- Publication number
- CN106087750B CN106087750B CN201610467070.7A CN201610467070A CN106087750B CN 106087750 B CN106087750 B CN 106087750B CN 201610467070 A CN201610467070 A CN 201610467070A CN 106087750 B CN106087750 B CN 106087750B
- Authority
- CN
- China
- Prior art keywords
- bridge
- pile
- steel platform
- pile cover
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610467070.7A CN106087750B (en) | 2016-06-21 | 2016-06-21 | Across the stake formula of pile integrative-structure does not land the construction method of construction steel platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610467070.7A CN106087750B (en) | 2016-06-21 | 2016-06-21 | Across the stake formula of pile integrative-structure does not land the construction method of construction steel platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106087750A CN106087750A (en) | 2016-11-09 |
CN106087750B true CN106087750B (en) | 2017-11-10 |
Family
ID=57253588
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610467070.7A Active CN106087750B (en) | 2016-06-21 | 2016-06-21 | Across the stake formula of pile integrative-structure does not land the construction method of construction steel platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106087750B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107327068B (en) * | 2017-08-09 | 2022-11-11 | 广东省建筑工程集团有限公司 | Steel structure truss string system roof ceiling structure and construction method thereof |
CN112411466B (en) * | 2020-11-06 | 2021-12-24 | 中国港湾工程有限责任公司 | Construction platform based on old pile foundation transformation and construction method thereof |
CN113981821A (en) * | 2021-08-25 | 2022-01-28 | 浙大宁波理工学院 | Full-prefabricated assembled bridge construction platform and construction method |
CN114808707A (en) * | 2022-03-24 | 2022-07-29 | 中建国际建设有限公司 | A do not fall to ground circulation removal steel platform for bridge construction |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6264002B1 (en) * | 1995-07-25 | 2001-07-24 | Paul Kristen, Inc. | Scaffolding for bridges and other structures |
CN201437587U (en) * | 2009-07-16 | 2010-04-14 | 浙江省舟山连岛建设工程指挥部 | Steel-casing assembling platform suitable for marine construction |
CN201531017U (en) * | 2009-10-12 | 2010-07-21 | 中铁大桥局集团第四工程有限公司 | Rapid positioning and connection system used when inserting and ramming steel pipe supporting piles |
CN202247830U (en) * | 2011-09-13 | 2012-05-30 | 中国建筑土木建设有限公司路桥分公司 | Novel underwater steel platform |
CN102677592A (en) * | 2012-05-24 | 2012-09-19 | 中国水电建设集团十五工程局有限公司 | Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea |
CN103866784A (en) * | 2014-03-28 | 2014-06-18 | 上海绿地建设(集团)有限公司 | Adjustable tower crane steel platform foundation |
CN105274976A (en) * | 2015-09-11 | 2016-01-27 | 中交路桥华东工程有限公司 | Prefabricated installing construction method of underwater steel platform |
-
2016
- 2016-06-21 CN CN201610467070.7A patent/CN106087750B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6264002B1 (en) * | 1995-07-25 | 2001-07-24 | Paul Kristen, Inc. | Scaffolding for bridges and other structures |
CN201437587U (en) * | 2009-07-16 | 2010-04-14 | 浙江省舟山连岛建设工程指挥部 | Steel-casing assembling platform suitable for marine construction |
CN201531017U (en) * | 2009-10-12 | 2010-07-21 | 中铁大桥局集团第四工程有限公司 | Rapid positioning and connection system used when inserting and ramming steel pipe supporting piles |
CN202247830U (en) * | 2011-09-13 | 2012-05-30 | 中国建筑土木建设有限公司路桥分公司 | Novel underwater steel platform |
CN102677592A (en) * | 2012-05-24 | 2012-09-19 | 中国水电建设集团十五工程局有限公司 | Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea |
CN103866784A (en) * | 2014-03-28 | 2014-06-18 | 上海绿地建设(集团)有限公司 | Adjustable tower crane steel platform foundation |
CN105274976A (en) * | 2015-09-11 | 2016-01-27 | 中交路桥华东工程有限公司 | Prefabricated installing construction method of underwater steel platform |
Also Published As
Publication number | Publication date |
---|---|
CN106087750A (en) | 2016-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106087750B (en) | Across the stake formula of pile integrative-structure does not land the construction method of construction steel platform | |
CN104213508B (en) | A kind of method utilizing stull and external tendon to control king-post displacement | |
CN106677070A (en) | Construction support and method for overhead large-span heavy-duty cross beam | |
CN103088917B (en) | There is after a kind of shake the novel prefabricated prestress steel frame structure system of Self-resetting function | |
CN205527429U (en) | Jib crane is from jacking device | |
CN209584871U (en) | A kind of only column great cantilever Coping Construction bracket of high pier | |
CN109057013A (en) | Self-resetting can assemble multistage beam concentrically braced steel frame after shake | |
CN103103925B (en) | Combined H-shaped steel column bracket | |
CN108374326A (en) | A kind of combined rigid structure steel plate girder bridge pier consolidation construction | |
CN206495142U (en) | A kind of overhead pier column operation platform of assembled | |
CN109024881A (en) | Self-resetting can assemble multistage beam accentric support steel frame after shake | |
CN105274939B (en) | Connecting device for PC track beam | |
CN106758741B (en) | Modular box type plate beam structure and pontic erection method based on box type plate beam structure | |
CN205775876U (en) | A kind of pile integrative-structure does not land construction steel platform across stake formula | |
CN211949510U (en) | Annular cantilever platform construction supporting system | |
CN205776163U (en) | A kind of pile cover structure for pile one bridge structure construction | |
CN107989190A (en) | A kind of H profile steel beam and the connecting node and the practice of circular section profile steel concrete column | |
CN104775363A (en) | Assembling method of upper tower column reinforcing steel bar segment | |
CN106835929A (en) | A kind of assembled Wavelike steel webplate continuous composite beam | |
CN204023422U (en) | A kind of assembling Coping Construction operating platform | |
CN207891720U (en) | A kind of straddle-type monorail rectilinear orbit girder construction with lateral connection component | |
CN204435544U (en) | Annular self-locking node connecting structure | |
CN207904746U (en) | A kind of connection structure of steel truss and concrete bridge tower | |
CN207582277U (en) | A kind of combination steel suspension bridge | |
CN205907597U (en) | Truss -like breast moving platform device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Gao Pu Inventor after: Zhou Junlong Inventor after: Li Fei Inventor after: Yang Yankai Inventor after: Chen Yong Inventor after: Chen Zhe Inventor after: Liu Zhiyong Inventor after: Huang Keqi Inventor after: Wang Dianyong Inventor before: Zhou Junlong Inventor before: Li Fei Inventor before: Yang Yankai Inventor before: Gao Pu Inventor before: Chen Yong Inventor before: Chen Zhe Inventor before: Liu Zhiyong Inventor before: Huang Keqi Inventor before: Wang Dianyong |
|