CN106078036A - Evacuation platform support foot plank is installed and is coordinated dolly - Google Patents

Evacuation platform support foot plank is installed and is coordinated dolly Download PDF

Info

Publication number
CN106078036A
CN106078036A CN201610428555.5A CN201610428555A CN106078036A CN 106078036 A CN106078036 A CN 106078036A CN 201610428555 A CN201610428555 A CN 201610428555A CN 106078036 A CN106078036 A CN 106078036A
Authority
CN
China
Prior art keywords
dolly
bracket
evacuation platform
fixed
roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610428555.5A
Other languages
Chinese (zh)
Inventor
吴勇
董养斌
童万里
王兴培
王冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201610428555.5A priority Critical patent/CN106078036A/en
Publication of CN106078036A publication Critical patent/CN106078036A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The invention discloses a kind of evacuation platform support foot plank and cooperation dolly is installed, include flat car, flat car one end is fixed with L bracket, L bracket upper end is fixed with assembly pulley, and L bracket bottom is provided with around axle bed, is rotatablely equipped with roll on axle bed, roll one end connects crank, steel wire rope one end is wound on roll, and the other end walks around assembly pulley connection hook, and hook has hung evacuation platform plate.With from dolly whole process carry out support welding coordinate can backing positions after accurate positioning support welding, welding accurately, smooth-going, attractive in appearance, and save labour force, efficiency of construction is greatly improved, also have preferably guarantee in safety.

Description

Evacuation platform support foot plank is installed and is coordinated dolly
Technical field
The present invention relates to subway work auxiliary device field, particularly belong to the installation of evacuation platform support foot plank and coordinate little Car.
Background technology
The welding of evacuation platform support and walking plate are installed when using Traditional Man installation method to be difficult to carry out support welding Be accurately positioned work (manually carry out on circular tunnel wall lift support welding), not only easily cause the weldering of evacuation platform support Connect the major quality defects such as crooked not level, and manually lift in support welding process and increase peace owing to cement based support is overweight Full blast danger.
Subway dispersing platform support foot plank install coordinate dolly carry out coordinate support welding and lay foot plank time, because of Take the driving of track tracking row district to bring inconvenience, coordinate dolly mainly to use radius 30mm* thickness 3mm round steel pipe, thickness at present 3mm* width 50mm band steel is welded, and coordinates the gross weight of dolly to be about 100kg, allows in terms of derailed row of channels moving away from Gui Hang district Underaction is easy, needs coordinating the material of dolly, force structure to be optimized.
Summary of the invention
It is an object of the invention to provide a kind of evacuation platform support foot plank to install and coordinate dolly, from dolly whole process enter The welding of row support coordinates and walking plate lay can not only accurate positioning support welding, convenient-laying foot plank, but also save Labour force, efficiency of construction are greatly improved, also have preferably guarantee in safety.
Technical scheme is as follows:
Evacuation platform support foot plank is installed and is coordinated dolly, includes flat car, and flat car one end is fixed with L bracket, and L-shaped is propped up Frame upper end is fixed with assembly pulley, and L bracket bottom is provided with around axle bed, is rotatablely equipped with roll, roll one on axle bed End connection has crank, steel wire rope one end to be wound on roll, and the other end walks around assembly pulley connection hook, and hook has hung Evacuation platform plate.
Described assembly pulley includes the pulley being fixed on L bracket left end, is fixed on two of L bracket right-hand member Pulley.
Described evacuation platform plate is placed on hook by the rope made of hemp.
The present invention coordinate dolly whole process carry out support welding coordinate solve can not be accurately positioned when manually lifting welding Support, causes the technical quality problems such as crooked, irregularity;Beneficial effects of the present invention: with from, dolly whole process carries out support weldering Connect coordinate can backing positions after accurate positioning support welding, welding accurately, smooth-going, attractive in appearance, and save labour force, construction effect Rate is greatly improved, also have preferably guarantee in safety.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the side view of the present invention.
Detailed description of the invention
Seeing accompanying drawing, evacuation platform support foot plank is installed and is coordinated dolly, includes flat car 1, and flat car 1 one end is fixed Having L bracket 2, L bracket 2 upper end to be fixed with assembly pulley 3, L bracket 2 bottom is provided with around axle bed 4, rotates on axle bed 4 Being provided with roll 5, roll 5 one end connects has crank 6, steel wire rope 7 one end to be wound on roll 5, and the other end walks around cunning Wheels 3 connect hook 8, and hook 8 has hung evacuation platform plate 9, and evacuation platform plate 9 is placed on hook 8 by the rope made of hemp, sliding Wheels 3 include the pulley being fixed on L bracket 2 left end, are fixed on two pulleys of L bracket 2 right-hand member.

Claims (3)

1. evacuation platform support foot plank is installed and is coordinated dolly, includes flat car, it is characterised in that flat car one end is fixed with L bracket, L bracket upper end is fixed with assembly pulley, and L bracket bottom is provided with around axle bed, be rotatablely equipped with on axle bed around Bobbin, roll one end connects has crank, steel wire rope one end to be wound on roll, and the other end walks around assembly pulley connection extension Hook, hook has hung evacuation platform plate.
Evacuation platform support foot plank the most according to claim 1 is installed and is coordinated dolly, it is characterised in that described pulley Group includes the pulley being fixed on L bracket left end, is fixed on two pulleys of L bracket right-hand member.
Evacuation platform support foot plank the most according to claim 1 is installed and is coordinated dolly, it is characterised in that described evacuation Landing slab is placed on hook by the rope made of hemp.
CN201610428555.5A 2016-06-15 2016-06-15 Evacuation platform support foot plank is installed and is coordinated dolly Pending CN106078036A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610428555.5A CN106078036A (en) 2016-06-15 2016-06-15 Evacuation platform support foot plank is installed and is coordinated dolly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610428555.5A CN106078036A (en) 2016-06-15 2016-06-15 Evacuation platform support foot plank is installed and is coordinated dolly

Publications (1)

Publication Number Publication Date
CN106078036A true CN106078036A (en) 2016-11-09

Family

ID=57235929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610428555.5A Pending CN106078036A (en) 2016-06-15 2016-06-15 Evacuation platform support foot plank is installed and is coordinated dolly

Country Status (1)

Country Link
CN (1) CN106078036A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502746A (en) * 2018-05-22 2018-09-07 安徽兴宇轨道装备有限公司 A kind of boom hoisting that foot plank paving is changed trains

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87200741U (en) * 1987-01-16 1988-01-20 夏静远 Multipurpose lift for building
US5195726A (en) * 1991-07-03 1993-03-23 Agc Research And Development Corp. Portable luggage carrier
CN2613403Y (en) * 2003-04-12 2004-04-28 刘来起 Hand operated vehicle-carried small hoist
CN201068372Y (en) * 2007-07-06 2008-06-04 泰豪科技股份有限公司 Hand-operated transmission hoisting mechanism
CN201240784Y (en) * 2008-07-10 2009-05-20 于雪 Portable movable conveying device inside single beam attaching rack of vertical slide conveyor
CN201729565U (en) * 2010-05-28 2011-02-02 中国一冶集团有限公司 Combination pulley block lifting appliance device
CN201924963U (en) * 2010-12-31 2011-08-10 宁波华缘复合新材料有限公司 Flat plate type evacuation platform
CN202297855U (en) * 2011-11-10 2012-07-04 常州华盛恒能光电有限公司 Furnace detaching device for graphite thermal field of single crystal furnace
CN203568719U (en) * 2013-09-30 2014-04-30 西安达刚路面机械股份有限公司 Hoisting mechanism of asphalt pavement maintenance truck
CN103964316A (en) * 2014-04-17 2014-08-06 江苏海隆重机有限公司 Multifunctional and multipurpose portal crane
CN203794532U (en) * 2014-04-17 2014-08-27 新蒲建设集团有限公司 Distribution cabinet transporting rack for construction site
CN203865887U (en) * 2014-05-26 2014-10-08 浙江美通筑路机械股份有限公司 Lifting device of road construction vehicle
CN104743464A (en) * 2015-04-25 2015-07-01 杜志刚 Movable simple crane
CN204474179U (en) * 2015-02-10 2015-07-15 青岛天晟防水建材有限公司 A kind of waterproof building material construction bont
CN204917756U (en) * 2015-09-09 2015-12-30 河北华能源电力设备有限公司 Device is examined in hanging of on -load tap -changer
CN105645314A (en) * 2016-03-14 2016-06-08 湖州中辰建设有限公司 Decorating ceramic tile stacking and conveying trolley

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87200741U (en) * 1987-01-16 1988-01-20 夏静远 Multipurpose lift for building
US5195726A (en) * 1991-07-03 1993-03-23 Agc Research And Development Corp. Portable luggage carrier
CN2613403Y (en) * 2003-04-12 2004-04-28 刘来起 Hand operated vehicle-carried small hoist
CN201068372Y (en) * 2007-07-06 2008-06-04 泰豪科技股份有限公司 Hand-operated transmission hoisting mechanism
CN201240784Y (en) * 2008-07-10 2009-05-20 于雪 Portable movable conveying device inside single beam attaching rack of vertical slide conveyor
CN201729565U (en) * 2010-05-28 2011-02-02 中国一冶集团有限公司 Combination pulley block lifting appliance device
CN201924963U (en) * 2010-12-31 2011-08-10 宁波华缘复合新材料有限公司 Flat plate type evacuation platform
CN202297855U (en) * 2011-11-10 2012-07-04 常州华盛恒能光电有限公司 Furnace detaching device for graphite thermal field of single crystal furnace
CN203568719U (en) * 2013-09-30 2014-04-30 西安达刚路面机械股份有限公司 Hoisting mechanism of asphalt pavement maintenance truck
CN103964316A (en) * 2014-04-17 2014-08-06 江苏海隆重机有限公司 Multifunctional and multipurpose portal crane
CN203794532U (en) * 2014-04-17 2014-08-27 新蒲建设集团有限公司 Distribution cabinet transporting rack for construction site
CN203865887U (en) * 2014-05-26 2014-10-08 浙江美通筑路机械股份有限公司 Lifting device of road construction vehicle
CN204474179U (en) * 2015-02-10 2015-07-15 青岛天晟防水建材有限公司 A kind of waterproof building material construction bont
CN104743464A (en) * 2015-04-25 2015-07-01 杜志刚 Movable simple crane
CN204917756U (en) * 2015-09-09 2015-12-30 河北华能源电力设备有限公司 Device is examined in hanging of on -load tap -changer
CN105645314A (en) * 2016-03-14 2016-06-08 湖州中辰建设有限公司 Decorating ceramic tile stacking and conveying trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108502746A (en) * 2018-05-22 2018-09-07 安徽兴宇轨道装备有限公司 A kind of boom hoisting that foot plank paving is changed trains

Similar Documents

Publication Publication Date Title
CN101881021B (en) Hoisting method for deep water large-scale jacket construction on land
CN107458973A (en) A kind of hanging lifting device of surface structures steel pipe
CN104060844A (en) Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN107359759B (en) Device for finishing core penetration of large synchronous motor by utilizing flat car
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN107500109A (en) A kind of overhead crane with electric hoists
CN105347206A (en) Intelligent assisting platform for gas insulated substation (GIS) dismounting
CN203794533U (en) Light portable mobile lifting equipment
CN205312918U (en) Portal frame changes outfit
CN204873572U (en) Gantry crane with compensating beam
CN106078036A (en) Evacuation platform support foot plank is installed and is coordinated dolly
CN205442496U (en) High -rise building roof curtain lifting device
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN205773031U (en) A kind of wet seam bed die model sheetinstallat dolly
CN204369491U (en) A kind of pipe hanger
CN111711131A (en) Cable guiding device in bridge and cable laying method
CN207483220U (en) A kind of suspension apparatus during the exacerbation for oil drilling scene jumbo bag
CN103486330B (en) Either inside high-altitude pipeline mounting construction method
CN206125079U (en) Communication cable transfer car(buggy) of being under construction
CN204508629U (en) A kind of light type agricultural lifting appliance
CN202594676U (en) Bridge deck system shielding plate installation gantry crane for passenger dedicated railway line
CN205772933U (en) A kind of guide rail lifting appliance for guide rail processing
CN107190991A (en) The special-shaped curtain wall vertical lifting system of glass plate
CN208235590U (en) A kind of rectangle vertical shaft sliding sash turning-over
CN205257821U (en) Movable hoisting equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109