CN106089156B - A kind of beam pumping unit work in combination system formula pumping operation method - Google Patents

A kind of beam pumping unit work in combination system formula pumping operation method Download PDF

Info

Publication number
CN106089156B
CN106089156B CN201610589252.1A CN201610589252A CN106089156B CN 106089156 B CN106089156 B CN 106089156B CN 201610589252 A CN201610589252 A CN 201610589252A CN 106089156 B CN106089156 B CN 106089156B
Authority
CN
China
Prior art keywords
complete cycle
pumping
crank
run
cycle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610589252.1A
Other languages
Chinese (zh)
Other versions
CN106089156A (en
Inventor
王凤山
师国臣
王林
巩宏亮
任刚
常瑞清
孙延安
单红宇
韩名廷
刘海龙
李金源
张传绪
徐国民
任成锋
苗国晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Oilfield Co Ltd
China Petroleum and Natural Gas Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co Ltd, China Petroleum and Natural Gas Co Ltd filed Critical Daqing Oilfield Co Ltd
Priority to CN201610589252.1A priority Critical patent/CN106089156B/en
Publication of CN106089156A publication Critical patent/CN106089156A/en
Application granted granted Critical
Publication of CN106089156B publication Critical patent/CN106089156B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells

Abstract

A kind of beam pumping unit work in combination system formula pumping operation method of the present invention belongs to technical field of oil production engineering, and in particular to a kind of beam pumping unit operation method;The permission variable quantity of dynamic oil level variable quantity and hydrodynamic face of the present invention corresponding to individual well total displacement in one day obtains crank within pumping cycle time by a series of mathematical operations, completes to take respectively altogetherComplete cycle operation and time-consuming total duration be

Description

A kind of beam pumping unit work in combination system formula pumping operation method
Technical field
Beam pumping unit work in combination system formula pumping operation method of the present invention belongs to technical field of oil production engineering, specifically It is related to a kind of beam pumping unit operation method.
Background technology
In oil recovery process, under the insufficient operating mode of stripper well feed flow, it is often necessary to reduce individual well theoretical displacement.Due to walking beam Formula pumping unit conventional operation working system is limited to the continuous complete cycle movement of crank, therefore reduces individual well theoretical displacement, can only pass through Following technological means:
The first, operation jig frequency is reduced, but this mode has the following problems:Due to the drop with pumping unit complete cycle jig frequency It is low, there are problems that plunger pump leak rate gradually increases, moreover, if turning down motor speed using conversion system, motor Drive efficiency can be also gradually reduced with the reduction of motor speed;
The second, due to relying on reduction complete cycle jig frequency will produce merely, plunger leak rate is big low with motor drive efficiency to ask Topic, therefore under the too low operating mode of underground yield, working system is taken out using, i.e. the continuous complete cycle movement of crank and shutdown is alternate Working method reduces the purpose of theoretical displacement to realize, still, this mode will produce following new problem again:First, by shutdown shape State is transferred to booting and needs to carry out under conditions of Attended mode, and since oil well is more, distance is remote, therefore wave is wanted in shutdown and booting work Take a large amount of manpower and materials;Second is that since artificial problem of start-up on duty causes to be difficult to start/stop machine more than twice in 24 hours, and compared with Hydrodynamic face and underground can be caused to flow fluctuating widely for pressure without pumping for a long time, the development of well yield and oil-producing formation is caused Extremely disadvantageous influence.
Application No. is 201510783876.2 patents of invention《The non-pumping of beam pumping unit based on the non-complete cycle movement of crank Draw operation method》, and application No. is 201510838831.0 patents of invention《Beam type based on the non-complete cycle movement of crank is taken out Oil machine dynamic becomes stroke operation method》, breaching beam pumping unit, there is only the continuous complete cycles of crank to move a kind of operation side The technology prejudice of formula is realized in non-stop-machine no pumping operation or is become by the non-complete cycle oscillatory motion of crank Stroke is run.If the non-complete cycle of crank that the working method of the continuous complete cycle movement of traditional crank is proposed with above-mentioned two patents transported Dynamic working method is combined according to certain working method, is on the one hand not only not necessarily to reduce complete cycle jig frequency, is solved plunger leak rate Big and low motor drive efficiency problem, and since pumping unit above ground portion is never shut down, therefore it is not necessarily to artificial implement completely Power-on operation can obviously save manpower and materials caused by manual site's booting and financial resources consumption;On the other hand, this combined type Pumping operation system the multiple complete cycle of automatic implementation can be run on demand, therefore can be to avoid long-time without pumping, hence it is evident that be reduced dynamic What liquid level and underground stream were pressed fluctuates widely, and advantageously accounts for asking what well yield and oil-producing formation development adversely affected Topic.
However, how to implement the combination of both working methods, there are no related art schemes.
Invention content
In view of the above-mentioned problems, the invention discloses beam pumping unit work in combination system formula pumping operation method, the party Method provides a kind of method of operation that the operation of crank complete cycle is combined with non-complete cycle without pumping operation, this mode, without reducing Complete cycle jig frequency advantageously accounts for the problem that plunger leak rate is big and motor drive efficiency is low, eliminates power-on operation demand, favorably In saving manpower and materials caused by people removes field conduct power-on operation and financial resources consumption, while avoiding for a long time without pumping The problem of drawing, advantageously accounting for adversely affecting well yield and oil-producing formation development.
The object of the present invention is achieved like this.
A kind of beam pumping unit work in combination system formula pumping operation method, includes the following steps:
Step a, the permission in the dynamic oil level variable quantity A corresponding to individual well total displacement Q in one day and hydrodynamic face Variable quantity a determines intraday pumping number:
In formula,For the operation that rounds up;
Step b, in conjunction with the actual conditions of different time sections underground liquid supply speed in one day, discharge capacity in the period is taken out with each It is all mutually principle, cycle time length t is taken out between determining in different time sections;
Step c, according to individual well total displacement Q in one day and pumping times N, the discharge capacity q in the period is taken out between determining individually:
Q=Q/N
Step d, it according to the single-revolution discharge capacity q' of each complete cycle operation of crank, determines and takes out period inside crank complete cycle fortune at each Capable frequency n:
In formula,For downward rounding operation;
Step e, occupied time t is run according to each complete cycle of crank1、t2、…、tn, when determining that the non-complete cycle of crank is run Between tNon- complete cycle,
Step f, for crank in t time ranges, it is respectively t to complete to take altogether1、t2、…、tnComplete cycle operation, and take Total duration is tNon- complete cycleNon- complete cycle without pumping run.
Above-mentioned beam pumping unit work in combination system formula pumping operation method, the step c and step d are replaced with:
Step c ', by being monitored statistics to actual condition, obtain completing crank required for individual well total displacement Q in one day The total degree n of complete cycle operationAlways
Step d ', the total degree n run according to crank complete cycleAlwaysTimes N is taken out with, determines and takes out period inside crank at each The frequency n of complete cycle operation:
In formula,For downward rounding operation;
Or
Step c ', by being monitored statistics to actual condition, obtain completing crank required for individual well total displacement Q in one day The average jig frequency r of complete cycle operation;
Step d ', cycle time length t is taken out between, determine the frequency n that the operation of period inside crank complete cycle is taken out at each:
In formula,For downward rounding operation.
The above beam pumping unit work in combination system formula pumping operation method, different time sections in one day described in step b The actual conditions of underground liquid supply speed, are obtained by statistical method.
The above beam pumping unit work in combination system formula pumping operation method, the t described in step e1、t2、…、tnIt is equal Or differ.
The above beam pumping unit work in combination system formula pumping operation method, crank complete cycle operation described in step f and Non- complete cycle is run without pumping, t1、t2、…、tnSize can arbitrarily adjust, sequentially can arbitrarily exchange.
Advantageous effect:
The permission of dynamic oil level variable quantity A and hydrodynamic face of the present invention corresponding to individual well total displacement Q in one day Variable quantity a obtains crank within pumping cycle time by a series of mathematical operations, and it is respectively t to complete to take altogether1、 t2、…、tnComplete cycle operation and time-consuming total duration be tNon- complete cycleNon- complete cycle without pumping run;The present invention provides a kind of cranks Complete cycle operation runs the method for operation being combined without pumping with non-complete cycle, and this mode is conducive to solve without reducing complete cycle jig frequency The problem that certainly plunger leak rate is big and motor drive efficiency is low, eliminates power-on operation demand, is conducive to save because people goes to scene Implement the manpower and materials caused by power-on operation and financial resources consumption, while avoiding advantageously accounting for list without pumping for a long time The problem of well production and oil-producing formation development adversely affect.
Specific embodiment
The specific embodiment of the invention is described in further detail below.
Specific embodiment one
The beam pumping unit work in combination system formula pumping operation method of the present embodiment, includes the following steps:
Step a, the permission in the dynamic oil level variable quantity A corresponding to individual well total displacement Q in one day and hydrodynamic face Variable quantity a determines intraday pumping number:
In formula,For the operation that rounds up;
Step b, in conjunction with the actual conditions of different time sections underground liquid supply speed in one day, discharge capacity in the period is taken out with each It is all mutually principle, cycle time length t is taken out between determining in different time sections;
Step c, according to individual well total displacement Q in one day and pumping times N, the discharge capacity q in the period is taken out between determining individually:
Q=Q/N
Step d, it according to the single-revolution discharge capacity q' of each complete cycle operation of crank, determines and takes out period inside crank complete cycle fortune at each Capable frequency n:
In formula,For downward rounding operation;
Step e, occupied time t is run according to each complete cycle of crank1、t2、…、tn, when determining that the non-complete cycle of crank is run Between tNon- complete cycle,
Step f, for crank in t time ranges, it is respectively t to complete to take altogether1、t2、…、tnComplete cycle operation, and take Total duration is tNon- complete cycleNon- complete cycle without pumping run.
Specific embodiment two
The beam pumping unit work in combination system formula pumping operation method of the present embodiment, the difference with specific embodiment one It is, step c and step d are replaced with:
Step c ', by being monitored statistics to actual condition, obtain completing crank required for individual well total displacement Q in one day The total degree n of complete cycle operationAlways
Step d ', the total degree n run according to crank complete cycleAlwaysTimes N is taken out with, determines and takes out period inside crank at each The frequency n of complete cycle operation:
In formula,For downward rounding operation;
Specific embodiment three
The beam pumping unit work in combination system formula pumping operation method of the present embodiment, the difference with specific embodiment one It is, step c and step d are replaced with:
Step c ', by being monitored statistics to actual condition, obtain completing crank required for individual well total displacement Q in one day The average jig frequency r of complete cycle operation;
Step d ', cycle time length t is taken out between, determine the frequency n that the operation of period inside crank complete cycle is taken out at each:
In formula,For downward rounding operation.
In three above embodiment, also following 4 points need to illustrate:
The first, described in step b in one day different time sections underground liquid supply speed actual conditions, obtained by statistical method, If underground liquid supply speed changes unobvious or hydrodynamic surface wave momentum differences requirement in confused situation or to all pumping during all It is not high, then take out the period (i.e. between desirable equal length:Between to take out cycle time length t be definite value) and take out equal numbers complete cycle fortune in the period Row scheme is (i.e.:The frequency n that the operation of period inside crank complete cycle is taken out between each is definite value).
The second, it is taken out in the period at each, it is desirable that it is respectively t that crank, which is completed to take altogether,1、t2、…、tnComplete cycle operation, with And time-consuming total duration is tNon- complete cycleNon- complete cycle run without pumping, but t1、t2、…、tnSize can arbitrarily adjust, sequence It can arbitrarily exchange.Wherein, the meaning that size can be adjusted arbitrarily is t1、t2、…、tnValue can carry out as needed Change;The meaning that sequence can be exchanged arbitrarily is the specific location being distributed in for this n complete cycle operation in this pumping period, It is whether continuous, do not do any requirement, can according to actual needs, such as underground liquid supply speed, pump condition and gear-box lubrication The actual conditions of demand are adjusted.Such as, it is desirable that 10 complete cycle operations are completed within some pumping period, we can be first complete It is run at 2 complete cycles, then carries out a period of time non-complete cycle and run without pumping, then complete 8 complete cycle operations;We can also be straight 10 complete cycle operations of completion are connect, non-complete cycle is then carried out and is run without pumping, the period is taken out until next.
Third, in the present invention, as long as being not enough to the artificial misunderstanding for being in shutdown status at pumping unit, for saving energy The considerations of consumption, non-complete cycle is without the pause allowed in pumping operational process in short-term.
4th, in the actual production process, it tends to be difficult to accurately grasp the quiet deflection of elasticity of each moment polished rod, simultaneously The accurate location for being difficult to grasp crank is also tended to, it, can be by the bidirectional swinging model of crank as the approximation method in a kind of engineering Enclose limitation in a certain range, you can think crank progress is that non-complete cycle is run without pumping.

Claims (5)

1. a kind of beam pumping unit work in combination system formula pumping operation method, which is characterized in that include the following steps:
Step a, the dynamic oil level variable quantity A corresponding to individual well total displacement Q in one day and hydrodynamic face allow to change A is measured, determines intraday pumping number:
In formula,For the operation that rounds up;
Step b, in conjunction with the actual conditions of different time sections underground liquid supply speed in one day, it is identical to take out discharge capacity in the period with each For principle, cycle time length t is taken out between determining in different time sections;
Step c, according to individual well total displacement Q in one day and pumping times N, the discharge capacity q in the period is taken out between determining individually:
Q=Q/N
Step d, it according to the single-revolution discharge capacity q' of each complete cycle operation of crank, determines and smokes what period inside crank complete cycle was run at each Frequency n:
In formula,For downward rounding operation;
Step e, occupied time t is run according to each complete cycle of crank1、t2、…、tn, determine the non-complete cycle run time of crank tNon- complete cycle,
Step f, for crank in t time ranges, it is respectively t to complete to take altogether1、t2、…、tnComplete cycle operation, and take it is total when A length of tNon- complete cycleNon- complete cycle without pumping run.
2. beam pumping unit work in combination system formula pumping operation method according to claim 1, which is characterized in that institute The step c and step d stated is replaced with:
Step c ', by being monitored statistics to actual condition, obtain completing crank complete cycle required for individual well total displacement Q in one day The total degree n of operationAlways
Step d ', the total degree n run according to crank complete cycleAlwaysTimes N is taken out with, determines and takes out period inside crank complete cycle at each The frequency n of operation:
In formula,For downward rounding operation;
Or
Step c ', by being monitored statistics to actual condition, obtain completing crank complete cycle required for individual well total displacement Q in one day The average jig frequency r of operation;
Step d ', cycle time length t is taken out between, determine the frequency n that the operation of period inside crank complete cycle is taken out at each:
In formula,For downward rounding operation.
3. beam pumping unit work in combination system formula pumping operation method according to claim 1 or 2, feature exist In, described in step b in one day different time sections underground liquid supply speed actual conditions, obtained by statistical method.
4. beam pumping unit work in combination system formula pumping operation method according to claim 1 or 2, feature exist In the t described in step e1、t2、…、tnIt is equal or different.
5. beam pumping unit work in combination system formula pumping operation method according to claim 1 or 2, feature exist In the operation of crank complete cycle and non-complete cycle described in step f are run without pumping, t1、t2、…、tnSize can arbitrarily adjust, Sequence can be exchanged arbitrarily.
CN201610589252.1A 2016-07-26 2016-07-26 A kind of beam pumping unit work in combination system formula pumping operation method Active CN106089156B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610589252.1A CN106089156B (en) 2016-07-26 2016-07-26 A kind of beam pumping unit work in combination system formula pumping operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610589252.1A CN106089156B (en) 2016-07-26 2016-07-26 A kind of beam pumping unit work in combination system formula pumping operation method

Publications (2)

Publication Number Publication Date
CN106089156A CN106089156A (en) 2016-11-09
CN106089156B true CN106089156B (en) 2018-09-14

Family

ID=57450412

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610589252.1A Active CN106089156B (en) 2016-07-26 2016-07-26 A kind of beam pumping unit work in combination system formula pumping operation method

Country Status (1)

Country Link
CN (1) CN106089156B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387028B (en) * 2016-05-17 2018-04-24 张敏 A kind of beam pumping unit working system combined running method
CN109669050A (en) * 2019-02-21 2019-04-23 宋成立 Oil well Extraction rate detection device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105119A (en) * 2006-07-11 2008-01-16 刘克文 Pumping unit balance adjusting apparatus and pumping unit balance structure adjusting method
CN202132024U (en) * 2011-07-19 2012-02-01 大庆明昊源石油科技开发有限公司 Intermittently pumping controller for oil pumping unit well
CA2848031A1 (en) * 2014-04-07 2015-10-07 Tundra Process Solutions Ltd. Method for controlling an artificial lifting system and an artificial lifting system employing same
CN105019869A (en) * 2015-07-31 2015-11-04 中能世华(北京)节能科技有限公司 Intelligent intermittent pumping energy saving system of oil pumping unit
CN204906247U (en) * 2015-09-02 2015-12-23 安徽钟南电器有限责任公司 Frequency conversion compensation energy -saving control device of oil field beam -pumping unit
CN204960893U (en) * 2015-07-23 2016-01-13 台安科技(无锡)有限公司 Take out surplus oil mass estimation device of well between oil field

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105119A (en) * 2006-07-11 2008-01-16 刘克文 Pumping unit balance adjusting apparatus and pumping unit balance structure adjusting method
CN202132024U (en) * 2011-07-19 2012-02-01 大庆明昊源石油科技开发有限公司 Intermittently pumping controller for oil pumping unit well
CA2848031A1 (en) * 2014-04-07 2015-10-07 Tundra Process Solutions Ltd. Method for controlling an artificial lifting system and an artificial lifting system employing same
CN204960893U (en) * 2015-07-23 2016-01-13 台安科技(无锡)有限公司 Take out surplus oil mass estimation device of well between oil field
CN105019869A (en) * 2015-07-31 2015-11-04 中能世华(北京)节能科技有限公司 Intelligent intermittent pumping energy saving system of oil pumping unit
CN204906247U (en) * 2015-09-02 2015-12-23 安徽钟南电器有限责任公司 Frequency conversion compensation energy -saving control device of oil field beam -pumping unit

Also Published As

Publication number Publication date
CN106089156A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN103776234B (en) A kind of refrigerator method for controlling frequency conversion and application thereof
CN106089156B (en) A kind of beam pumping unit work in combination system formula pumping operation method
CN106982977A (en) A kind of ice cream maker with magnetic force driving pump
CN103487318A (en) High-frequency impulse generator and loading system thereof
CN107387028B (en) A kind of beam pumping unit working system combined running method
CN205109997U (en) Novel fat liquoring of full -automatic drawing die utensil mould needle device
CN104179735B (en) Hydraulic system energy match control method
CN110296007B (en) Pumping equipment power system power management method and system
CN210966947U (en) Square billet cooling device with good cooling effect
CN202800092U (en) Automatic oil spreading device for cold noodles
CN205013215U (en) Automatic pumping device of energy -saving rivers
CN205840850U (en) A kind of oil pumper fall stroke-frequency device
CN207111549U (en) A kind of oil circulating system of novel hydraulic forming machine
CN105804699B (en) Beam pumping unit dynamic based on the non-complete cycle motion of crank becomes stroke operation method
CN204152741U (en) Water pump for mining
CN113153261A (en) Method for determining down stroke running time of oil pumping unit in segmented speed regulation single cycle
CN102953966B (en) Self-adaptive iterative control method of variable-frequency pumps in pump station group
CN203383480U (en) Automatic feeding coater
CN106678086A (en) Double-plug series connection application method of reciprocating pump and high-efficiency liquid pump applying method
CN105148733B (en) A kind of piston oscillation manifold type variable ratio frequency changer pulsating energy exchanger
CN204622433U (en) A kind of engagement type cooling device of extruder
CN204921486U (en) Pump machine seals water closed circulation cooling system
CN210599333U (en) Efficient energy-saving equipment for permanent magnet variable frequency air compressor equipment
CN203572717U (en) High-frequency pulse generator
CN204781132U (en) Constant voltage variable water supply equipment with long -range monitoring function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant