CN106120538A - A kind of bridge shear key and installation method - Google Patents

A kind of bridge shear key and installation method Download PDF

Info

Publication number
CN106120538A
CN106120538A CN201610478670.3A CN201610478670A CN106120538A CN 106120538 A CN106120538 A CN 106120538A CN 201610478670 A CN201610478670 A CN 201610478670A CN 106120538 A CN106120538 A CN 106120538A
Authority
CN
China
Prior art keywords
seat board
lower seat
bridge
base plate
pinner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610478670.3A
Other languages
Chinese (zh)
Other versions
CN106120538B (en
Inventor
黄轶
张桂军
郭继舟
李少祥
黄菊华
赵海莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201610478670.3A priority Critical patent/CN106120538B/en
Publication of CN106120538A publication Critical patent/CN106120538A/en
Application granted granted Critical
Publication of CN106120538B publication Critical patent/CN106120538B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention proposes a kind of bridge shear key and installation method, this shear connector includes upper base plate and lower seat board, the marginal position uniform intervals of upper base plate and lower seat board is provided with several screw, upper base plate center is provided with flange, lower seat board center is provided with boss, flange and boss phase configuration, and upper and lower seat board uses jack pushing tow to put in place, adjust to installation site, be connected with the embedded support in upper and lower pinner by bolt respectively.Present configuration is simple, can effectively limit bridge lateral motion.

Description

A kind of bridge shear key and installation method
Technical field
The invention belongs to the technical field of bridge shear key, particularly relate to a kind of bridge shear key and installation method.
Background technology
Bridge shear key is to provide the device of bridge lateral constraint, plays a part to limit bridge lateral motion, existing Bridge shear key does not all have the function of vibration damping, when bridge main beam produces vibration because vehicle travels, can carry to lower member transmission Lotus, produces impact to lower member, affects the service life of bridge.
Summary of the invention
The technical problem to be solved is the problem for above-mentioned existence, it is provided that a kind of bridge shear key and peace Dress method, may also operate as the effect of buffer shock-absorbing while limiting bridge lateral motion.
The present invention solves above-mentioned technical problem and be the technical scheme is that a kind of bridge shear key, it is characterised in that bag Including upper base plate and lower seat board, the marginal position uniform intervals of described upper base plate and lower seat board is provided with several screw, upper base plate center Being provided with flange, lower seat board center is provided with boss, described flange and boss phase configuration, and flange inner wall face is provided with flange slide plate, convex Platform outside wall surface is provided with boss slide plate.
By such scheme, the gap between described flange slide plate and boss slide plate is 1.5mm~3mm.
By such scheme, described flange slide plate and boss slide plate are corrosion resistant plate.
The installation method of a kind of bridge shear key, it is characterised in that comprise the following steps:
S1: install and prepare, first by the center line of upper base plate and the screw of lower seat board respectively at lower pinner and the bridge of pier stud Mark on the upper pinner of plate, hole devious or the reinforcing bar relative with screw are processed, then by upper and lower seat board screw Foreign material, loosen concrete and thoroughly remove totally, then with water flushing one time, by complete for the reinforcing bar binding of lower pinner, then reinforcement and strengthening, After also mark out by the sideline of upper and lower seat board, it is simple to check whether that installation puts in place;
The conveying of S2: shear connector puts in place, is put in place by upper and lower seat board pushing tow with multiple stage jack, and horizontal level checks upper and lower seat Whether the edge of plate overlaps with sideline, and upright position is controlled by absolute altitude, by upper and lower seat board top to designed elevation, after putting in place under Seat board spike or iron plate are propped up, and upper base plate directly can pad on lower seat board with parallels;
S3: adjust before installing, by the pre-deviator of the upper and lower seat board of size Control in installing, controls the four of upper and lower seat board The individual angle point discrepancy in elevation, absolute altitude and plane angular deviation;
S4: shear connector is tentatively installed, if installing shear connector before the bearing of bridge plate is not installed, can be first fixed by lower seat board Position, then put upper base plate, mark the centrage of upper and lower seat board, then descend seat board motionless, by the center of upper base plate to the side of design To the pre-deviator of offset design, allow upper and lower seat board be relatively fixed the most again temporarily;If after the bearing of bridge plate installs Shear connector is installed again, first according to the good and sound upper base plate of the unwrapping wire of upper base plate, then the bolt of lower seat board is tentatively put into hole, then pacify Load seat board, tight a bolt the most again and the embedded support in upper and lower pinner is connected;
S5: shear connector is in the milk, cleaning foreign material before grouting, and rinses the moistening and nothing of shear connector, lower pinner, upper pinner with water Hydrops, in filling process, it is necessary to vibration compacting, and lower pinner can vibrate with vibrating head, and upper pinner can be used by the hole of grouting Reinforcing bar vibrates, and carries out maintenance after being in the milk.
By such scheme, in described step S3 four angle point discrepancy in elevation of upper and lower seat board be less than 3mm, absolute altitude increase 5~ 10mm, Plane Angle deviation is not more than 0.01 radian.
By such scheme, in described step S5, curing time is no less than 7 days.
The invention has the beneficial effects as follows: this method installs bridge shear connector, short construction period, can reduce cost, shearing Key is to provide the device of bridge lateral constraint, limits bridge lateral motion, has high bearing capacity, high-durability, it is easy to safeguards Study for a second time courses one has flunked, and upper undersetting can mutually occur sliding, plays the effect of buffer shock-absorbing.
Accompanying drawing explanation
Fig. 1 is the structural representation of one embodiment of the present of invention.
Wherein: 1. upper base plate, 2. descend seat board, 3. go up pinner, 4. descend pinner, 5. bolt, the most embedded support, 7. flange, 8. boss, 9. flange slide plate, 10. boss slide plate.
Detailed description of the invention
For being more fully understood that the present invention, the invention will be further described with embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, a kind of bridge shear key, including upper base plate 1 and lower seat board 2, the marginal position of upper and lower seat board is uniform Being interval with several screw, upper base plate center is provided with flange 7, and lower seat board center is provided with boss 8, flange and boss phase configuration, convex Edge internal face is provided with flange slide plate 9, and outer wall of boss face is provided with boss slide plate 10, flange slide plate and boss slide plate and is stainless Steel plate, the gap between flange slide plate and boss slide plate is 1.5mm~3mm, and when bridge main beam occurs vibration, two slide plates can There is Relative sliding, play the effect of buffer shock-absorbing, extend bridge service life.
The installation method of a kind of bridge shear key, it is characterised in that comprise the following steps:
(1), preparation is installed, first by the center line of upper base plate and the screw of lower seat board respectively at lower pinner 4 and the bridge of pier stud Mark on the upper pinner 3 of beam slab, hole devious or the reinforcing bar relative with screw are processed, then by upper and lower seat board spiral shell Foreign material, loosening concrete in hole are thoroughly removed totally, then are rinsed one time with water, by complete for the reinforcing bar binding of lower pinner, then reinforce benefit By force, finally also marking out by the sideline of upper and lower seat board, it is simple to check whether that installation puts in place, the center line of screw is when mounted It is blocked, is only controlled by sideline;
(2), shear connector conveying put in place, first put up shelf with steel pipe, then carry out vertical transport to the position installed with jack, Being put in place by upper and lower seat board pushing tow with multiple stage jack, horizontal level checks whether the edge of upper and lower seat board overlaps with sideline, hangs down Straight position is controlled by absolute altitude, and by upper and lower seat board top to designed elevation, after putting in place, lower seat board spike or iron plate are propped up, the seat of honour Plate directly can pad on lower seat board with parallels;
(3), front adjustment is installed, by the pre-deviator of the upper and lower seat board of size Control in installing, controls upper and lower seat board Four angle point discrepancy in elevation, absolute altitude and plane angular deviation, four angle point discrepancy in elevation of upper and lower seat board are less than 3mm, absolute altitude increase 5~ 10mm, Plane Angle deviation is not more than 0.01 radian;
(4), shear connector tentatively install, if installing shear connector before the bearing of bridge plate is not installed, can be first by lower seat board Location, then put upper base plate, mark the centrage of upper and lower seat board, then descend seat board motionless, by the center of upper base plate to design The pre-deviator of direction offset design, allows upper and lower seat board be relatively fixed the most again temporarily;If the bearing at bridge plate installs After shear connector is installed again, first according to the good and sound upper base plate of the unwrapping wire of upper base plate, then the bolt 5 of lower seat board is tentatively put into hole, Lower seat board is installed again, tights a bolt the most again and the embedded support 6 in upper and lower pinner is connected;
(5), shear connector grouting, cleaning foreign material before grouting, and with water rinse shear connector, lower pinner, upper pinner moistening and Without hydrops, in filling process, it is necessary to vibration compacting, lower pinner can vibrate with vibrating head, and upper pinner can be by the hole of grouting Vibrating with reinforcing bar, carry out maintenance after being in the milk, curing time is no less than 7 days.

Claims (6)

1. a bridge shear key, it is characterised in that include upper base plate and lower seat board, described upper base plate and the margin location of lower seat board Putting uniform intervals and be provided with several screw, upper base plate center is provided with flange, and lower seat board center is provided with boss, described flange and boss phase Configuration, flange inner wall face is provided with flange slide plate, and outer wall of boss face is provided with boss slide plate.
A kind of bridge shear key the most according to claim 1, it is characterised in that between described flange slide plate and boss slide plate Gap be 1.5mm~3mm.
A kind of bridge shear key the most according to claim 1, it is characterised in that described flange slide plate and boss slide plate are Corrosion resistant plate.
The installation method of a kind of bridge shear key the most according to claim 1, it is characterised in that comprise the following steps:
S1: install and prepare, first by the center line of upper base plate and the screw of lower seat board respectively at the lower pinner of pier stud and bridge plate Mark on upper pinner, hole devious or the reinforcing bar relative with screw are processed, then miscellaneous by upper and lower seat board screw Thing, loosening concrete are thoroughly removed totally, then are rinsed one time with water, by complete for the reinforcing bar binding of lower pinner, and then reinforcement and strengthening, finally will The sideline of upper and lower seat board also marks out, it is simple to check whether that installation puts in place;
The conveying of S2: shear connector puts in place, is put in place by upper and lower seat board pushing tow with multiple stage jack, and horizontal level checks upper and lower seat board Whether edge overlaps with sideline, and upright position is controlled by absolute altitude, by upper and lower seat board top to designed elevation, and lower seat board after putting in place Propping up with spike or iron plate, upper base plate directly can pad on lower seat board with parallels;
S3: adjust before installing, by the pre-deviator of the upper and lower seat board of size Control in installing, controls four angles of upper and lower seat board The point discrepancy in elevation, absolute altitude and plane angular deviation;
S4: shear connector is tentatively installed, if installing shear connector before the bearing of bridge plate is not installed, can first position lower seat board, Put upper base plate again, mark the centrage of upper and lower seat board, then descend seat board motionless, by the center of upper base plate to the direction of design The pre-deviator of offset design, allows upper and lower seat board be relatively fixed the most again temporarily;If after the bearing of bridge plate installs again Shear connector is installed, first according to the good and sound upper base plate of the unwrapping wire of upper base plate, then the bolt of lower seat board is tentatively put into hole, then install Lower seat board, tights a bolt the most again and the embedded support in upper and lower pinner is connected;
S5: shear connector is in the milk, cleaning foreign material before grouting, and rinses shear connector, lower pinner, upper pinner moistening and without long-pending with water Water, in filling process, it is necessary to vibration compacting, and lower pinner can vibrate with vibrating head, and upper pinner can be by the hole steel of grouting Muscle vibrates, and carries out maintenance after being in the milk.
The installation method of a kind of bridge shear key the most according to claim 4, it is characterised in that upper in described step S3, Four angle point discrepancy in elevation of lower seat board are less than 3mm, and absolute altitude increases 5~10mm, and Plane Angle deviation is not more than 0.01 radian.
The installation method of a kind of bridge shear key the most according to claim 4, it is characterised in that maintenance in described step S5 Time is no less than 7 days.
CN201610478670.3A 2016-06-27 2016-06-27 A kind of bridge shear key and installation method Active CN106120538B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610478670.3A CN106120538B (en) 2016-06-27 2016-06-27 A kind of bridge shear key and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610478670.3A CN106120538B (en) 2016-06-27 2016-06-27 A kind of bridge shear key and installation method

Publications (2)

Publication Number Publication Date
CN106120538A true CN106120538A (en) 2016-11-16
CN106120538B CN106120538B (en) 2019-04-23

Family

ID=57266154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610478670.3A Active CN106120538B (en) 2016-06-27 2016-06-27 A kind of bridge shear key and installation method

Country Status (1)

Country Link
CN (1) CN106120538B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067184A (en) * 2019-05-14 2019-07-30 华南理工大学 A kind of pin device constraining curved beam bridges horizontal displacement
CN112342898A (en) * 2020-10-30 2021-02-09 重庆交通大学 Bridge anti-seismic and anti-beam-falling device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003227109A (en) * 2002-02-05 2003-08-15 Kaimon:Kk Mounting method of horizontal force buffer of structure and mounting structure
CN202577137U (en) * 2012-05-28 2012-12-05 衡水宝力工程橡胶有限公司 Plug-in type shape steel damping support
CN202787058U (en) * 2012-07-19 2013-03-13 武汉臣基工程科技有限公司 Wind-resistant seismic isolation rubber bearing
CN104878686A (en) * 2015-06-04 2015-09-02 北京市市政工程研究院 Device for preventing curved beam bridge from horizontal displacement and construction method thereof
CN204644864U (en) * 2015-05-16 2015-09-16 新疆联诚重工科技有限公司 Steel work shock isolating pedestal
CN105064508A (en) * 2015-07-24 2015-11-18 上海市政工程设计研究总院(集团)有限公司 Friction pendulum type seismic mitigation and absorption bearing with variable friction coefficient

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003227109A (en) * 2002-02-05 2003-08-15 Kaimon:Kk Mounting method of horizontal force buffer of structure and mounting structure
CN202577137U (en) * 2012-05-28 2012-12-05 衡水宝力工程橡胶有限公司 Plug-in type shape steel damping support
CN202787058U (en) * 2012-07-19 2013-03-13 武汉臣基工程科技有限公司 Wind-resistant seismic isolation rubber bearing
CN204644864U (en) * 2015-05-16 2015-09-16 新疆联诚重工科技有限公司 Steel work shock isolating pedestal
CN104878686A (en) * 2015-06-04 2015-09-02 北京市市政工程研究院 Device for preventing curved beam bridge from horizontal displacement and construction method thereof
CN105064508A (en) * 2015-07-24 2015-11-18 上海市政工程设计研究总院(集团)有限公司 Friction pendulum type seismic mitigation and absorption bearing with variable friction coefficient

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067184A (en) * 2019-05-14 2019-07-30 华南理工大学 A kind of pin device constraining curved beam bridges horizontal displacement
CN112342898A (en) * 2020-10-30 2021-02-09 重庆交通大学 Bridge anti-seismic and anti-beam-falling device

Also Published As

Publication number Publication date
CN106120538B (en) 2019-04-23

Similar Documents

Publication Publication Date Title
CN106437160B (en) The pump line of the compound pumping of the downward ultra-deep of concrete fixes construction method
TWI506201B (en) Apparatus for and method of anchoring a wind power installation
CN102900024B (en) Using method for overturning die plate for large-scale concrete structure and
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN103850352A (en) Connection method of prefabricated slab
CN102899971B (en) Precast slab assembled floating road bed
CN106120538A (en) A kind of bridge shear key and installation method
JP4934779B2 (en) Boarding / exit structure and boarding / exiting method
JP2020079496A (en) Method for constructing top slab for underground structure
CN105442855B (en) A kind of high-precision buried equipment, method of large scale embedded board
JP2017227052A (en) Mold hanger
CN110004939A (en) A kind of device and construction method applied to foundation pit support replacement
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN206289530U (en) One kind subtracts shock insulation rubber bearing
CN108487529A (en) A kind of three-dimensional vibration isolation floor construction
JP2016008463A (en) Bearing installation method and bearing structure
CN210238156U (en) Beam type adjustable ballastless track system
CN105298140B (en) Reinforcing bar posting and its localization method are used in outer shear wall construction
JP5165139B1 (en) Seismic isolation device mounting method and mounting structure
CN104179124B (en) A kind of self adaptation binder template for pier stud binder concrete construction
CN208981171U (en) A kind of double-disk T bridge reinforcement structure
CN106149563B (en) Steel anchor beam accurate positioning device and installation method built in free-standing Sarasota
CN105839521A (en) Bridge polyurethane lamination isolation bearing and construction method thereof
CN204781974U (en) Pump line can be fixed in fixing device of precipice
RU213548U1 (en) RAIL PLATE

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant