CN106092849B - A kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method - Google Patents

A kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method Download PDF

Info

Publication number
CN106092849B
CN106092849B CN201610365907.7A CN201610365907A CN106092849B CN 106092849 B CN106092849 B CN 106092849B CN 201610365907 A CN201610365907 A CN 201610365907A CN 106092849 B CN106092849 B CN 106092849B
Authority
CN
China
Prior art keywords
pressure
metal plate
plate hole
water
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610365907.7A
Other languages
Chinese (zh)
Other versions
CN106092849A (en
Inventor
张淑朝
贺少辉
李承辉
刘夏冰
汪大海
刘仰鹏
朱自鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiaotong University
Original Assignee
Beijing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiaotong University filed Critical Beijing Jiaotong University
Priority to CN201610365907.7A priority Critical patent/CN106092849B/en
Publication of CN106092849A publication Critical patent/CN106092849A/en
Application granted granted Critical
Publication of CN106092849B publication Critical patent/CN106092849B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/082Investigating permeability by forcing a fluid through a sample

Landscapes

  • Chemical & Material Sciences (AREA)
  • Biochemistry (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Dispersion Chemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The present invention discloses a kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method, device includes experiment cylinder, water supplying pipe and pressurizing device, it tests cylinder inner bottom surface and is equipped with base support, the top of base support is equipped with lower metal plate hole, the upper surface of lower metal plate hole is equipped with lower filter screen, filling test soil sample on lower filter screen, the top surface for testing soil sample are equipped with upper filter screen, and the upper surface of upper filter screen is equipped with upper metal plate hole.The lower metal plate hole side wall connection connection overflow pipe below for testing cylinder, tests and is connected to connection pressure-measuring pipe on the side wall between the lower metal plate hole of cylinder and upper metal plate hole, tests the side wall connection connection water inlet pipe of the upper metal plate hole of cylinder or more.Fixed setting servo water pump and water pressure gauge, pressurizing device are connect with water supplying pipe in pressurizing device.The high hydraulic condition of servo water pump analog, the critical pressure that measurement sandy gravel is gushed under high hydraulic condition.The apparatus structure is simple, strong operability, has stronger directive significance for practice of construction.

Description

A kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method
Technical field
The present invention relates to geotechnical testament apparatus technical fields, and in particular to a kind of sand-pebble layer earth pressure balanced shield, EPBS Driving anti-gush experimental provision and method.
Background technique
Sand-pebble layer is tunneled using earth pressure balanced shield, EPBS under high hydraulic condition, since sandy gravel infiltration coefficient is big, water Head pressure is big, and needing to add additive progress sediment improvement reduces its infiltration coefficient, to guarantee shield machine internal screw conveyer not It gushs, guarantees support pressure, but how improve dregs effect, how much infiltration coefficient can prevent hair of gushing less if reducing Raw, when hydraulic pressure is much, improvement sandy gravel will gush, and there is presently no preferable methods and experimental rig to be tested.And Sandy gravel is improved in balancing earth-pressure shielding machine Tu Cang and screw conveyor by certain Water And Earth Pressures, infiltration coefficient and often Different when pressure condition, conventional infiltration experiment device can not carry out pressure test infiltration coefficient to soil sample, need to be to improvement sandy gravel Anti- test method of gushing is improved and is innovated with device.
Accordingly, it is desirable to provide a kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method, the dress Permeability apparatus with pressure is installed, which can pressurize to soil sample, test infiltration of the soil sample under different Water And Earth Pressures Coefficient, and by pressure water injection, test soil sample generates the critical pressure gushed.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of anti-experiments of gushing of sand-pebble layer earth pressure balanced shield, EPBS driving Device and method carry out the constant head permeability test and not under normal pressure state by the way that the sandy gravel of improvement to be put into experiment cylinder With the constant head permeability test under soil pressure, and soil sample is tested by simulating high hydraulic pressure test sandy gravel and is gushed destruction Critical pressure.
In order to solve the above technical problems, the present invention adopts the following technical solutions:
A kind of anti-experimental provision of gushing of sand-pebble layer earth pressure balanced shield, EPBS driving, including experiment cylinder, water supplying pipe and pressurization Device, the experiment cylinder inner bottom surface are equipped with base support, and the top of base support is equipped with lower metal plate hole, the lower metal plate The upper surface in hole is equipped with lower filter screen, and the top surface of filling test soil sample on the lower filter screen, the test soil sample is equipped with upper filter screen, institute The upper surface for stating upper filter screen is equipped with upper metal plate hole.
The lower metal plate hole of experiment cylinder side wall connection connection overflow pipe below, the lower metal plate hole of the experiment cylinder It is sequentially communicated from bottom to top on side wall between upper metal plate hole and connect the first pressure-measuring pipe, the second pressure-measuring pipe and third survey pressure It manages, side wall connection connection the water inlet pipe more than upper metal plate hole of the experiment cylinder.
Fixed setting servo water pump and water pressure gauge, the pressurizing device are connect with water supplying pipe in the pressurizing device.Servo The high hydraulic condition of water pump analog, the critical pressure that measurement improvement sandy gravel is gushed under high hydraulic condition.
Preferably, which further includes increased pressure beam, jack and axle power meter, and the increased pressure beam is located at experiment cylinder Top, the pedestal of the jack are fixed at the lower surface of increased pressure beam, the mandril of the jack and upper metal plate hole Upper surface contact, the axle power meter is fixed on increased pressure beam.Increased pressure beam can be that test soil sample is applied by jack Add soil pressure, upper metal plate hole is placed in test soil sample, water penetration can be made to go out, can test practical work while applying pressure Infiltration coefficient of the sandy gravel in screw machine under different soil pressures in journey.
Preferably, water check valve is fixedly installed on the water supplying pipe.Water check valve can control the water supply and closing of water supplying pipe.
Preferably, scale plate, the scale plate and the first pressure-measuring pipe, the second survey are fixedly installed on the side wall of the experiment cylinder The position of pressure pipe and third pressure-measuring pipe is corresponding.Scale plate can show the first pressure-measuring pipe, the second pressure-measuring pipe and third pressure-measuring pipe Interior height of water level.
Preferably, which further includes sliding support and graduated cylinder, and the overflow pipe rides upon on sliding support, the spilling water Pipe is connected with graduated cylinder.Graduated cylinder can directly display the volume of the water infiltrated.
Preferably, the diameter ratio of metal plate hole, upper filter screen and lower filter screen tests cylinder under the base support, upper metal plate hole The small 0.5cm of internal diameter.
The upper metal plate hole is consistent with the aperture of lower metal plate hole.
Utilize a kind of above-mentioned experimental method of the anti-experimental provision of gushing of sand-pebble layer earth pressure balanced shield, EPBS driving, the experiment Method the following steps are included:
A, base support, lower metal plate hole, lower filter screen being sequentially placed into experiment cylinder, layering, which is packed into, tests soil sample, and every layer 10cm connects water supplying pipe and water inlet pipe, opens water check valve, after being saturated test soil sample gradually, is again loaded into test soil sample, until The last layer test soil sample is higher by third piezometric level 10cm, and test soil sample top is sequentially placed upper filter screen and upper metal plate There is water spilling in hole when the water surface is higher by test soil sample and continues to be filled with water to overflow pipe, closes water check valve, stand to third piezometric level When flushing with experiment cylinder, the constant head permeability test under normal pressure state is carried out;
B, start jack, the mandril of jack is made to apply downward pressure to upper metal plate hole, axle power measurement examination applies The size of pressure carries out the constant head permeability test under different soil pressures;
C, the first pressure-measuring pipe, the second pressure-measuring pipe and third pressure-measuring pipe are closed, servo water pump is connect with overflow pipe, pressurizeed There is water to gush at the top of test soil sample in experiment cylinder, water pressure gauge measures test soil sample and gushs the water pressure of destruction.
Beneficial effects of the present invention are as follows:
A kind of sand-pebble layer earth pressure balanced shield, EPBS driving of the invention is anti-to gush experimental provision and method due to using Above technical scheme, increased pressure beam can be that test soil sample applies soil pressure by jack, and upper metal plate hole is placed in test soil sample On, water penetration can be made to go out while applying pressure, sandy gravel can be tested in Practical Project in screw machine under different soil pressures Infiltration coefficient.The high hydraulic condition of servo water pump analog, what measurement improvement sandy gravel was gushed under high hydraulic condition faces Boundary's water pressure.The apparatus structure is simple, strong operability, has stronger directive significance for practice of construction.
Detailed description of the invention
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing.
Fig. 1 shows a kind of anti-experimental provision band pressurizing device of gushing of sand-pebble layer earth pressure balanced shield, EPBS driving of the invention Structural schematic diagram.
Fig. 2 shows a kind of sand-pebble layer earth pressure balanced shield, EPBS of the invention drivings to prevent gushing experimental provision with jack Structural schematic diagram.
Description of symbols: 1 experiment cylinder, 2 water, 3 pressurizing devices, 4 sliding supports, 5 graduated cylinders, 6 increased pressure beams, 7 pedestal branch Frame, metal perforated plate on 8,9 lower metal perforated plates, 10 upper filter screens, 11 lower filter screens, 12 overflow pipes, 13 first pressure-measuring pipes, 14 second survey pressure Pipe, 15 third pressure-measuring pipes, 16 scale plates, 17 water inlet pipes, 18 water supplying pipes, 19 water check valves, 20 jack, 21 axle power meters, 22 servos Water pump, 23 water pressure gauges, 24 test soil samples
Specific embodiment
In order to illustrate more clearly of the present invention, the present invention is done further below with reference to preferred embodiments and drawings It is bright.Similar component is indicated in attached drawing with identical appended drawing reference.It will be appreciated by those skilled in the art that institute is specific below The content of description is illustrative and be not restrictive, and should not be limited the scope of the invention with this.
As Figure 1-Figure 2, a kind of anti-experimental provision of gushing of sand-pebble layer earth pressure balanced shield, EPBS driving, including experiment cylinder 1, water supplying pipe 18 and pressurizing device 3,1 inner bottom surface of experiment cylinder are equipped with base support 7, and the top of base support 7 is equipped with down Metal plate hole 9, the upper surface of the lower metal plate hole 9 are equipped with lower filter screen 11, filling test soil sample 24 on the lower filter screen 11, institute The top surface for stating test soil sample 24 is equipped with upper filter screen 10, and the upper surface of the upper filter screen 10 is equipped with upper metal plate hole 8.The experiment cylinder 1 side wall below of lower metal plate hole 9 connection connection overflow pipe 12, the lower metal plate hole 9 and upper metal plate hole of the experiment cylinder 1 The first pressure-measuring pipe 13 of connection, the second pressure-measuring pipe 14 and third pressure-measuring pipe 15 are sequentially communicated on side wall between 8 from bottom to top, it is described It tests and scale plate 16, the scale plate 16 and the first pressure-measuring pipe 13, the second pressure-measuring pipe 14 and third is fixedly installed on the side wall of cylinder 1 The position of pressure-measuring pipe 15 is corresponding.The side wall connection connection water inlet pipe 17 of 8 or more the upper metal plate hole of the experiment cylinder 1.It is described Fixed setting servo water pump 22 and water pressure gauge 23, the pressurizing device 3 are connect with water supplying pipe 18 in pressurizing device 3, the water supply Water check valve 19 is fixedly installed on pipe 18.
The device further includes increased pressure beam 6, jack 20 and axle power meter 21, and the increased pressure beam 6 is located at experiment cylinder 1 Top, the pedestal of the jack 20 are fixed at the lower surface of increased pressure beam 6, the mandril and upper metal of the jack 20 The upper surface of plate hole 8 contacts, and the axle power meter 21 is fixed on increased pressure beam 6.
The device further includes sliding support 4 and graduated cylinder 5, and the overflow pipe 12 rides upon on sliding support 4, the overflow pipe 12 are connected with graduated cylinder 5.
The diameter of the base support 7, upper metal plate hole 8 lower metal plate hole 9, upper filter screen 10 and lower filter screen 11 is than experiment cylinder The small 0.5cm of 1 internal diameter.
The upper metal plate hole 8 is consistent with the aperture of lower metal plate hole 9.
Utilize a kind of above-mentioned experimental method of the anti-experimental provision of gushing of sand-pebble layer earth pressure balanced shield, EPBS driving, the experiment Method the following steps are included:
A, base support 7, lower metal plate hole 9, lower filter screen 11 are sequentially placed into experiment cylinder 1, layering is packed into test soil sample 24, every layer of 10cm connect water supplying pipe 18 and water inlet pipe 17, open water check valve 19, after being saturated test soil sample 24 gradually, fill again Enter to test soil sample 24, until the last layer test soil sample 24 is higher by 15 water level 10cm of third pressure-measuring pipe, test 24 top of soil sample according to Secondary placement upper filter screen 10 and upper metal plate hole 8 have when the water surface elevation of water 2 is higher by test soil sample 24 and continues to be filled with water to overflow pipe 12 Water 2 overflows, and closes water check valve 19, when standing to 15 water level of third pressure-measuring pipe is flushed with experiment cylinder 1, carries out normal under normal pressure state Head permeability experiment;
B, start jack 20, the mandril of jack 20 is made to apply downward pressure to upper metal plate hole 8, axle power meter 21 is surveyed Stressed size is applied in examination, carries out the constant head permeability test under different soil pressures;
C, the first pressure-measuring pipe 13, the second pressure-measuring pipe 14 and third pressure-measuring pipe 15 are closed, by servo water pump 22 and overflow pipe 12 connections, being forced at the top of the test soil sample 24 tested in cylinder 1 has water to gush, and water pressure gauge 23 measures test soil sample 24 and gushs The water pressure of destruction.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention may be used also on the basis of the above description for those of ordinary skill in the art To make other variations or changes in different ways, all embodiments can not be exhaustive here, it is all to belong to this hair Bright technical solution changes and variations that derived from are still in the scope of protection of the present invention.

Claims (5)

1. a kind of experimental method for tunneling anti-experimental provision of gushing using sand-pebble layer earth pressure balanced shield, EPBS, it is characterised in that: The anti-experimental provision of gushing of sand-pebble layer earth pressure balanced shield, EPBS driving includes experiment cylinder (1), water supplying pipe (18) and pressurizing device (3), experiment cylinder (1) inner bottom surface is equipped with base support (7), and the top of base support (7) is equipped with lower metal plate hole (9), The upper surface of the lower metal plate hole (9) is equipped with lower filter screen (11), filling test soil sample (24) on the lower filter screen (11), described The top surface for testing soil sample (24) is equipped with upper filter screen (10), and the upper surface of the upper filter screen (10) is equipped with upper metal plate hole (8);
The lower metal plate hole (9) of experiment cylinder (1) side wall connection connection overflow pipe (12) below, experiment cylinder (1) It is sequentially communicated from bottom to top on side wall between lower metal plate hole (9) and upper metal plate hole (8) and connect the first pressure-measuring pipe (13), Two pressure-measuring pipes (14) and third pressure-measuring pipe (15), it is described experiment cylinder (1) upper metal plate hole (8) more than side wall connect into Water pipe (17);
Fixed setting servo water pump (22) and water pressure gauge (23), the pressurizing device (3) and water supplying pipe in the pressurizing device (3) (18) it connects;
The device further includes increased pressure beam (6), jack (20) and axle power meter (21), and the increased pressure beam (6) is located at experiment The top of cylinder (1), the pedestal of the jack (20) are fixed at the lower surface of increased pressure beam (6), the jack (20) Mandril contacted with the upper surface of upper metal plate hole (8), the axle power meter (21) is fixed on increased pressure beam (6);
Water check valve (19) are fixedly installed on the water supplying pipe (18);
Experimental method the following steps are included:
A, base support (7), lower metal plate hole (9), lower filter screen (11) are sequentially placed into experiment cylinder (1), layering is packed into test Soil sample (24), every layer of 10cm, connection water supplying pipe (18) and water inlet pipe (17) are opened water check valve (19), make test soil sample (24) by After being gradually saturated, it is again loaded into test soil sample (24), until the last layer test soil sample (24) is higher by third pressure-measuring pipe (15) 10cm, Test soil sample (24) top is sequentially placed upper filter screen (10) and upper metal plate hole (8), continues when the water surface is higher by test soil sample (24) Being filled with water to overflow pipe (12) has water spilling, closes water check valve (19), stands neat to third pressure-measuring pipe (15) water level and experiment cylinder (1) Usually, the constant head permeability test under normal pressure state is carried out;
B, start jack (20), the mandril of jack (20) is made to apply downward pressure, axle power meter to upper metal plate hole (8) (21) stressed size is applied in test, carries out the constant head permeability test under different soil pressures;
C, the first pressure-measuring pipe (13), the second pressure-measuring pipe (14) and third pressure-measuring pipe (15) are closed, by servo water pump (22) and is overflow Water pipe (12) connection, test soil sample (24) top being forced into experiment cylinder (1) have water to gush, and water pressure gauge (23) measures test soil Sample (24) is gushed the water pressure of destruction.
2. experimental method according to claim 1, it is characterised in that: be fixedly installed and carve on the side wall of experiment cylinder (1) It spends plate (16), the position of the scale plate (16) and the first pressure-measuring pipe (13), the second pressure-measuring pipe (14) and third pressure-measuring pipe (15) It is corresponding.
3. experimental method according to claim 1, it is characterised in that: the device further includes sliding support (4) and graduated cylinder (5), the overflow pipe (12) rides upon on sliding support (4), and the overflow pipe (12) is connected with graduated cylinder (5).
4. experimental method according to claim 1, it is characterised in that: the base support (7), upper metal plate hole (8), under The diameter of metal plate hole (9), upper filter screen (10) and lower filter screen (11) is 0.5cm smaller than the internal diameter for testing cylinder (1).
5. experimental method according to claim 1, it is characterised in that: the upper metal plate hole (8) and lower metal plate hole (9) Aperture it is consistent.
CN201610365907.7A 2016-05-27 2016-05-27 A kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method Expired - Fee Related CN106092849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610365907.7A CN106092849B (en) 2016-05-27 2016-05-27 A kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610365907.7A CN106092849B (en) 2016-05-27 2016-05-27 A kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method

Publications (2)

Publication Number Publication Date
CN106092849A CN106092849A (en) 2016-11-09
CN106092849B true CN106092849B (en) 2019-02-05

Family

ID=57230244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610365907.7A Expired - Fee Related CN106092849B (en) 2016-05-27 2016-05-27 A kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method

Country Status (1)

Country Link
CN (1) CN106092849B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106769787A (en) * 2017-02-17 2017-05-31 宿州学院 A kind of multimedium infiltration experiment device and its method of testing
CN106918536A (en) * 2017-02-24 2017-07-04 同济大学 The measure device and method of the vertical effective diffusion cofficient of solute in a kind of saturation soil layer
CN108061698A (en) * 2017-12-11 2018-05-22 叶剑红 The full-automatic experimental rig and its method of measurement fluctuation current infiltration towing force coefficient
CN108169459A (en) * 2018-01-11 2018-06-15 河海大学 EPB shield tunneling pressure chamber-spiral dumper is gushed laboratory apparatus and its experimental method
CN110658120B (en) * 2018-06-28 2021-04-16 中南大学 Method and device for testing permeability coefficient of foam-improved sandy residue soil under high water pressure
CN109060526A (en) * 2018-07-05 2018-12-21 沈阳工业大学 Thief zone sand-pebble layer earth pressure balanced shield, EPBS consolidates permeability experimental facility and method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201348601Y (en) * 2008-12-31 2009-11-18 长沙理工大学 Pressure permeameter
CN101598658A (en) * 2009-05-27 2009-12-09 中国科学院地质与地球物理研究所 Servo-control earth-rockfill mixture transformation permeameter
CN102128775A (en) * 2010-12-29 2011-07-20 河海大学 Detachable constant head permeability coefficient tester
CN202018415U (en) * 2010-12-03 2011-10-26 安徽理工大学 Aquifer parameter testing device under simulated water pumping conditions
CN202024949U (en) * 2011-01-25 2011-11-02 成都理工大学 Variable-pressure constant head permeability test device
CN202869938U (en) * 2012-11-06 2013-04-10 中国化学工程第十三建设有限公司 Constant head soil layer permeability coefficient tester
CN103293286A (en) * 2013-06-24 2013-09-11 重庆交通大学 Testing device for testing soil phase transformation-constitutive coupling law, and method
CN103808642A (en) * 2014-02-26 2014-05-21 王军 Electronic-clogging experiment device of geotextile
CN203732406U (en) * 2014-01-21 2014-07-23 盐城工学院 Permeation device capable of continuously pressurizing and used for rock mass seepage test
CN104155427A (en) * 2014-08-08 2014-11-19 王平 Low back pressure saturation method for loess liquidation experiment
CN203965428U (en) * 2014-06-12 2014-11-26 中国建筑股份有限公司 Native test unit is flowed in a kind of piping
CN104819925A (en) * 2015-05-14 2015-08-05 湘潭大学 Comprehensive test equipment for observing permeation and settlement of accumulated gravel soil
CN105486840A (en) * 2015-12-28 2016-04-13 中国科学院武汉岩土力学研究所 Solidification and permeation combined experimental device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3350197B2 (en) * 1993-12-29 2002-11-25 大成建設株式会社 Permeability test equipment and water path exploration method

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201348601Y (en) * 2008-12-31 2009-11-18 长沙理工大学 Pressure permeameter
CN101598658A (en) * 2009-05-27 2009-12-09 中国科学院地质与地球物理研究所 Servo-control earth-rockfill mixture transformation permeameter
CN202018415U (en) * 2010-12-03 2011-10-26 安徽理工大学 Aquifer parameter testing device under simulated water pumping conditions
CN102128775A (en) * 2010-12-29 2011-07-20 河海大学 Detachable constant head permeability coefficient tester
CN202024949U (en) * 2011-01-25 2011-11-02 成都理工大学 Variable-pressure constant head permeability test device
CN202869938U (en) * 2012-11-06 2013-04-10 中国化学工程第十三建设有限公司 Constant head soil layer permeability coefficient tester
CN103293286A (en) * 2013-06-24 2013-09-11 重庆交通大学 Testing device for testing soil phase transformation-constitutive coupling law, and method
CN203732406U (en) * 2014-01-21 2014-07-23 盐城工学院 Permeation device capable of continuously pressurizing and used for rock mass seepage test
CN103808642A (en) * 2014-02-26 2014-05-21 王军 Electronic-clogging experiment device of geotextile
CN203965428U (en) * 2014-06-12 2014-11-26 中国建筑股份有限公司 Native test unit is flowed in a kind of piping
CN104155427A (en) * 2014-08-08 2014-11-19 王平 Low back pressure saturation method for loess liquidation experiment
CN104819925A (en) * 2015-05-14 2015-08-05 湘潭大学 Comprehensive test equipment for observing permeation and settlement of accumulated gravel soil
CN105486840A (en) * 2015-12-28 2016-04-13 中国科学院武汉岩土力学研究所 Solidification and permeation combined experimental device

Also Published As

Publication number Publication date
CN106092849A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106092849B (en) A kind of sand-pebble layer earth pressure balanced shield, EPBS driving anti-gush experimental provision and method
CN109030182B (en) Saturated clay sample strength and strain softening parameter measuring device based on full-flow sounding
CN103868799B (en) Rock mechanical characteristic analyzer for non-conventional oil-gas reservoir stratum
CN108845108B (en) Simulation device and determination method for compacted loess seepage and post-construction settlement
CN106840977A (en) Slurry filling imitation device
CN108732024A (en) Simulate the pilot system and test method of differently stress condition lower plate gushing water
CN106814016A (en) The analogy method of slurry filling imitation device
CN105043960B (en) A kind of modified soil body joint consolidation permeameter
CN106404607A (en) Soil column testing apparatus for simulating solute transport in consolidated soil
CN106771615B (en) A kind of soil body electrical conductance and permeability multipurpose test system and test method
CN105004509A (en) Structural fracture filling structure water and mud outburst test device
CN204125898U (en) The experimental rig of Dam Foundation Seepage under a kind of failure under earthquake action
CN103884597B (en) The analogue measurement device and method of coal seam hydraulic fracture induction surrouding rock stress change
CN105675846B (en) Phreatic table and the excavation of foundation pit model test apparatus of artesian head collaboration lifting
CN208888043U (en) A kind of saturation clay probe intensity and strain softening parameter measuring apparatus based on full stream feeler inspection
CN107941604A (en) A kind of consolidation testing device and test method of gassiness soil
CN103926182A (en) Permeability coefficient test method and test device under normal pressure
CN208239220U (en) Shear tester in hole in situ
CN105696636B (en) Can in Simulation of Excavation Process WATER LEVEL CHANGES excavation models experimental rig
CN104062408B (en) A kind of delamination pour slurry model assay systems
CN106198228A (en) A kind of drilling cuttings method predicting rock burst experimental simulation system and method
CN202216789U (en) Test stand of adsorption force of bottom of pile shoe of self-elevating platform
CN103926183B (en) Water-flowing amount test method under normal pressure and assay device
CN104990659A (en) Expansion soil area slurry balance shield tunnel tunnel-face expansion force test device
CN205786199U (en) A kind of soil-column test device for simulating solute transfer in consolidated soil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190205