CN106120831A - 一种建筑自动化排水系统及施工方法 - Google Patents
一种建筑自动化排水系统及施工方法 Download PDFInfo
- Publication number
- CN106120831A CN106120831A CN201610638306.9A CN201610638306A CN106120831A CN 106120831 A CN106120831 A CN 106120831A CN 201610638306 A CN201610638306 A CN 201610638306A CN 106120831 A CN106120831 A CN 106120831A
- Authority
- CN
- China
- Prior art keywords
- switch
- drainage
- sump
- immersible pump
- float
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 44
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000011449 brick Substances 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 230000001681 protective Effects 0.000 claims description 10
- 238000009412 basement excavation Methods 0.000 claims description 7
- 239000004575 stone Substances 0.000 claims description 7
- 210000003371 Toes Anatomy 0.000 claims description 5
- RYGMFSIKBFXOCR-UHFFFAOYSA-N copper Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 4
- 229910052802 copper Inorganic materials 0.000 claims description 4
- 239000010949 copper Substances 0.000 claims description 4
- 238000006073 displacement reaction Methods 0.000 claims description 4
- 238000007667 floating Methods 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 4
- 210000001513 Elbow Anatomy 0.000 claims description 3
- 240000004713 Pisum sativum Species 0.000 claims description 3
- 235000010582 Pisum sativum Nutrition 0.000 claims description 3
- 239000011083 cement mortar Substances 0.000 claims description 3
- 239000003292 glue Substances 0.000 claims description 3
- 229920000915 polyvinyl chloride Polymers 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 8
- 238000005516 engineering process Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229920003023 plastic Polymers 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 210000004369 Blood Anatomy 0.000 description 1
- 241000521257 Hydrops Species 0.000 description 1
- 210000001503 Joints Anatomy 0.000 description 1
- 240000007509 Phytolacca dioica Species 0.000 description 1
- 206010044565 Tremor Diseases 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 239000008280 blood Substances 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000000875 corresponding Effects 0.000 description 1
- 230000003247 decreasing Effects 0.000 description 1
- 230000003028 elevating Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/12—Restraining of underground water by damming or interrupting the passage of underground water
- E02D19/20—Restraining of underground water by damming or interrupting the passage of underground water by displacing the water, e.g. by compressed air
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/08—Restraining of underground water by employing open ditches arranged below the level of the water
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D9/00—Level control, e.g. controlling quantity of material stored in vessel
- G05D9/12—Level control, e.g. controlling quantity of material stored in vessel characterised by the use of electric means
Abstract
本发明公开了一种建筑自动化排水系统及施工方法,包括明水收集系统和排水系统,所述明水收集系统包括排水沟和集水井,排水系统包括排水管和潜水泵,潜水泵设置在集水井内,潜水泵和开关箱电连接,浮球开关与开关箱电连接,排水管进一步和潜水泵连接,浮球开关设置在潜水泵上,浮球开关与开关箱之间设有浮球配重块,浮球配重块能够在水位上升或下降时使浮球开关接通或断开线路,实现了全自动排水的目的,可极大的减少人力资源的消耗,降低工程成本,同时自动化排水系统自行运转,提高了排水效率,效果显著。
Description
技术领域
[0001]本发明属于建筑工程施工技术领域,具体涉及一种建筑自动化排水系统及施工方法。
背景技术
[0002] 随着建筑业的发展,我国高层建筑逐渐兴起,地库深基坑越来越普遍,而基坑工程施工现场的排水工作贯穿于整个地下施工全过程,降排水工作的好坏对基础施工的质量安全影响巨大。传统的排水措施一般在坡脚修筑简易的集水沟和集水井,采用Φ 50- Φ 100的潜水栗人工开关抽排,费工费时,效率低下。
[0003]专利申请号为CN201520552232.8的发明专利涉及一种自动化排水系统,主要包括水栗,其特征在于水栗通过流量传感器、水位传感器和通讯基站连接智能排水开关,智能排水开关设有与高水位、低水位及报警水位相对应的浮球,通过浮球的位置直接控制水栗的开停。水栗排水与停止由智能排水开关直接执行,当浮球开关到达高水位时,开关起动开始排水、低于低水位时排水停止,当到达报警水位时上传报警信号,当水栗故障时上传故障信号。通讯基站可以通过计算机的监控软件对水栗进行远程监测和参数设置。但是该发明并没有具体公开浮球的结构,单纯依靠浮球的位置直接控制水栗的开停,不稳定,流量或冲击量的大小也会对水栗的开停产生影响。
发明内容
[0004]本发明的目的是提供一种建筑自动化排水系统及施工方法,实现了全自动排水的目的,可极大的减少人力资源的消耗,降低工程成本,同时自动化排水系统自行运转,提高了排水效率,效果显著。
[0005]本发明公开了一种建筑自动化排水系统,包括明水收集系统和排水系统,所述明水收集系统包括排水沟和集水井,排水系统包括排水管和潜水栗,潜水栗设置在集水井内,潜水栗和开关箱电连接,浮球开关与开关箱电连接,排水管进一步和潜水栗连接,浮球开关设置在潜水栗上,浮球开关与开关箱之间设有浮球配重块,浮球配重块能够在水位上升或下降时使浮球开关接通或断开线路。具体设置时,浮球配重块可以设置在浮球开关与配电箱连接线中间,将开关线路一端下压固定在集水井底,浮球配重块靠近潜水栗的一侧设置,采用混凝土预制块作为浮球配重块,主要根据水位的升降控制浮球的倾斜度和位置,达到让浮球内钢珠运动开合开关的作用。
[0006]优选的是,所述浮球开关包括浮球接线端子,浮球接线端子的一端依次设有钢球接触铜片和钢球,当浮球开关倾斜或水平时,钢珠能与钢球接触铜片接触或分离从而接通或断开线路。
[0007]本发明还提供一种建筑自动化排水系统的施工方法,包括以下步骤:
步骤(I).砌筑明水收集系统:在基坑单侧、两侧或四周设置排水沟和集水井,具体包括以下步骤: 步骤(la).利用实心砖砌筑排水沟,后用水泥砂浆和细石混凝土抹面封底,顺着集水井方向留置0.5-1%的排水纵坡;
步骤(Ib).沿基坑边设置集水井,用砖砌或较大直径涵管制作,集水井井底比排水沟沟底低500-1000_,集水井直径或边长为700-1,集水井井底铺设厚碎石垫层;
步骤(2).安装排水系统,具体包括以下步骤:
步骤(2a).预制300 X 300mm厚50mm混凝土垫板,水平安置在集水井碎石垫层中;
步骤(2b).将潜水栗安放在混凝土垫板上;
步骤(2c).安装开关箱:按照一机,一箱,一闸,一漏的标准,设置开关、断路器、熔断器和漏电保护器,开关箱中各种开关电器的额定值和动作整定值应与控制用电设备的额定值和特性相适应;
步骤(2d).安装排水管:沿基坑边坡或地面铺设排水管并固定,根据坡面长度及潜水栗的安装位置,计算排水管需要的长度,利用钢锯下料,利用专用转换弯头和接头连接或,使用PVC专用胶水粘结;
步骤(2e).安装浮球配重块:位置应设置恰当,以保证在水位上升或下降时浮球有适当的倾斜或水平,使钢珠能接通或断开线路。
[0008]优选的是,所述步骤(2b)将潜水栗安放在垫板上之前还包括检查供电设备及供电线路能否保证潜水栗正常运行;检查电源电压和频率是否符合使用条件;按装箱单位检查零部件是否安全,并熟悉安装使用说明书;检查电气线路,控制和保护装置是否合理、安全可靠;检查各种安装使用工具。
[0009]上述任一方案优选的是,所述步骤(I)中排水沟、集水井沿基坑边坡并离开坡脚300mm-500mm距离设置。
[0010]上述任一方案优选的是,所述步骤(Ib)中集水井沿基坑边每隔15-20m设置一座,用砖砌或较大直径涵管制作,集水井井底铺设300_厚碎石垫层;
上述任一方案优选的是,所述步骤(2c)中开关箱中漏电保护器的额定漏电动作电流应小于30mA,额定漏电动作时间不应大于0.1s,漏电保护器应装设在靠近负荷的一侧,且不得用于启动电器设备的操作。
[0011]上述任一方案优选的是,所述步骤(2c)中开关箱与潜水栗之间的距离范围在3-
8m ο
[0012]上述任一方案优选的是,所述步骤(2d)中排水管与潜水栗功率相配套,排水管管径根据排水量需要选择,管径范围在50-100_之间。
[0013]本发明公开了一种建筑自动化排水系统及施工方法,包括明水收集系统和排水系统,所述明水收集系统包括排水沟和集水井,排水系统包括排水管和潜水栗,潜水栗设置在集水井内,潜水栗和开关箱电连接,浮球开关与开关箱电连接,排水管进一步和潜水栗连接,浮球开关设置在潜水栗上,浮球开关与开关箱之间设有浮球配重块,浮球配重块能够在水位上升或下降时使浮球开关接通或断开线路,实现了全自动排水的目的,可极大的减少人力资源的消耗,降低工程成本,同时自动化排水系统自行运转,提高了排水效率,效果显著。
附图说明
[0014]图1是本发明的自动化排水系统整体结构示意图;
图2是图1的的潜水栗结构示意图;
图3是图1的浮球开关剖视图;
图4是图1的浮球开关另一剖视图。
具体实施方式
[0015]下述实施例是对于本发明内容的进一步说明以作为对本发明技术内容的阐释,但本发明的实质内容并不仅限于下述实施例所述,本领域的普通技术人员可以且应当知晓任何基于本发明实质精神的简单变化或替换均应属于本发明所要求的保护范围。
[0016]如图1-图4所示,本发明公开一种建筑自动化排水系统及施工方法,其结构包括在基坑四周设置排水沟9与集水井8,排水沟9、集水井8是沿基坑边坡并离开坡脚一定距离(300mm-500mm)设置,集水井8—般按照15m-20m设置一个,排水沟尺寸300 X 400mm,集水井尺寸500-1000 X 700-1000mm,形成基坑明水收集系统,所述潜水栗I是安装在集水井8内砂或碎石垫层上。浮球开关2为塑料浮球开关,浮球开关2加装在潜水栗I上,根据水位变化和自身的活动机制来控制电路的开闭;开关箱6是将电机线路集中在内的连接端子的箱体,再利用硬质PVC管材作为排水管7的自动化排水系统结构。
[0017]本发明公开了一种建筑自动化排水系统,明水收集系统包括排水沟9和集水井8。明水收集系统统一收集雨水、地下水。排水系统包括排水管7和潜水栗1.在集水井8中安装潜水栗I,加装浮球开关2,通过自动控制线路和内部活动机制来开闭电源的自动化系统。潜水栗I和开关箱6通过水栗电缆线4电连接,浮球开关2与开关箱6通过浮球电缆线5电连接,排水管7进一步和潜水栗I连接,浮球开关2设置在潜水栗I上,浮球开关2与开关箱6之间设有浮球配重块3,浮球配重块3能够在水位上升或下降时使浮球开关2接通或断开线路。当集水井8中水位达到一定高度,浮球开关2上浮到一定位置后,由于浮球配重块3的重力作用,浮球开关2会倾斜,自动化排水系统即自行启动运转排水,水位降低到一定低位排水系统则自动停止运转。
[0018] 一种建筑自动化排水系统的施工方法,施工方法包括:根据基坑的边坡长度合理设置积水井8、排水沟9,集水井8内铺设垫层,制作混凝土垫板,安装架设塑料浮球开关2的潜水栗I,安装开关箱6、连接线路,再安装排水管7,实现基坑排水工作的自动化时,实现无人值守排水,排水及时整体性能好的效果,具体方法如下:
1.1雨水、地下水收集系统砌筑
根据计算的排水量设计雨水、地下水收集系统。排水沟9和集水井8要根据基坑的大小、形状,沿建筑物基坑的单侧、两侧或四周设置。
[0019] 排水沟9(300 X 400mm)利用实心砖砌筑,后用水泥砂楽和细石混凝土抹面封底。位置设置在离开坡脚300mm处,顺着集水井8方向留置0.5_1%的排水纵坡。
[0020]集水井8沿基坑边每隔15-20m设置一座,用砖砌或较大直径涵管制作,井底应比排水沟9底低500-1000mm,集水井8直径或边长宜为700-1000mm,井底铺设300mm厚碎石滤层。[0021 ]当基坑深度较大,地下水位较高且多层土中上部有透水性较强的土层时,需要结合降水措施共同协作。
[0022] 1.2自动排水系统安装 (I)预制300 X 300mm,厚50mm混凝土垫板,水平安置在集水井8碎石垫层中,再将潜水栗I安放在垫板上,防止水栗I不稳倾覆,影响系统运行。
[0023] (2)水栗安装:水栗I安装前应检查供电设备及供电线路能否保证电栗正常运行;电源电压和频率是否符合使用条件;按装箱单位检查零部件是否安全,并熟悉安装使用说明书;检查电气线路,控制和保护装置是否合理、安全可靠;检查各种安装使用工具,然后利用塔吊吊入集水井中安装牢固。在集水井8内安装自动潜水栗I加浮球开关2的自动排水系统。在水位达到一定高度,由水位上升带动浮球开关2上升,由于浮球开关2内部的钢球12滚动接通线路,潜水栗I即可自行运转抽水,水位下降后浮球下降,钢球12脱离线路断开,水栗停止工作。
[0024] (3)开关箱6安装:开关箱6安装固定在防护栏杆13上,在按照“一机,一箱,一闸,一漏”的标准,设置开关、断路器或熔断器,以及漏电保护器。当漏电保护器是同时具有短路、过载、漏电保护功能的漏电断路器时,可不装设断路器或熔断器。
[0025]开关箱6中各种开关电器的额定值和动作整定值应与控制用电设备的额定值和特性相适应。
[0026]漏电保护器应装设在靠近负荷的一侧,且不得用于启动电器设备的操作。开关箱6中漏电保护器的额定漏电动作电流不应大于30mA,额定漏电动作时间不应大于0.1 s。
[0027]开关箱6的位置应尽量靠近排水栗I,一般控制在3_8m。
[0028] (4)排水管7安装:应沿基坑边坡或地面铺设,并采用卡箍与边坡固定,防止排水管7接头处因震动和水流冲击发生松动。排水管7管径在50-100mm,根据排水量需要选择,并与水栗功率相配套。
[0029]根据坡面长度及水栗I的安装位置,计算排水管7需要的长度,利用钢锯下料,专用转换弯头、接头,使用PVC专用胶水粘结。排水管7的一端和潜水栗I连接,另一端延伸至上部排水沟14内。
[0030] (5)浮球配重块3安装:位置应设置恰当,以保证在水位上升或下降时浮球有适当的倾斜或水平,使钢珠能接通或断开线路。
[0031] 1.3注水测试
地下基坑工程标准化自动排水组合系统组建完毕后,应向集水井中8注水检测系统的运行情况。测试潜水栗I的安装位置和浮球的位置是否符合排水水位要求,浮球随水位升降的开关闭合情况是否可靠,系统运行是否顺畅,及时调整与改进。
[0032]本发明提供一种建筑自动化排水系统及施工方法,实现了全自动排水的目的,可极大的减少人力资源的消耗,降低工程成本,同时自动化排水系统自行运转,提高了排水效率,效果显著。
[0033]以上详细描述了本发明的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本发明的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。
Claims (9)
1.一种建筑自动化排水系统,包括明水收集系统和排水系统,其特征在于,所述明水收集系统包括排水沟(9)和集水井(8),排水系统包括排水管(7)和潜水栗(I),潜水栗(I)设置在集水井(8)内,潜水栗(I)和开关箱(6)电连接,浮球开关(2)与开关箱(6)电连接,排水管(7)进一步和潜水栗(I)连接,浮球开关(2)设置在潜水栗(I)上,浮球开关(2)与开关箱(6)之间设有浮球配重块(3),浮球配重块(3)能够在水位上升或下降时使浮球开关(2)接通或断开线路。
2.根据权利要求1所述的建筑自动化排水系统,其特征在于,所述浮球开关(2)包括浮球接线端子(10),浮球接线端子(10)的一端依次设有钢球接触铜片(11)和钢球(12),当浮球开关(2)倾斜或水平时,钢珠(12)能与钢球接触铜片(11)接触或分离从而接通或断开线路。
3.—种建筑自动化排水系统的施工方法,其特征在于,包括以下步骤: 步骤(I).砌筑明水收集系统:在基坑单侧、两侧或四周设置排水沟(9)和集水井(8),具体包括以下步骤: 步骤(la).利用实心砖砌筑排水沟(9),后用水泥砂浆和细石混凝土抹面封底,顺着集水井(8 )方向留置0.5-1 %的排水纵坡; 步骤(Ib).沿基坑边设置集水井(8),用砖砌或较大直径涵管制作,集水井(8)井底比排水沟(9)沟底低500-1000_,集水井(8)直径或边长为700-1000mm,集水井(8)井底铺设厚碎石垫层; 步骤(2).安装排水系统,具体包括以下步骤: 步骤(2a).预制300 X 300mm厚50mm混凝土垫板,水平安置在集水井(8)碎石垫层中; 步骤(2b).将潜水栗(I)安放在混凝土垫板上; (2c)安装开关箱(6):按照一机,一箱,一闸,一漏的标准,设置开关、断路器、熔断器和漏电保护器,开关箱(6)中各种开关电器的额定值和动作整定值应与控制用电设备的额定值和特性相适应; (2d)安装排水管(7):沿基坑边坡或地面铺设排水管(7)并固定,根据坡面长度及潜水栗(I)的安装位置,计算排水管(7)需要的长度,利用钢锯下料,利用专用转换弯头和接头连接或,使用PVC专用胶水粘结; (2e)安装浮球配重块(3):位置应设置恰当,以保证在水位上升或下降时浮球有适当的倾斜或水平,使钢珠能接通或断开线路。
4.根据权利要求3所述的建筑自动化排水系统的施工方法,其特征在于,所述步骤(2b)将潜水栗(I)安放在垫板上之前还包括检查供电设备及供电线路能否保证潜水栗(I)正常运行;检查电源电压和频率是否符合使用条件;按装箱单位检查零部件是否安全,并熟悉安装使用说明书;检查电气线路,控制和保护装置是否合理、安全可靠;检查各种安装使用工具。
5.根据权利要求3所述的建筑自动化排水系统的施工方法,其特征在于,所述步骤(I)中排水沟(9)、集水井(8)沿基坑边坡并离开坡脚300mm-500mm距离设置。
6.根据权利要求3所述的建筑自动化排水系统的施工方法,其特征在于,所述步骤(Ib)中集水井(8)沿基坑边每隔15-20m设置一座,用砖砌或较大直径涵管制作,集水井(8)井底铺设300mm厚碎石垫层。
7.根据权利要求3所述的建筑自动化排水系统的施工方法,其特征在于,所述步骤(2c)中开关箱(6)中漏电保护器的额定漏电动作电流应小于30mA,额定漏电动作时间不应大于0.1s,漏电保护器应装设在靠近负荷的一侧,且不得用于启动电器设备的操作。
8.根据权利要求3所述的建筑自动化排水系统的施工方法,其特征在于,所述步骤(2c)中开关箱(6)与潜水栗(I)之间的距离范围在3-8m。
9.根据权利要求3所述的建筑自动化排水系统的施工方法,其特征在于,所述步骤(2d)中排水管(7)与潜水栗(I)功率相配套,排水管(7)管径根据排水量需要选择,管径范围在50-1 OOmm之间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610638306.9A CN106120831B (zh) | 2016-08-06 | 2016-08-06 | 一种建筑自动化排水系统及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610638306.9A CN106120831B (zh) | 2016-08-06 | 2016-08-06 | 一种建筑自动化排水系统及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106120831A true CN106120831A (zh) | 2016-11-16 |
CN106120831B CN106120831B (zh) | 2018-06-29 |
Family
ID=57255900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610638306.9A Active CN106120831B (zh) | 2016-08-06 | 2016-08-06 | 一种建筑自动化排水系统及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106120831B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366294A (zh) * | 2017-07-07 | 2017-11-21 | 中国十七冶集团有限公司 | 一种地下室的综合排水系统 |
CN108035369A (zh) * | 2017-12-07 | 2018-05-15 | 中国二十冶集团有限公司 | 建筑地下水降排及再利用方法 |
CN108797618A (zh) * | 2018-06-21 | 2018-11-13 | 中国十七冶集团有限公司 | 一种用于城市地下综合管廊基坑排水结构及其施工方法 |
CN111733846A (zh) * | 2020-06-24 | 2020-10-02 | 江苏省宁强建设有限公司 | 一种建筑自动化排水系统及施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101126242A (zh) * | 2006-08-16 | 2008-02-20 | 张骐 | 地下建筑物的控制水位的方法及系统 |
JP2010001615A (ja) * | 2008-06-18 | 2010-01-07 | Ihi Amtec Co Ltd | 止水箱の設置方法および止水箱 |
CN203201823U (zh) * | 2013-04-07 | 2013-09-18 | 国家电网公司 | 一种电缆沟自动排水装置 |
CN104989148A (zh) * | 2015-07-07 | 2015-10-21 | 铃木电梯(中国)有限公司 | 室内外地下底坑设备的积水避让系统及方法 |
CN204904099U (zh) * | 2015-07-28 | 2015-12-23 | 南京双京制泵有限公司 | 一种自动化排水系统 |
CN205975650U (zh) * | 2016-08-06 | 2017-02-22 | 安徽华力建设集团有限公司 | 一种建筑自动化排水系统 |
-
2016
- 2016-08-06 CN CN201610638306.9A patent/CN106120831B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101126242A (zh) * | 2006-08-16 | 2008-02-20 | 张骐 | 地下建筑物的控制水位的方法及系统 |
JP2010001615A (ja) * | 2008-06-18 | 2010-01-07 | Ihi Amtec Co Ltd | 止水箱の設置方法および止水箱 |
CN203201823U (zh) * | 2013-04-07 | 2013-09-18 | 国家电网公司 | 一种电缆沟自动排水装置 |
CN104989148A (zh) * | 2015-07-07 | 2015-10-21 | 铃木电梯(中国)有限公司 | 室内外地下底坑设备的积水避让系统及方法 |
CN204904099U (zh) * | 2015-07-28 | 2015-12-23 | 南京双京制泵有限公司 | 一种自动化排水系统 |
CN205975650U (zh) * | 2016-08-06 | 2017-02-22 | 安徽华力建设集团有限公司 | 一种建筑自动化排水系统 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366294A (zh) * | 2017-07-07 | 2017-11-21 | 中国十七冶集团有限公司 | 一种地下室的综合排水系统 |
CN108035369A (zh) * | 2017-12-07 | 2018-05-15 | 中国二十冶集团有限公司 | 建筑地下水降排及再利用方法 |
CN108797618A (zh) * | 2018-06-21 | 2018-11-13 | 中国十七冶集团有限公司 | 一种用于城市地下综合管廊基坑排水结构及其施工方法 |
CN111733846A (zh) * | 2020-06-24 | 2020-10-02 | 江苏省宁强建设有限公司 | 一种建筑自动化排水系统及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106120831B (zh) | 2018-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106120831B (zh) | 一种建筑自动化排水系统及施工方法 | |
CN205276316U (zh) | 组合式预制管廊 | |
CN105863287B (zh) | 框架结构建筑物顶升增层和隔震方法 | |
CN205975650U (zh) | 一种建筑自动化排水系统 | |
CN104631438A (zh) | 长螺旋钻孔压灌混凝土抗拔桩施工方法 | |
CN101725369A (zh) | 电缆隧道自动排水系统 | |
CN105133619A (zh) | 电梯井深基坑施工方法 | |
CN207452925U (zh) | 基坑降水装置及基坑降水系统 | |
CN106400822A (zh) | 深基坑降水井封井施工方法 | |
CN204343257U (zh) | 一种自控式带抗磨钢板的橡胶坝 | |
CN206233272U (zh) | 一种地下建筑物抗浮结构 | |
CN102705006A (zh) | 采用井点降水法治理营运隧道水患的方法 | |
CN201679008U (zh) | 基坑刚性排水装置 | |
CN107386308A (zh) | 一种边坡坡体自动化降水方法 | |
CN206986911U (zh) | 一种地下综合管廊深基坑降水管井水泵限位自动启停装置 | |
CN201502401U (zh) | 电缆隧道自动排水系统 | |
CN111206624A (zh) | 一种用于地下建/构筑物减压抗浮结构及施工方法 | |
CN111188341A (zh) | 一种砂土地基基坑用降水装置 | |
CN203741886U (zh) | 一种土工膜防渗水池鸭嘴阀抗浮结构 | |
CN109914442A (zh) | 一种电渗排水一体桩 | |
CN207392219U (zh) | 非监护式网孔型集水排水设备 | |
CN207194141U (zh) | 地下室外墙背水面的防水结构 | |
CN205954822U (zh) | 一种用于电炉地坑的自动抽水系统 | |
CN110106899A (zh) | 地下室抗浮降排水体系及其施工方法 | |
CN110130375A (zh) | 一种基坑降水装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 230000 No.16 Qianshan North Road, Luyang District, Hefei City, Anhui Province Patentee after: Zhongan Huali Construction Group Co.,Ltd. Address before: 230022 9th floor, Huali building, 116 Wangjiang West Road, Hefei City, Anhui Province Patentee before: ANHUI HUALI CONSTRUCTION Group Co. |