叠合夹心墙包括预制外叶墙、预制内叶墙和现浇夹心层。
本发明的叠合装配式的地下室通过工厂预制一部分,现场叠合现浇一部分,充分发挥工厂预制质量好、速度快、效率高和现场浇注整体性好、结构强度高的优势,克服两者的缺点,扬长避短,改变了传统现浇地下室土方量大、施工困难,成本高,周期长、效率低、原材料浪费多、环境污染严重的原始落后状态,实现了现场无模板化施工,土方量小,人工成本和材料成本低,建设速度快,质量可控,无环境污染,优质高效,并具有优良的防水性能。
以面积为10431m2的地下室为例,传统技术工期40天,本发明工期10天,传统技术工人156人,本发明只需82人,所用模板量大大减少,脚手架用量也减少,人工措施减少,砌体抹灰减少,施工速度提高四倍,文明施工,环保性能好。以工程造价为例,模板工程造价能减少100元/ m2,现浇钢筋、混凝土工程造价减少127元/ m2,防水工程造价减少87/ m2,砌体及抹灰工程造价减少29元/ m2,脚手架工程费用减少30元/ m2,其他措施项目费用减少25元/ m2。因此,本发明的叠合装配式地下室比传统技术施工地下室减少工程造价398元/ m2
本发明的生产为柔性智能生产流水线作业,生产效率高,成本低,本发明的运输方便、高效、成本低;本发明的施工简单易操作,施工质量可控,综合成本低,外观平整,防水性能好,整体质量优。
附图说明:
图1为本发明整体结构示意图;
图2为预制叠合实心楼板安装结构示意图。
附图标记: 1—地下室底板,2—地下室侧墙,3—现浇柱,4—叠合梁,5—叠合楼板预制层,6—叠合楼板现浇层,7—桁架。
具体实施方式:
参见图1、图2,本发明的实心楼盖梁柱体系的叠合装配整体式地下室,地下室底板为全现浇混凝土底板或预制叠合底板,地下室侧墙为预制叠合夹心墙,地下室中间设有若干现浇柱,现浇柱上安装有叠合梁,地下室顶板和负n层采用预制叠合实心楼板,其中n为自然数,预制叠合实心楼板与侧墙的预制叠合夹心墙顶部和现浇柱上的叠合梁通过现浇连接成整体,所述的叠合梁包括预制梁部分和现浇梁部分,所述预制叠合实心楼板包括叠合楼板预制层和叠合楼板现浇层,预制叠合实心楼板的端头搭接在叠合梁的预制梁部分上,并连接有拼缝钢筋和/或构造钢筋,预制叠合实心楼板的叠合楼板现浇层与叠合梁的现浇梁部分一起通过现浇混凝土整体成型,所述的叠合梁采用明梁或/和暗梁,所述的预制叠合底板包括底板预制层和底板现浇层,所述预制叠合夹心墙包括预制外叶墙、预制内叶墙和现浇夹心层。

Claims (6)

1.一种实心楼盖梁柱体系的叠合装配整体式地下室,其特征在于:地下室底板为全现浇混凝土底板或预制叠合底板,地下室侧墙为预制叠合夹心墙,地下室中间设有若干现浇柱,现浇柱上安装有叠合梁,地下室顶板和负n层采用预制叠合实心楼板,其中n为自然数,预制叠合实心楼板与侧墙的预制叠合夹心墙顶部和现浇柱上的叠合梁通过现浇连接成整体。
2.根据权利要求1所述的实心楼盖梁柱体系的叠合装配整体式地下室,其特征在于:所述的叠合梁包括预制梁部分和现浇梁部分。
3.根据权利要求1所述的实心楼盖梁柱体系的叠合装配整体式地下室,其特征在于:所述预制叠合实心楼板包括叠合楼板预制层和叠合楼板现浇层,预制叠合实心楼板的端头搭接在叠合梁的预制梁部分上,并连接有拼缝钢筋和/或构造钢筋,叠合楼板现浇层与叠合梁的现浇梁部分一起通过现浇混凝土整体连接固定成型。
4.根据权利要求1所述的实心楼盖梁柱体系的叠合装配整体式地下室,其特征在于:所述的叠合梁采用明梁或/和暗梁。
5.根据权利要求1所述的实心楼盖梁柱体系的叠合装配整体式地下室,其特征在于:所述的预制叠合底板包括底板预制层和底板现浇层。
6.根据权利要求1所述的实心楼盖梁柱体系的叠合装配整体式地下室,其特征在于:所述预制叠合夹心墙包括预制外叶墙、预制内叶墙和现浇夹心层。
CN201610659635.1A 2016-08-12 2016-08-12 一种实心楼盖梁柱体系的叠合装配整体式地下室 Pending CN106121033A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610659635.1A CN106121033A (zh) 2016-08-12 2016-08-12 一种实心楼盖梁柱体系的叠合装配整体式地下室

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610659635.1A CN106121033A (zh) 2016-08-12 2016-08-12 一种实心楼盖梁柱体系的叠合装配整体式地下室

Publications (1)

Publication Number Publication Date
CN106121033A true CN106121033A (zh) 2016-11-16

Family

ID=57258688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610659635.1A Pending CN106121033A (zh) 2016-08-12 2016-08-12 一种实心楼盖梁柱体系的叠合装配整体式地下室

Country Status (1)

Country Link
CN (1) CN106121033A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700648A (zh) * 2017-10-23 2018-02-16 浙江展诚建设集团股份有限公司 预制件和现浇柱装配整体式混凝土框架结构施工工法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07207800A (ja) * 1994-01-10 1995-08-08 Kajima Corp プレキャスト鉄筋コンクリート大梁と鉄骨小梁を使用した床工法
CN103741714A (zh) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 地下工程全盖挖逆作法施工方法
CN104005476A (zh) * 2014-06-16 2014-08-27 王睿敏 易于制作安装预制框架系统及施工方法
CN104278749A (zh) * 2014-10-23 2015-01-14 湖北弘毅建设有限公司 一种装配式建筑钢-混组合结构部品一体化连接系统
CN105484354A (zh) * 2015-12-15 2016-04-13 宝钢建筑系统集成有限公司 一种装配式钢结构建筑体系及其施工方法
CN105649360A (zh) * 2015-12-29 2016-06-08 山东远博建筑科技有限公司 一种整体装配式建筑系统及安装方法
CN205894278U (zh) * 2016-08-12 2017-01-18 长沙远大住宅工业集团股份有限公司 一种实心楼盖梁柱体系的叠合装配整体式地下室

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07207800A (ja) * 1994-01-10 1995-08-08 Kajima Corp プレキャスト鉄筋コンクリート大梁と鉄骨小梁を使用した床工法
CN103741714A (zh) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 地下工程全盖挖逆作法施工方法
CN104005476A (zh) * 2014-06-16 2014-08-27 王睿敏 易于制作安装预制框架系统及施工方法
CN104278749A (zh) * 2014-10-23 2015-01-14 湖北弘毅建设有限公司 一种装配式建筑钢-混组合结构部品一体化连接系统
CN105484354A (zh) * 2015-12-15 2016-04-13 宝钢建筑系统集成有限公司 一种装配式钢结构建筑体系及其施工方法
CN105649360A (zh) * 2015-12-29 2016-06-08 山东远博建筑科技有限公司 一种整体装配式建筑系统及安装方法
CN205894278U (zh) * 2016-08-12 2017-01-18 长沙远大住宅工业集团股份有限公司 一种实心楼盖梁柱体系的叠合装配整体式地下室

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700648A (zh) * 2017-10-23 2018-02-16 浙江展诚建设集团股份有限公司 预制件和现浇柱装配整体式混凝土框架结构施工工法

Similar Documents

Publication Publication Date Title
CN205894281U (zh) 一种无梁楼盖体系的叠合装配整体式地下室
CN105839667B (zh) 全预制叠合装配式地下综合管廊的施工制作工艺
WO2017206411A1 (zh) 全预制叠合装配式地下综合管廊及其连接节点
CN206070835U (zh) 一种装配式建筑底层组合楼板
CN205662947U (zh) 叠合装配式地下管廊体系
CN107313517B (zh) 叠合墙与中间层叠合楼板连接节点
CN104805866A (zh) 预制的综合管廊及施工方法
CN106088318A (zh) 无梁楼盖体系与梁柱体系结合的叠合装配整体式地下室
CN106121035A (zh) 一种无梁楼盖体系的叠合装配整体式地下室
CN106088316A (zh) 一种空心楼盖梁柱体系的叠合装配整体式地下室
CN106088320A (zh) 一种楼盖梁柱体系的叠合装配整体式地下室
CN204753627U (zh) 预制的综合管廊
CN106522359A (zh) 一种全装配式村镇民居类复合墙结构体系及其施工方法
CN106088317A (zh) 梁柱体系与无梁楼盖体系结合的叠合装配整体式地下室
CN205894280U (zh) 一种空心楼盖梁柱体系的叠合装配整体式地下室
CN106088319A (zh) 一种无梁空心楼盖体系的叠合装配整体式地下室
CN205894278U (zh) 一种实心楼盖梁柱体系的叠合装配整体式地下室
CN206956949U (zh) 叠合墙与中间层叠合楼板连接节点
CN205894279U (zh) 一种无梁空心楼盖体系的叠合装配整体式地下室
CN106121033A (zh) 一种实心楼盖梁柱体系的叠合装配整体式地下室
CN106121034A (zh) 一种无梁实心楼盖体系的叠合装配整体式地下室
CN206205140U (zh) 一种全装配式村镇民居类复合墙结构体系
CN107471404A (zh) 一种水渠渠槽侧通预制件的生产方法
CN103243936A (zh) 后张法预应力钢筋混凝土模块装配式住宅
CN105401681A (zh) 一种基于装配式复合墙结构体系的快速拼装坡屋面及其建造方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication