CN106089156A - A kind of beam pumping unit work in combination system formula pumping operation method - Google Patents

A kind of beam pumping unit work in combination system formula pumping operation method Download PDF

Info

Publication number
CN106089156A
CN106089156A CN201610589252.1A CN201610589252A CN106089156A CN 106089156 A CN106089156 A CN 106089156A CN 201610589252 A CN201610589252 A CN 201610589252A CN 106089156 A CN106089156 A CN 106089156A
Authority
CN
China
Prior art keywords
complete cycle
cycle
crank
run
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610589252.1A
Other languages
Chinese (zh)
Other versions
CN106089156B (en
Inventor
王凤山
师国臣
王林
巩宏亮
任刚
常瑞清
孙延安
单红宇
韩名廷
刘海龙
李金源
张传绪
徐国民
任成锋
苗国晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Oilfield Co Ltd
China Petroleum and Natural Gas Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co Ltd, China Petroleum and Natural Gas Co Ltd filed Critical Daqing Oilfield Co Ltd
Priority to CN201610589252.1A priority Critical patent/CN106089156B/en
Publication of CN106089156A publication Critical patent/CN106089156A/en
Application granted granted Critical
Publication of CN106089156B publication Critical patent/CN106089156B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Abstract

One beam pumping unit work in combination system formula pumping operation method of the present invention belongs to technical field of oil production engineering, is specifically related to a kind of beam pumping unit operation method;The present invention is according to the dynamic oil level variable quantity corresponding to individual well total displacement in a day, and the permission variable quantity of producing fluid level, through a series of mathematical operations, obtains crank in the range of taking out cycle time, completes time-consuming being respectively altogetherComplete cycle run, and a length of time time-consuming total

Description

A kind of beam pumping unit work in combination system formula pumping operation method
Technical field
One beam pumping unit work in combination system formula pumping operation method of the present invention belongs to technical field of oil production engineering, It is specifically related to a kind of beam pumping unit operation method.
Background technology
In oil recovery process, under the operating mode that stripper well feed flow is not enough, it is often necessary to reduce individual well theoretical displacement.Due to walking beam Formula oil pumper conventional operation working system is limited to the motion of crank continuous complete cycle, therefore reduces individual well theoretical displacement, can only pass through Techniques below means:
The first, reduce operation jig frequency, but this mode there is problems in that owing to along with the reduction of oil pumper complete cycle jig frequency, depositing In the problem that plunger displacement pump leak rate is gradually increased, and, if using conversion system to turn down motor speed, then the driving effect of motor Rate also can be gradually reduced with the reduction of motor speed;
The second, reduction complete cycle jig frequency is relied on can to produce the problem that plunger leak rate is big and motor drive efficiency is low due to simple, because of This is under the operating mode that down-hole yield is too low, takes out the motion of working system, i.e. crank continuous complete cycle and shut down work alternately between employing Mode realizes reducing the purpose of theoretical displacement, but, this mode can produce again following new problem: one is to be turned by stopped status Entering start to need to carry out under conditions of Attended mode, owing to oil well is many, distance is remote, therefore shuts down and work of starting shooting to be wasted greatly The manpower and materials of amount;Two be cause 24 hours due to artificial problem of start-up on duty in be difficult to start/stop machine more than twice, and time longer Between without pumping can cause producing fluid level and down-hole stream pressure fluctuate widely, the growth to well yield and oil-producing formation causes extremely Adverse influence.
" beam pumping unit based on the motion of crank non-complete cycle is non-to be taken out the patent of invention of Application No. 201510783876.2 Draw operation method ", and Application No. 201510838831.0 patent of invention " based on crank non-complete cycle motion beam type take out Oil machine dynamically becomes stroke operation method ", all breach beam pumping unit and only exist a kind of operation side of crank continuous complete cycle motion The technology prejudice of formula, by the non-complete cycle oscillatory motion of crank, it is achieved running without pumping or becoming in the case of non-stop-machine Stroke runs.If the crank non-complete cycle fortune that the working method moved by continuous for traditional crank complete cycle and above-mentioned two patents propose Dynamic working method combines according to certain working method, on the one hand not only without reducing complete cycle jig frequency, solves plunger leak rate Big and that motor drive efficiency is low problem, and owing to oil pumper above ground portion is never shut down, therefore implement without artificial completely Power-on operation, can substantially save manpower and materials and financial resources consumption that manual site's start causes;On the other hand, this combination type Pumping operation system can be run with on-demand automatic enforcement repeatedly complete cycle, therefore can avoid long-time without pumping, hence it is evident that reduce dynamic What liquid level and down-hole stream were pressed fluctuates widely, and advantageously accounts for asking that well yield and oil-producing formation growth adversely affect Topic.
But, how to implement the combination of both working methods, also there is no related art scheme.
Summary of the invention
For the problems referred to above, the invention discloses a kind of beam pumping unit work in combination system formula pumping operation method, This method provide a kind of crank complete cycle and run the method for operation combined without pumping operation with non-complete cycle, this mode, it is not necessary to Reduce complete cycle jig frequency, advantageously account for the problem that plunger leak rate is big and motor drive efficiency is low, eliminate power-on operation demand, Be conducive to saving because people goes what field conduct power-on operation was caused manpower and materials and financial resources consumption, avoid long-time nothing simultaneously Pumping, advantageously accounts for well yield and oil-producing formation are grown the problem adversely affected.
The object of the present invention is achieved like this.
A kind of beam pumping unit work in combination system formula pumping operation method, comprises the following steps:
Step a, according to individual well total displacement in a dayQCorresponding dynamic oil level variable quantityA, and producing fluid level permission change Amounta, determine that intraday is taken out number of times:
In formula,For the computing that rounds up;
Step b, combine one day in the practical situation of different time sections down-hole liquid supply speed, in taking out the cycle with each, discharge capacity is identical For principle, between determining in different time sections, take out length cycle timet
Step c, according to individual well total displacement in a dayQNumber of times is taken out withN, determine that single is taken out the discharge capacity in the cycleq:
Step d, the single-revolution discharge capacity run according to each complete cycle of crank, determine and smoke what cycle inside crank complete cycle ran at each Number of timesn:
In formula,For downward rounding operation;
Step e, according to each complete cycle of crank run shared by time, determine that the non-complete cycle of crank runs the time,
Step f, crank existtIn time range, complete time-consuming being respectively altogetherComplete cycle run, and the most total Shi ChangweiNon-complete cycle without pumping run.
Above-mentioned a kind of beam pumping unit work in combination system formula pumping operation method, described step c and step d are replaced For:
Step c ', by actual condition is monitored statistics, individual well total displacement in having obtained a dayQRequired crank complete cycle The total degree run
Step d ', according to crank complete cycle run total degreeNumber of times is taken out withN, determine and take out cycle inside crank complete cycle at each The number of times runn:
In formula,For downward rounding operation;
Or
Step c ', by actual condition is monitored statistics, individual well total displacement in having obtained a dayQRequired crank complete cycle The average jig frequency runr
Step d ', according between take out length cycle timet, determine and take out, at each, the number of times that cycle inside crank complete cycle runsn:
In formula,For downward rounding operation.
One of the above beam pumping unit work in combination system formula pumping operation method, time different in one day described in step b Between the practical situation of section down-hole liquid supply speed, statistical method obtain.
One of the above beam pumping unit work in combination system formula pumping operation method, described in step e Equal or different.
One of the above beam pumping unit work in combination system formula pumping operation method, the crank complete cycle fortune described in step f Row and non-complete cycle run without pumping,Size all can arbitrarily adjust, order can arbitrarily exchange.
Beneficial effect:
The present invention is according to individual well total displacement in a dayQCorresponding dynamic oil level variable quantityA, and the permission change of producing fluid level Amounta, through a series of mathematical operations, obtain crank in the range of taking out cycle time, complete time-consuming being respectively altogetherComplete cycle run, and a length of time time-consuming totalNon-complete cycle without pumping run;The invention provides one Crank complete cycle runs and runs, with non-complete cycle, the method for operation combined without pumping, and this mode is without reducing complete cycle jig frequency, favorably In solving the problem that plunger leak rate is big and motor drive efficiency is low, eliminate power-on operation demand, be conducive to saving because people goes What field conduct power-on operation was caused manpower and materials and financial resources consumption, avoid long-time without pumping simultaneously, advantageously account for The problem adversely affected is grown in well yield and oil-producing formation.
Specific embodiment: below the specific embodiment of the invention is described in further detail.
Specific embodiment one:
A kind of beam pumping unit work in combination system formula pumping operation method of the present embodiment, comprises the following steps:
Step a, according to individual well total displacement in a dayQCorresponding dynamic oil level variable quantityA, and producing fluid level permission change Amounta, determine that intraday is taken out number of times:
In formula,For the computing that rounds up;
Step b, combine one day in the practical situation of different time sections down-hole liquid supply speed, in taking out the cycle with each, discharge capacity is identical For principle, between determining in different time sections, take out length cycle timet
Step c, according to individual well total displacement in a dayQNumber of times is taken out withN, determine that single is taken out the discharge capacity in the cycleq:
Step d, the single-revolution discharge capacity run according to each complete cycle of crank, determine and smoke what cycle inside crank complete cycle ran at each Number of timesn:
In formula,For downward rounding operation;
Step e, according to each complete cycle of crank run shared by time, determine that the non-complete cycle of crank runs the time,
Step f, crank existtIn time range, complete time-consuming being respectively altogetherComplete cycle run, and the most total Shi ChangweiNon-complete cycle without pumping run.
Specific embodiment two:
A kind of beam pumping unit work in combination system formula pumping operation method of the present embodiment, different from specific embodiment one Being, step c and step d replace with:
Step c ', by actual condition is monitored statistics, individual well total displacement in having obtained a dayQRequired crank complete cycle The total degree run
Step d ', according to crank complete cycle run total degreeNumber of times is taken out withN, determine and take out cycle inside crank complete cycle at each The number of times runn:
In formula,For downward rounding operation;
Specific embodiment three:
A kind of beam pumping unit work in combination system formula pumping operation method of the present embodiment, different from specific embodiment one Being, step c and step d replace with:
Step c ', by actual condition is monitored statistics, individual well total displacement in having obtained a dayQRequired crank complete cycle The average jig frequency runr
Step d ', according between take out length cycle timet, determine and take out, at each, the number of times that cycle inside crank complete cycle runsn:
In formula,For downward rounding operation.
In three above embodiment, following 4 needs are also had to illustrate:
The first, in described in step b one day, the practical situation of different time sections down-hole liquid supply speed, is obtained by statistical method, if Inconspicuous or in confused situation or during taking out week to all the producing fluid level undulate quantity difference of down-hole liquid supply speed change is less demanding, Take out the cycle between the most desirable equal length and (that is: take out length cycle timetFor definite value) and the number of times complete cycle operation side such as take out in the cycle Case (that is: takes out the number of times that cycle inside crank complete cycle runs for eachnFor definite value).
The second, take out in the cycle at each, it is desirable to crank completes time-consuming being respectively altogetherComplete cycle run, And it is a length of time the most totalNon-complete cycle without pumping run, butSize all can arbitrarily adjust, suitable Sequence can arbitrarily be exchanged.Wherein, the implication that size all can arbitrarily adjust isValue can enter as required Row changes;The implication that order can arbitrarily be exchanged is for thisnIndividual complete cycle runs and is distributed in this concrete position taking out in the cycle Put, if continuously, do not do any requirement, can according to actual needs, such as down-hole liquid supply speed, pump condition and the profit of gear-box The practical situation of sliding demand is adjusted.Such as, it is desirable to completing 10 complete cycles in certain takes out the cycle and run, we can be first Complete 2 complete cycles to run, then carry out a period of time non-complete cycle and run without pumping, then complete 8 complete cycles operations;We are all right It is done directly 10 complete cycles to run, then carries out non-complete cycle and run without pumping, until taking out the cycle between the next one.
3rd, in the present invention, as long as being not enough to cause oil pumper to be in the misunderstanding of stopped status to people, for saving energy The consideration of consumption, non-complete cycle is without allowing time-out in short-term in pumping running.
4th, in actual production process, it tends to be difficult to accurately grasp the quiet deflection of elasticity of each moment polished rod, simultaneously Also tend to the accurate location being difficult to grasp crank, as the approximation method in a kind of engineering, can be by the bidirectional swinging model of crank Enclose and be limited in certain scope, i.e. it is believed that crank carry out to be non-complete cycle run without pumping.

Claims (5)

1. a beam pumping unit work in combination system formula pumping operation method, it is characterised in that: comprise the following steps:
Step a, according to individual well total displacement in a dayQCorresponding dynamic oil level variable quantityA, and producing fluid level permission change Amounta, determine that intraday is taken out number of times:
In formula,For the computing that rounds up;
Step b, combine one day in the practical situation of different time sections down-hole liquid supply speed, in taking out the cycle with each, discharge capacity is identical For principle, between determining in different time sections, take out length cycle timet
Step c, according to individual well total displacement in a dayQNumber of times is taken out withN, determine that single is taken out the discharge capacity in the cycleq:
Step d, the single-revolution discharge capacity run according to each complete cycle of crank, determine and smoke what cycle inside crank complete cycle ran at each Number of timesn:
In formula,For downward rounding operation;
Step e, according to each complete cycle of crank run shared by time, determine that the non-complete cycle of crank runs the time,
Step f, crank existtIn time range, complete time-consuming being respectively altogetherComplete cycle run, and time time-consuming total A length ofNon-complete cycle without pumping run.
A kind of beam pumping unit work in combination system formula pumping operation method the most according to claim 1, its feature exists In: described step c and step d replace with:
Step c ', by actual condition is monitored statistics, individual well total displacement in having obtained a dayQRequired crank complete cycle The total degree run
Step d ', according to crank complete cycle run total degreeNumber of times is taken out withN, determine and take out cycle inside crank complete cycle at each The number of times runn:
In formula,For downward rounding operation;
Or
Step c ', by actual condition is monitored statistics, individual well total displacement in having obtained a dayQRequired crank complete cycle The average jig frequency runr
Step d ', according between take out length cycle timet, determine and take out, at each, the number of times that cycle inside crank complete cycle runsn:
In formula,For downward rounding operation.
A kind of beam pumping unit work in combination system formula pumping operation method the most according to claim 1 and 2, its feature It is: the practical situation of different time sections down-hole liquid supply speed in described in step b one day, statistical method obtains.
A kind of beam pumping unit work in combination system formula pumping operation method the most according to claim 1 and 2, its feature It is: described in step eEqual or different.
A kind of beam pumping unit work in combination system formula pumping operation method the most according to claim 1 and 2, its feature It is: the crank complete cycle described in step f runs and non-complete cycle runs without pumping,Size all can arbitrarily adjust Whole, order can arbitrarily be exchanged.
CN201610589252.1A 2016-07-26 2016-07-26 A kind of beam pumping unit work in combination system formula pumping operation method Active CN106089156B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610589252.1A CN106089156B (en) 2016-07-26 2016-07-26 A kind of beam pumping unit work in combination system formula pumping operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610589252.1A CN106089156B (en) 2016-07-26 2016-07-26 A kind of beam pumping unit work in combination system formula pumping operation method

Publications (2)

Publication Number Publication Date
CN106089156A true CN106089156A (en) 2016-11-09
CN106089156B CN106089156B (en) 2018-09-14

Family

ID=57450412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610589252.1A Active CN106089156B (en) 2016-07-26 2016-07-26 A kind of beam pumping unit work in combination system formula pumping operation method

Country Status (1)

Country Link
CN (1) CN106089156B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387028A (en) * 2016-05-17 2017-11-24 张敏 A kind of beam pumping unit working system combined running method
CN109669050A (en) * 2019-02-21 2019-04-23 宋成立 Oil well Extraction rate detection device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105119A (en) * 2006-07-11 2008-01-16 刘克文 Pumping unit balance adjusting apparatus and pumping unit balance structure adjusting method
CN202132024U (en) * 2011-07-19 2012-02-01 大庆明昊源石油科技开发有限公司 Intermittently pumping controller for oil pumping unit well
CA2848031A1 (en) * 2014-04-07 2015-10-07 Tundra Process Solutions Ltd. Method for controlling an artificial lifting system and an artificial lifting system employing same
CN105019869A (en) * 2015-07-31 2015-11-04 中能世华(北京)节能科技有限公司 Intelligent intermittent pumping energy saving system of oil pumping unit
CN204906247U (en) * 2015-09-02 2015-12-23 安徽钟南电器有限责任公司 Frequency conversion compensation energy -saving control device of oil field beam -pumping unit
CN204960893U (en) * 2015-07-23 2016-01-13 台安科技(无锡)有限公司 Take out surplus oil mass estimation device of well between oil field

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105119A (en) * 2006-07-11 2008-01-16 刘克文 Pumping unit balance adjusting apparatus and pumping unit balance structure adjusting method
CN202132024U (en) * 2011-07-19 2012-02-01 大庆明昊源石油科技开发有限公司 Intermittently pumping controller for oil pumping unit well
CA2848031A1 (en) * 2014-04-07 2015-10-07 Tundra Process Solutions Ltd. Method for controlling an artificial lifting system and an artificial lifting system employing same
CN204960893U (en) * 2015-07-23 2016-01-13 台安科技(无锡)有限公司 Take out surplus oil mass estimation device of well between oil field
CN105019869A (en) * 2015-07-31 2015-11-04 中能世华(北京)节能科技有限公司 Intelligent intermittent pumping energy saving system of oil pumping unit
CN204906247U (en) * 2015-09-02 2015-12-23 安徽钟南电器有限责任公司 Frequency conversion compensation energy -saving control device of oil field beam -pumping unit

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387028A (en) * 2016-05-17 2017-11-24 张敏 A kind of beam pumping unit working system combined running method
CN109669050A (en) * 2019-02-21 2019-04-23 宋成立 Oil well Extraction rate detection device

Also Published As

Publication number Publication date
CN106089156B (en) 2018-09-14

Similar Documents

Publication Publication Date Title
CN106089156A (en) A kind of beam pumping unit work in combination system formula pumping operation method
CN106982977A (en) A kind of ice cream maker with magnetic force driving pump
CN107387028B (en) A kind of beam pumping unit working system combined running method
CN106224310A (en) A kind of enclosed many single plunger pumps restructuring controls cylinder device
CN110296007B (en) Pumping equipment power system power management method and system
CN210966947U (en) Square billet cooling device with good cooling effect
CN109869137B (en) Method for controlling fixed production mode of pumping well based on flowmeter and indicator diagram
CN208462393U (en) A kind of hydraulic-driven ear-picking unit
CN104047328A (en) Excavator positive flow control method
CN103397993A (en) Cam pump
CN105804699B (en) Beam pumping unit dynamic based on the non-complete cycle motion of crank becomes stroke operation method
CN205013215U (en) Automatic pumping device of energy -saving rivers
CN209800180U (en) Double-cylinder double-acting hydraulic reciprocating pump
CN204532736U (en) A kind of power-driven system of high pressure water jet pump
CN207111549U (en) A kind of oil circulating system of novel hydraulic forming machine
Nikitin Machine regulation volume hydraulic drive with reciprocating motion of hydraulic motors
CN102465856A (en) Gas injection reciprocating pump
CN102953966B (en) Self-adaptive iterative control method of variable-frequency pumps in pump station group
CN202708534U (en) Automatic lubrication system and engineering machine
CN112262758B (en) Plant growth device based on tidal irrigation
CN105148733B (en) A kind of piston oscillation manifold type variable ratio frequency changer pulsating energy exchanger
CN207297310U (en) A kind of low pressure transfiguration flow control device for adjustable-flow injection pump
CN102734623A (en) Automatic lubrication system and engineering machinery
CN106678086A (en) Double-plug series connection application method of reciprocating pump and high-efficiency liquid pump applying method
CN1327130A (en) Two-way pump hydraulic straight line reciprocator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant