CN106087750A - Pile integrative-structure does not land the construction method of construction steel platform across stake formula - Google Patents

Pile integrative-structure does not land the construction method of construction steel platform across stake formula Download PDF

Info

Publication number
CN106087750A
CN106087750A CN201610467070.7A CN201610467070A CN106087750A CN 106087750 A CN106087750 A CN 106087750A CN 201610467070 A CN201610467070 A CN 201610467070A CN 106087750 A CN106087750 A CN 106087750A
Authority
CN
China
Prior art keywords
bridge
pile
steel
many
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610467070.7A
Other languages
Chinese (zh)
Other versions
CN106087750B (en
Inventor
周俊龙
李飞
杨延凯
高璞
陈勇
陈哲
刘志永
黄克起
王殿永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201610467070.7A priority Critical patent/CN106087750B/en
Publication of CN106087750A publication Critical patent/CN106087750A/en
Application granted granted Critical
Publication of CN106087750B publication Critical patent/CN106087750B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses pile integrative-structure and do not land the construction method of construction steel platform across stake formula, comprise the following steps: (1) carries out the installation of pile cover structure;(2) along suitable bridge to connecting a steel main platform body truss between two the most adjacent campshed caps, the two ends of steel main platform body truss are connected with the otic placode pin joint of installation up and down in multiple half pile cover structures of corresponding side respectively;(3) on each steel main platform body truss, many direction across bridge distribution beam are set up along direction across bridge interval, then in many direction across bridge distribution beam along along bridge to arrange many spaced along bridges to distribution beam, finally in distribution beam, completely spread many bridge floor distribution beam at many along direction across bridge direction along bridge, complete steel putting up platform;(4) on steel platform, carry out bridge structure and along bridge to the construction of anteposition pile, after completing construction, pile cover structure is torn open spelling.Use what this method was capable of pile integrative-structure bridge superstructure not land construction.

Description

Pile integrative-structure does not land the construction method of construction steel platform across stake formula
Technical field
The present invention relates to field of bridge construction, relate in particular to a kind of use pile integrative-structure not land across stake formula to execute The construction method of work steel platform.
Background technology
Pile one bridge structure is a kind of novel bridge substructure configuration.This structure has quick construction, batch production The feature such as manufacture, effect on environment is little, be to realize bridge construction industrialized important component part future.But because of in pile one The bending resistance shear resistance of the pilework in structure is weak, therefore it should not be applied excessive horizontal lotus before bridge builds up completely Carry, in case pile structure is destroyed.Therefore, at present in pile one bridge structure construction, construction machinery is arranged under bridge On temporary pavement or trestle, superstructure is installed.
But in the construction operation environment that some special construction environment (such as marshland etc.) or environmental requirement are high, it is impossible to fill out and make Road surface or set up trestle, can only lay construction equipment in existing pile structure.Not yet there is the constructing structure of satisfied needs at present.
Summary of the invention
It is an object of the invention to overcome the deficiency of prior art, it is provided that a kind of highly versatile, little to pile structure influence, Surrounding ground environment is not landed across stake formula without the pile integrative-structure of impact the construction method of construction steel platform.
For reaching above-mentioned purpose, the present invention uses following technical proposals:
Pile integrative-structure does not land the construction method of construction steel platform across stake formula, comprises the following steps:
(1) carry out the installation of pile cover structure, concretely comprise the following steps:
First by vibration isolation rubber sheet pad in the termination of pile structure, then will attach on the inwall of every half half pile cover structure Being assembled in the termination of pile structure after vibration isolation rubber bar, vibration isolation rubber sheet is arranged on the top of pile structure and installs with two semi-involutions Half pile cover structure top board between, the fastening otic placode of half pile cover structure C installed through two semi-involutions with bolt is also tightened, and makes Pile cover structure is connected with pile close structure;In the middle of the outer wall of every half half pile cover structure between the upper and lower every be provided with upper and lower two Individual installation otic placode;
(2) along suitable bridge to connecting a steel main platform body truss, described steel between two the most adjacent campshed caps The two ends of main platform body truss are connected with the otic placode pin joint of installation up and down in multiple half pile cover structures of corresponding side respectively;
(3) on the steel main platform body truss each described, many direction across bridge distribution beam are set up, so along direction across bridge interval After in many described direction across bridge distribution beam along along bridge to arrange many spaced along bridges to distribution beam, finally described Many in distribution beam, completely spread many bridge floor distribution beam along direction across bridge direction along bridges, complete steel putting up platform, described cross-bridges Using Two bors d's oeuveres I-steel to distribution beam, described suitable bridge uses I-steel to distribution beam;
(4) on steel platform, bridge structure is carried out and along bridge to the construction of anteposition pile, after completing construction, to pile cover structure Carry out tearing open spelling: the spelling process of tearing open of pile cover structure is: in pile cover structure, will fasten the disassembling bolts of otic placode, steel platform and being connected Half pile cover structure entirety is sling, and is hoisted to pre-installed position, according to the installation method of step (1) king-pile cap, just prepares The pile cover structure that the half pile cover structure that half good pile cover structure and handling are connected on steel platform is assembled into is installed to pile structure On, and then complete the assembly of steel platform.
The invention has the beneficial effects as follows:
(1) what this steel platform was capable of pile integrative-structure bridge superstructure does not lands construction, i.e. construction equipment cloth Put on the steel platform on pile integrative-structure;
(2) this structure uses vibration isolation rubber bar and rubber sheet gasket to protect pile structure, little to structure influence, it is possible to Play the effect of protection existing structure;
(3) this structure can realize quickly removing and installing, it is adaptable to streamline constructing operation;
(4) use two halves can half pile cover structure of involutory installation to be easy to structure assembled, installations can be greatly improved, dismounting is imitated Rate;
The top board of (5) half pile cover structures can increase the bearing capacity of pile cover structure, and pile structure plays well guarantor Protect effect;
(6) utilizing the fastening otic placode structure in half pile cover structure, the mounting means using bolt to tighten can facilitate pile cover to pacify Dress, improves and installs speed;
(7) steel main platform body truss is installed and uses Dual-layer structure, it is possible to be effectively improved steel main platform body Stability Analysis of Structures Property, improve the degree of safety of steel platform;
(8) use along bridge to three grades of distribution such as distribution beam, direction across bridge distribution beam, bridge floor distribution beam, it is possible to effectively reduce knot The stress of structure is concentrated, and makes structure stress reasonable;
(9) connecting hole on upper and lower main longitudinal grider can facilitate the connection of steel platform and pile cover structure, accelerates speed of application;
The rib structure of (10) half pile cover structures can effectively promote the bonding strength between top board and pile cover cap body, promotes stake The safety of cap.
Accompanying drawing explanation
Fig. 1 is the pile integrative-structure using the present invention not to land the structure of construction method of construction steel platform across stake formula and shows It is intended to;
Fig. 2 is that the pile integrative-structure using the present invention does not land single spanning of construction method of construction steel platform across stake formula Inner structure schematic diagram;
Fig. 3 is that the pile integrative-structure using the present invention does not land the direction across bridge of construction method of construction steel platform across stake formula Structural representation;
Fig. 4 be use the present invention pile integrative-structure across stake formula do not land construction steel platform construction method suitable bridge to Structural representation;
Fig. 5 is that the pile integrative-structure using the present invention does not land the structure group of construction method of construction steel platform across stake formula Pile cover structural representation after spelling;
Fig. 6 is the pile cover structure sectional view in the structure shown in Fig. 1 of the present invention;
Fig. 7 is the top view of the structure shown in Fig. 6;
Fig. 8 is the upward view of the pile cover structure being arranged in the structure shown in Fig. 1 of the present invention in pile structure;
Fig. 9 is the explosive view of the structure shown in Fig. 8;
Figure 10 is the connecting hole structure chart on the main longitudinal grider up and down in Fig. 1 of the present invention;
Figure 11 is steel main platform body truss structure figure in Fig. 1 of the present invention.
Detailed description of the invention
With specific embodiment, the present invention is described in detail below in conjunction with the accompanying drawings.
Pile one bridge structure does not land construction steel platform construction method across stake formula, comprises the following steps:
(1) carry out the installation of pile cover structure A, concretely comprise the following steps:
First by vibration isolation rubber sheet pad in the termination of pile structure 1, then will paste on the inwall of every half half pile cover structure C Being assembled in the termination of pile structure 1 after attached vibration isolation rubber bar 11, vibration isolation rubber sheet is arranged on top and the two halves pair of pile structure Close between the horizontally disposed top board of the half pile cover structure installed, the half pile cover knot installed through two semi-involutions with bolt The fastening otic placode 9 of structure C is also tightened, and makes pile cover structure A and pile structure 1 compact siro spinning technology;Outer wall at every half half pile cover structure C Middle between the upper and lower every be provided with upper and lower two otic placodes 10 be installed, preferably weld between half tubular pile cover cap body 8 and top board 13 It is connected to the floor 14 of multiple bonding strength effect played and strengthen top board 13 and half tubular pile cover cap body 8.
(2) along suitable bridge to connecting a steel main platform body truss B between two the most adjacent campshed cap A, described The two ends of steel main platform body truss B are connected with otic placode 10 pin joint of installation up and down in multiple half pile cover structures of corresponding side respectively; As one embodiment of the present invention, described steel main platform body truss B includes indulging along along bridge to the many upper and lower masters arranged Beam 5, is arranged along direction across bridge interval between the upper main longitudinal grider of described many and between many lower main longitudinal griders 5, and described upper master indulges Beam, lower main longitudinal grider 5 all use Two bors d's oeuveres I-steel, are welded with cant beam 6 between described upper main longitudinal grider, lower main longitudinal grider 5, and described is oblique Beam 6 uses I-steel, between many upper main longitudinal griders and between many lower main longitudinal griders respectively by many upper main beams 7, many Lower main beam 7 is weldingly connected, and under many upper main beams 7 and Duo Gen, main beam 7 uses I-steel.Indulge each described upper master Beam, lower main longitudinal grider 5 have connecting hole 15 with installing otic placode 10 junction, and described upper main longitudinal grider, lower main longitudinal grider 5 pass through to wear respectively The bearing pin crossing connecting hole 15 is connected with installation otic placode 10 pin joint being correspondingly arranged.
(3) on the steel main platform body truss B each described, many direction across bridge distribution beam 2 are set up along direction across bridge interval, Then in many described direction across bridge distribution beam 2 along along bridge to arrange many spaced along bridges to distribution beam 3, finally exist Described many completely spread many bridge floor distribution beam 4 along bridge in distribution beam 3 along direction across bridge direction, complete steel putting up platform.Described Direction across bridge distribution beam 2 use Two bors d's oeuveres I-steel.Described suitable bridge uses I-steel to distribution beam 3.Described bridge floor distribution beam 4 Using channel-section steel or I-steel, when bridge floor distribution beam 4 uses channel-section steel, channel-section steel opening part is downward.
(4) on steel platform, bridge structure is carried out and along bridge to the construction of anteposition pile, after completing construction, to pile cover structure A carries out tearing open spelling: the spelling process of tearing open of pile cover structure A is: will in pile cover structure A fasten otic placode disassembling bolts, steel platform and be connected The half pile cover structure C entirety connect is sling, and is hoisted to pre-installed position, according to the installation method of step (1) king-pile cap A, and will Pile cover structure A being assembled into by the half pile cover structure C that ready half pile cover structure C and handling are connected on steel platform is installed extremely In pile structure 1, and then complete the assembly of steel platform.
Pile cover structure A in the inventive method is arranged in each pile structure, and it includes being arranged on each pile Pile cover structure A in structure, described pile cover structure A include two halves can half pile cover structure C of involutory installation, can realize interim fast Packing technique requirement.Two halves half pile cover structure C all includes one and half tubular pile cover cap body 8, at the top of two pile cover cap body 8 respectively Being welded with horizontally disposed top board 13, two pieces of top boards in two pile cover cap body of involutory installation can involutory be arranged on Together, each pile cover cap body 8 inwall posts a plurality of vibration isolation rubber bar 11, at the two halves pile cover structure C of involutory installation Involutory installation place is respectively welded at least two fastening otic placode 9, by through tight between the two halves half pile cover structure C of involutory installation Gu the securing member of the connecting hole on otic placode 9 is fixedly linked so that two halves half pile cover structure is fitted tightly by extruding vibration isolation rubber bar Being arranged on the termination of pile structure, between the top board of the top of pile structure and two halves half pile cover structure, pad is placed with vibration isolation rubber Sheet 12, described securing member can use bolt etc..In the middle of the outer wall of every half half pile cover structure C between the upper and lower every be provided with Otic placodes 10 are installed, are preferably welded with between half tubular pile cover cap body 8 and top board 13 and multiple play reinforcement top board for upper and lower two 13 and half floor 14 of bonding strength effect of tubular pile cover cap body 8.

Claims (4)

1. pile integrative-structure does not land the construction method of construction steel platform across stake formula, it is characterised in that comprise the following steps:
(1) carry out the installation of pile cover structure, concretely comprise the following steps:
First by vibration isolation rubber sheet pad in the termination of pile structure, then vibration damping will be attached on the inwall of every half half pile cover structure Being assembled in the termination of pile structure after rubber strip, vibration isolation rubber sheet is arranged on top and the half of the two semi-involutions installations of pile structure Between the top board of pile cover structure, through the fastening otic placode of half pile cover structure C of two semi-involutions installations and tighten with bolt, make pile cover Structure is connected with pile close structure;In the middle of the outer wall of every half half pile cover structure between the upper and lower every upper and lower two peaces are installed Dress otic placode;
(2) along suitable bridge to connecting a steel main platform body truss, described steel platform between two the most adjacent campshed caps The two ends of main body truss are connected with the otic placode pin joint of installation up and down in multiple half pile cover structures of corresponding side respectively;
(3) on the steel main platform body truss each described, set up many direction across bridge distribution beam along direction across bridge interval, then exist In many described direction across bridge distribution beam along along bridge to arrange many spaced along bridges to distribution beam, finally described many Root completely spreads many bridge floor distribution beam along bridge in distribution beam along direction across bridge direction, completes steel putting up platform, and described direction across bridge divides Joining beam and use Two bors d's oeuveres I-steel, described suitable bridge uses I-steel to distribution beam;
(4) on steel platform, carry out bridge structure and along bridge to the construction of anteposition pile, after completing construction, pile cover structure is carried out Tear spelling open: the spelling process of tearing open of pile cover structure is: in pile cover structure, will fasten the disassembling bolts of otic placode, steel platform and be connected half Cap entirety is sling, and is hoisted to pre-installed position, according to the installation method of step (1) king-pile cap, the most ready The pile cover structure that the half pile cover structure that half pile cover structure and handling are connected on steel platform is assembled into is installed to pile structure, enters And complete the assembly of steel platform.
Pile integrative-structure the most according to claim 1 does not land the construction method of construction steel platform across stake formula, its feature It is: between described half tubular pile cover cap body and top board, be welded with multiple playing strengthen top board and half tubular pile cover cap body The floor of bonding strength effect.
Pile integrative-structure the most according to claim 2 does not land the construction method of construction steel platform across stake formula, its feature It is: described steel main platform body truss includes along suitable bridge to many arranged upper main longitudinal grider, lower main longitudinal griders, on described many Arranging along direction across bridge interval between main longitudinal grider and between many lower main longitudinal griders, described upper main longitudinal grider, lower main longitudinal grider all use Two bors d's oeuveres I-steel, is welded with cant beam between described upper main longitudinal grider, lower main longitudinal grider, and described cant beam uses I-steel, on many It is weldingly connected by many upper main beams, many lower main beams respectively between main longitudinal grider and between many lower main longitudinal griders, many Under upper main beam and Duo Gen, main beam uses I-steel, connects with installing otic placode at each described upper main longitudinal grider, lower main longitudinal grider The place of connecing has connecting hole, and described upper main longitudinal grider, lower main longitudinal grider are respectively by through the bearing pin of connecting hole and the peace being correspondingly arranged Dress otic placode pin joint connects.
4. do not land the construction method of construction steel platform across stake formula according to the pile integrative-structure one of claim 1-3 Suo Shu, It is characterized in that: described bridge floor distribution beam uses channel-section steel or I-steel, when bridge floor distribution beam uses channel-section steel, channel-section steel opening Place is downwards.
CN201610467070.7A 2016-06-21 2016-06-21 Across the stake formula of pile integrative-structure does not land the construction method of construction steel platform Active CN106087750B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610467070.7A CN106087750B (en) 2016-06-21 2016-06-21 Across the stake formula of pile integrative-structure does not land the construction method of construction steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610467070.7A CN106087750B (en) 2016-06-21 2016-06-21 Across the stake formula of pile integrative-structure does not land the construction method of construction steel platform

Publications (2)

Publication Number Publication Date
CN106087750A true CN106087750A (en) 2016-11-09
CN106087750B CN106087750B (en) 2017-11-10

Family

ID=57253588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610467070.7A Active CN106087750B (en) 2016-06-21 2016-06-21 Across the stake formula of pile integrative-structure does not land the construction method of construction steel platform

Country Status (1)

Country Link
CN (1) CN106087750B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327068A (en) * 2017-08-09 2017-11-07 广东省建筑工程集团有限公司 Steel construction truss string structure system roof system ceiling structure and its construction method
CN112411466A (en) * 2020-11-06 2021-02-26 中国港湾工程有限责任公司 Construction platform based on old pile foundation transformation and construction method thereof
CN113981821A (en) * 2021-08-25 2022-01-28 浙大宁波理工学院 Full-prefabricated assembled bridge construction platform and construction method
CN114808707A (en) * 2022-03-24 2022-07-29 中建国际建设有限公司 A do not fall to ground circulation removal steel platform for bridge construction

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6264002B1 (en) * 1995-07-25 2001-07-24 Paul Kristen, Inc. Scaffolding for bridges and other structures
CN201437587U (en) * 2009-07-16 2010-04-14 浙江省舟山连岛建设工程指挥部 Steel-casing assembling platform suitable for marine construction
CN201531017U (en) * 2009-10-12 2010-07-21 中铁大桥局集团第四工程有限公司 Rapid positioning and connection system used when inserting and ramming steel pipe supporting piles
CN202247830U (en) * 2011-09-13 2012-05-30 中国建筑土木建设有限公司路桥分公司 Novel underwater steel platform
CN102677592A (en) * 2012-05-24 2012-09-19 中国水电建设集团十五工程局有限公司 Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN103866784A (en) * 2014-03-28 2014-06-18 上海绿地建设(集团)有限公司 Adjustable tower crane steel platform foundation
CN105274976A (en) * 2015-09-11 2016-01-27 中交路桥华东工程有限公司 Prefabricated installing construction method of underwater steel platform

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6264002B1 (en) * 1995-07-25 2001-07-24 Paul Kristen, Inc. Scaffolding for bridges and other structures
CN201437587U (en) * 2009-07-16 2010-04-14 浙江省舟山连岛建设工程指挥部 Steel-casing assembling platform suitable for marine construction
CN201531017U (en) * 2009-10-12 2010-07-21 中铁大桥局集团第四工程有限公司 Rapid positioning and connection system used when inserting and ramming steel pipe supporting piles
CN202247830U (en) * 2011-09-13 2012-05-30 中国建筑土木建设有限公司路桥分公司 Novel underwater steel platform
CN102677592A (en) * 2012-05-24 2012-09-19 中国水电建设集团十五工程局有限公司 Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN103866784A (en) * 2014-03-28 2014-06-18 上海绿地建设(集团)有限公司 Adjustable tower crane steel platform foundation
CN105274976A (en) * 2015-09-11 2016-01-27 中交路桥华东工程有限公司 Prefabricated installing construction method of underwater steel platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327068A (en) * 2017-08-09 2017-11-07 广东省建筑工程集团有限公司 Steel construction truss string structure system roof system ceiling structure and its construction method
CN107327068B (en) * 2017-08-09 2022-11-11 广东省建筑工程集团有限公司 Steel structure truss string system roof ceiling structure and construction method thereof
CN112411466A (en) * 2020-11-06 2021-02-26 中国港湾工程有限责任公司 Construction platform based on old pile foundation transformation and construction method thereof
CN112411466B (en) * 2020-11-06 2021-12-24 中国港湾工程有限责任公司 Construction platform based on old pile foundation transformation and construction method thereof
CN113981821A (en) * 2021-08-25 2022-01-28 浙大宁波理工学院 Full-prefabricated assembled bridge construction platform and construction method
CN114808707A (en) * 2022-03-24 2022-07-29 中建国际建设有限公司 A do not fall to ground circulation removal steel platform for bridge construction

Also Published As

Publication number Publication date
CN106087750B (en) 2017-11-10

Similar Documents

Publication Publication Date Title
CN106087750A (en) Pile integrative-structure does not land the construction method of construction steel platform across stake formula
CN103088918B (en) There is after a kind of shake the novel pre-stressed steel frame beam column joint of Self-resetting function
CN103882801B (en) The section assembling formula highway and railway bi-purpose cable-stayed bridge girder public, railway deck width is inconsistent
CN103741832A (en) Building column-truncating, replacing and seismic-isolating support construction method and supporting device
CN104374597A (en) Railway cable-stayed bridge test model
CN103072906B (en) Connecting device of inner climbing type tower crane and building structure and construction method utilizing same
CN104213501B (en) A kind of cable-stayed type bent unlatching trestle work structure construction method
CN203684439U (en) Supporting device for construction of installing shock insulation support on building by cutting columns
CN105088971B (en) Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge
CN205775876U (en) A kind of pile integrative-structure does not land construction steel platform across stake formula
KR101542192B1 (en) The structure of steel bridge system and method for constructing bridge using the same
CN109752239A (en) A kind of reaction frame for blower embedded foundation load carrying capacity test
CN205776163U (en) A kind of pile cover structure for pile one bridge structure construction
CN106758741B (en) Modular box type plate beam structure and pontic erection method based on box type plate beam structure
CN107574924A (en) The component and construction method of a kind of assembly concrete framework for the connection of steel joint
CN105274939B (en) Connecting device for PC track beam
CN201347616Y (en) Split type steel welding operation platform
KR101038013B1 (en) Main girder combining structure of temporary birdge
CN107893480A (en) A kind of assembled connecting node of lattice beam and post
CN209194318U (en) A kind of spreading connection structure of steel truss
JP5961000B2 (en) Viaduct pillar replacement method and replacement viaduct pillar
CN207904746U (en) A kind of connection structure of steel truss and concrete bridge tower
CN104060845B (en) A kind of steel column temporary fixing structure and construction method thereof
CN209741672U (en) two-width parallel viaduct central anti-collision guardrail simultaneous construction formwork
CN110282154A (en) A kind of engine installation system test of static strength bogusware

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Gao Pu

Inventor after: Zhou Junlong

Inventor after: Li Fei

Inventor after: Yang Yankai

Inventor after: Chen Yong

Inventor after: Chen Zhe

Inventor after: Liu Zhiyong

Inventor after: Huang Keqi

Inventor after: Wang Dianyong

Inventor before: Zhou Junlong

Inventor before: Li Fei

Inventor before: Yang Yankai

Inventor before: Gao Pu

Inventor before: Chen Yong

Inventor before: Chen Zhe

Inventor before: Liu Zhiyong

Inventor before: Huang Keqi

Inventor before: Wang Dianyong

CB03 Change of inventor or designer information