Prior art keywords
bim
threedimensional model
bim threedimensional
surrounding enviroment
site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610498595.7A
Other languages
Chinese (zh)
Inventor
吕帅
李盛
张海堂
靳亚北
王阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201610498595.7A priority Critical patent/CN106055839A/en
Publication of CN106055839A publication Critical patent/CN106055839A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Abstract

The invention relates to an application method of a three-dimensional scanning technology in building engineering based on a BIM. The method comprises the steps of scanning a construction site and surroundings through the three-dimensional scanning technology, and generating data; establishing a BIM three-dimensional model of the construction site and the surroundings; guiding site construction through the BIM three-dimensional model of the construction site and the surroundings; establishing a BIM three-dimensional model of design paper; establishing a BIM three-dimensional model of a finished process; comparing the BIM three-dimensional model of the design paper with the CAD model of the paper of a designing institute or the BIM three-dimensional model of the design paper; and modifying or perfecting the finished process if there are deficiencies or defects.

Description

The 3-D scanning technology based on BIM application process in architectural engineering
Technical field
The present invention relates to a kind of 3-D scanning technology based on BIM application process in architectural engineering, belong to building work Journey technical field.
Background technology
3-D scanning is to integrate light, mechanical, electrical and computer technology new and high technology, outside being mainly used in object space Shape and structure and color are scanned, to obtain the space coordinates of body surface.Its significance is can be by material object Steric information is converted to calculate the digital signal that function directly processes, and provides the most conveniently hands for digitized in kind Section.And arise at the historic moment at present building field architecture information model (BIM) under the background of the big data age of Internet of Things, and Rapid popularization and development are arrived.Both are combined in the use in terms of building is to bring out the best in each other.
1, the most simple BIM model is the most all that the drawing be given according to designing institute is modeled, it is easy to ignore existing Topography and geomorphology and the composite factor of surrounding enviroment that field Construction in Preparatory Stage runs into affect, thus affect construction speed, produce volume Outer cost.
2, for completing operation, drawing can only be relied at present to carry out traditional inspection of quality, comparison reverse with BIM model Complicated loaded down with trivial details.Can not convenient and efficient utilize BIM model at aspect of inspecting for acceptance so that it is in terms of guide field construction management without Method forms complete Guan Bi.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of 3-D scanning technology based on BIM answering in architectural engineering By method, building-site preparation of construction rank should be solved by the 3-D scanning technology based on BIM application process in architectural engineering Duan Wufa predicts and tackles early stage scene landform in advance and periphery complex environment causes project progress obstacle and the most right In completing operation, drawing can only be relied on to carry out traditional inspection of quality, the complicated loaded down with trivial details problem of the course of receiving.
In order to solve above-mentioned technical problem, the application in architectural engineering of the 3-D scanning technology based on BIM of the present invention Method, the method comprises the following steps:
Step one, is scanned construction site and surrounding enviroment by 3-D scanning technology, generates data: select on construction ground Take several datum marks and visual angle, with spatial digitizer site topography landforms and surrounding be scanned and record data, Generate cloud data;
Step 2, sets up the BIM threedimensional model of construction site and surrounding enviroment: utilize the Dian Yunchu of 3 d modeling software Revit Cloud data is processed by reason plug-in unit PointSense, and the cloud data storehouse after processing is docked in Revit set up construction The BIM threedimensional model of place and surrounding enviroment, derives construction site and the BIM threedimensional model of surrounding enviroment;
Step 3, is instructed site operation by the BIM threedimensional model of construction site and surrounding enviroment: on construction ground and Loading field information in the BIM threedimensional model of surrounding enviroment, workman carries out site operation, if encountering problems during site operation, then The construction site of foundation and the BIM threedimensional model of surrounding enviroment are carried out three-dimensional display, and formulates solution;
Step 4, sets up the BIM threedimensional model of design drawing: generate design drawing in designing institute's drawing imports to Revit BIM threedimensional model;
Step 5, sets up the BIM threedimensional model having completed operation: be scanned selected engineering position also with spatial digitizer Record data, generate cloud data, and cloud data is carried out by the points cloud processing plug-in unit PointSense of 3 d modeling software Revit Processing, the cloud data storehouse after processing is docked in Revit set up the BIM threedimensional model completing operation, derives and completes The BIM threedimensional model of operation, extracts scanning information;
Step 6, three-dimensional with the BIM of the cad model of designing institute's drawing or design drawing by completing the BIM threedimensional model of operation Model contrasts, if finding to have completed the BIM threedimensional model of operation and the cad model of designing institute's drawing or design drawing BIM threedimensional model has deficiency or a defect, then rectify and improve or perfect completing operation.
Described field data includes construction site and the data message of surrounding enviroment, landform and geomorphic feature.
Described scanning information includes apparent mass, inspect for acceptance time, position, image progress, agent structure component chi Very little, position, the trend of comprehensive pipeline, absolute altitude.
Use this 3-D scanning technology based on BIM application process in architectural engineering, have the advantage that
1, the multiple BIM three-dimensional being set up construction site and surrounding enviroment by scanning construction site and surrounding enviroment before constructing at the scene Model, the scheme of pre-establishing have for carry out preparation of construction and guidance, convenient treatment in accordance with local conditions accurately solves problem, reaches To preparing in advance, scientific guidance, reasonable construction, cost-effective effect.
2, after every one working procedure of engineering completes, it can be carried out 3-D scanning foundation and complete the BIM three-dimensional of operation Model, compares with the cad model of designing institute drawing or the BIM threedimensional model of design drawing, the conversion check of convenient and efficient Whether construction technology meets regulation requirement, allow BIM technology in the Life cycle of construction from preparing to instructing again to multiple The step such as core, conversion check forms a complete Guan Bi, has reached the effect that leakage detection is filled a vacancy, has made site operation finer Changing, standardization, the process making BIM technology construct at guide field is more perfect, accurate.
3, the valid data in scanning process all can import in BIM model, after the whole life cycle of building includes O&M in can play vital effect.Under the background of the big data of Internet of Things, three-dimensional surface sweeping technology is as a bridge Beam, organically combines job site with BIM.Under the call of whole nation green construction, both are combined in energy-saving Material, civilization are efficient, environmental protection aspect also plays considerable effect.
Detailed description of the invention
The 3-D scanning technology based on BIM application process in architectural engineering, step one, by 3-D scanning technology pair Construction site and surrounding enviroment are scanned, and generate data: choose several datum marks and visual angle on construction ground, sweep by three-dimensional Retouch instrument and site topography landforms and surrounding are scanned and are recorded data, generate cloud data;
Step 2, sets up the BIM threedimensional model of construction site and surrounding enviroment: utilize the Dian Yunchu of 3 d modeling software Revit Cloud data is processed by reason plug-in unit PointSense, and the cloud data storehouse after processing is docked in Revit set up construction The BIM threedimensional model of place and surrounding enviroment, derives construction site and the BIM threedimensional model of surrounding enviroment;
Step 3, is instructed site operation by the BIM threedimensional model of construction site and surrounding enviroment: on construction ground and Loading field information in the BIM threedimensional model of surrounding enviroment, workman carries out site operation, if encountering problems during site operation, then The construction site of foundation and the BIM threedimensional model of surrounding enviroment are carried out three-dimensional display, and formulates solution;Solve existing in advance The problem that field runs into, it is to avoid work holdup phenomenon produces and make BIM model more authentic and valid.Example: formulate large-scale according to road environment Equipment march into the arena scheme, formulate tower crane type selecting and erection scheme according to neighboring buildings environment, formulate precipitation according to periphery natural environment Arrangement and method for construction such as draining etc..
Step 4, sets up the BIM threedimensional model of design drawing: generate design drawing in designing institute's drawing imports to Revit The BIM threedimensional model of paper, instructs site operation;
Step 5, sets up the BIM threedimensional model having completed operation: be scanned selected engineering position also with spatial digitizer Record data, generate cloud data, and cloud data is carried out by the points cloud processing plug-in unit PointSense of 3 d modeling software Revit Processing, the cloud data storehouse after processing is docked in Revit set up the BIM threedimensional model completing operation, derives and completes The BIM threedimensional model of operation, extracts scanning information;
Step 6, three-dimensional with the BIM of the cad model of designing institute's drawing or design drawing by completing the BIM threedimensional model of operation Model contrasts, if finding to have completed the BIM threedimensional model of operation and the cad model of designing institute's drawing or design drawing BIM threedimensional model has deficiency or a defect, then rectify and improve or perfect completing operation.
Described field data includes construction site and the data message of surrounding enviroment, landform and geomorphic feature.
Described scanning information includes apparent mass, inspect for acceptance time, position, image progress, agent structure component chi Very little, position, the trend of comprehensive pipeline, absolute altitude.
Every scanning information that screening work on the spot needs, example: actual measurement actual quantities data, node actual finish time, image Progress and the every terms of information such as apparent mass picture, the on-the-spot unit type of actual installation, producer, guarantee maintenance etc., collect defeated Entering in BIM threedimensional model, field condition can completely be integrated in platform with BIM threedimensional model, more really Record field data is also shown, for field engineering personnel requirement, preferably provides data and service.
Not having the technical characteristic described in detail in the application is prior art.Above-described embodiment only illustrative the application Principle and effect, not for limit the application.Any person skilled in the art all can be in the essence without prejudice to the application God and under the scope of, above-described embodiment is modified or changes.Therefore, art has usually intellectual do not taking off All equivalences completed under spirit disclosed herein with technological thought are modified or change, must be by the right of the application Require to be contained.

Claims (3)

1. a 3-D scanning technology based on the BIM application process in architectural engineering, it is characterised in that: the method include with Lower step:
Step one, is scanned construction site and surrounding enviroment by 3-D scanning technology, generates data: select on construction ground Take several datum marks and visual angle, with spatial digitizer site topography landforms and surrounding be scanned and record data, Generate cloud data;
Step 2, sets up the BIM threedimensional model of construction site and surrounding enviroment: utilize the Dian Yunchu of 3 d modeling software Revit Cloud data is processed by reason plug-in unit PointSense, and the cloud data storehouse after processing is docked in Revit set up construction The BIM threedimensional model of place and surrounding enviroment, derives construction site and the BIM threedimensional model of surrounding enviroment;
Step 3, is instructed site operation by the BIM threedimensional model of construction site and surrounding enviroment: on construction ground and Loading field information in the BIM threedimensional model of surrounding enviroment, workman carries out site operation, if encountering problems during site operation, then The construction site of foundation and the BIM threedimensional model of surrounding enviroment are carried out three-dimensional display, and formulates solution;
Step 4, sets up the BIM threedimensional model of design drawing: generate design drawing in designing institute's drawing imports to Revit BIM threedimensional model;
Step 5, sets up the BIM threedimensional model having completed operation: be scanned selected engineering position also with spatial digitizer Record data, generate cloud data, and cloud data is carried out by the points cloud processing plug-in unit PointSense of 3 d modeling software Revit Processing, the cloud data storehouse after processing is docked in Revit set up the BIM threedimensional model completing operation, derives and completes The BIM threedimensional model of operation, extracts scanning information;
Step 6, three-dimensional with the BIM of the cad model of designing institute's drawing or design drawing by completing the BIM threedimensional model of operation Model contrasts, if finding to have completed the BIM threedimensional model of operation and the cad model of designing institute's drawing or design drawing BIM threedimensional model has deficiency or a defect, then rectify and improve or perfect completing operation.
2., according to the application process in architectural engineering of the 3-D scanning technology based on BIM described in claim 1, its feature exists In: described field data includes construction site and the data message of surrounding enviroment, landform and geomorphic feature.
3., according to the application process in architectural engineering of the 3-D scanning technology based on BIM described in claim 1, its feature exists Time of include apparent mass in: described scanning information, inspecting for acceptance, position, image progress, agent structure scantling, position Put, the trend of comprehensive pipeline, absolute altitude.
CN201610498595.7A 2016-06-30 2016-06-30 Application method of three-dimensional scanning technology in building engineering based on BIM Pending CN106055839A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610498595.7A CN106055839A (en) 2016-06-30 2016-06-30 Application method of three-dimensional scanning technology in building engineering based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610498595.7A CN106055839A (en) 2016-06-30 2016-06-30 Application method of three-dimensional scanning technology in building engineering based on BIM

Publications (1)

Publication Number Publication Date
CN106055839A true CN106055839A (en) 2016-10-26

Family

ID=57200223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610498595.7A Pending CN106055839A (en) 2016-06-30 2016-06-30 Application method of three-dimensional scanning technology in building engineering based on BIM

Country Status (1)

Country Link
CN (1) CN106055839A (en)

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639207A (en) * 2016-11-01 2017-05-10 苏州美瑞德建筑装饰有限公司 Complex shared space assembling building decoration construction method based on BIM (building information modeling)
CN106777831A (en) * 2017-02-10 2017-05-31 深圳瑞和建筑装饰股份有限公司 A kind of construction and decoration method based on BIM
CN106934092A (en) * 2017-01-10 2017-07-07 中铁四局集团第四工程有限公司 The modeling method of the high speed railway prefabricating Liang Chang based on BIM
CN107423523A (en) * 2017-08-14 2017-12-01 郭宇光 A kind of complicated communal space assembling building decoration construction method based on BIM
CN107633133A (en) * 2017-09-18 2018-01-26 中建局集团第二建筑有限公司 The construction method of antidetonation suspension and support based on BIM+3D scanning techniques
CN107657087A (en) * 2017-09-07 2018-02-02 中国建筑第六工程局有限公司 Pipeline layout method for arranging based on BIM technology
CN107730585A (en) * 2017-11-06 2018-02-23 济南市市政工程设计研究院(集团)有限责任公司 A kind of landform threedimensional model generation method and system
CN107764200A (en) * 2017-09-08 2018-03-06 中国建筑第八工程局有限公司 The measuring method of Super High elevator hoistways
CN107872648A (en) * 2017-10-06 2018-04-03 湖北聚注通用技术研究有限公司 A kind of interior decoration construction scene monitoring system based on three-dimensional modeling
CN107992643A (en) * 2017-10-25 2018-05-04 刘界鹏 It is a kind of to be produced and installation accuracy control technique with the construction industry structure component calculated based on 3-D scanning cloud data and artificial intelligence identification
CN108133118A (en) * 2018-01-17 2018-06-08 浙江汇新新能源科技有限公司 A kind of 3 d modeling system of prefabricated components
CN108197802A (en) * 2017-12-29 2018-06-22 湖南大学 It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control
CN108629849A (en) * 2018-05-16 2018-10-09 浙江大学 A kind of component quality inspection system based on BIM with point cloud
CN108717483A (en) * 2018-05-14 2018-10-30 华北水利水电大学 The design and construction method of packaged type bridges based on BIM
CN108759774A (en) * 2018-05-28 2018-11-06 中国建筑第八工程局有限公司 A kind of measurement method in irregular curved tunnel
CN108775894A (en) * 2018-06-01 2018-11-09 上海建坤信息技术有限责任公司 Construction monitoring method based on BIM
CN108875139A (en) * 2018-05-18 2018-11-23 中广核研究院有限公司 A kind of three dimensional arrangement method and system based on actual environment
CN108985969A (en) * 2018-07-24 2018-12-11 广东金熙商业建设股份有限公司 Intelligent show apparature and site space modular construction project management system
CN109035402A (en) * 2018-07-27 2018-12-18 中航建设集团成套装备股份有限公司 A kind of architectural electricity mechanized production system based on BIM model
CN109086530A (en) * 2018-08-07 2018-12-25 山东慧建天宝建筑工程科技有限公司 Construction data processing method, device, computer readable storage medium and terminal device
CN109101709A (en) * 2018-07-25 2018-12-28 中国十七冶集团有限公司 The site construction management system that 3D laser scanner technique is combined with BIM technology
CN109141307A (en) * 2018-09-10 2019-01-04 上海宝冶建筑工程有限公司 A kind of support of pipelines precision measurement and detection method
CN109146711A (en) * 2018-07-02 2019-01-04 中国十七冶集团有限公司 A method of comprehensive utilization BIM technology and 3D laser scanning system Optimizing construction
CN109540036A (en) * 2019-01-21 2019-03-29 中国葛洲坝集团第五工程有限公司 A kind of pond column measuring system and measurement method based on BIM and three-dimensional laser scanner
CN109737929A (en) * 2018-12-26 2019-05-10 国网浙江省电力有限公司建设分公司 A kind of extra-high steel tube tower segmentation acceptance method of work transmission line
CN109754143A (en) * 2017-11-08 2019-05-14 上海宝冶集团有限公司 Method based on unmanned plane and Building Information Model management engineering place
CN109959345A (en) * 2019-04-10 2019-07-02 国网上海市电力公司 The contactless actual measurement actual quantities method and system of cable laying based on 3-D scanning
CN110083947A (en) * 2019-04-30 2019-08-02 南方电网调峰调频发电有限公司 A method of three-dimensional entity model is switched based on reverse Engineering Technology building GIS
CN110348096A (en) * 2019-06-28 2019-10-18 广州大学 Remove carbon emission calculation method, system and the storage medium of building castoff
WO2020006984A1 (en) * 2018-07-04 2020-01-09 成都希盟泰克科技发展有限公司 Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme
CN110674546A (en) * 2019-09-06 2020-01-10 民航机场建设工程有限公司 CDM modeling method of building component
CN110782527A (en) * 2019-10-09 2020-02-11 北京建筑大学 Building modeling method and device
CN110880200A (en) * 2019-11-15 2020-03-13 国网福建省电力有限公司 Intelligent checking and accepting method for GIM model engineering based on three-dimensional reconstruction technology
CN111310333A (en) * 2020-02-12 2020-06-19 上海国太建筑装饰工程有限公司 Building decoration simulation construction method
CN111597606A (en) * 2020-04-08 2020-08-28 中交二公局第三工程有限公司 High-efficiency design method for digital large-scale engineering construction station
CN112362036A (en) * 2020-11-02 2021-02-12 上海建工一建集团有限公司 Method for counting complex engineering physical quantity based on 3D scanning and ray detection technology
CN112435143A (en) * 2020-11-23 2021-03-02 温岭市第一建筑工程有限公司 Building engineering construction optimization system based on BIM
CN113111827A (en) * 2021-04-22 2021-07-13 北京房江湖科技有限公司 Construction monitoring method and device, electronic equipment and storage medium
CN113239518A (en) * 2021-04-14 2021-08-10 中亿丰建设集团股份有限公司 S-shaped runner horizontal axial flow pump installation process based on combination of three-dimensional scanning and Revit
CN114638099A (en) * 2022-03-12 2022-06-17 武汉芳家盛世建筑劳务有限公司 BIM technology-based engineering construction progress on-line monitoring and analyzing system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104899378A (en) * 2015-06-10 2015-09-09 上海大学 Digital installation method for high-rise steel structure based on BIM and three-dimensional measurement
WO2015153393A1 (en) * 2014-04-02 2015-10-08 Faro Technologies, Inc. Registering of a scene disintegrating into clusters with visualized clusters
CN105547151A (en) * 2015-12-23 2016-05-04 上海建工集团股份有限公司 Three-dimensional laser scanning spot cloud data acquisition and processing method and system thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015153393A1 (en) * 2014-04-02 2015-10-08 Faro Technologies, Inc. Registering of a scene disintegrating into clusters with visualized clusters
CN104899378A (en) * 2015-06-10 2015-09-09 上海大学 Digital installation method for high-rise steel structure based on BIM and three-dimensional measurement
CN105547151A (en) * 2015-12-23 2016-05-04 上海建工集团股份有限公司 Three-dimensional laser scanning spot cloud data acquisition and processing method and system thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李亚东等: "现场扫描结合BIM技术在工程实施中的应用", 《施工技术》 *
田云峰等: "基于三维激光扫描和BIM模型在桥梁施工阶段质量管理中的研究", 《建筑设计管理》 *

Cited By (49)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639207A (en) * 2016-11-01 2017-05-10 苏州美瑞德建筑装饰有限公司 Complex shared space assembling building decoration construction method based on BIM (building information modeling)
CN106934092A (en) * 2017-01-10 2017-07-07 中铁四局集团第四工程有限公司 The modeling method of the high speed railway prefabricating Liang Chang based on BIM
WO2018145510A1 (en) * 2017-02-10 2018-08-16 深圳瑞和建筑装饰股份有限公司 Bim-based construction and decoration method
CN106777831A (en) * 2017-02-10 2017-05-31 深圳瑞和建筑装饰股份有限公司 A kind of construction and decoration method based on BIM
CN106777831B (en) * 2017-02-10 2020-07-21 深圳瑞和建筑装饰股份有限公司 Construction and decoration method based on BIM
CN107423523A (en) * 2017-08-14 2017-12-01 郭宇光 A kind of complicated communal space assembling building decoration construction method based on BIM
CN107657087A (en) * 2017-09-07 2018-02-02 中国建筑第六工程局有限公司 Pipeline layout method for arranging based on BIM technology
CN107764200A (en) * 2017-09-08 2018-03-06 中国建筑第八工程局有限公司 The measuring method of Super High elevator hoistways
CN107633133A (en) * 2017-09-18 2018-01-26 中建局集团第二建筑有限公司 The construction method of antidetonation suspension and support based on BIM+3D scanning techniques
CN107633133B (en) * 2017-09-18 2022-03-29 中建一局集团第二建筑有限公司 Construction method of earthquake-resistant support and hanger based on BIM +3D scanning technology
CN107872648A (en) * 2017-10-06 2018-04-03 湖北聚注通用技术研究有限公司 A kind of interior decoration construction scene monitoring system based on three-dimensional modeling
CN107992643A (en) * 2017-10-25 2018-05-04 刘界鹏 It is a kind of to be produced and installation accuracy control technique with the construction industry structure component calculated based on 3-D scanning cloud data and artificial intelligence identification
CN107992643B (en) * 2017-10-25 2021-09-21 刘界鹏 Method for controlling production and installation precision of building construction component
CN107730585A (en) * 2017-11-06 2018-02-23 济南市市政工程设计研究院(集团)有限责任公司 A kind of landform threedimensional model generation method and system
CN109754143A (en) * 2017-11-08 2019-05-14 上海宝冶集团有限公司 Method based on unmanned plane and Building Information Model management engineering place
CN108197802A (en) * 2017-12-29 2018-06-22 湖南大学 It is a kind of based on BIM technology to the method and system of concrete structure construction quality management and control
CN108133118A (en) * 2018-01-17 2018-06-08 浙江汇新新能源科技有限公司 A kind of 3 d modeling system of prefabricated components
CN108717483A (en) * 2018-05-14 2018-10-30 华北水利水电大学 The design and construction method of packaged type bridges based on BIM
CN108629849A (en) * 2018-05-16 2018-10-09 浙江大学 A kind of component quality inspection system based on BIM with point cloud
CN108875139A (en) * 2018-05-18 2018-11-23 中广核研究院有限公司 A kind of three dimensional arrangement method and system based on actual environment
CN108759774A (en) * 2018-05-28 2018-11-06 中国建筑第八工程局有限公司 A kind of measurement method in irregular curved tunnel
CN108775894A (en) * 2018-06-01 2018-11-09 上海建坤信息技术有限责任公司 Construction monitoring method based on BIM
CN109146711A (en) * 2018-07-02 2019-01-04 中国十七冶集团有限公司 A method of comprehensive utilization BIM technology and 3D laser scanning system Optimizing construction
WO2020006984A1 (en) * 2018-07-04 2020-01-09 成都希盟泰克科技发展有限公司 Bim technology-based comprehensive aid decision-making method for engineering construction organization scheme
CN108985969A (en) * 2018-07-24 2018-12-11 广东金熙商业建设股份有限公司 Intelligent show apparature and site space modular construction project management system
CN108985969B (en) * 2018-07-24 2021-09-03 广东金熙商业建设股份有限公司 Intelligent display prop and site space modular construction engineering management system
CN109101709A (en) * 2018-07-25 2018-12-28 中国十七冶集团有限公司 The site construction management system that 3D laser scanner technique is combined with BIM technology
CN109035402A (en) * 2018-07-27 2018-12-18 中航建设集团成套装备股份有限公司 A kind of architectural electricity mechanized production system based on BIM model
CN109086530A (en) * 2018-08-07 2018-12-25 山东慧建天宝建筑工程科技有限公司 Construction data processing method, device, computer readable storage medium and terminal device
CN109141307A (en) * 2018-09-10 2019-01-04 上海宝冶建筑工程有限公司 A kind of support of pipelines precision measurement and detection method
CN109737929A (en) * 2018-12-26 2019-05-10 国网浙江省电力有限公司建设分公司 A kind of extra-high steel tube tower segmentation acceptance method of work transmission line
CN109540036A (en) * 2019-01-21 2019-03-29 中国葛洲坝集团第五工程有限公司 A kind of pond column measuring system and measurement method based on BIM and three-dimensional laser scanner
CN109959345A (en) * 2019-04-10 2019-07-02 国网上海市电力公司 The contactless actual measurement actual quantities method and system of cable laying based on 3-D scanning
CN110083947A (en) * 2019-04-30 2019-08-02 南方电网调峰调频发电有限公司 A method of three-dimensional entity model is switched based on reverse Engineering Technology building GIS
CN110083947B (en) * 2019-04-30 2023-01-31 南方电网调峰调频发电有限公司 Method for constructing GIS switch three-dimensional solid model based on reverse engineering technology
CN110348096B (en) * 2019-06-28 2023-09-05 广州大学 Carbon emission calculation method, system and storage medium for demolishing construction waste
CN110348096A (en) * 2019-06-28 2019-10-18 广州大学 Remove carbon emission calculation method, system and the storage medium of building castoff
CN110674546A (en) * 2019-09-06 2020-01-10 民航机场建设工程有限公司 CDM modeling method of building component
CN110674546B (en) * 2019-09-06 2020-10-09 民航机场建设工程有限公司 CDM modeling method of building component
CN110782527A (en) * 2019-10-09 2020-02-11 北京建筑大学 Building modeling method and device
CN110782527B (en) * 2019-10-09 2023-11-21 北京建筑大学 Building modeling method and device
CN110880200A (en) * 2019-11-15 2020-03-13 国网福建省电力有限公司 Intelligent checking and accepting method for GIM model engineering based on three-dimensional reconstruction technology
CN111310333A (en) * 2020-02-12 2020-06-19 上海国太建筑装饰工程有限公司 Building decoration simulation construction method
CN111597606A (en) * 2020-04-08 2020-08-28 中交二公局第三工程有限公司 High-efficiency design method for digital large-scale engineering construction station
CN112362036A (en) * 2020-11-02 2021-02-12 上海建工一建集团有限公司 Method for counting complex engineering physical quantity based on 3D scanning and ray detection technology
CN112435143A (en) * 2020-11-23 2021-03-02 温岭市第一建筑工程有限公司 Building engineering construction optimization system based on BIM
CN113239518A (en) * 2021-04-14 2021-08-10 中亿丰建设集团股份有限公司 S-shaped runner horizontal axial flow pump installation process based on combination of three-dimensional scanning and Revit
CN113111827A (en) * 2021-04-22 2021-07-13 北京房江湖科技有限公司 Construction monitoring method and device, electronic equipment and storage medium
CN114638099A (en) * 2022-03-12 2022-06-17 武汉芳家盛世建筑劳务有限公司 BIM technology-based engineering construction progress on-line monitoring and analyzing system

Similar Documents

Publication Publication Date Title
CN106055839A (en) Application method of three-dimensional scanning technology in building engineering based on BIM
Baik et al. Jeddah Historical Building Information Modelling" JHBIM"–Object Library
CN106777680A (en) A kind of existing bridge fast B IM modelings and method
Badenko et al. Scan-to-BIM methodology adapted for different application
JP5048962B2 (en) Architectural plan change method and architectural plan change device using three-dimensional laser scanner
CN110689563A (en) Data processing method for extracting illegal building information in remote sensing image
CN104330074A (en) Intelligent surveying and mapping platform and realizing method thereof
CN103954970B (en) A kind of topographic(al) feature acquisition method
CN105468796A (en) Method for establishing temporary support moulding bed system for steel structure assembly
CN206497453U (en) A kind of existing bridge fast B IM modelings
CN105987673A (en) Integrated three-dimensional scanning modeling system
CN112256815A (en) Three-dimensional planning auxiliary examination and approval system and method
CN114332402A (en) Ground-based and handheld laser scanning-fused steel bridge simulation pre-assembly method
Apollonio et al. From documentation images to restauration support tools: a path following the neptune fountain in bologna design process
Cheng et al. Vision-based trajectory monitoring for assembly alignment of precast concrete bridge components
CN115479594B (en) BIM and three-dimensional scanning-based bridge pier perpendicularity detection method, system and application
Gabellone et al. A quick method for the texture mapping of meshes acquired by laser scanner
CN114923433B (en) Method for improving paying-off efficiency and precision of special-shaped structure curtain wall
Sammartano et al. Parametric generation in HBIM workflows for slam-based data: Discussing expectations on suitability and accuracy
US20220130030A1 (en) Information display apparatus, information display method, and information display program
CN116226965A (en) Building waste estimation algorithm based on BIM
Saidi et al. Development and use of the NIST intelligent and automated construction job site testbed
Lee et al. Finding the displacement of wood structure in heritage building by 3D laser scanner
CN112800514A (en) Method for applying laser point cloud and BIM modeling technology to visual control platform of converter station
Bitelli et al. Data acquisition and processing in cultural heritage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161026