CN106120538A - A kind of bridge shear key and installation method - Google Patents
A kind of bridge shear key and installation method Download PDFInfo
- Publication number
- CN106120538A CN106120538A CN201610478670.3A CN201610478670A CN106120538A CN 106120538 A CN106120538 A CN 106120538A CN 201610478670 A CN201610478670 A CN 201610478670A CN 106120538 A CN106120538 A CN 106120538A
- Authority
- CN
- China
- Prior art keywords
- seat board
- lower seat
- bridge
- base plate
- pinner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention proposes a kind of bridge shear key and installation method, this shear connector includes upper base plate and lower seat board, the marginal position uniform intervals of upper base plate and lower seat board is provided with several screw, upper base plate center is provided with flange, lower seat board center is provided with boss, flange and boss phase configuration, and upper and lower seat board uses jack pushing tow to put in place, adjust to installation site, be connected with the embedded support in upper and lower pinner by bolt respectively.Present configuration is simple, can effectively limit bridge lateral motion.
Description
Technical field
The invention belongs to the technical field of bridge shear key, particularly relate to a kind of bridge shear key and installation method.
Background technology
Bridge shear key is to provide the device of bridge lateral constraint, plays a part to limit bridge lateral motion, existing
Bridge shear key does not all have the function of vibration damping, when bridge main beam produces vibration because vehicle travels, can carry to lower member transmission
Lotus, produces impact to lower member, affects the service life of bridge.
Summary of the invention
The technical problem to be solved is the problem for above-mentioned existence, it is provided that a kind of bridge shear key and peace
Dress method, may also operate as the effect of buffer shock-absorbing while limiting bridge lateral motion.
The present invention solves above-mentioned technical problem and be the technical scheme is that a kind of bridge shear key, it is characterised in that bag
Including upper base plate and lower seat board, the marginal position uniform intervals of described upper base plate and lower seat board is provided with several screw, upper base plate center
Being provided with flange, lower seat board center is provided with boss, described flange and boss phase configuration, and flange inner wall face is provided with flange slide plate, convex
Platform outside wall surface is provided with boss slide plate.
By such scheme, the gap between described flange slide plate and boss slide plate is 1.5mm~3mm.
By such scheme, described flange slide plate and boss slide plate are corrosion resistant plate.
The installation method of a kind of bridge shear key, it is characterised in that comprise the following steps:
S1: install and prepare, first by the center line of upper base plate and the screw of lower seat board respectively at lower pinner and the bridge of pier stud
Mark on the upper pinner of plate, hole devious or the reinforcing bar relative with screw are processed, then by upper and lower seat board screw
Foreign material, loosen concrete and thoroughly remove totally, then with water flushing one time, by complete for the reinforcing bar binding of lower pinner, then reinforcement and strengthening,
After also mark out by the sideline of upper and lower seat board, it is simple to check whether that installation puts in place;
The conveying of S2: shear connector puts in place, is put in place by upper and lower seat board pushing tow with multiple stage jack, and horizontal level checks upper and lower seat
Whether the edge of plate overlaps with sideline, and upright position is controlled by absolute altitude, by upper and lower seat board top to designed elevation, after putting in place under
Seat board spike or iron plate are propped up, and upper base plate directly can pad on lower seat board with parallels;
S3: adjust before installing, by the pre-deviator of the upper and lower seat board of size Control in installing, controls the four of upper and lower seat board
The individual angle point discrepancy in elevation, absolute altitude and plane angular deviation;
S4: shear connector is tentatively installed, if installing shear connector before the bearing of bridge plate is not installed, can be first fixed by lower seat board
Position, then put upper base plate, mark the centrage of upper and lower seat board, then descend seat board motionless, by the center of upper base plate to the side of design
To the pre-deviator of offset design, allow upper and lower seat board be relatively fixed the most again temporarily;If after the bearing of bridge plate installs
Shear connector is installed again, first according to the good and sound upper base plate of the unwrapping wire of upper base plate, then the bolt of lower seat board is tentatively put into hole, then pacify
Load seat board, tight a bolt the most again and the embedded support in upper and lower pinner is connected;
S5: shear connector is in the milk, cleaning foreign material before grouting, and rinses the moistening and nothing of shear connector, lower pinner, upper pinner with water
Hydrops, in filling process, it is necessary to vibration compacting, and lower pinner can vibrate with vibrating head, and upper pinner can be used by the hole of grouting
Reinforcing bar vibrates, and carries out maintenance after being in the milk.
By such scheme, in described step S3 four angle point discrepancy in elevation of upper and lower seat board be less than 3mm, absolute altitude increase 5~
10mm, Plane Angle deviation is not more than 0.01 radian.
By such scheme, in described step S5, curing time is no less than 7 days.
The invention has the beneficial effects as follows: this method installs bridge shear connector, short construction period, can reduce cost, shearing
Key is to provide the device of bridge lateral constraint, limits bridge lateral motion, has high bearing capacity, high-durability, it is easy to safeguards
Study for a second time courses one has flunked, and upper undersetting can mutually occur sliding, plays the effect of buffer shock-absorbing.
Accompanying drawing explanation
Fig. 1 is the structural representation of one embodiment of the present of invention.
Wherein: 1. upper base plate, 2. descend seat board, 3. go up pinner, 4. descend pinner, 5. bolt, the most embedded support, 7. flange,
8. boss, 9. flange slide plate, 10. boss slide plate.
Detailed description of the invention
For being more fully understood that the present invention, the invention will be further described with embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, a kind of bridge shear key, including upper base plate 1 and lower seat board 2, the marginal position of upper and lower seat board is uniform
Being interval with several screw, upper base plate center is provided with flange 7, and lower seat board center is provided with boss 8, flange and boss phase configuration, convex
Edge internal face is provided with flange slide plate 9, and outer wall of boss face is provided with boss slide plate 10, flange slide plate and boss slide plate and is stainless
Steel plate, the gap between flange slide plate and boss slide plate is 1.5mm~3mm, and when bridge main beam occurs vibration, two slide plates can
There is Relative sliding, play the effect of buffer shock-absorbing, extend bridge service life.
The installation method of a kind of bridge shear key, it is characterised in that comprise the following steps:
(1), preparation is installed, first by the center line of upper base plate and the screw of lower seat board respectively at lower pinner 4 and the bridge of pier stud
Mark on the upper pinner 3 of beam slab, hole devious or the reinforcing bar relative with screw are processed, then by upper and lower seat board spiral shell
Foreign material, loosening concrete in hole are thoroughly removed totally, then are rinsed one time with water, by complete for the reinforcing bar binding of lower pinner, then reinforce benefit
By force, finally also marking out by the sideline of upper and lower seat board, it is simple to check whether that installation puts in place, the center line of screw is when mounted
It is blocked, is only controlled by sideline;
(2), shear connector conveying put in place, first put up shelf with steel pipe, then carry out vertical transport to the position installed with jack,
Being put in place by upper and lower seat board pushing tow with multiple stage jack, horizontal level checks whether the edge of upper and lower seat board overlaps with sideline, hangs down
Straight position is controlled by absolute altitude, and by upper and lower seat board top to designed elevation, after putting in place, lower seat board spike or iron plate are propped up, the seat of honour
Plate directly can pad on lower seat board with parallels;
(3), front adjustment is installed, by the pre-deviator of the upper and lower seat board of size Control in installing, controls upper and lower seat board
Four angle point discrepancy in elevation, absolute altitude and plane angular deviation, four angle point discrepancy in elevation of upper and lower seat board are less than 3mm, absolute altitude increase 5~
10mm, Plane Angle deviation is not more than 0.01 radian;
(4), shear connector tentatively install, if installing shear connector before the bearing of bridge plate is not installed, can be first by lower seat board
Location, then put upper base plate, mark the centrage of upper and lower seat board, then descend seat board motionless, by the center of upper base plate to design
The pre-deviator of direction offset design, allows upper and lower seat board be relatively fixed the most again temporarily;If the bearing at bridge plate installs
After shear connector is installed again, first according to the good and sound upper base plate of the unwrapping wire of upper base plate, then the bolt 5 of lower seat board is tentatively put into hole,
Lower seat board is installed again, tights a bolt the most again and the embedded support 6 in upper and lower pinner is connected;
(5), shear connector grouting, cleaning foreign material before grouting, and with water rinse shear connector, lower pinner, upper pinner moistening and
Without hydrops, in filling process, it is necessary to vibration compacting, lower pinner can vibrate with vibrating head, and upper pinner can be by the hole of grouting
Vibrating with reinforcing bar, carry out maintenance after being in the milk, curing time is no less than 7 days.
Claims (6)
1. a bridge shear key, it is characterised in that include upper base plate and lower seat board, described upper base plate and the margin location of lower seat board
Putting uniform intervals and be provided with several screw, upper base plate center is provided with flange, and lower seat board center is provided with boss, described flange and boss phase
Configuration, flange inner wall face is provided with flange slide plate, and outer wall of boss face is provided with boss slide plate.
A kind of bridge shear key the most according to claim 1, it is characterised in that between described flange slide plate and boss slide plate
Gap be 1.5mm~3mm.
A kind of bridge shear key the most according to claim 1, it is characterised in that described flange slide plate and boss slide plate are
Corrosion resistant plate.
The installation method of a kind of bridge shear key the most according to claim 1, it is characterised in that comprise the following steps:
S1: install and prepare, first by the center line of upper base plate and the screw of lower seat board respectively at the lower pinner of pier stud and bridge plate
Mark on upper pinner, hole devious or the reinforcing bar relative with screw are processed, then miscellaneous by upper and lower seat board screw
Thing, loosening concrete are thoroughly removed totally, then are rinsed one time with water, by complete for the reinforcing bar binding of lower pinner, and then reinforcement and strengthening, finally will
The sideline of upper and lower seat board also marks out, it is simple to check whether that installation puts in place;
The conveying of S2: shear connector puts in place, is put in place by upper and lower seat board pushing tow with multiple stage jack, and horizontal level checks upper and lower seat board
Whether edge overlaps with sideline, and upright position is controlled by absolute altitude, by upper and lower seat board top to designed elevation, and lower seat board after putting in place
Propping up with spike or iron plate, upper base plate directly can pad on lower seat board with parallels;
S3: adjust before installing, by the pre-deviator of the upper and lower seat board of size Control in installing, controls four angles of upper and lower seat board
The point discrepancy in elevation, absolute altitude and plane angular deviation;
S4: shear connector is tentatively installed, if installing shear connector before the bearing of bridge plate is not installed, can first position lower seat board,
Put upper base plate again, mark the centrage of upper and lower seat board, then descend seat board motionless, by the center of upper base plate to the direction of design
The pre-deviator of offset design, allows upper and lower seat board be relatively fixed the most again temporarily;If after the bearing of bridge plate installs again
Shear connector is installed, first according to the good and sound upper base plate of the unwrapping wire of upper base plate, then the bolt of lower seat board is tentatively put into hole, then install
Lower seat board, tights a bolt the most again and the embedded support in upper and lower pinner is connected;
S5: shear connector is in the milk, cleaning foreign material before grouting, and rinses shear connector, lower pinner, upper pinner moistening and without long-pending with water
Water, in filling process, it is necessary to vibration compacting, and lower pinner can vibrate with vibrating head, and upper pinner can be by the hole steel of grouting
Muscle vibrates, and carries out maintenance after being in the milk.
The installation method of a kind of bridge shear key the most according to claim 4, it is characterised in that upper in described step S3,
Four angle point discrepancy in elevation of lower seat board are less than 3mm, and absolute altitude increases 5~10mm, and Plane Angle deviation is not more than 0.01 radian.
The installation method of a kind of bridge shear key the most according to claim 4, it is characterised in that maintenance in described step S5
Time is no less than 7 days.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610478670.3A CN106120538B (en) | 2016-06-27 | 2016-06-27 | A kind of bridge shear key and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610478670.3A CN106120538B (en) | 2016-06-27 | 2016-06-27 | A kind of bridge shear key and installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106120538A true CN106120538A (en) | 2016-11-16 |
CN106120538B CN106120538B (en) | 2019-04-23 |
Family
ID=57266154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610478670.3A Active CN106120538B (en) | 2016-06-27 | 2016-06-27 | A kind of bridge shear key and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106120538B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067184A (en) * | 2019-05-14 | 2019-07-30 | 华南理工大学 | A kind of pin device constraining curved beam bridges horizontal displacement |
CN112342898A (en) * | 2020-10-30 | 2021-02-09 | 重庆交通大学 | Bridge anti-seismic and anti-beam-falling device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003227109A (en) * | 2002-02-05 | 2003-08-15 | Kaimon:Kk | Mounting method of horizontal force buffer of structure and mounting structure |
CN202577137U (en) * | 2012-05-28 | 2012-12-05 | 衡水宝力工程橡胶有限公司 | Plug-in type shape steel damping support |
CN202787058U (en) * | 2012-07-19 | 2013-03-13 | 武汉臣基工程科技有限公司 | Wind-resistant seismic isolation rubber bearing |
CN104878686A (en) * | 2015-06-04 | 2015-09-02 | 北京市市政工程研究院 | Device for preventing curved beam bridge from horizontal displacement and construction method thereof |
CN204644864U (en) * | 2015-05-16 | 2015-09-16 | 新疆联诚重工科技有限公司 | Steel work shock isolating pedestal |
CN105064508A (en) * | 2015-07-24 | 2015-11-18 | 上海市政工程设计研究总院(集团)有限公司 | Friction pendulum type seismic mitigation and absorption bearing with variable friction coefficient |
-
2016
- 2016-06-27 CN CN201610478670.3A patent/CN106120538B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003227109A (en) * | 2002-02-05 | 2003-08-15 | Kaimon:Kk | Mounting method of horizontal force buffer of structure and mounting structure |
CN202577137U (en) * | 2012-05-28 | 2012-12-05 | 衡水宝力工程橡胶有限公司 | Plug-in type shape steel damping support |
CN202787058U (en) * | 2012-07-19 | 2013-03-13 | 武汉臣基工程科技有限公司 | Wind-resistant seismic isolation rubber bearing |
CN204644864U (en) * | 2015-05-16 | 2015-09-16 | 新疆联诚重工科技有限公司 | Steel work shock isolating pedestal |
CN104878686A (en) * | 2015-06-04 | 2015-09-02 | 北京市市政工程研究院 | Device for preventing curved beam bridge from horizontal displacement and construction method thereof |
CN105064508A (en) * | 2015-07-24 | 2015-11-18 | 上海市政工程设计研究总院(集团)有限公司 | Friction pendulum type seismic mitigation and absorption bearing with variable friction coefficient |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067184A (en) * | 2019-05-14 | 2019-07-30 | 华南理工大学 | A kind of pin device constraining curved beam bridges horizontal displacement |
CN112342898A (en) * | 2020-10-30 | 2021-02-09 | 重庆交通大学 | Bridge anti-seismic and anti-beam-falling device |
Also Published As
Publication number | Publication date |
---|---|
CN106120538B (en) | 2019-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437160B (en) | The pump line of the compound pumping of the downward ultra-deep of concrete fixes construction method | |
TWI506201B (en) | Apparatus for and method of anchoring a wind power installation | |
CN102900024B (en) | Using method for overturning die plate for large-scale concrete structure and | |
CN103243649B (en) | The system and method for a kind of cable saddle Fast Installation, location | |
CN103850352A (en) | Connection method of prefabricated slab | |
CN102899971B (en) | Precast slab assembled floating road bed | |
CN106120538A (en) | A kind of bridge shear key and installation method | |
JP4934779B2 (en) | Boarding / exit structure and boarding / exiting method | |
JP2020079496A (en) | Method for constructing top slab for underground structure | |
CN105442855B (en) | A kind of high-precision buried equipment, method of large scale embedded board | |
JP2017227052A (en) | Mold hanger | |
CN110004939A (en) | A kind of device and construction method applied to foundation pit support replacement | |
CN206448272U (en) | Roadbed side slope arched framework one-time-shaped mould | |
CN206289530U (en) | One kind subtracts shock insulation rubber bearing | |
CN108487529A (en) | A kind of three-dimensional vibration isolation floor construction | |
JP2016008463A (en) | Bearing installation method and bearing structure | |
CN210238156U (en) | Beam type adjustable ballastless track system | |
CN105298140B (en) | Reinforcing bar posting and its localization method are used in outer shear wall construction | |
JP5165139B1 (en) | Seismic isolation device mounting method and mounting structure | |
CN104179124B (en) | A kind of self adaptation binder template for pier stud binder concrete construction | |
CN208981171U (en) | A kind of double-disk T bridge reinforcement structure | |
CN106149563B (en) | Steel anchor beam accurate positioning device and installation method built in free-standing Sarasota | |
CN105839521A (en) | Bridge polyurethane lamination isolation bearing and construction method thereof | |
CN204781974U (en) | Pump line can be fixed in fixing device of precipice | |
RU213548U1 (en) | RAIL PLATE |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |