CN106066411A - 用于大型接地网接地电阻测量的辅助电极结构 - Google Patents
用于大型接地网接地电阻测量的辅助电极结构 Download PDFInfo
- Publication number
- CN106066411A CN106066411A CN201610637816.4A CN201610637816A CN106066411A CN 106066411 A CN106066411 A CN 106066411A CN 201610637816 A CN201610637816 A CN 201610637816A CN 106066411 A CN106066411 A CN 106066411A
- Authority
- CN
- China
- Prior art keywords
- support arm
- stake
- auxiliary electrode
- bearing bracket
- resistance measurement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Measurement Of Resistance Or Impedance (AREA)
Abstract
本发明公开了一种用于大型接地网接地电阻测量的辅助电极结构,其特征在于:包括金属材质的中心支架(1),中心支架(1)中心设有定位孔,定位孔内设有中心金属桩(2),中心支架(1)外侧通过6个转动销(3)分别与6个均匀分布的金属材质的支臂(4)相连;每个支臂(4)的端部均设有定位套筒(5),定位套筒(5)内设有侧边金属桩(6)。本发明可以解决现有辅助电极接地不良的问题,降低测试干扰,提高测试精度,而且安装和使用更加方便。
Description
技术领域
本发明涉及一种辅助电极结构,特别是一种用于大型接地网接地电阻测量的辅助电极结构。
背景技术
大型接地网接地电阻测量时需布置安装测量辅助电极,一般采用一根长度1000mm~2000mm的槽钢或角钢打入地下,对接地网进行接地电阻测量。辅助电极本身接地不良极易影响测试结果,使测试仪器无法进行有效地测量,或者使测量数据离散性较大,无法判断测试结果。这时需重新布置安装测量辅助电极,多次调整测量。安装辅助电极不仅工作量大,且最终测试时间也大大延长。
发明内容
本发明的目的在于,提供一种用于大型接地网接地电阻测量的辅助电极结构。本发明可以解决现有辅助电极接地不良的问题,降低测试干扰,提高测试精度,而且安装和使用更加方便。
本发明的技术方案:用于大型接地网接地电阻测量的辅助电极结构,其特点是:包括金属材质的中心支架,中心支架中心设有定位孔,定位孔内设有中心金属桩,中心支架外侧通过6个转动销分别与6个均匀分布的金属材质的支臂相连;每个支臂的端部均设有定位套筒,定位套筒内设有侧边金属桩。
上述的用于大型接地网接地电阻测量的辅助电极结构中,所述中心支架与支臂的连接处设有限制支臂最大张开角小于90°的限位框;中心支架上设有一圈围绕在定位孔外侧的环形凹槽;所述侧边金属桩下端设有中空腔体,且设有多个连通至中空腔体的渗出孔,中空 腔体上端位置设有进管孔;支臂为中空结构,支臂内设有软管,软管一端连通至环形凹槽,另一端穿出支臂后从侧边金属桩的进管孔插入中空腔体。
前述的用于大型接地网接地电阻测量的辅助电极结构中,所述中心金属桩上端设有桩帽,桩帽下方设有限位盘,桩帽与限位盘之间设有压线螺母,限位盘位于中心支架的定位孔上方,限位盘与中心支架之间设有金属弹性垫圈,中心金属桩上还设有锁紧螺母,锁紧螺母位于中心支架的定位孔下方。
前述的用于大型接地网接地电阻测量的辅助电极结构中,侧边金属桩上端设有桩帽,桩帽与定位套筒之间设有金属弹性垫圈,侧边金属桩上还设有锁紧螺母,锁紧螺母位于定位套筒下方。
前述的用于大型接地网接地电阻测量的辅助电极结构中,所述支臂穿出软管的位置设有弹片,弹片向上压住软管。
前述的用于大型接地网接地电阻测量的辅助电极结构中,所述支臂和中心支架之间通过导线相连,导线两端分别与支臂和中心支架焊接。
前述的用于大型接地网接地电阻测量的辅助电极结构中,6个侧边金属桩与中心金属桩的距离相同,均为0.8至1.2米,从而可以形成7个等间距的接地点,降低地电流对测试的干扰。
前述的用于大型接地网接地电阻测量的辅助电极结构中,所述侧边金属桩和中心金属桩的直径为100mm~200mm,打进地下的长度为300mm~500mm。
与现有技术相比,本发明使用6个侧边金属桩围绕中心金属桩的多桩分布方式进行连接大地,可以克服传统辅助电极接地效果差的问题,从而提高大型接地网接地电阻测量的精度。而且本发明的结构可以方便地收起,携带极为方便,而且接地安装时,中心支架可以方便 地对各个金属桩进行定位,无需额外测量,安装极为方便,可以大大提高测量效率。
附图说明
图1是本发明的示意图。
附图中的标记为:1-中心支架,2-中心金属桩,3-转动销,4-支臂,5-定位套筒,6-侧边金属桩,7-限位框,8-环形凹槽,9-软管,10-渗出孔,11-进管孔,12-限位盘,13-压线螺母,14-导线。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明,但并不作为对本发明限制的依据。
实施例。用于大型接地网接地电阻测量的辅助电极结构,如图1和图2所示:包括金属材质的中心支架1,中心支架1中心设有定位孔,定位孔内设有中心金属桩2,中心支架1外侧通过6个转动销3分别与6个均匀分布的金属材质的支臂4相连;每个支臂4的端部均设有定位套筒5,定位套筒5内设有侧边金属桩6。所述中心支架1与支臂4的连接处设有限制支臂4最大张开角小于90°的限位框7(使用状态下,支臂4是外侧低的倾斜状态);中心支架1上设有一圈围绕在定位孔外侧的环形凹槽8;所述侧边金属桩6下端设有中空腔体,且设有多个连通至中空腔体的渗出孔10,中空腔体上端位置设有进管孔11;支臂4为中空结构,支臂4内设有软管9,软管9一端连通至环形凹槽8,另一端穿出支臂4后从侧边金属桩6的进管孔11插入中空腔体。所述中心金属桩2上端设有桩帽,桩帽下方设有限位盘12,桩帽与限位盘12之间设有压线螺母13,限位盘12位于中心支架1的定位孔上方,限位盘12与中心支架1之间设有金属弹性垫圈,中心金属桩2上还设有锁紧螺母,锁紧螺母位于中心支架1的定位孔下方。侧边金属桩6上端设有桩帽,桩帽与定位套筒5之 间设有金属弹性垫圈,侧边金属桩6上还设有锁紧螺母,锁紧螺母位于定位套筒5下方。所述支臂4穿出软管9的位置设有弹片13,弹片13向上压住软管9。所述支臂4和中心支架1之间通过导线14相连,导线14两端分别与支臂4和中心支架1焊接。6个侧边金属桩6与中心金属桩2的距离相同,均为0.8至1.2米。所述侧边金属桩6和中心金属桩2的直径为100mm~200mm,打进地下的长度为300mm~500mm。
本发明的工作原理:先找好平整的地面,然后将中心支架上的支臂展开,呈图2所示状态,然后将中心金属桩套入定位孔后压入地下,然后分别将6个侧边金属桩插入定位套筒后压入地下,在侧边金属桩下移过程中,软管端部会在弹片作用下自动压入进管口。然后通过锁紧螺母使中心金属桩和侧边金属桩分别与定位套筒和中心支架实现紧密的电接触。接着在环形凹槽内倒入导电液,导电液顺着软管进入侧边金属桩的中空腔体,并顺着渗出孔进入大地土壤,使附近土壤处于潮湿的导电状态,可以避免因大地过渡干燥而导致金属桩接触不良。而且本发明多个金属桩组成环形阵列,可以降低地电流对与测量的干扰,因此测量精度更高。测量时,只需将电极置于中心金属桩,然后使用压线螺母将电极压紧即可进行测量工作。测量完成后,拔出各个金属桩,然后向上提起中心支架,支臂自动收起,形成非常便于携带的形状,非常方便。
Claims (8)
1.用于大型接地网接地电阻测量的辅助电极结构,其特征在于:包括金属材质的中心支架(1),中心支架(1)中心设有定位孔,定位孔内设有中心金属桩(2),中心支架(1)外侧通过6个转动销(3)分别与6个均匀分布的金属材质的支臂(4)相连;每个支臂(4)的端部均设有定位套筒(5),定位套筒(5)内设有侧边金属桩(6)。
2.根据权利要求1所述的用于大型接地网接地电阻测量的辅助电极结构,其特征在于:所述中心支架(1)与支臂(4)的连接处设有限制支臂(4)最大张开角小于90°的限位框(7);中心支架(1)上设有一圈围绕在定位孔外侧的环形凹槽(8);所述侧边金属桩(6)下端设有中空腔体,且设有多个连通至中空腔体的渗出孔(10),中空腔体上端位置设有进管孔(11);支臂(4)为中空结构,支臂(4)内设有软管(9),软管(9)一端连通至环形凹槽(8),另一端穿出支臂(4)后从侧边金属桩(6)的进管孔(11)插入中空腔体。
3.根据权利要求2所述的用于大型接地网接地电阻测量的辅助电极结构,其特征在于:所述中心金属桩(2)上端设有桩帽,桩帽下方设有限位盘(12),桩帽与限位盘(12)之间设有压线螺母(13),限位盘(12)位于中心支架(1)的定位孔上方,限位盘(12)与中心支架(1)之间设有金属弹性垫圈,中心金属桩(2)上还设有锁紧螺母,锁紧螺母位于中心支架(1)的定位孔下方。
4.根据权利要求2所述的用于大型接地网接地电阻测量的辅助电极结构,其特征在于:侧边金属桩(6)上端设有桩帽,桩帽与定位套筒(5)之间设有金属弹性垫圈,侧边金属桩(6)上还设有锁紧螺母,锁紧螺母位于定位套筒(5)下方。
5.根据权利要求2所述的用于大型接地网接地电阻测量的辅助电极结构,其特征在于:所述支臂(4)穿出软管(9)的位置设有弹片(13),弹片(13)向上压住软管(9)。
6.根据权利要求1所述的用于大型接地网接地电阻测量的辅助电极结构,其特征在于:所述支臂(4)和中心支架(1)之间通过导线(14)相连,导线(14)两端分别与支臂(4)和中心支架(1)焊接。
7.根据权利要求1至6任一权利要求所述的用于大型接地网接地电阻测量的辅助电极结构,其特征在于:6个侧边金属桩(6)与中心金属桩(2)的距离相同,均为0.8至1.2米。
8.根据权利要求7所述的用于大型接地网接地电阻测量的辅助电极结构,其特征在于:所述侧边金属桩(6)和中心金属桩(2)的直径为100mm~200mm,打进地下的长度为300mm~500mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610637816.4A CN106066411B (zh) | 2016-08-05 | 2016-08-05 | 用于大型接地网接地电阻测量的辅助电极结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610637816.4A CN106066411B (zh) | 2016-08-05 | 2016-08-05 | 用于大型接地网接地电阻测量的辅助电极结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106066411A true CN106066411A (zh) | 2016-11-02 |
CN106066411B CN106066411B (zh) | 2019-03-19 |
Family
ID=57206880
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610637816.4A Active CN106066411B (zh) | 2016-08-05 | 2016-08-05 | 用于大型接地网接地电阻测量的辅助电极结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106066411B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109884396A (zh) * | 2019-04-28 | 2019-06-14 | 赣南医学院 | 一种电路板支路电阻快速检测设备 |
CN114267970A (zh) * | 2022-01-04 | 2022-04-01 | 天威保变(秦皇岛)变压器有限公司 | 一种油浸式变压器的接地装置 |
KR102673695B1 (ko) * | 2023-12-04 | 2024-06-10 | 주식회사 중앙일렉파워 | 배전선 접지 장치 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2344544Y (zh) * | 1998-07-22 | 1999-10-20 | 汤井林 | 一种推靠式井径微电极组合测井仪 |
CN101806839A (zh) * | 2009-12-29 | 2010-08-18 | 贵州南源电力科技开发有限公司 | 一种变电站接地网接地电阻值变化在线监测系统 |
CN103969312A (zh) * | 2013-01-28 | 2014-08-06 | 红电医学科技股份有限公司 | 检测试片的检测装置及检测方法 |
CN203798829U (zh) * | 2014-04-10 | 2014-08-27 | 国家电网公司 | 一种万用表表笔接地固定装置 |
CN203983556U (zh) * | 2014-07-25 | 2014-12-03 | 中国工程物理研究院应用电子学研究所 | 一种可调节式匹配负载接地装置 |
CN204649910U (zh) * | 2015-06-12 | 2015-09-16 | 国家电网公司 | 绝缘绳试验装置 |
CN104953434A (zh) * | 2015-05-26 | 2015-09-30 | 国网黑龙江省电力有限公司鹤岗供电公司 | 新型多针式垂直接地系统设计方法 |
CN204720573U (zh) * | 2015-06-11 | 2015-10-21 | 湖南中普防雷股份有限公司 | 一体式快速接地降阻装置 |
CN204793241U (zh) * | 2015-07-15 | 2015-11-18 | 国家电网公司 | 测量接地电阻用电极 |
CN205157654U (zh) * | 2015-12-09 | 2016-04-13 | 四川桑莱特智能电气设备股份有限公司 | 一种接地电阻测试系统的安装结构 |
CN207081750U (zh) * | 2016-08-05 | 2018-03-09 | 国家电网公司 | 一种用于大型接地网接地电阻测量的辅助电极结构 |
-
2016
- 2016-08-05 CN CN201610637816.4A patent/CN106066411B/zh active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2344544Y (zh) * | 1998-07-22 | 1999-10-20 | 汤井林 | 一种推靠式井径微电极组合测井仪 |
CN101806839A (zh) * | 2009-12-29 | 2010-08-18 | 贵州南源电力科技开发有限公司 | 一种变电站接地网接地电阻值变化在线监测系统 |
CN103969312A (zh) * | 2013-01-28 | 2014-08-06 | 红电医学科技股份有限公司 | 检测试片的检测装置及检测方法 |
CN203798829U (zh) * | 2014-04-10 | 2014-08-27 | 国家电网公司 | 一种万用表表笔接地固定装置 |
CN203983556U (zh) * | 2014-07-25 | 2014-12-03 | 中国工程物理研究院应用电子学研究所 | 一种可调节式匹配负载接地装置 |
CN104953434A (zh) * | 2015-05-26 | 2015-09-30 | 国网黑龙江省电力有限公司鹤岗供电公司 | 新型多针式垂直接地系统设计方法 |
CN204720573U (zh) * | 2015-06-11 | 2015-10-21 | 湖南中普防雷股份有限公司 | 一体式快速接地降阻装置 |
CN204649910U (zh) * | 2015-06-12 | 2015-09-16 | 国家电网公司 | 绝缘绳试验装置 |
CN204793241U (zh) * | 2015-07-15 | 2015-11-18 | 国家电网公司 | 测量接地电阻用电极 |
CN205157654U (zh) * | 2015-12-09 | 2016-04-13 | 四川桑莱特智能电气设备股份有限公司 | 一种接地电阻测试系统的安装结构 |
CN207081750U (zh) * | 2016-08-05 | 2018-03-09 | 国家电网公司 | 一种用于大型接地网接地电阻测量的辅助电极结构 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109884396A (zh) * | 2019-04-28 | 2019-06-14 | 赣南医学院 | 一种电路板支路电阻快速检测设备 |
CN114267970A (zh) * | 2022-01-04 | 2022-04-01 | 天威保变(秦皇岛)变压器有限公司 | 一种油浸式变压器的接地装置 |
CN114267970B (zh) * | 2022-01-04 | 2023-08-15 | 天威保变(秦皇岛)变压器有限公司 | 一种油浸式变压器的接地装置 |
KR102673695B1 (ko) * | 2023-12-04 | 2024-06-10 | 주식회사 중앙일렉파워 | 배전선 접지 장치 |
Also Published As
Publication number | Publication date |
---|---|
CN106066411B (zh) | 2019-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106066411A (zh) | 用于大型接地网接地电阻测量的辅助电极结构 | |
CN102692310B (zh) | 一种风洞试验用三孔探针式测压尾耙 | |
CN108802110B (zh) | 用于测量灌浆套筒灌浆密实度的检测装置及其检测方法 | |
AR088949A1 (es) | Aparato, sistemas y metodos de deteccion de tallos | |
WO2018086185A1 (zh) | 一种用于类岩石试样的环向和轴向应变测量装置 | |
CN102410894A (zh) | 界面压力分布测试传感元件 | |
CN203684198U (zh) | 利用静力触探设备的土壤原位电阻率测试装置 | |
CN102520214A (zh) | 全直径岩心电阻率夹持器 | |
US20150042355A1 (en) | Cable System and Test Cable Therefore | |
CN106593412B (zh) | 一种全角度瓦斯抽采钻孔稳定性动态监测装置与监测方法 | |
CN204356818U (zh) | 混凝土灌注桩荷载传递检测弧形保护装置 | |
CN207081750U (zh) | 一种用于大型接地网接地电阻测量的辅助电极结构 | |
CN205210183U (zh) | 石墨电极电阻率测定仪测试架 | |
CN108362399B (zh) | 一种测温电缆 | |
CN202256406U (zh) | 全直径岩心电阻率夹持器 | |
CN102538994A (zh) | 一种小惯性电偶 | |
CN104237571B (zh) | 用于避雷器试验的加压线支撑装置 | |
CN204902804U (zh) | 一种焊缝间隙的测量装置 | |
CN105091819B (zh) | 一种焊缝间隙的测量装置及方法 | |
CN107036588A (zh) | 隧道围岩位移监测测点装置 | |
CN104034311B (zh) | 成对三等分环-圆嵌套极板相向交错放置式倾角测量方法与装置 | |
CN207440231U (zh) | 高压电气元件局部放电超声检测辅助装置 | |
CN105890492B (zh) | 一种跳线弧垂测量装置 | |
CN206258129U (zh) | 一种铜丝压线检测架 | |
CN205638429U (zh) | 测试仪器悬挂装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |