CN106089258B - Tunnel device and construction method - Google Patents

Tunnel device and construction method Download PDF

Info

Publication number
CN106089258B
CN106089258B CN201610716126.8A CN201610716126A CN106089258B CN 106089258 B CN106089258 B CN 106089258B CN 201610716126 A CN201610716126 A CN 201610716126A CN 106089258 B CN106089258 B CN 106089258B
Authority
CN
China
Prior art keywords
arc panel
panel section
template
air bag
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610716126.8A
Other languages
Chinese (zh)
Other versions
CN106089258A (en
Inventor
王悦
王清江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Technology and Business Institute
Original Assignee
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Technology and Business Institute filed Critical Chongqing Technology and Business Institute
Priority to CN201610716126.8A priority Critical patent/CN106089258B/en
Publication of CN106089258A publication Critical patent/CN106089258A/en
Application granted granted Critical
Publication of CN106089258B publication Critical patent/CN106089258B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Abstract

The invention discloses a kind of Tunnel device and construction methods, including supporting trolley, template and air bag component, support trolley includes vehicle frame and the running mechanism in bottom of frame is arranged, vehicle frame includes multiple gate supporting supports being arranged side by side along vehicle frame length direction and the tie-beam for connecting gate supporting support, it is connected by tie-beam between each gate supporting support, running mechanism is arranged in the bottom of the gate supporting support at vehicle frame length direction both ends, template is domes made of being hinged by multiple arcs plate section, several injected holes are distributed in arc panel section, platen cover is above support trolley, it is provided with hydraulic telescopic rod between template and gate supporting support, air bag component includes the air bag II being arranged in the air bag I and the arc panel section bottom for being arranged in template lower part of each arc panel section side.The present invention can avoid Tunnel gunite concrete operation, reduce environmental pollution, and can realize rapid construction, promote Tunnel Construction Schedule.

Description

Tunnel device and construction method
Technical field
The present invention relates to Tunnel Engineering device field, more particularly to a kind of Tunnel device and construction method.
Background technology
Currently, when drill+blast tunnel engineering excavation, after each cycle is excavated, preliminary bracing injection need to be applied excavating scar Concrete.Form of construction work in the prior art typically uses concrete ejection to pump and premixing jetting material is injected directly on excavation On scar, since general spraying operation needs could repeatedly be completed, in this way in course of injection, a large amount of dust is often will produce, Operating personnel's health is influenced, and spraying operation speed is more slow, influences the construction speed in tunnel.
Therefore, Tunnel gunite concrete operation can be avoided by being badly in need of exploitation one kind, be reduced environmental pollution, and can It realizes rapid construction, promotes the Tunnel device of Tunnel Construction Schedule.
Invention content
In view of this, the purpose of the present invention is to provide a kind of Tunnel device and construction method, can avoid Tunnel gunite concrete operation, reduces environmental pollution, and can realize rapid construction, promotes Tunnel Construction Schedule.
The Tunnel device of the present invention, including support trolley, template and air bag component, the support trolley packet It includes vehicle frame and the running mechanism in bottom of frame is set, the vehicle frame includes multiple gate being arranged side by side along vehicle frame length direction Supporting support and tie-beam for connecting gate supporting support are connected by tie-beam between each gate supporting support, described Running mechanism is arranged in the bottom of the gate supporting support at vehicle frame length direction both ends, and the template is by multiple arcs plate Several injected holes are distributed in the arc panel section in domes made of section is hinged, the platen cover above support trolley, Hydraulic telescopic rod is provided between the template and gate supporting support, the air bag component includes being arranged in each arc panel section side The air bag II of the air bag I in face and the arc panel section bottom for being arranged in template lower part.
Further, the gate supporting support includes upper door shaped stent and lower door shaped stent, and upper door shaped stent is by symmetrically setting The column I set and the crossbeam I compositions being arranged between two column I, lower door shaped stent is by symmetrically arranged column II, setting two Crossbeam II between column II and the inclined support bar composition being arranged between column II and crossbeam II, the upper door shaped stent Column I is weldingly fixed on the crossbeam II of lower door shaped stent.
Further, it is respectively arranged with traveling positioned at the bottoms each column II of the gate supporting support at vehicle frame length direction both ends Mechanism, the running mechanism include universal wheel and the positioning support leg for fixing vehicle frame position, the positioning support leg top Equipped with positioning pin can be provided on the sliding sleeve of column II longitudinal sliding motions, the sliding sleeve.
Further, the template includes positioned at the arc panel section I on template top, positioned at template middle part and symmetrical arc Shape plate section II and positioned at template lower part and symmetrical arc panel section III, the both ends of the arc panel section I pass through work respectively One end of dynamic hinge I and corresponding arc panel section II is hinged, and each arc panel section II other ends are right by moveable hinge II and institute respectively One end of the arc panel section III answered is hinged.
Further, the both sides side of the arc panel section I, arc panel section II and arc panel section III are both provided with air bag I, The bottom of each arc panel section III is respectively arranged with air bag II.
Further, it is in matrix arrangements to be distributed on the arc panel section I, arc panel section II and arc panel section III several Injected hole, horizontal spacing and longitudinal pitch between each injected hole are 1~2m.
Further, the intrados and gate supporting support of the arc panel section I, arc panel section II and arc panel section III it Between be both provided with hydraulic telescopic rod.
Further, it is both provided on the extrados of the arc panel section I, arc panel section II and arc panel section III for pacifying Fill the H-type supporting block of supporting steel frame.
Further, the length of the vehicle frame is 4~7m, and the spacing between each gate supporting support is 1~1.5m.
The invention also discloses a kind of construction methods of Tunnel device, include the following steps:
A. Tunnel Blasting boring mud is removed, and measures and releases tunnel tunnel face center line and absolute altitude;
B. support trolley is moved to face position, after trolley to be supported is in place, by positioning support leg to supporting table Truck position is locked;
C. it is inflated into air bag component, closed slip casting is formed between template and country rock excavation face after air bag component inflation Space;
D. the pump line of grouting pump is connected to the injected hole in template, mortar is injected into slip casting space by grouting pump, Stop slip casting when mortar is oozed out in the gap between air bag component and country rock excavation face;
E. after grout material solidifies, air bag component is deflated, and form removal, by positioning support leg to supporting table parking stall Unlock is set, support trolley is moved to next drilling position, repeats step a~d, until completing all supportings of institute's construction tunnel Construction.
Beneficial effects of the present invention:The Tunnel device of the present invention, it is simple in structure, it is easy to use, it can avoid Tunnel gunite concrete operation, reduces environmental pollution, and can realize rapid construction, promotes Tunnel Construction Schedule, this The construction method of invention is suitable for tunnel IV grades and the above country rock, can effectively improve construction efficiency, shortens the construction time, ensures to apply Working medium amount.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structure diagram of present invention support trolley;
Fig. 3 is the structural schematic diagram of arc panel section of the present invention;
Fig. 4 is the A of Fig. 3 to partial schematic diagram;
Fig. 5 is the structural schematic diagram of supporting block of the present invention.
Specific implementation mode
Fig. 1 is the structural diagram of the present invention, and Fig. 2 is the structure diagram of present invention support trolley, and Fig. 3 is arc of the present invention The structural schematic diagram of plate section, the A that Fig. 4 is Fig. 3 is to partial schematic diagram, and Fig. 5 is the structural schematic diagram of supporting block of the present invention, as schemed institute Show:The Tunnel device of the present embodiment, including support trolley, template and air bag component, the support trolley include Vehicle frame and the running mechanism in bottom of frame is set, the vehicle frame includes multiple gate branch being arranged side by side along vehicle frame length direction Holder and the tie-beam 1 for connecting gate supporting support are supportted, is connected by tie-beam 1 between each gate supporting support, structure Firm, support strength is high;The running mechanism is arranged in the bottom of the gate supporting support at vehicle frame length direction both ends, just It is easy to use in support trolley movement;The template 2 be by multiple arcs plate section (arc panel section I21, arc panel section II22 and Arc panel section III23) it is hinged made of domes, so that it is adapted with tunnel scar structure, easily facilitate construction, and each arc It is fixed using hinged between shape plate section, also allows for being adjusted template and packing up, arc panel section (arc panel section I21, the arc Shape plate section II22 and arc panel section III23) on several injected holes 3 are distributed with, the pump line for connecting grouting pump, convenient for slip casting grasp Make;The template 2 covers on above support trolley, and hydraulic telescopic rod 4 is provided between the template 2 and gate supporting support, leads to Adjustment of the realization of hydraulic telescopic rod 4 to template position is crossed, is easy to use;The air bag component includes being arranged in each arc panel section The air bag I5 of the side (arc panel section I21, arc panel section II22 and arc panel section III23) and it is arranged in 1 lower part of template The air bag II6 of the bottom arc panel section (i.e. arc panel section III23) can after so that air bag component is inflated by the way that air bag component is arranged Closed slip casting space is formed between template and country rock excavation face can be by air bag group for slip casting, and after the completion of slip casting Part is deflated, and is completed form removable and is reduced environmental pollution so as to effectively avoid Tunnel gunite concrete operation, And can realize rapid construction, promote Tunnel Construction Schedule.
In the present embodiment, the gate supporting support includes upper door shaped stent 7 and lower door shaped stent 8, upper door shaped stent by Symmetrically arranged column I71 and the crossbeam I72 compositions being arranged between two column I71, lower door shaped stent 8 is by symmetrically arranged vertical Column II81, the crossbeam II82 being arranged between two column II81 and the bearing diagonal being arranged between column II81 and crossbeam II82 Bar 83 forms, and the column I71 of the upper door shaped stent 7 is weldingly fixed on the crossbeam II82 of lower door shaped stent 8, simple in structure, Integral strength is high.Connected by upper tie-beam between the crossbeam I72 of the upper door shaped stent 7 of each gate supporting support of the present embodiment It connects, is connected by middle tie-beam between the crossbeam II82 of the lower door shaped stent 8 of each gate supporting support, each gate supporting support It is connected by lower tie-beam between the bottoms column II81 of lower door shaped stent 8, to ensure the support strength of gate supporting support.
In the present embodiment, it is respectively set positioned at the bottoms each column II81 of the gate supporting support at vehicle frame length direction both ends It includes universal wheel 9 and the positioning support leg 10 for fixing vehicle frame position, the positioning branch to have running mechanism, the running mechanism 10 top of support leg is equipped with and can be provided with positioning pin 12 on the sliding sleeve 11 of column II81 longitudinal sliding motions, the sliding sleeve 11, passes through pine Positioning pin 12 is opened, 11 upward sliding of sliding sleeve is enable and positioning support leg 10 is driven to move up, is moved on to not in support leg 10 to be positioned When the height that universal wheel 9 can be interfered to move, you can sliding sleeve 11 is locked on column II81 by positioning pin 12, realizes supporting table The movement of vehicle;After supporting trolley to be moved to position, by unclamping positioning pin 12 again, making 11 slide downward of sliding sleeve and driving positioning Support leg 10 moves down, after support leg 10 to be positioned is entirely fallen on ground, you can and locking positioning pin prevents universal wheel 9 from moving, with The position of fixed support trolley.
In the present embodiment, the template 2 includes positioned at the arc panel section I21 on 2 top of template, positioned at 1 middle part of template and phase Mutually symmetrical arc panel section II22 and positioned at 1 lower part of template and symmetrical arc panel section III23, the arc panel section The both ends of I21 are hinged by one end of moveable hinge I13a and corresponding arc panel section II22 respectively, and each arc panel section II22 is another One end is hinged by one end of moveable hinge II13b and corresponding arc panel section III23 respectively, micro- in order to be carried out to template 1 It adjusts, easily facilitates use, and simple in structure, making easy to process is at low cost.
In the present embodiment, the both sides side of the arc panel section I21, arc panel section II22 and arc panel section III23 are all provided with It is equipped with air bag I5, the bottom of each arc panel section III3 is respectively arranged with air bag II6, can after so that air bag I5 and air bag II6 is inflated Closed slip casting space is formed between template 1 and country rock excavation face, in order to grouting operation.
In the present embodiment, it is distributed on the arc panel section I21, arc panel section II22 and arc panel section III23 several In the injected hole 3 of matrix arrangements, horizontal spacing and longitudinal pitch between each injected hole 3 are 1~2m, are convenient for quick slip casting, Construction efficiency is improved, and can effectively avoid Tunnel gunite concrete operation, is reduced environmental pollution, environmental protection is conducive to.
In the present embodiment, the arc panel section I21, arc panel section II22 and arc panel section III23 intrados and gate It is both provided with hydraulic telescopic rod 4 between supporting support, easily facilitates hydraulic telescopic rod 4 and the position of template 1 is adjusted and is controlled System, it is easy to use.
In the present embodiment, it is all provided on the extrados of the arc panel section I21, arc panel section II22 and arc panel section III23 It is equipped with the H-type supporting block 14 for installing supporting steel frame, for placing preliminary bracing supporting steel frame, keeps supporting steel frame advance It is placed in template 1, and is moved together in place with template 1.
In the present embodiment, the length of the vehicle frame is 4~7m, and the spacing between each gate supporting support is 1~1.5m, vehicle The length of frame is set according to the spacing between each gate supporting support, and the quantity of gate supporting support is according to actual use Depending on needing, the requirement of construction tunnel to adapt to.
The invention also discloses it is a kind of using Tunnel device carry out Tunnel construction construction method, Include the following steps:
A. Tunnel Blasting boring mud is removed, and measures and releases tunnel tunnel face center line and absolute altitude;
B. support trolley is moved to face position, after trolley to be supported is in place, by positioning support leg 10 to support Trolley position is locked;
C. it is inflated into air bag component, closed note is formed between template 2 and country rock excavation face after air bag component inflation Starch space;
D. the pump line of grouting pump is connected to the injected hole 3 in template 2, sand is injected into slip casting space by grouting pump Slurry stops slip casting when mortar is oozed out in the gap between air bag component and country rock excavation face;
E. after grout material solidifies, air bag component is deflated, and form removal 2, by positioning support leg 10 to supporting table Truck position unlocks, and support trolley is moved to next drilling position, repeats step a~d, until completing all of institute's construction tunnel Supporting construction;This construction method is suitable for tunnel IV grades and the above country rock, can effectively improve construction efficiency, shortens the construction time, Ensure construction quality.
Finally illustrate, the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although with reference to compared with Good embodiment describes the invention in detail, it will be understood by those of ordinary skill in the art that, it can be to the skill of the present invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of technical solution of the present invention, should all be covered at this In the right of invention.

Claims (7)

1. a kind of Tunnel device, it is characterised in that:Including support trolley, template and air bag component, the support Trolley includes vehicle frame and the running mechanism in bottom of frame is arranged, and the vehicle frame includes multiple arranged side by side along vehicle frame length direction Gate supporting support and tie-beam for connecting gate supporting support, connected by tie-beam between each gate supporting support It connects, the running mechanism is arranged in the bottom of the gate supporting support at vehicle frame length direction both ends, and the template is by more Several injected holes are distributed in the arc panel section in domes made of a arc panel section is hinged, and the platen cover is supporting Above trolley, hydraulic telescopic rod is provided between the template and gate supporting support, the air bag component includes being arranged each The air bag II of the air bag I of arc panel section side and the arc panel section bottom for being arranged in template lower part;The template includes position In the arc panel section I on template top, positioned at template middle part and symmetrical arc panel section II and positioned at template lower part and phase Mutually the both ends of symmetrical arc panel section III, the arc panel section I pass through moveable hinge I's and corresponding arc panel section II respectively One end is hinged, and each arc panel section II other ends are hinged by one end of moveable hinge II and corresponding arc panel section III respectively;Institute The both sides side for stating arc panel section I, arc panel section II and arc panel section III is both provided with air bag I, the bottom of each arc panel section III Portion is respectively arranged with air bag II;It is in matrix to be distributed on the arc panel section I, arc panel section II and arc panel section III several The injected hole of arrangement, horizontal spacing and longitudinal pitch between each injected hole are 1~2m.
2. Tunnel device according to claim 1, it is characterised in that:The gate supporting support includes visiting Type holder and lower door shaped stent, upper door shaped stent are made of symmetrically arranged column I and the crossbeam I being arranged between two column I, Lower door shaped stent is by symmetrically arranged column II, the crossbeam II being arranged between two column II and is arranged in column II and crossbeam Inclined support bar composition between II, the column I of the upper door shaped stent are weldingly fixed on the crossbeam II of lower door shaped stent.
3. Tunnel device according to claim 2, it is characterised in that:Door positioned at vehicle frame length direction both ends The bottoms each column II of type supporting support are respectively arranged with running mechanism, and the running mechanism includes universal wheel and for fixing vehicle The positioning support leg of rack position, the positioning support leg top is equipped with can be along the sliding sleeve of column II longitudinal sliding motions, the sliding sleeve It is provided with positioning pin.
4. Tunnel device according to claim 1, it is characterised in that:The arc panel section I, arc panel section II It is both provided with hydraulic telescopic rod between the intrados and gate supporting support of arc panel section III.
5. Tunnel device according to claim 4, it is characterised in that:The arc panel section I, arc panel section II With the H-type supporting block for installing supporting steel frame is both provided on the extrados of arc panel section III.
6. Tunnel device according to claim 1, it is characterised in that:The length of the vehicle frame is 4~7m, respectively Spacing between gate supporting support is 1~1.5m.
7. a kind of Tunnel device using described in any claim in claim 1 to 6 carries out tunnel initial-stage branch Protect the construction method of construction, it is characterised in that include the following steps:
A. Tunnel Blasting boring mud is removed, and measures and releases tunnel tunnel face center line and absolute altitude;
B. support trolley is moved to face position, after trolley to be supported is in place, by positioning support leg to supporting table parking stall It sets and is locked;
C. it is inflated into air bag component, it is empty that closed slip casting is formed between template and country rock excavation face after air bag component inflation Between;
D. the pump line of grouting pump is connected to the injected hole in template, mortar is injected into slip casting space by grouting pump, waits for gas Gap between capsule component and country rock excavation face stops slip casting when oozing out mortar;
E. after grout material solidifies, air bag component is deflated, and form removal, supporting table truck position is solved by positioning support leg Support trolley is moved to next drilling position, repeats step a~d, until all supportings for completing institute's construction tunnel are applied by lock Work.
CN201610716126.8A 2016-08-24 2016-08-24 Tunnel device and construction method Active CN106089258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610716126.8A CN106089258B (en) 2016-08-24 2016-08-24 Tunnel device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610716126.8A CN106089258B (en) 2016-08-24 2016-08-24 Tunnel device and construction method

Publications (2)

Publication Number Publication Date
CN106089258A CN106089258A (en) 2016-11-09
CN106089258B true CN106089258B (en) 2018-08-10

Family

ID=57226200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610716126.8A Active CN106089258B (en) 2016-08-24 2016-08-24 Tunnel device and construction method

Country Status (1)

Country Link
CN (1) CN106089258B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344862A (en) * 2019-07-10 2019-10-18 河南城建学院 A kind of foundation pit support device for tunnel drainage engineering
CN109505634B (en) * 2019-01-28 2023-10-17 山东科技大学 Emergency type anti-seepage water-air bag device in tunnel and application method thereof

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968691A (en) * 2017-05-23 2017-07-21 中国十七冶集团有限公司 Improve CD method construction methods in a kind of extremely frigid zones silty clay tunnel
CN107165653B (en) * 2017-06-29 2019-06-21 西南交通大学 A kind of Rock-burst in Underground Rock Engineering geological disaster passively prevents and treats equipment and its application method
CN107435543A (en) * 2017-09-19 2017-12-05 北京建工土木工程有限公司 IV grade of step construction method of three step of country rock large section five
CN108005695A (en) * 2018-01-31 2018-05-08 中铁北京工程局集团第工程有限公司 The fast-supporting device and method of branch large deformation at the beginning of for punishing tunnel weak surrounding rock
CN108386219B (en) * 2018-04-18 2023-08-11 招商局重庆交通科研设计院有限公司 Supporting system of tunnel supporting structure and operation method
CN111396102B (en) * 2018-05-23 2021-06-08 南京溧水高新产业股权投资有限公司 Supporting device for tunnel construction and using method
CN109373193B (en) * 2018-11-22 2020-08-14 杭州江润科技有限公司 Tunnel blasting excavation system and construction method
CN109296386B (en) * 2018-11-26 2024-03-29 四川蓝海智能装备制造有限公司 Forearm mechanism for die spraying
US11030356B2 (en) * 2018-12-20 2021-06-08 Disney Enterprises, Inc. Automated system for design and fabrication of artificial rockwork structures
CN109989772A (en) * 2019-04-30 2019-07-09 厦门合诚工程技术有限公司 A kind of tunnel reinforcement mould clamp device
CN109973122A (en) * 2019-05-14 2019-07-05 福建工程学院 A kind of tunnel reinforcement control method of wall rock loosening or soft rock large deformation
CN110847932A (en) * 2019-09-12 2020-02-28 中交投资南京有限公司 Double-layer preliminary bracing construction method based on small clear distance tunnel
CN112127931A (en) * 2020-09-25 2020-12-25 温州源铭振跃科技有限公司 Supporting device for traffic engineering tunnel construction
CN112483138B (en) * 2020-11-19 2023-10-20 河北建筑工程学院 H-shaped large-section tunnel supporting device and supporting method thereof
CN112963172A (en) * 2021-03-08 2021-06-15 太原理工大学 Deep roadway surrounding rock control device and control method thereof
CN113700515B (en) * 2021-07-19 2023-06-30 中铁十六局集团第三工程有限公司 Method, device and equipment for using ultra-large cross-tunnel support and readable storage medium
CN113982631B (en) * 2021-10-29 2024-04-05 成都未来智隧科技有限公司 Tunnel supporting structure and tunnel supporting method
CN113914901B (en) * 2021-11-11 2024-04-09 中国铁建大桥工程局集团有限公司 Tunnel supporting structure
CN114439511A (en) * 2022-01-28 2022-05-06 青岛市西海岸轨道交通有限公司 Reinforcing device for grouting treatment of leakage water of operating tunnel and working method
CN116517596B (en) * 2023-06-27 2023-10-10 中铁六局集团太原铁路建设有限公司 Tunnel supporting structure and supporting method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100898812B1 (en) * 2008-08-28 2009-05-22 주식회사 하이드로코리아 Atch tunnel structure construction method
CN102733827B (en) * 2012-06-29 2014-09-10 湖南省交通规划勘察设计院 Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction
CN202810871U (en) * 2012-09-06 2013-03-20 成都市新筑路桥机械股份有限公司 Formwork trolley for side wall lining
CN203499697U (en) * 2013-10-11 2014-03-26 北京住总集团有限责任公司 Trolley used for concrete construction of various cross sections through mining method
CN203891901U (en) * 2014-06-24 2014-10-22 重庆广播电视大学 Device for paving tunnel with waterproof board with adhesion method
CN205171393U (en) * 2015-11-18 2016-04-20 中国水利水电第四工程局有限公司 A formworking jumbo for arch culvert construction
CN105507927B (en) * 2015-12-30 2017-11-17 中铁一局集团有限公司 Air bag inner model mobile formwork and Tunnel construction of shotcrete method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505634B (en) * 2019-01-28 2023-10-17 山东科技大学 Emergency type anti-seepage water-air bag device in tunnel and application method thereof
CN110344862A (en) * 2019-07-10 2019-10-18 河南城建学院 A kind of foundation pit support device for tunnel drainage engineering

Also Published As

Publication number Publication date
CN106089258A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106089258B (en) Tunnel device and construction method
CN102900362B (en) Narrow-machine-body full-hydraulic bolt and anchor cable drill carriage for coal mine tunnel
CN104653104B (en) Suspension rail type rock drilling machine
CN106837392A (en) Tunnel gantry type multifunctional supporting chassis
CN104695984A (en) Multifunctional tunnel construction trolley
CN208650880U (en) A kind of arch installation manipulator for tunnel support construction equipment
CN102337905B (en) Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel
CN109236302A (en) A kind of tunnel variable section excavation trolley
CN102278110A (en) Movable two-arm of lifting platform hanging wall anchor rod and anchor cable construction drill carriage
CN106194022A (en) A kind of Portable drilling device for fully-mechanized mining working passing fault and using method
CN109611112A (en) A kind of tunnel excavation driving bull rock drilling machine
CN202866651U (en) Narrow-body full hydraulic anchor bolt anchor cable drill carriage for coal mine tunnel
CN104033168A (en) Self-moving flat-bed drilling anchor vehicle
CN103174382B (en) Multifunctional hydraulic anchor rod drill carriage
CN206419048U (en) Tunnel gantry type multifunctional supporting chassis
CN204627622U (en) The multi-functional construction trolley in a kind of tunnel
CN104763330B (en) Special drilling machine for horizontal rotary spraying construction
CN209469436U (en) Tunnel excavation driving bull rock drilling machine
CN203271588U (en) Wheel type truck-mounted drilling rig
CN202055821U (en) Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN206158574U (en) A portable drilling equipment for combining adopt working face and cross fault
CN208416455U (en) A kind of rock drilling robot for tunnel support construction equipment
CN206860205U (en) A kind of platform mechanical arm of bow member installation chassis
CN201560798U (en) Horizontal directional drilling machine framework
CN103277046A (en) Wheel type truck-mounted drilling rig

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant