CN106065709B - Prefabricated concrete beam operating platform - Google Patents
Prefabricated concrete beam operating platform Download PDFInfo
- Publication number
- CN106065709B CN106065709B CN201610440090.5A CN201610440090A CN106065709B CN 106065709 B CN106065709 B CN 106065709B CN 201610440090 A CN201610440090 A CN 201610440090A CN 106065709 B CN106065709 B CN 106065709B
- Authority
- CN
- China
- Prior art keywords
- frame
- column
- concrete beam
- crossbeam
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/04—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/156—Stackable platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/242—Scaffolds movable on wheels or tracks
- E04G2001/244—Scaffolds movable on wheels or tracks mechanically operated
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Disclosed by the invention is a kind of Prefabricated Concrete beam operating platform of the realm of building construction, frame including gate, the frame includes column, the crossbeam and diagonal brace that are connected at the top of column, the base of frame is equipped with walking mechanism, frame facet is equipped with ladder and spraying mechanism, and the crossbeam of frame roof is equipped with hoisting mechanism and plucking mechanism.The beneficial effects of the invention are as follows:By the way that walking mechanism, spraying mechanism, hoisting mechanism and plucking mechanism etc. are combined on gate frame, form the standing platform for work such as template inspection, wing plate inspection of steel reinforcement bars, concrete vibrating, beam-ends and flange plate dabbings, the construction efficiency and working security of concrete beam can be greatly improved by the platform, and platform can repeatedly use after building up, be conducive to save the cost, reduce labor intensity.
Description
Technical field
The present invention relates to technical field of building construction more particularly to a kind of operating platforms for the construction of Prefabricated Concrete beam.
Background technique
Prefabricated Concrete beam, including box beam, T-type beam etc. are very universal in bridge construction, with standardization building site implementation,
Requirement to precast beam construction standardization, fining is higher and higher, how to improve construction management technical level, promotes work efficiency, does
Become the emphasis of construction management to safety and environmental protection etc..Currently, needing to carry out the binding of wing plate reinforcing bar, concrete in precast beam construction
It pours, prestressed stretch-draw, beam-ends and flange plate dabbing, back plucking, the operations such as spray maintenance, traditional mode of operation one
As be to set up fixed frame and springboard, construction personnel constructs at station on springboard, but since operating position is special, constructs numerous
It is trivial, certain difficulty can be brought to operation, safety accident easily occurred, and operate time and effort consuming, influenced construction speed.
Summary of the invention
To overcome cumbersome, time and effort consuming in existing concrete beam work progress, easily the deficiencies of safety accident occur, the present invention
The technical problem to be solved is that:A kind of operating platform that can be improved concrete beam construction efficiency, ensure construction safety is provided.
The technical solution adopted by the present invention to solve the technical problems is:Prefabricated Concrete beam operating platform, the frame including gate
Frame, the frame include column, the crossbeam being connected at the top of column and the diagonal brace for being connected in column side, and the base of frame is set
There is walking mechanism, frame facet is equipped with ladder and spraying mechanism, and the crossbeam of frame roof is equipped with hoisting mechanism and plucking mechanism.
Further, the walking mechanism includes two groups of driving rollers and two groups of driven rollers, the driving roller institute
Column on be equipped with and drive the motor of idler wheel rotation, idler wheel lock is equipped on all idler wheels.
Further, the spraying mechanism includes the spray head for being arranged at intervals on column side, the increasing that is connected with column
Press pump and the water-supply-pipe being connected with booster pump, wherein booster pump sucks water from water-supply-pipe, then column and cross through tubulose
Beam reaches each spray head.
Further, the lift structure includes the longitudinal slide rail and horizontal slide rail being arranged on crossbeam, the sliding rail
It is equipped with electric hoist.
Further, the plucking mechanism includes the hairbrush of the link being fixed on crossbeam and hanging on link.
Further, the walking mechanism and spray system are controlled by control system, remote controler reality can be passed through
The automatic operating of existing frame walking and spray.
Further, further include tensioning Dang Hu mechanism, which includes shoulder guard and folding platform, shoulder guard
Through steel plate hook hanging on crossbeam, folding platform is located at the lower end of shoulder guard for upper end.
Further, the lower end of the shoulder guard is equipped with bayonet lock, corresponding position is equipped with card hole on column, and bayonet lock is inserted in
It can prevent shoulder guard from shaking in card hole.
The beneficial effects of the invention are as follows:By the way that walking mechanism, spraying mechanism, hoisting mechanism and plucking mechanism etc. are combined to
On gate frame, form for work such as template inspection, wing plate inspection of steel reinforcement bars, concrete vibrating, beam-ends and flange plate dabbings
Standing platform, can greatly improve the construction efficiency and working security of concrete beam by the platform, and platform build up after can be more
Secondary reuse is conducive to save the cost, reduces labor intensity.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Label is 1- frame, 11- column, 12- crossbeam, 13- diagonal brace, 14- ladder, 15- card hole, 21- actively rolling in figure
Wheel, 22- driven roller, 23- motor, 24- idler wheel lock, 31- spray head, 32- booster pump, 33- delivery pipe, 41- horizontal slide rail, 42-
Longitudinal slide rail, 43- electric hoist, 51- link, 52- hairbrush, 61- shoulder guard, 62- folding platform, 63- steel plate hook, 64- card
Pin.
Specific embodiment
As shown in Figure 1, the present invention includes the frame 1 of gate, the frame 1 includes column 11, is connected to 11 top of column
Crossbeam 12 and be connected in the diagonal brace 13 of 11 side of column, 1 bottom of frame is equipped with walking mechanism, and 1 side of frame is equipped with ladder
14 and spraying mechanism, the crossbeam 12 at 1 top of frame is equipped with hoisting mechanism and plucking mechanism.11 height of column is according to Prefabricated Concrete beam
Height is configured, and guarantees that column is located in gate frame, and diagonal brace 13 plays stabilization, prevents frame 1 from shaking, and is improved steady
It is qualitative.Since concrete beam is generally longer, walking mechanism enables frame arbitrarily to move, and convenient for construction and transfer, spraying mechanism can be to concrete
Beam carries out cleaning maintenance, and hoisting mechanism can assist completing the lifting of wing plate reinforcing bar or construction appliance, plucking be mainly used for beam-ends and
The work such as flange plate dabbing.
Specifically, the walking mechanism includes two groups of driving rollers 21 and two groups of driven rollers 22, the driving roller 21
The column at place is equipped with the motor 23 for driving idler wheel rotation, and idler wheel lock 24 is equipped on all idler wheels.After increasing motor 23, apply
Worker person can be run while constructing on platform by remote control control walking mechanism, can improve construction efficiency, of course for
Make to run smoothly, needs to be arranged matched track.The position that fixed platform is needed when needing Fixed Point Operation avoids its shifting
Dynamic or shaking is provided with idler wheel lock 24 on each idler wheel.
It in the work progress of Prefabricated Concrete beam, generally requires and spray maintenance is carried out to concrete beam, traditional form of construction work is to apply
Worker person is directly washed away with water pipe, which time and effort consuming, and non-uniform spraying, may influence concrete beam quality.This
Spraying mechanism is integrated on platform by invention, including being arranged at intervals on the spray head 31 of column side, the increasing being connected with column 11
Press pump 32 and the water-supply-pipe 33 being connected with booster pump 32, wherein booster pump 32 sucks water from water-supply-pipe 33, then through tubulose
Column 11 and crossbeam 12 reach each spray head 31, using column 11 and measure 12 as water-supply-pipe, overall structure can be simplified, be convenient for
Construction.Multiple spray heads 31 can be such that entire concrete beam once sprays uniformly by water spray on concrete beam surface, and by the movement of platform
Leaching is completed, ultrahigh in efficiency and uniform spraying.
The lift structure includes the longitudinal slide rail 42 and horizontal slide rail 41 being arranged on crossbeam 12, and the sliding rail is equipped with
Electric hoist 43.Longitudinal slide rail 42 and horizontal slide rail 41 can be arranged a plurality of according to the actual situation, and convenient for constructing simultaneously, electric hoist 43 is most
It well using remote-controlled control, operates more convenient, it is easier to control, be also convenient for cooperating with walking mechanism and complete geotextiles
The work such as covering.
Plucking mechanism is mainly used for the work such as beam-ends and flange plate dabbing, and plucking mechanism includes the extension being fixed on crossbeam 12
The hairbrush 52 of ring 51 and hanging on link 51, hairbrush 52 is put down, contact it with concrete beam when needing dabbing, or artificial control
52 position of hairbrush is made, then by mobile platform, so that hairbrush 52 is disposably completed dabbing work on concrete beam surface, compared to people
Work dabbing is more efficient, is more evenly also easier to control.
In order to further increase the construction efficiency of spray maintenance and geotextiles covering, control system is increased to the walking
Mechanism and spray system are controlled, and the automatic operating of frame walking and spray can be realized by remote controler, are not needed artificial
Operation, can be automatically performed, greatly improve construction efficiency, save human cost.
The items such as jack, upper clip, sealing off and covering anchorage are installed to answer in advance in the work progress of concrete beam, when further including tensioning, mud jacking
Power construction working, these work are manually completed mainly by construction personnel, so needing to be arranged on platform one for construction personnel
The platform of standing, i.e. tensioning Dang Hu mechanism, the mechanism include shoulder guard 61 and folding platform 62, and the upper end of shoulder guard 61 is logical
63 hanging of steel plate hook is crossed on crossbeam 12, folding platform 62 is located at the lower end of shoulder guard 61.It can will protect when not in use
Crossbeam of the steel plate 61 around top rotates, and the top of crossbeam is placed into, so as to the movement of platform.The lower end of shoulder guard 61 is set
There is bayonet lock 64, corresponding position is equipped with card hole 15 on column 11, and bayonet lock 64 can be inserted in card hole 15 when shoulder guard 61 is put down
It can prevent shoulder guard 61 from shaking, the station for keeping construction personnel stable is constructed on folding platform 62.
The present invention brings together various mechanism, forms template inspection, wing plate inspection of steel reinforcement bars, concrete vibrating, beam
The standing platform of the work such as end and flange plate dabbing is, it can be achieved that part wing plate reinforcing bar or construction appliance lifting, can assist to complete to open
Every pre-stress construction such as installation jack, upper clip, sealing off and covering anchorage when drawing, mud jacking, can be realized by platform walking and spray system
The maintenance of precast beam automatic spray and geotextiles covering.The platform structure is simple, easy to use, and synergy drop energy has real well
With property and application prospect.
Claims (7)
1. Prefabricated Concrete beam operating platform, the frame (1) including gate, the frame (1) include column (11), are connected to column
(11) crossbeam (12) at the top of and the diagonal brace (13) for being connected in column (11) side, it is characterized in that:Frame (1) bottom is equipped with row
Mechanism is walked, frame (1) side is equipped with ladder (14) and spraying mechanism, and the crossbeam (12) at the top of frame (1) is equipped with hoisting mechanism
With plucking mechanism, the spraying mechanism includes that be arranged at intervals on column side spray head (31), the booster pump that is connected with column
(32) and with booster pump (32) water-supply-pipe (33) being connected, wherein booster pump (32) sucks water from water-supply-pipe (33), then
Column (11) and crossbeam (12) through tubulose reach each spray head (31).
2. Prefabricated Concrete beam operating platform as described in claim 1, it is characterized in that:The walking mechanism includes two groups of driving rollers
(21) and two groups of driven rollers (22), the column where the driving roller (21) are equipped with the motor for driving idler wheel rotation
(23), idler wheel lock (24) is equipped on all idler wheels.
3. Prefabricated Concrete beam operating platform as described in claim 1, it is characterized in that:The lift structure includes being arranged in crossbeam
(12) longitudinal slide rail (42) and horizontal slide rail (41) on, the sliding rail are equipped with electric hoist (43).
4. Prefabricated Concrete beam operating platform as described in claim 1, it is characterized in that:The plucking mechanism includes being fixed on crossbeam
(12) hairbrush (52) of link (51) and hanging on link (51) on.
5. the Prefabricated Concrete beam operating platform as described in Claims 1 to 4 any one claim, it is characterized in that:The walking
Mechanism and spray system are controlled by control system, can realize that frame walking and the automation of spray are transported by remote controler
Row.
6. the Prefabricated Concrete beam operating platform as described in Claims 1 to 4 any one claim, it is characterized in that:It further include
La Danghu mechanism, the mechanism include shoulder guard (61) and folding platform (62), and the upper end of shoulder guard (61) is hung by steel plate
Hook (63) is hung on crossbeam (12), and folding platform (62) is located at the lower end of shoulder guard (61).
7. Prefabricated Concrete beam operating platform as claimed in claim 6, it is characterized in that:The lower end of the shoulder guard (61) is equipped with card
It sells (64), corresponding position is equipped with card hole (15) on column, and bayonet lock (64), which is inserted in card hole (15), can prevent shoulder guard (61) to shake
It is dynamic.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610440090.5A CN106065709B (en) | 2016-06-20 | 2016-06-20 | Prefabricated concrete beam operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610440090.5A CN106065709B (en) | 2016-06-20 | 2016-06-20 | Prefabricated concrete beam operating platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106065709A CN106065709A (en) | 2016-11-02 |
CN106065709B true CN106065709B (en) | 2018-11-30 |
Family
ID=57420540
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610440090.5A Active CN106065709B (en) | 2016-06-20 | 2016-06-20 | Prefabricated concrete beam operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106065709B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108240114B (en) * | 2018-02-01 | 2023-05-02 | 三峡大学 | High-pressure concrete wool punching machine and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4527363A (en) * | 1982-03-22 | 1985-07-09 | Kolbjorn Saether | Erecting precast horizontal slabs in building construction |
CN85109622A (en) * | 1984-11-23 | 1986-12-24 | 混凝土和钢筋混凝土制造公司 | Produce the apparatus and method of concrete component |
JPH10245977A (en) * | 1997-03-03 | 1998-09-14 | Taisei Corp | On-deck movable scaffold |
CN101664963A (en) * | 2009-09-11 | 2010-03-10 | 中铁大桥局集团第五工程有限公司 | Multifunctional operating platform for large-volume prestressed concrete box girder tensioning |
CN103302741A (en) * | 2013-07-05 | 2013-09-18 | 中铁三局集团有限公司 | Prefabricated bridge concrete rainproof mobile pouring trolley |
CN204844444U (en) * | 2015-08-18 | 2015-12-09 | 五洋建设集团股份有限公司 | Concrete tower crane high altitude sprays maintenance system |
-
2016
- 2016-06-20 CN CN201610440090.5A patent/CN106065709B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4527363A (en) * | 1982-03-22 | 1985-07-09 | Kolbjorn Saether | Erecting precast horizontal slabs in building construction |
CN85109622A (en) * | 1984-11-23 | 1986-12-24 | 混凝土和钢筋混凝土制造公司 | Produce the apparatus and method of concrete component |
JPH10245977A (en) * | 1997-03-03 | 1998-09-14 | Taisei Corp | On-deck movable scaffold |
CN101664963A (en) * | 2009-09-11 | 2010-03-10 | 中铁大桥局集团第五工程有限公司 | Multifunctional operating platform for large-volume prestressed concrete box girder tensioning |
CN103302741A (en) * | 2013-07-05 | 2013-09-18 | 中铁三局集团有限公司 | Prefabricated bridge concrete rainproof mobile pouring trolley |
CN204844444U (en) * | 2015-08-18 | 2015-12-09 | 五洋建设集团股份有限公司 | Concrete tower crane high altitude sprays maintenance system |
Also Published As
Publication number | Publication date |
---|---|
CN106065709A (en) | 2016-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108970854B (en) | Paint spraying construction method for wall surface at bottom of bridge | |
CN100526581C (en) | Reciprocating self-climbing type climbing form system and its climbing form method | |
CN207609153U (en) | A kind of elevator liftable construction operation platform | |
CN207377165U (en) | A kind of automatic dabbing machine of facade | |
CN202347842U (en) | Hydraulic climbing template device of high-rise building | |
CN106065709B (en) | Prefabricated concrete beam operating platform | |
CN106013774A (en) | Slip-form flexible platform device suitable for assigning | |
CN104060860B (en) | A kind of sectional telescopic rain-proof shelter for precast concrete T-beam and using method | |
CN207277192U (en) | Portable overhanging lifting platform for crash barrier template construction | |
CN211735442U (en) | Slope protection construction work platform | |
CN206273948U (en) | Truss operating platform | |
CN209771679U (en) | dust-proof device for mixing station | |
CN202117689U (en) | Light-duty trolley which is matched with shield station-passing for structure formwork | |
CN208009267U (en) | A kind of middle cross beam tensioning protective platform | |
CN104612060B (en) | Construction working stand under prefabricated side bar lateral roof | |
CN214459726U (en) | Hanging-filling beam spraying maintenance equipment | |
CN202899608U (en) | Climbing device of building construction hydraulic pressure template | |
CN204455839U (en) | Construction working stand under prefabricated side bar lateral roof | |
CN214194550U (en) | Attached type working trolley | |
CN104179126B (en) | Municipal overhead anti-collision wall construction method | |
CN213622943U (en) | Fixing mechanism for beam lifting machine | |
CN201212250Y (en) | Mobile wheel track installation platform for large-sized network frame engineering | |
CN210238316U (en) | Bridge inverted U-shaped hanging basket device | |
CN108425348B (en) | Hydraulic overhaul platform for flood discharge flow channel of hydropower station and operation method | |
CN208763382U (en) | A kind of removable hydraulic up-down floor scaffold of umbrella shape |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |