CN106055839A - Application method of three-dimensional scanning technology in building engineering based on BIM - Google Patents
Application method of three-dimensional scanning technology in building engineering based on BIM Download PDFInfo
- Publication number
- CN106055839A CN106055839A CN201610498595.7A CN201610498595A CN106055839A CN 106055839 A CN106055839 A CN 106055839A CN 201610498595 A CN201610498595 A CN 201610498595A CN 106055839 A CN106055839 A CN 106055839A
- Authority
- CN
- China
- Prior art keywords
- bim
- threedimensional model
- bim threedimensional
- surrounding enviroment
- site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
Abstract
The invention relates to an application method of a three-dimensional scanning technology in building engineering based on a BIM. The method comprises the steps of scanning a construction site and surroundings through the three-dimensional scanning technology, and generating data; establishing a BIM three-dimensional model of the construction site and the surroundings; guiding site construction through the BIM three-dimensional model of the construction site and the surroundings; establishing a BIM three-dimensional model of design paper; establishing a BIM three-dimensional model of a finished process; comparing the BIM three-dimensional model of the design paper with the CAD model of the paper of a designing institute or the BIM three-dimensional model of the design paper; and modifying or perfecting the finished process if there are deficiencies or defects.
Description
Technical field
The present invention relates to a kind of 3-D scanning technology based on BIM application process in architectural engineering, belong to building work
Journey technical field.
Background technology
3-D scanning is to integrate light, mechanical, electrical and computer technology new and high technology, outside being mainly used in object space
Shape and structure and color are scanned, to obtain the space coordinates of body surface.Its significance is can be by material object
Steric information is converted to calculate the digital signal that function directly processes, and provides the most conveniently hands for digitized in kind
Section.And arise at the historic moment at present building field architecture information model (BIM) under the background of the big data age of Internet of Things, and
Rapid popularization and development are arrived.Both are combined in the use in terms of building is to bring out the best in each other.
1, the most simple BIM model is the most all that the drawing be given according to designing institute is modeled, it is easy to ignore existing
Topography and geomorphology and the composite factor of surrounding enviroment that field Construction in Preparatory Stage runs into affect, thus affect construction speed, produce volume
Outer cost.
2, for completing operation, drawing can only be relied at present to carry out traditional inspection of quality, comparison reverse with BIM model
Complicated loaded down with trivial details.Can not convenient and efficient utilize BIM model at aspect of inspecting for acceptance so that it is in terms of guide field construction management without
Method forms complete Guan Bi.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of 3-D scanning technology based on BIM answering in architectural engineering
By method, building-site preparation of construction rank should be solved by the 3-D scanning technology based on BIM application process in architectural engineering
Duan Wufa predicts and tackles early stage scene landform in advance and periphery complex environment causes project progress obstacle and the most right
In completing operation, drawing can only be relied on to carry out traditional inspection of quality, the complicated loaded down with trivial details problem of the course of receiving.
In order to solve above-mentioned technical problem, the application in architectural engineering of the 3-D scanning technology based on BIM of the present invention
Method, the method comprises the following steps:
Step one, is scanned construction site and surrounding enviroment by 3-D scanning technology, generates data: select on construction ground
Take several datum marks and visual angle, with spatial digitizer site topography landforms and surrounding be scanned and record data,
Generate cloud data;
Step 2, sets up the BIM threedimensional model of construction site and surrounding enviroment: utilize the Dian Yunchu of 3 d modeling software Revit
Cloud data is processed by reason plug-in unit PointSense, and the cloud data storehouse after processing is docked in Revit set up construction
The BIM threedimensional model of place and surrounding enviroment, derives construction site and the BIM threedimensional model of surrounding enviroment;
Step 3, is instructed site operation by the BIM threedimensional model of construction site and surrounding enviroment: on construction ground and
Loading field information in the BIM threedimensional model of surrounding enviroment, workman carries out site operation, if encountering problems during site operation, then
The construction site of foundation and the BIM threedimensional model of surrounding enviroment are carried out three-dimensional display, and formulates solution;
Step 4, sets up the BIM threedimensional model of design drawing: generate design drawing in designing institute's drawing imports to Revit
BIM threedimensional model;
Step 5, sets up the BIM threedimensional model having completed operation: be scanned selected engineering position also with spatial digitizer
Record data, generate cloud data, and cloud data is carried out by the points cloud processing plug-in unit PointSense of 3 d modeling software Revit
Processing, the cloud data storehouse after processing is docked in Revit set up the BIM threedimensional model completing operation, derives and completes
The BIM threedimensional model of operation, extracts scanning information;
Step 6, three-dimensional with the BIM of the cad model of designing institute's drawing or design drawing by completing the BIM threedimensional model of operation
Model contrasts, if finding to have completed the BIM threedimensional model of operation and the cad model of designing institute's drawing or design drawing
BIM threedimensional model has deficiency or a defect, then rectify and improve or perfect completing operation.
Described field data includes construction site and the data message of surrounding enviroment, landform and geomorphic feature.
Described scanning information includes apparent mass, inspect for acceptance time, position, image progress, agent structure component chi
Very little, position, the trend of comprehensive pipeline, absolute altitude.
Use this 3-D scanning technology based on BIM application process in architectural engineering, have the advantage that
1, the multiple BIM three-dimensional being set up construction site and surrounding enviroment by scanning construction site and surrounding enviroment before constructing at the scene
Model, the scheme of pre-establishing have for carry out preparation of construction and guidance, convenient treatment in accordance with local conditions accurately solves problem, reaches
To preparing in advance, scientific guidance, reasonable construction, cost-effective effect.
2, after every one working procedure of engineering completes, it can be carried out 3-D scanning foundation and complete the BIM three-dimensional of operation
Model, compares with the cad model of designing institute drawing or the BIM threedimensional model of design drawing, the conversion check of convenient and efficient
Whether construction technology meets regulation requirement, allow BIM technology in the Life cycle of construction from preparing to instructing again to multiple
The step such as core, conversion check forms a complete Guan Bi, has reached the effect that leakage detection is filled a vacancy, has made site operation finer
Changing, standardization, the process making BIM technology construct at guide field is more perfect, accurate.
3, the valid data in scanning process all can import in BIM model, after the whole life cycle of building includes
O&M in can play vital effect.Under the background of the big data of Internet of Things, three-dimensional surface sweeping technology is as a bridge
Beam, organically combines job site with BIM.Under the call of whole nation green construction, both are combined in energy-saving
Material, civilization are efficient, environmental protection aspect also plays considerable effect.
Detailed description of the invention
The 3-D scanning technology based on BIM application process in architectural engineering, step one, by 3-D scanning technology pair
Construction site and surrounding enviroment are scanned, and generate data: choose several datum marks and visual angle on construction ground, sweep by three-dimensional
Retouch instrument and site topography landforms and surrounding are scanned and are recorded data, generate cloud data;
Step 2, sets up the BIM threedimensional model of construction site and surrounding enviroment: utilize the Dian Yunchu of 3 d modeling software Revit
Cloud data is processed by reason plug-in unit PointSense, and the cloud data storehouse after processing is docked in Revit set up construction
The BIM threedimensional model of place and surrounding enviroment, derives construction site and the BIM threedimensional model of surrounding enviroment;
Step 3, is instructed site operation by the BIM threedimensional model of construction site and surrounding enviroment: on construction ground and
Loading field information in the BIM threedimensional model of surrounding enviroment, workman carries out site operation, if encountering problems during site operation, then
The construction site of foundation and the BIM threedimensional model of surrounding enviroment are carried out three-dimensional display, and formulates solution;Solve existing in advance
The problem that field runs into, it is to avoid work holdup phenomenon produces and make BIM model more authentic and valid.Example: formulate large-scale according to road environment
Equipment march into the arena scheme, formulate tower crane type selecting and erection scheme according to neighboring buildings environment, formulate precipitation according to periphery natural environment
Arrangement and method for construction such as draining etc..
Step 4, sets up the BIM threedimensional model of design drawing: generate design drawing in designing institute's drawing imports to Revit
The BIM threedimensional model of paper, instructs site operation;
Step 5, sets up the BIM threedimensional model having completed operation: be scanned selected engineering position also with spatial digitizer
Record data, generate cloud data, and cloud data is carried out by the points cloud processing plug-in unit PointSense of 3 d modeling software Revit
Processing, the cloud data storehouse after processing is docked in Revit set up the BIM threedimensional model completing operation, derives and completes
The BIM threedimensional model of operation, extracts scanning information;
Step 6, three-dimensional with the BIM of the cad model of designing institute's drawing or design drawing by completing the BIM threedimensional model of operation
Model contrasts, if finding to have completed the BIM threedimensional model of operation and the cad model of designing institute's drawing or design drawing
BIM threedimensional model has deficiency or a defect, then rectify and improve or perfect completing operation.
Described field data includes construction site and the data message of surrounding enviroment, landform and geomorphic feature.
Described scanning information includes apparent mass, inspect for acceptance time, position, image progress, agent structure component chi
Very little, position, the trend of comprehensive pipeline, absolute altitude.
Every scanning information that screening work on the spot needs, example: actual measurement actual quantities data, node actual finish time, image
Progress and the every terms of information such as apparent mass picture, the on-the-spot unit type of actual installation, producer, guarantee maintenance etc., collect defeated
Entering in BIM threedimensional model, field condition can completely be integrated in platform with BIM threedimensional model, more really
Record field data is also shown, for field engineering personnel requirement, preferably provides data and service.
Not having the technical characteristic described in detail in the application is prior art.Above-described embodiment only illustrative the application
Principle and effect, not for limit the application.Any person skilled in the art all can be in the essence without prejudice to the application
God and under the scope of, above-described embodiment is modified or changes.Therefore, art has usually intellectual do not taking off
All equivalences completed under spirit disclosed herein with technological thought are modified or change, must be by the right of the application
Require to be contained.
Claims (3)
1. a 3-D scanning technology based on the BIM application process in architectural engineering, it is characterised in that: the method include with
Lower step:
Step one, is scanned construction site and surrounding enviroment by 3-D scanning technology, generates data: select on construction ground
Take several datum marks and visual angle, with spatial digitizer site topography landforms and surrounding be scanned and record data,
Generate cloud data;
Step 2, sets up the BIM threedimensional model of construction site and surrounding enviroment: utilize the Dian Yunchu of 3 d modeling software Revit
Cloud data is processed by reason plug-in unit PointSense, and the cloud data storehouse after processing is docked in Revit set up construction
The BIM threedimensional model of place and surrounding enviroment, derives construction site and the BIM threedimensional model of surrounding enviroment;
Step 3, is instructed site operation by the BIM threedimensional model of construction site and surrounding enviroment: on construction ground and
Loading field information in the BIM threedimensional model of surrounding enviroment, workman carries out site operation, if encountering problems during site operation, then
The construction site of foundation and the BIM threedimensional model of surrounding enviroment are carried out three-dimensional display, and formulates solution;
Step 4, sets up the BIM threedimensional model of design drawing: generate design drawing in designing institute's drawing imports to Revit
BIM threedimensional model;
Step 5, sets up the BIM threedimensional model having completed operation: be scanned selected engineering position also with spatial digitizer
Record data, generate cloud data, and cloud data is carried out by the points cloud processing plug-in unit PointSense of 3 d modeling software Revit
Processing, the cloud data storehouse after processing is docked in Revit set up the BIM threedimensional model completing operation, derives and completes
The BIM threedimensional model of operation, extracts scanning information;
Step 6, three-dimensional with the BIM of the cad model of designing institute's drawing or design drawing by completing the BIM threedimensional model of operation
Model contrasts, if finding to have completed the BIM threedimensional model of operation and the cad model of designing institute's drawing or design drawing
BIM threedimensional model has deficiency or a defect, then rectify and improve or perfect completing operation.
2., according to the application process in architectural engineering of the 3-D scanning technology based on BIM described in claim 1, its feature exists
In: described field data includes construction site and the data message of surrounding enviroment, landform and geomorphic feature.
3., according to the application process in architectural engineering of the 3-D scanning technology based on BIM described in claim 1, its feature exists
Time of include apparent mass in: described scanning information, inspecting for acceptance, position, image progress, agent structure scantling, position
Put, the trend of comprehensive pipeline, absolute altitude.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610498595.7A CN106055839A (en) | 2016-06-30 | 2016-06-30 | Application method of three-dimensional scanning technology in building engineering based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610498595.7A CN106055839A (en) | 2016-06-30 | 2016-06-30 | Application method of three-dimensional scanning technology in building engineering based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106055839A true CN106055839A (en) | 2016-10-26 |
Family
ID=57200223
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610498595.7A Pending CN106055839A (en) | 2016-06-30 | 2016-06-30 | Application method of three-dimensional scanning technology in building engineering based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106055839A (en) |
Cited By (40)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639207A (en) * | 2016-11-01 | 2017-05-10 | 苏州美瑞德建筑装饰有限公司 | Complex shared space assembling building decoration construction method based on BIM (building information modeling) |
CN106777831A (en) * | 2017-02-10 | 2017-05-31 | 深圳瑞和建筑装饰股份有限公司 | A kind of construction and decoration method based on BIM |
CN106934092A (en) * | 2017-01-10 | 2017-07-07 | 中铁四局集团第四工程有限公司 | The modeling method of the high speed railway prefabricating Liang Chang based on BIM |
CN107423523A (en) * | 2017-08-14 | 2017-12-01 | 郭宇光 | A kind of complicated communal space assembling building decoration construction method based on BIM |
CN107633133A (en) * | 2017-09-18 | 2018-01-26 | 中建局集团第二建筑有限公司 | The construction method of antidetonation suspension and support based on BIM+3D scanning techniques |
CN107657087A (en) * | 2017-09-07 | 2018-02-02 | 中国建筑第六工程局有限公司 | Pipeline layout method for arranging based on BIM technology |
CN107730585A (en) * | 2017-11-06 | 2018-02-23 | 济南市市政工程设计研究院(集团)有限责任公司 | A kind of landform threedimensional model generation method and system |
CN107764200A (en) * | 2017-09-08 | 2018-03-06 | 中国建筑第八工程局有限公司 | The measuring method of Super High elevator hoistways |
CN107872648A (en) * | 2017-10-06 | 2018-04-03 | 湖北聚注通用技术研究有限公司 | A kind of interior decoration construction scene monitoring system based on three-dimensional modeling |
CN107992643A (en) * | 2017-10-25 | 2018-05-04 | 刘界鹏 | It is a kind of to be produced and installation accuracy control technique with the construction industry structure component calculated based on 3-D scanning cloud data and artificial intelligence identification |
CN108133118A (en) * | 2018-01-17 | 2018-06-08 | 浙江汇新新能源科技有限公司 | A kind of 3 d modeling system of prefabricated components |
CN108197802A (en) * | 2017-12-29 | 2018-06-22 | 湖南大学 | It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control |
CN108629849A (en) * | 2018-05-16 | 2018-10-09 | 浙江大学 | A kind of component quality inspection system based on BIM with point cloud |
CN108717483A (en) * | 2018-05-14 | 2018-10-30 | 华北水利水电大学 | The design and construction method of packaged type bridges based on BIM |
CN108759774A (en) * | 2018-05-28 | 2018-11-06 | 中国建筑第八工程局有限公司 | A kind of measurement method in irregular curved tunnel |
CN108775894A (en) * | 2018-06-01 | 2018-11-09 | 上海建坤信息技术有限责任公司 | Construction monitoring method based on BIM |
CN108875139A (en) * | 2018-05-18 | 2018-11-23 | 中广核研究院有限公司 | A kind of three dimensional arrangement method and system based on actual environment |
CN108985969A (en) * | 2018-07-24 | 2018-12-11 | 广东金熙商业建设股份有限公司 | Intelligent show apparature and site space modular construction project management system |
CN109035402A (en) * | 2018-07-27 | 2018-12-18 | 中航建设集团成套装备股份有限公司 | A kind of architectural electricity mechanized production system based on BIM model |
CN109086530A (en) * | 2018-08-07 | 2018-12-25 | 山东慧建天宝建筑工程科技有限公司 | Construction data processing method, device, computer readable storage medium and terminal device |
CN109101709A (en) * | 2018-07-25 | 2018-12-28 | 中国十七冶集团有限公司 | The site construction management system that 3D laser scanner technique is combined with BIM technology |
CN109141307A (en) * | 2018-09-10 | 2019-01-04 | 上海宝冶建筑工程有限公司 | A kind of support of pipelines precision measurement and detection method |
CN109146711A (en) * | 2018-07-02 | 2019-01-04 | 中国十七冶集团有限公司 | A method of comprehensive utilization BIM technology and 3D laser scanning system Optimizing construction |
CN109540036A (en) * | 2019-01-21 | 2019-03-29 | 中国葛洲坝集团第五工程有限公司 | A kind of pond column measuring system and measurement method based on BIM and three-dimensional laser scanner |
CN109737929A (en) * | 2018-12-26 | 2019-05-10 | 国网浙江省电力有限公司建设分公司 | A kind of extra-high steel tube tower segmentation acceptance method of work transmission line |
CN109754143A (en) * | 2017-11-08 | 2019-05-14 | 上海宝冶集团有限公司 | Method based on unmanned plane and Building Information Model management engineering place |
CN109959345A (en) * | 2019-04-10 | 2019-07-02 | 国网上海市电力公司 | The contactless actual measurement actual quantities method and system of cable laying based on 3-D scanning |
CN110083947A (en) * | 2019-04-30 | 2019-08-02 | 南方电网调峰调频发电有限公司 | A method of three-dimensional entity model is switched based on reverse Engineering Technology building GIS |
CN110348096A (en) * | 2019-06-28 | 2019-10-18 | 广州大学 | Remove carbon emission calculation method, system and the storage medium of building castoff |
WO2020006984A1 (en) * | 2018-07-04 | 2020-01-09 | 成都希盟泰克科技发展有限公司 | Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme |
CN110674546A (en) * | 2019-09-06 | 2020-01-10 | 民航机场建设工程有限公司 | CDM modeling method of building component |
CN110782527A (en) * | 2019-10-09 | 2020-02-11 | 北京建筑大学 | Building modeling method and device |
CN110880200A (en) * | 2019-11-15 | 2020-03-13 | 国网福建省电力有限公司 | Intelligent checking and accepting method for GIM model engineering based on three-dimensional reconstruction technology |
CN111310333A (en) * | 2020-02-12 | 2020-06-19 | 上海国太建筑装饰工程有限公司 | Building decoration simulation construction method |
CN111597606A (en) * | 2020-04-08 | 2020-08-28 | 中交二公局第三工程有限公司 | High-efficiency design method for digital large-scale engineering construction station |
CN112362036A (en) * | 2020-11-02 | 2021-02-12 | 上海建工一建集团有限公司 | Method for counting complex engineering physical quantity based on 3D scanning and ray detection technology |
CN112435143A (en) * | 2020-11-23 | 2021-03-02 | 温岭市第一建筑工程有限公司 | Building engineering construction optimization system based on BIM |
CN113111827A (en) * | 2021-04-22 | 2021-07-13 | 北京房江湖科技有限公司 | Construction monitoring method and device, electronic equipment and storage medium |
CN113239518A (en) * | 2021-04-14 | 2021-08-10 | 中亿丰建设集团股份有限公司 | S-shaped runner horizontal axial flow pump installation process based on combination of three-dimensional scanning and Revit |
CN114638099A (en) * | 2022-03-12 | 2022-06-17 | 武汉芳家盛世建筑劳务有限公司 | BIM technology-based engineering construction progress on-line monitoring and analyzing system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104899378A (en) * | 2015-06-10 | 2015-09-09 | 上海大学 | Digital installation method for high-rise steel structure based on BIM and three-dimensional measurement |
WO2015153393A1 (en) * | 2014-04-02 | 2015-10-08 | Faro Technologies, Inc. | Registering of a scene disintegrating into clusters with visualized clusters |
CN105547151A (en) * | 2015-12-23 | 2016-05-04 | 上海建工集团股份有限公司 | Three-dimensional laser scanning spot cloud data acquisition and processing method and system thereof |
-
2016
- 2016-06-30 CN CN201610498595.7A patent/CN106055839A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015153393A1 (en) * | 2014-04-02 | 2015-10-08 | Faro Technologies, Inc. | Registering of a scene disintegrating into clusters with visualized clusters |
CN104899378A (en) * | 2015-06-10 | 2015-09-09 | 上海大学 | Digital installation method for high-rise steel structure based on BIM and three-dimensional measurement |
CN105547151A (en) * | 2015-12-23 | 2016-05-04 | 上海建工集团股份有限公司 | Three-dimensional laser scanning spot cloud data acquisition and processing method and system thereof |
Non-Patent Citations (2)
Title |
---|
李亚东等: "现场扫描结合BIM技术在工程实施中的应用", 《施工技术》 * |
田云峰等: "基于三维激光扫描和BIM模型在桥梁施工阶段质量管理中的研究", 《建筑设计管理》 * |
Cited By (49)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106639207A (en) * | 2016-11-01 | 2017-05-10 | 苏州美瑞德建筑装饰有限公司 | Complex shared space assembling building decoration construction method based on BIM (building information modeling) |
CN106934092A (en) * | 2017-01-10 | 2017-07-07 | 中铁四局集团第四工程有限公司 | The modeling method of the high speed railway prefabricating Liang Chang based on BIM |
WO2018145510A1 (en) * | 2017-02-10 | 2018-08-16 | 深圳瑞和建筑装饰股份有限公司 | Bim-based construction and decoration method |
CN106777831A (en) * | 2017-02-10 | 2017-05-31 | 深圳瑞和建筑装饰股份有限公司 | A kind of construction and decoration method based on BIM |
CN106777831B (en) * | 2017-02-10 | 2020-07-21 | 深圳瑞和建筑装饰股份有限公司 | Construction and decoration method based on BIM |
CN107423523A (en) * | 2017-08-14 | 2017-12-01 | 郭宇光 | A kind of complicated communal space assembling building decoration construction method based on BIM |
CN107657087A (en) * | 2017-09-07 | 2018-02-02 | 中国建筑第六工程局有限公司 | Pipeline layout method for arranging based on BIM technology |
CN107764200A (en) * | 2017-09-08 | 2018-03-06 | 中国建筑第八工程局有限公司 | The measuring method of Super High elevator hoistways |
CN107633133A (en) * | 2017-09-18 | 2018-01-26 | 中建局集团第二建筑有限公司 | The construction method of antidetonation suspension and support based on BIM+3D scanning techniques |
CN107633133B (en) * | 2017-09-18 | 2022-03-29 | 中建一局集团第二建筑有限公司 | Construction method of earthquake-resistant support and hanger based on BIM +3D scanning technology |
CN107872648A (en) * | 2017-10-06 | 2018-04-03 | 湖北聚注通用技术研究有限公司 | A kind of interior decoration construction scene monitoring system based on three-dimensional modeling |
CN107992643A (en) * | 2017-10-25 | 2018-05-04 | 刘界鹏 | It is a kind of to be produced and installation accuracy control technique with the construction industry structure component calculated based on 3-D scanning cloud data and artificial intelligence identification |
CN107992643B (en) * | 2017-10-25 | 2021-09-21 | 刘界鹏 | Method for controlling production and installation precision of building construction component |
CN107730585A (en) * | 2017-11-06 | 2018-02-23 | 济南市市政工程设计研究院(集团)有限责任公司 | A kind of landform threedimensional model generation method and system |
CN109754143A (en) * | 2017-11-08 | 2019-05-14 | 上海宝冶集团有限公司 | Method based on unmanned plane and Building Information Model management engineering place |
CN108197802A (en) * | 2017-12-29 | 2018-06-22 | 湖南大学 | It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control |
CN108133118A (en) * | 2018-01-17 | 2018-06-08 | 浙江汇新新能源科技有限公司 | A kind of 3 d modeling system of prefabricated components |
CN108717483A (en) * | 2018-05-14 | 2018-10-30 | 华北水利水电大学 | The design and construction method of packaged type bridges based on BIM |
CN108629849A (en) * | 2018-05-16 | 2018-10-09 | 浙江大学 | A kind of component quality inspection system based on BIM with point cloud |
CN108875139A (en) * | 2018-05-18 | 2018-11-23 | 中广核研究院有限公司 | A kind of three dimensional arrangement method and system based on actual environment |
CN108759774A (en) * | 2018-05-28 | 2018-11-06 | 中国建筑第八工程局有限公司 | A kind of measurement method in irregular curved tunnel |
CN108775894A (en) * | 2018-06-01 | 2018-11-09 | 上海建坤信息技术有限责任公司 | Construction monitoring method based on BIM |
CN109146711A (en) * | 2018-07-02 | 2019-01-04 | 中国十七冶集团有限公司 | A method of comprehensive utilization BIM technology and 3D laser scanning system Optimizing construction |
WO2020006984A1 (en) * | 2018-07-04 | 2020-01-09 | 成都希盟泰克科技发展有限公司 | Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme |
CN108985969A (en) * | 2018-07-24 | 2018-12-11 | 广东金熙商业建设股份有限公司 | Intelligent show apparature and site space modular construction project management system |
CN108985969B (en) * | 2018-07-24 | 2021-09-03 | 广东金熙商业建设股份有限公司 | Intelligent display prop and site space modular construction engineering management system |
CN109101709A (en) * | 2018-07-25 | 2018-12-28 | 中国十七冶集团有限公司 | The site construction management system that 3D laser scanner technique is combined with BIM technology |
CN109035402A (en) * | 2018-07-27 | 2018-12-18 | 中航建设集团成套装备股份有限公司 | A kind of architectural electricity mechanized production system based on BIM model |
CN109086530A (en) * | 2018-08-07 | 2018-12-25 | 山东慧建天宝建筑工程科技有限公司 | Construction data processing method, device, computer readable storage medium and terminal device |
CN109141307A (en) * | 2018-09-10 | 2019-01-04 | 上海宝冶建筑工程有限公司 | A kind of support of pipelines precision measurement and detection method |
CN109737929A (en) * | 2018-12-26 | 2019-05-10 | 国网浙江省电力有限公司建设分公司 | A kind of extra-high steel tube tower segmentation acceptance method of work transmission line |
CN109540036A (en) * | 2019-01-21 | 2019-03-29 | 中国葛洲坝集团第五工程有限公司 | A kind of pond column measuring system and measurement method based on BIM and three-dimensional laser scanner |
CN109959345A (en) * | 2019-04-10 | 2019-07-02 | 国网上海市电力公司 | The contactless actual measurement actual quantities method and system of cable laying based on 3-D scanning |
CN110083947A (en) * | 2019-04-30 | 2019-08-02 | 南方电网调峰调频发电有限公司 | A method of three-dimensional entity model is switched based on reverse Engineering Technology building GIS |
CN110083947B (en) * | 2019-04-30 | 2023-01-31 | 南方电网调峰调频发电有限公司 | Method for constructing GIS switch three-dimensional solid model based on reverse engineering technology |
CN110348096B (en) * | 2019-06-28 | 2023-09-05 | 广州大学 | Carbon emission calculation method, system and storage medium for demolishing construction waste |
CN110348096A (en) * | 2019-06-28 | 2019-10-18 | 广州大学 | Remove carbon emission calculation method, system and the storage medium of building castoff |
CN110674546A (en) * | 2019-09-06 | 2020-01-10 | 民航机场建设工程有限公司 | CDM modeling method of building component |
CN110674546B (en) * | 2019-09-06 | 2020-10-09 | 民航机场建设工程有限公司 | CDM modeling method of building component |
CN110782527A (en) * | 2019-10-09 | 2020-02-11 | 北京建筑大学 | Building modeling method and device |
CN110782527B (en) * | 2019-10-09 | 2023-11-21 | 北京建筑大学 | Building modeling method and device |
CN110880200A (en) * | 2019-11-15 | 2020-03-13 | 国网福建省电力有限公司 | Intelligent checking and accepting method for GIM model engineering based on three-dimensional reconstruction technology |
CN111310333A (en) * | 2020-02-12 | 2020-06-19 | 上海国太建筑装饰工程有限公司 | Building decoration simulation construction method |
CN111597606A (en) * | 2020-04-08 | 2020-08-28 | 中交二公局第三工程有限公司 | High-efficiency design method for digital large-scale engineering construction station |
CN112362036A (en) * | 2020-11-02 | 2021-02-12 | 上海建工一建集团有限公司 | Method for counting complex engineering physical quantity based on 3D scanning and ray detection technology |
CN112435143A (en) * | 2020-11-23 | 2021-03-02 | 温岭市第一建筑工程有限公司 | Building engineering construction optimization system based on BIM |
CN113239518A (en) * | 2021-04-14 | 2021-08-10 | 中亿丰建设集团股份有限公司 | S-shaped runner horizontal axial flow pump installation process based on combination of three-dimensional scanning and Revit |
CN113111827A (en) * | 2021-04-22 | 2021-07-13 | 北京房江湖科技有限公司 | Construction monitoring method and device, electronic equipment and storage medium |
CN114638099A (en) * | 2022-03-12 | 2022-06-17 | 武汉芳家盛世建筑劳务有限公司 | BIM technology-based engineering construction progress on-line monitoring and analyzing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106055839A (en) | Application method of three-dimensional scanning technology in building engineering based on BIM | |
Baik et al. | Jeddah Historical Building Information Modelling" JHBIM"–Object Library | |
CN106777680A (en) | A kind of existing bridge fast B IM modelings and method | |
Badenko et al. | Scan-to-BIM methodology adapted for different application | |
JP5048962B2 (en) | Architectural plan change method and architectural plan change device using three-dimensional laser scanner | |
CN110689563A (en) | Data processing method for extracting illegal building information in remote sensing image | |
CN104330074A (en) | Intelligent surveying and mapping platform and realizing method thereof | |
CN103954970B (en) | A kind of topographic(al) feature acquisition method | |
CN105468796A (en) | Method for establishing temporary support moulding bed system for steel structure assembly | |
CN206497453U (en) | A kind of existing bridge fast B IM modelings | |
CN105987673A (en) | Integrated three-dimensional scanning modeling system | |
CN112256815A (en) | Three-dimensional planning auxiliary examination and approval system and method | |
CN114332402A (en) | Ground-based and handheld laser scanning-fused steel bridge simulation pre-assembly method | |
Apollonio et al. | From documentation images to restauration support tools: a path following the neptune fountain in bologna design process | |
Cheng et al. | Vision-based trajectory monitoring for assembly alignment of precast concrete bridge components | |
CN115479594B (en) | BIM and three-dimensional scanning-based bridge pier perpendicularity detection method, system and application | |
Gabellone et al. | A quick method for the texture mapping of meshes acquired by laser scanner | |
CN114923433B (en) | Method for improving paying-off efficiency and precision of special-shaped structure curtain wall | |
Sammartano et al. | Parametric generation in HBIM workflows for slam-based data: Discussing expectations on suitability and accuracy | |
US20220130030A1 (en) | Information display apparatus, information display method, and information display program | |
CN116226965A (en) | Building waste estimation algorithm based on BIM | |
Saidi et al. | Development and use of the NIST intelligent and automated construction job site testbed | |
Lee et al. | Finding the displacement of wood structure in heritage building by 3D laser scanner | |
CN112800514A (en) | Method for applying laser point cloud and BIM modeling technology to visual control platform of converter station | |
Bitelli et al. | Data acquisition and processing in cultural heritage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161026 |