CN106088600A - Primary structure and secondary structure door opening lintel one-shot forming construction method - Google Patents
Primary structure and secondary structure door opening lintel one-shot forming construction method Download PDFInfo
- Publication number
- CN106088600A CN106088600A CN201610475922.7A CN201610475922A CN106088600A CN 106088600 A CN106088600 A CN 106088600A CN 201610475922 A CN201610475922 A CN 201610475922A CN 106088600 A CN106088600 A CN 106088600A
- Authority
- CN
- China
- Prior art keywords
- lintel
- stirrup
- template
- construction
- secondary structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C2003/023—Lintels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention provides a kind of primary structure and secondary structure door opening lintel one-shot forming construction method, after the construction of colligation primary structure lintel completes, anchoring into by stirrup, the reinforcing bar part of construction secondary structure beam, manufacture template afterwards, template molding after-pouring concrete, the present invention is by above-mentioned construction method, secondary structure lintel is included in once construction, synchronization carry out with once constructing, the common quality defect in the crack between solution primary structure and secondary structure door opening lintel, reduces secondary structure lintel secondary working procedure, propelling construction progress.
Description
Technical field
The present invention relates to a kind of construction method, especially a kind of primary structure is executed with secondary structure door opening lintel one-shot forming
Work method.
Background technology
At present in construction, secondary structure lintel uses prefabricated engineering method, need in practice of construction prefabricated, transport, install
Deng, experience multiple working procedure form of construction work is loaded down with trivial details, labor intensive and material resources.And after using said method to construct, it is easy to
The quality problems such as appearance crack, add difficulty to follow-up construction and construction quality can not be guaranteed.
Summary of the invention
In order to solve above-mentioned technical problem, it is a kind of primary structure and secondary structure door opening lintel that the invention provides
One-shot forming construction method, first carries out the construction of primary structure lintel, afterwards anchoring into by stirrup, construction on beams of concrete
The reinforcing bar part of secondary structure beam, manufactures template, molding after-pouring concrete afterwards, solves and utilize tradition to execute in prior art
Work method and cause easily occur that crack, construction quality are low and subsequent construction difficult, and construct loaded down with trivial details consumption manpower and thing
The technical problem of power.
To achieve these goals, the technical solution used in the present invention is: primary structure and secondary structure door opening lintel one
Secondary molding construction method, the steps include:
1) the reinforcing bar part construction of primary structure lintel, is carried out;
2), secondary structure is crossed beam steel carry out decompose setting-out:
2a), stirrup setting-out construction is carried out: stirrup is generally with the frame like structure of opening, and the stirrup of opening part is vertically to frame
Internal extension;During construction, stirrup is anchored in primary structure lintel with the crotch at opening part two ends, and colligation will be bound round once
On the reinforcing bar of structure lintel;
2b), the construction of long muscle: penetrating in stirrup by the elongated muscle of elongated for bottom muscle and middle part, wherein, the elongated muscle in bottom puts into stirrup
Bottom fold corner, the elongated muscle in middle part is positioned in the middle part of stirrup hanging portion, and with stirrup perpendicular contact, finally muscle elongated to bottom
With stirrup, the elongated muscle in middle part and stirrup carry out colligation.
3), require to classify reinforcing bar according to setting-out, be hoisted to scene;
4), Site Template makes:
4a), according to step 2) in reinforcing bar sample carry out installing template, template cavity and be wrapped in primary structure lintel and tie with secondary
Outside structure lintel, template butt seam cements with pressure sensitive adhesive double coated, it is to avoid gap;Template machines and makes primary structure lintel and secondary
The template of structure lintel is through, is an entire body;
4b), while installing template, being provided with thickness between the template outside secondary structure lintel and concrete walls is 1-
The soft isolation of 5cm, it is to avoid one-shot forming lintel and concrete walls connect as one structure;
5), on-the-spot colligation: by reinforcing bar completely colligation, to adjusting anchorage of stirrups part, keep the straight and mutual of reinforcing bar
Between distance.
6), checking and accepting, casting concrete in the template installed, the thickness controlling concrete cover is 1cm;
7), watering maintenance;
8), terminate construction, check and accept.
Step 2b) in, stirrup anchors into 1/6th of a length of total length of primary structure lintel, and described stirrup is straight
The one-level steel of footpath 6cm.
Described soft isolation is specially extruded sheet or template material, and its height does not anchors into primary structure with secondary structure lintel
The height of lintel sections is equal.
Having the beneficial effects that of the invention: the invention provides a kind of primary structure and secondary structure door opening mistake
Beam one-shot forming construction method, first carries out the construction of primary structure reinforcing bar beam, afterwards anchoring into by secondary structure stirrup, construction
The reinforcing bar part of secondary structure beam, makes template afterwards, molding after-pouring concrete, the present invention by above-mentioned construction method, two
Aggregated(particle) structure lintel is included in once construction, synchronization carries out with once constructing, and solves primary structure and splits with secondary structure contact position
The common quality defects such as seam, reduce precast lintel secondary working procedure, propelling construction progress.
Accompanying drawing explanation
Fig. 1: present configuration schematic side view.
Fig. 2: for present configuration front view.
Fig. 3: construct schematic diagram for the present invention.
Fig. 4: for conventional construction method construction schematic diagram.
Detailed description of the invention
Primary structure and secondary structure door opening lintel one-shot forming construction method, the steps include:
1) the reinforcing bar part construction of primary structure lintel 2, is carried out;
2), secondary structure lintel 1 reinforcing bar is carried out decompose setting-out:
2a), stirrup 1-2 setting-out construction is carried out: stirrup 1-2 is generally with the frame like structure of opening, and the stirrup 1-2 of opening part hangs down
Directly extend to the inside of frame;During construction, stirrup 1-2 is anchored in primary structure lintel 2 with the crotch at opening part two ends, and will
Hoop 1-2 colligation is on the reinforcing bar of primary structure lintel 2;
2b), the construction of long muscle: penetrating in stirrup 1-2 by elongated for bottom muscle 1-1 and middle part elongated muscle 1-3, wherein, bottom is elongated
Muscle 1-1 puts into stirrup 1-2 bottom fold corner, and middle part elongated muscle 1-3 is positioned in the middle part of stirrup 1-2 hanging portion, and with stirrup 1-2
Perpendicular contact, finally muscle 1-1 elongated to bottom and stirrup 1-2, middle part elongated muscle 1-3 and stirrup 1-2 carry out colligation.
3), require to classify reinforcing bar according to setting-out, be hoisted to scene;
4), Site Template makes:
4a), according to step 2) in reinforcing bar sample carry out installing template 4, template 4 cavity and be wrapped in primary structure lintel 2 and two
Aggregated(particle) structure lintel 1 is outside, and template butt seam cements with pressure sensitive adhesive double coated, it is to avoid gap;Template machines and makes primary structure lintel 2
Through with the template of secondary structure lintel 1, it is an entire body;
4b), while installing template, being provided with thickness between template 4 and the concrete walls outside secondary structure lintel 1 is
The soft isolation 3 of 1-5cm, it is to avoid one-shot forming lintel and concrete walls connect as one structure;
5), on-the-spot colligation: by reinforcing bar completely colligation, to adjusting stirrup 1-2 anchorage part, keep the straight and phase of reinforcing bar
Distance between Hu.
6), checking and accepting, casting concrete in the template installed, the thickness controlling concrete cover 4 is 1cm;
7), watering maintenance;
8), terminate construction, check and accept.
Step 2b) in, stirrup 1-2 anchors into 1/6th of a length of total length of primary structure lintel, described stirrup
1-2 is the one-level steel of diameter 6cm.
Described soft isolation 3 is specially extruded sheet or template material, and its height does not anchors into secondary structure lintel 1 once to be tied
The height of structure lintel 2 part is equal, and preferred thickness is 3cm.
Described stirrup 1-2, bottom elongated muscle 1-1 and middle part elongated muscle 1-3 are one-level steel, its middle and lower part elongated muscle 1-
A diameter of 12mm of 1 and middle part elongated muscle 1-3;The a diameter of 6mm of stirrup 1-2, arrangement pitch is 20cm;When secondary structure lintel 1
When not anchoring into the Partial Height of primary structure lintel 2 less than 20cm, the elongated muscle 1-3 in middle part can not be applied.
Fig. 4 show prior art constructing structure schematic diagram, needs precast lintel in advance, and precast lintel needs the most in advance
Prefabricated, and need to build masonry I in advance by laying bricks or stones, and precast lintel is placed on the masonry I built by laying bricks or stones, then the masonry II later stage is built
Build, precast lintel is filled with primary structure beam space.Construction procedure is loaded down with trivial details and the duration is longer, wastes manpower thing simultaneously
Power.
Claims (3)
1. primary structure and secondary structure door opening lintel one-shot forming construction method, the steps include:
1) the reinforcing bar part construction of primary structure lintel (2), is carried out;
2), secondary structure lintel (1) reinforcing bar is carried out decompose setting-out:
2a), stirrup (1-2) setting-out construction is carried out: stirrup (1-2) is generally with the frame like structure of opening, the stirrup of opening part
(1-2) vertically extend to the inside of frame;During construction, stirrup (1-2) is anchored into primary structure lintel with the crotch at opening part two ends
(2) in, and (1-2) colligation will be bound round on the reinforcing bar of primary structure lintel (2);
2b), the construction of long muscle: in elongated for bottom muscle (1-1) and middle part elongated muscle (1-3) are penetrated stirrup (1-2), wherein, under
Portion elongated muscle (1-1) puts into stirrup (1-2) bottom fold corner, and middle part elongated muscle (1-3) is positioned in stirrup (1-2) hanging portion
Portion, and with stirrup (1-2) perpendicular contact, finally muscle elongated to bottom (1-1) and stirrup (1-2), the elongated muscle in middle part (1-3) and hoop
Muscle (1-2) carries out colligation;
3), require to classify reinforcing bar according to setting-out, be hoisted to scene;
4), Site Template makes:
4a), according to step 2) in reinforcing bar sample carry out installing template (4), template (4) cavity and be wrapped in primary structure lintel
(2) outside with secondary structure lintel (1), template butt seam cements with pressure sensitive adhesive double coated, it is to avoid gap;Template machines and makes once
Structure lintel (2) is through with the template of secondary structure lintel (1), is an entire body;
4b), while installing template, between template (4) and concrete walls that secondary structure lintel (1) is outside, it is provided with thickness
Degree is the soft isolation (3) of 1-5cm, it is to avoid one-shot forming lintel and concrete walls connect as one structure;
5), on-the-spot colligation: by reinforcing bar completely colligation, to adjusting stirrup (1-2) anchorage part, keep the straight of reinforcing bar and
Mutual distance;
6), checking and accepting, casting concrete in the template installed, the thickness controlling concrete cover (4) is 1cm;
7), watering maintenance;
8), terminate construction, check and accept.
Primary structure the most according to claim 1 and secondary structure door opening lintel one-shot forming construction method, its feature exists
In: step 2b) in, stirrup (1-2) anchors into 1/6th of a length of total length of primary structure lintel, described stirrup (1-
2) it is the one-level steel of diameter 6cm.
Primary structure the most according to claim 1 and secondary structure door opening lintel one-shot forming construction method, its feature exists
In: described soft isolation (3) is specially squeezes north plate or linen-cotton material, and its height does not anchors into secondary structure lintel (1) once to be tied
The height of structure lintel (2) part is equal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610475922.7A CN106088600B (en) | 2016-06-27 | 2016-06-27 | Primary structure and secondary structure door opening lintel one-pass molding construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610475922.7A CN106088600B (en) | 2016-06-27 | 2016-06-27 | Primary structure and secondary structure door opening lintel one-pass molding construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106088600A true CN106088600A (en) | 2016-11-09 |
CN106088600B CN106088600B (en) | 2018-08-10 |
Family
ID=57252921
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610475922.7A Active CN106088600B (en) | 2016-06-27 | 2016-06-27 | Primary structure and secondary structure door opening lintel one-pass molding construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106088600B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108071230A (en) * | 2017-12-12 | 2018-05-25 | 北京崇建工程有限公司 | A kind of construction method of door-window opening |
CN109057335A (en) * | 2018-08-16 | 2018-12-21 | 徽都建设有限公司 | A kind of construction method of door-window opening |
CN111139972A (en) * | 2019-12-24 | 2020-05-12 | 中建一局集团第一建筑有限公司 | Steel rib and stirrup connecting structure of steel reinforced concrete structural column and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08226189A (en) * | 1995-02-22 | 1996-09-03 | Shimizu Corp | Composite beam |
JP2008121345A (en) * | 2006-11-14 | 2008-05-29 | Ohbayashi Corp | Reinforcement structure of reinforced concrete beam having opening, method of manufacturing reinforced concrete beam having opening, and beam structure |
CN203499262U (en) * | 2013-09-18 | 2014-03-26 | 中建六局建设发展有限公司 | One-off pouring structure of door and window hole lintel structure and vertical plate strip concrete structure |
CN104878930A (en) * | 2015-06-02 | 2015-09-02 | 常州第一建筑集团有限公司 | One-time forming construction method for secondary structure and heat preservation plate of self-insulation wall body |
CN105525753A (en) * | 2015-06-05 | 2016-04-27 | 中建四局第一建筑工程有限公司 | Method and structure for simultaneously constructing constructional column and main body structure |
-
2016
- 2016-06-27 CN CN201610475922.7A patent/CN106088600B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08226189A (en) * | 1995-02-22 | 1996-09-03 | Shimizu Corp | Composite beam |
JP2008121345A (en) * | 2006-11-14 | 2008-05-29 | Ohbayashi Corp | Reinforcement structure of reinforced concrete beam having opening, method of manufacturing reinforced concrete beam having opening, and beam structure |
CN203499262U (en) * | 2013-09-18 | 2014-03-26 | 中建六局建设发展有限公司 | One-off pouring structure of door and window hole lintel structure and vertical plate strip concrete structure |
CN104878930A (en) * | 2015-06-02 | 2015-09-02 | 常州第一建筑集团有限公司 | One-time forming construction method for secondary structure and heat preservation plate of self-insulation wall body |
CN105525753A (en) * | 2015-06-05 | 2016-04-27 | 中建四局第一建筑工程有限公司 | Method and structure for simultaneously constructing constructional column and main body structure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108071230A (en) * | 2017-12-12 | 2018-05-25 | 北京崇建工程有限公司 | A kind of construction method of door-window opening |
CN109057335A (en) * | 2018-08-16 | 2018-12-21 | 徽都建设有限公司 | A kind of construction method of door-window opening |
CN111139972A (en) * | 2019-12-24 | 2020-05-12 | 中建一局集团第一建筑有限公司 | Steel rib and stirrup connecting structure of steel reinforced concrete structural column and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106088600B (en) | 2018-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102116061B (en) | Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure | |
CN105696817B (en) | A kind of multilayer cold formed steel is integral prefabricated to assemble house and its joining method | |
CN103469939A (en) | Flexible connection anti-seismic structure for masonry infilled wall and main body, and construction method for flexible connection anti-seismic structure | |
CN106088326B (en) | Assembling frame rod structure based on 3D printing | |
CN108755963A (en) | A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method | |
CN105064555A (en) | Structural wallboard for superimposed decorative layer and insulating layer and construction method | |
CN207959612U (en) | A kind of frame, shear wall cast-in-place structural fill wall with assembled light | |
CN106088600A (en) | Primary structure and secondary structure door opening lintel one-shot forming construction method | |
CN108005387A (en) | A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers | |
US20180345535A1 (en) | Formwork for providing a concrete foundation element, in particular a plinth with exposed horizontal reinforcing bars, plinth provided with such formwork, and structure comprising such plinth | |
CN206859453U (en) | A kind of modified insulated wall light steel skeleton | |
CN108612228A (en) | Prestressed assembly precast light partition plate and its installation method | |
CN105019598B (en) | A kind of cutting armored concrete surface layer strengthens light weight board | |
CN108252407A (en) | A kind of building with prefabricated reinforced concrete bearing | |
CN111042569B (en) | Construction method for additionally building linear accelerator machine room in limited space of hospital basement | |
CN109183983A (en) | A kind of assembly method of upper and lower interior wall and floor | |
CN109235702A (en) | A kind of assembled double steel plate combined shear wall construction and its construction method with ribbing | |
CN206245520U (en) | Overlaid plate type concrete shear wall longitudinal connection structure | |
ITBO20110611A1 (en) | METHOD FOR REINFORCING A WALL AND CORRESPONDING STRUCTURE REINFORCEMENT SYSTEM | |
CN203947498U (en) | Poured band of outer wall of basement wall Side Template | |
CN103882976A (en) | Frame-shear wall structure based on three-side-grooved strip precast concrete wallboard assembly and construction method thereof | |
CN208430661U (en) | A kind of vertical piece construction of line-styled self-heat conserving overlapped shear wall | |
CN108104284B (en) | Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method | |
CN205804745U (en) | A kind of precast concrete shear wall component | |
CN207110035U (en) | Assembled steel tendon concrete frame structure based on steel plate connection joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |