CN106088600A - Primary structure and secondary structure door opening lintel one-shot forming construction method - Google Patents

Primary structure and secondary structure door opening lintel one-shot forming construction method Download PDF

Info

Publication number
CN106088600A
CN106088600A CN201610475922.7A CN201610475922A CN106088600A CN 106088600 A CN106088600 A CN 106088600A CN 201610475922 A CN201610475922 A CN 201610475922A CN 106088600 A CN106088600 A CN 106088600A
Authority
CN
China
Prior art keywords
lintel
stirrup
template
construction
secondary structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610475922.7A
Other languages
Chinese (zh)
Other versions
CN106088600B (en
Inventor
王国瑞
韩越
代强
靳国英
蒋春勇
唐毅
敬屹鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Northeast Construction (shenyang) Engineering Technology Co Ltd
Original Assignee
Mcc Northeast Construction (shenyang) Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mcc Northeast Construction (shenyang) Engineering Technology Co Ltd filed Critical Mcc Northeast Construction (shenyang) Engineering Technology Co Ltd
Priority to CN201610475922.7A priority Critical patent/CN106088600B/en
Publication of CN106088600A publication Critical patent/CN106088600A/en
Application granted granted Critical
Publication of CN106088600B publication Critical patent/CN106088600B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C2003/023Lintels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention provides a kind of primary structure and secondary structure door opening lintel one-shot forming construction method, after the construction of colligation primary structure lintel completes, anchoring into by stirrup, the reinforcing bar part of construction secondary structure beam, manufacture template afterwards, template molding after-pouring concrete, the present invention is by above-mentioned construction method, secondary structure lintel is included in once construction, synchronization carry out with once constructing, the common quality defect in the crack between solution primary structure and secondary structure door opening lintel, reduces secondary structure lintel secondary working procedure, propelling construction progress.

Description

Primary structure and secondary structure door opening lintel one-shot forming construction method
Technical field
The present invention relates to a kind of construction method, especially a kind of primary structure is executed with secondary structure door opening lintel one-shot forming Work method.
Background technology
At present in construction, secondary structure lintel uses prefabricated engineering method, need in practice of construction prefabricated, transport, install Deng, experience multiple working procedure form of construction work is loaded down with trivial details, labor intensive and material resources.And after using said method to construct, it is easy to The quality problems such as appearance crack, add difficulty to follow-up construction and construction quality can not be guaranteed.
Summary of the invention
In order to solve above-mentioned technical problem, it is a kind of primary structure and secondary structure door opening lintel that the invention provides One-shot forming construction method, first carries out the construction of primary structure lintel, afterwards anchoring into by stirrup, construction on beams of concrete The reinforcing bar part of secondary structure beam, manufactures template, molding after-pouring concrete afterwards, solves and utilize tradition to execute in prior art Work method and cause easily occur that crack, construction quality are low and subsequent construction difficult, and construct loaded down with trivial details consumption manpower and thing The technical problem of power.
To achieve these goals, the technical solution used in the present invention is: primary structure and secondary structure door opening lintel one Secondary molding construction method, the steps include:
1) the reinforcing bar part construction of primary structure lintel, is carried out;
2), secondary structure is crossed beam steel carry out decompose setting-out:
2a), stirrup setting-out construction is carried out: stirrup is generally with the frame like structure of opening, and the stirrup of opening part is vertically to frame Internal extension;During construction, stirrup is anchored in primary structure lintel with the crotch at opening part two ends, and colligation will be bound round once On the reinforcing bar of structure lintel;
2b), the construction of long muscle: penetrating in stirrup by the elongated muscle of elongated for bottom muscle and middle part, wherein, the elongated muscle in bottom puts into stirrup Bottom fold corner, the elongated muscle in middle part is positioned in the middle part of stirrup hanging portion, and with stirrup perpendicular contact, finally muscle elongated to bottom With stirrup, the elongated muscle in middle part and stirrup carry out colligation.
3), require to classify reinforcing bar according to setting-out, be hoisted to scene;
4), Site Template makes:
4a), according to step 2) in reinforcing bar sample carry out installing template, template cavity and be wrapped in primary structure lintel and tie with secondary Outside structure lintel, template butt seam cements with pressure sensitive adhesive double coated, it is to avoid gap;Template machines and makes primary structure lintel and secondary The template of structure lintel is through, is an entire body;
4b), while installing template, being provided with thickness between the template outside secondary structure lintel and concrete walls is 1- The soft isolation of 5cm, it is to avoid one-shot forming lintel and concrete walls connect as one structure;
5), on-the-spot colligation: by reinforcing bar completely colligation, to adjusting anchorage of stirrups part, keep the straight and mutual of reinforcing bar Between distance.
6), checking and accepting, casting concrete in the template installed, the thickness controlling concrete cover is 1cm;
7), watering maintenance;
8), terminate construction, check and accept.
Step 2b) in, stirrup anchors into 1/6th of a length of total length of primary structure lintel, and described stirrup is straight The one-level steel of footpath 6cm.
Described soft isolation is specially extruded sheet or template material, and its height does not anchors into primary structure with secondary structure lintel The height of lintel sections is equal.
Having the beneficial effects that of the invention: the invention provides a kind of primary structure and secondary structure door opening mistake Beam one-shot forming construction method, first carries out the construction of primary structure reinforcing bar beam, afterwards anchoring into by secondary structure stirrup, construction The reinforcing bar part of secondary structure beam, makes template afterwards, molding after-pouring concrete, the present invention by above-mentioned construction method, two Aggregated(particle) structure lintel is included in once construction, synchronization carries out with once constructing, and solves primary structure and splits with secondary structure contact position The common quality defects such as seam, reduce precast lintel secondary working procedure, propelling construction progress.
Accompanying drawing explanation
Fig. 1: present configuration schematic side view.
Fig. 2: for present configuration front view.
Fig. 3: construct schematic diagram for the present invention.
Fig. 4: for conventional construction method construction schematic diagram.
Detailed description of the invention
Primary structure and secondary structure door opening lintel one-shot forming construction method, the steps include:
1) the reinforcing bar part construction of primary structure lintel 2, is carried out;
2), secondary structure lintel 1 reinforcing bar is carried out decompose setting-out:
2a), stirrup 1-2 setting-out construction is carried out: stirrup 1-2 is generally with the frame like structure of opening, and the stirrup 1-2 of opening part hangs down Directly extend to the inside of frame;During construction, stirrup 1-2 is anchored in primary structure lintel 2 with the crotch at opening part two ends, and will Hoop 1-2 colligation is on the reinforcing bar of primary structure lintel 2;
2b), the construction of long muscle: penetrating in stirrup 1-2 by elongated for bottom muscle 1-1 and middle part elongated muscle 1-3, wherein, bottom is elongated Muscle 1-1 puts into stirrup 1-2 bottom fold corner, and middle part elongated muscle 1-3 is positioned in the middle part of stirrup 1-2 hanging portion, and with stirrup 1-2 Perpendicular contact, finally muscle 1-1 elongated to bottom and stirrup 1-2, middle part elongated muscle 1-3 and stirrup 1-2 carry out colligation.
3), require to classify reinforcing bar according to setting-out, be hoisted to scene;
4), Site Template makes:
4a), according to step 2) in reinforcing bar sample carry out installing template 4, template 4 cavity and be wrapped in primary structure lintel 2 and two Aggregated(particle) structure lintel 1 is outside, and template butt seam cements with pressure sensitive adhesive double coated, it is to avoid gap;Template machines and makes primary structure lintel 2 Through with the template of secondary structure lintel 1, it is an entire body;
4b), while installing template, being provided with thickness between template 4 and the concrete walls outside secondary structure lintel 1 is The soft isolation 3 of 1-5cm, it is to avoid one-shot forming lintel and concrete walls connect as one structure;
5), on-the-spot colligation: by reinforcing bar completely colligation, to adjusting stirrup 1-2 anchorage part, keep the straight and phase of reinforcing bar Distance between Hu.
6), checking and accepting, casting concrete in the template installed, the thickness controlling concrete cover 4 is 1cm;
7), watering maintenance;
8), terminate construction, check and accept.
Step 2b) in, stirrup 1-2 anchors into 1/6th of a length of total length of primary structure lintel, described stirrup 1-2 is the one-level steel of diameter 6cm.
Described soft isolation 3 is specially extruded sheet or template material, and its height does not anchors into secondary structure lintel 1 once to be tied The height of structure lintel 2 part is equal, and preferred thickness is 3cm.
Described stirrup 1-2, bottom elongated muscle 1-1 and middle part elongated muscle 1-3 are one-level steel, its middle and lower part elongated muscle 1- A diameter of 12mm of 1 and middle part elongated muscle 1-3;The a diameter of 6mm of stirrup 1-2, arrangement pitch is 20cm;When secondary structure lintel 1 When not anchoring into the Partial Height of primary structure lintel 2 less than 20cm, the elongated muscle 1-3 in middle part can not be applied.
Fig. 4 show prior art constructing structure schematic diagram, needs precast lintel in advance, and precast lintel needs the most in advance Prefabricated, and need to build masonry I in advance by laying bricks or stones, and precast lintel is placed on the masonry I built by laying bricks or stones, then the masonry II later stage is built Build, precast lintel is filled with primary structure beam space.Construction procedure is loaded down with trivial details and the duration is longer, wastes manpower thing simultaneously Power.

Claims (3)

1. primary structure and secondary structure door opening lintel one-shot forming construction method, the steps include:
1) the reinforcing bar part construction of primary structure lintel (2), is carried out;
2), secondary structure lintel (1) reinforcing bar is carried out decompose setting-out:
2a), stirrup (1-2) setting-out construction is carried out: stirrup (1-2) is generally with the frame like structure of opening, the stirrup of opening part (1-2) vertically extend to the inside of frame;During construction, stirrup (1-2) is anchored into primary structure lintel with the crotch at opening part two ends (2) in, and (1-2) colligation will be bound round on the reinforcing bar of primary structure lintel (2);
2b), the construction of long muscle: in elongated for bottom muscle (1-1) and middle part elongated muscle (1-3) are penetrated stirrup (1-2), wherein, under Portion elongated muscle (1-1) puts into stirrup (1-2) bottom fold corner, and middle part elongated muscle (1-3) is positioned in stirrup (1-2) hanging portion Portion, and with stirrup (1-2) perpendicular contact, finally muscle elongated to bottom (1-1) and stirrup (1-2), the elongated muscle in middle part (1-3) and hoop Muscle (1-2) carries out colligation;
3), require to classify reinforcing bar according to setting-out, be hoisted to scene;
4), Site Template makes:
4a), according to step 2) in reinforcing bar sample carry out installing template (4), template (4) cavity and be wrapped in primary structure lintel (2) outside with secondary structure lintel (1), template butt seam cements with pressure sensitive adhesive double coated, it is to avoid gap;Template machines and makes once Structure lintel (2) is through with the template of secondary structure lintel (1), is an entire body;
4b), while installing template, between template (4) and concrete walls that secondary structure lintel (1) is outside, it is provided with thickness Degree is the soft isolation (3) of 1-5cm, it is to avoid one-shot forming lintel and concrete walls connect as one structure;
5), on-the-spot colligation: by reinforcing bar completely colligation, to adjusting stirrup (1-2) anchorage part, keep the straight of reinforcing bar and Mutual distance;
6), checking and accepting, casting concrete in the template installed, the thickness controlling concrete cover (4) is 1cm;
7), watering maintenance;
8), terminate construction, check and accept.
Primary structure the most according to claim 1 and secondary structure door opening lintel one-shot forming construction method, its feature exists In: step 2b) in, stirrup (1-2) anchors into 1/6th of a length of total length of primary structure lintel, described stirrup (1- 2) it is the one-level steel of diameter 6cm.
Primary structure the most according to claim 1 and secondary structure door opening lintel one-shot forming construction method, its feature exists In: described soft isolation (3) is specially squeezes north plate or linen-cotton material, and its height does not anchors into secondary structure lintel (1) once to be tied The height of structure lintel (2) part is equal.
CN201610475922.7A 2016-06-27 2016-06-27 Primary structure and secondary structure door opening lintel one-pass molding construction method Active CN106088600B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610475922.7A CN106088600B (en) 2016-06-27 2016-06-27 Primary structure and secondary structure door opening lintel one-pass molding construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610475922.7A CN106088600B (en) 2016-06-27 2016-06-27 Primary structure and secondary structure door opening lintel one-pass molding construction method

Publications (2)

Publication Number Publication Date
CN106088600A true CN106088600A (en) 2016-11-09
CN106088600B CN106088600B (en) 2018-08-10

Family

ID=57252921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610475922.7A Active CN106088600B (en) 2016-06-27 2016-06-27 Primary structure and secondary structure door opening lintel one-pass molding construction method

Country Status (1)

Country Link
CN (1) CN106088600B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071230A (en) * 2017-12-12 2018-05-25 北京崇建工程有限公司 A kind of construction method of door-window opening
CN109057335A (en) * 2018-08-16 2018-12-21 徽都建设有限公司 A kind of construction method of door-window opening
CN111139972A (en) * 2019-12-24 2020-05-12 中建一局集团第一建筑有限公司 Steel rib and stirrup connecting structure of steel reinforced concrete structural column and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226189A (en) * 1995-02-22 1996-09-03 Shimizu Corp Composite beam
JP2008121345A (en) * 2006-11-14 2008-05-29 Ohbayashi Corp Reinforcement structure of reinforced concrete beam having opening, method of manufacturing reinforced concrete beam having opening, and beam structure
CN203499262U (en) * 2013-09-18 2014-03-26 中建六局建设发展有限公司 One-off pouring structure of door and window hole lintel structure and vertical plate strip concrete structure
CN104878930A (en) * 2015-06-02 2015-09-02 常州第一建筑集团有限公司 One-time forming construction method for secondary structure and heat preservation plate of self-insulation wall body
CN105525753A (en) * 2015-06-05 2016-04-27 中建四局第一建筑工程有限公司 Method and structure for simultaneously constructing constructional column and main body structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08226189A (en) * 1995-02-22 1996-09-03 Shimizu Corp Composite beam
JP2008121345A (en) * 2006-11-14 2008-05-29 Ohbayashi Corp Reinforcement structure of reinforced concrete beam having opening, method of manufacturing reinforced concrete beam having opening, and beam structure
CN203499262U (en) * 2013-09-18 2014-03-26 中建六局建设发展有限公司 One-off pouring structure of door and window hole lintel structure and vertical plate strip concrete structure
CN104878930A (en) * 2015-06-02 2015-09-02 常州第一建筑集团有限公司 One-time forming construction method for secondary structure and heat preservation plate of self-insulation wall body
CN105525753A (en) * 2015-06-05 2016-04-27 中建四局第一建筑工程有限公司 Method and structure for simultaneously constructing constructional column and main body structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108071230A (en) * 2017-12-12 2018-05-25 北京崇建工程有限公司 A kind of construction method of door-window opening
CN109057335A (en) * 2018-08-16 2018-12-21 徽都建设有限公司 A kind of construction method of door-window opening
CN111139972A (en) * 2019-12-24 2020-05-12 中建一局集团第一建筑有限公司 Steel rib and stirrup connecting structure of steel reinforced concrete structural column and construction method thereof

Also Published As

Publication number Publication date
CN106088600B (en) 2018-08-10

Similar Documents

Publication Publication Date Title
CN102116061B (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN105696817B (en) A kind of multilayer cold formed steel is integral prefabricated to assemble house and its joining method
CN103469939A (en) Flexible connection anti-seismic structure for masonry infilled wall and main body, and construction method for flexible connection anti-seismic structure
CN106088326B (en) Assembling frame rod structure based on 3D printing
CN108755963A (en) A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method
CN105064555A (en) Structural wallboard for superimposed decorative layer and insulating layer and construction method
CN207959612U (en) A kind of frame, shear wall cast-in-place structural fill wall with assembled light
CN106088600A (en) Primary structure and secondary structure door opening lintel one-shot forming construction method
CN108005387A (en) A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers
US20180345535A1 (en) Formwork for providing a concrete foundation element, in particular a plinth with exposed horizontal reinforcing bars, plinth provided with such formwork, and structure comprising such plinth
CN206859453U (en) A kind of modified insulated wall light steel skeleton
CN108612228A (en) Prestressed assembly precast light partition plate and its installation method
CN105019598B (en) A kind of cutting armored concrete surface layer strengthens light weight board
CN108252407A (en) A kind of building with prefabricated reinforced concrete bearing
CN111042569B (en) Construction method for additionally building linear accelerator machine room in limited space of hospital basement
CN109183983A (en) A kind of assembly method of upper and lower interior wall and floor
CN109235702A (en) A kind of assembled double steel plate combined shear wall construction and its construction method with ribbing
CN206245520U (en) Overlaid plate type concrete shear wall longitudinal connection structure
ITBO20110611A1 (en) METHOD FOR REINFORCING A WALL AND CORRESPONDING STRUCTURE REINFORCEMENT SYSTEM
CN203947498U (en) Poured band of outer wall of basement wall Side Template
CN103882976A (en) Frame-shear wall structure based on three-side-grooved strip precast concrete wallboard assembly and construction method thereof
CN208430661U (en) A kind of vertical piece construction of line-styled self-heat conserving overlapped shear wall
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN205804745U (en) A kind of precast concrete shear wall component
CN207110035U (en) Assembled steel tendon concrete frame structure based on steel plate connection joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant