CN106050303A - Underground roadway plugging method and device - Google Patents
Underground roadway plugging method and device Download PDFInfo
- Publication number
- CN106050303A CN106050303A CN201610619209.5A CN201610619209A CN106050303A CN 106050303 A CN106050303 A CN 106050303A CN 201610619209 A CN201610619209 A CN 201610619209A CN 106050303 A CN106050303 A CN 106050303A
- Authority
- CN
- China
- Prior art keywords
- filling
- framework
- pipeline
- filler
- bag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000011049 filling Methods 0.000 claims abstract description 37
- 239000000463 material Substances 0.000 claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 10
- 239000010959 steel Substances 0.000 claims abstract description 10
- 238000003756 stirring Methods 0.000 claims abstract description 8
- 238000005086 pumping Methods 0.000 claims description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 7
- 230000002787 reinforcement Effects 0.000 claims description 6
- 230000000903 blocking effect Effects 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 2
- 239000000945 filler Substances 0.000 claims 4
- 238000007711 solidification Methods 0.000 claims 1
- 230000008023 solidification Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract 1
- 239000002023 wood Substances 0.000 abstract 1
- 230000003014 reinforcing effect Effects 0.000 description 4
- 239000004568 cement Substances 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 238000007569 slipcasting Methods 0.000 description 3
- 239000003245 coal Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 230000005494 condensation Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 235000013599 spices Nutrition 0.000 description 1
- 230000002269 spontaneous effect Effects 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/103—Dams, e.g. for ventilation
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The invention relates to an underground roadway plugging method and device. According to the underground roadway plugging method and device, the structure is simple, operation is convenient and safe, the workload of workers can be reduced, and the efficiency of workers can be improved. The underground roadway plugging method and device are characterized in that a frame of a plugging wall is built with steel rods, wood plates and a steel bar net, then filling bags are arranged in the frame, a pump station is arranged within a certain distance of the frame and used for stirring high-water-content materials, the filling bags are filled with filling materials through a pipeline after being well supported, and roadway plugging can be carried out after the filling materials are solidified. The method and the device are simple, effective and beneficial to efficient production of a mine.
Description
Technical field:
The method that the present invention relates to the closure of a kind of underworkings, uses a kind of simple mechanism water blockoff, prevents fires, hinders gas.
Background technology:
At present, coal mine roadway, during driving uses, needs because producing, and some tunnel needs discarded, for avoiding tunnel
The secondary harm brought, such as retention of excessive fluid, Gas Outburst or even spontaneous combustion of coal seam ignition etc., it is necessary to process tunnel.?
Straightforward procedure is by laneway plugging, intercepts one section and utilizes material tunneling boring to block, and isolation tunnel contacts with mine production system.
At present, the closure of underworkings is mainly cement injection closure, and closure framework mainly has two kinds, and one is in laneway plugging position
The upper wall of each block front and back, then closes space cement injection to this, and another kind is to replace building a wall with plank, sets up mould with plank
Son, constitutes and closes space then slip casting.Cement injection closure can block tunnel, but construction technology is complicated, and operability difficulty
Greatly, especially it may happen that plugging during slip casting, cost and the amount of labour are increased.
Summary of the invention:
In order to overcome the deficiency that existing technique can not facilitate workman to construct well and cost is bigger, the present invention provides one
Planting new method, this method can not only make the technique in closure tunnel simply, more can reduce mine production costs.
The technical solution adopted in the present invention is: installing pumping plant away from the tunnel rational position that need to block, facilitate haul and
Equipment is put, and at filling pumping plant stirring high-water material, (height of a kind of rapid condensation coagulates water material, ratio of mud 2:1, and comprcssive strength reaches
9MPa), utilize anchor pole, plank, filling bag to put up filling mould at block-up position simultaneously, pass through after casting resin stirring fully
Pipeline injects filling mould, and block wall is the formation of.
The present invention has the advantage that with good effect: equipment is simple, and labor strength is low, safe, economical, effectively.
Accompanying drawing illustrates:
Fig. 1 is the laneway plugging location drawing.
Fig. 2 is closure framework sectional drawing.
Fig. 3 is filling pumping plant figure.
Fig. 4 is filling pumping plant I-1 profile
Fig. 5 is filling bag accompanying drawing.
Wherein: 1-tunnel, 2-steel rod, 3-plank, 4-bar-mat reinforcement, 5-filling bag, 6-filling pipeline, 7-midge pipeline, 8-
Filling pump, 9-hydraulic fluid tank, 10-first material agitator, 11-second material agitator, 12-stirring pool, 13-blowoff basin, 14-link, 15-note
Slurry mouth.
Detailed description of the invention:
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
In Fig. 1, Fig. 2, building closure framework in laneway plugging position, substitute enclosing wall, the outside composition of closure framework is filled
Fill out barricade before and after bag, be made up of steel rod (2), plank (3), bar-mat reinforcement (4), then filling bag (5) is hung over closing space, fills
Top and the surrounding of filling out bag (5) have the part that can be used for fixing.Closure framework build process is: utilize air drill or other instruments
Play 1-2m deep drilling at closure front-and-back stop wall displacement every 1m, then firm rod (2) is inserted in boring, because of drift section diverse location
Height different, press desired height connection steel rod (2) at diverse location, after connecting, plank (3) tied up at the steel rod (2) put up
On, tie up lastblock every 800mm the most successively, depending on length is because of span length, then bar-mat reinforcement (4) is suspended on plank (3).
Wherein plank (3) uses veneer, width about 25mm, moderate length, conveniently binds;Bar-mat reinforcement (4) is by fine steel rib
Constituting, be commonly called as " reinforcing bar embankment ", use reinforcing rod to connect reinforcing rod by 10 × 20 eyelet weldings, " reinforcing bar embankment " length and width are regarding tunnel needs
Fixed, it is therefore an objective to the space of plank (4) and steel rod (2) to be blocked, in order to filling bag not external drum, prevent obturator in stowing operation from inhaling
Thermal expansion, causes the support of filling bag big, and generation is split up.After barricade is constructed, filling bag is sent into, each angle of filling bag is tied up
Surely arrive predetermined position, with good conditionsi hang up properly filling bag after and air blast inflation in filling bag so that filling bag is heaved to needs
Each corner of filling, improves the utilizing status of filling bag.Closure framying completes, followed by slip casting in filling bag.
In figure 3, during closure framework installs, Fig. 4 filling pumping plant starts spice, and first, second material is respectively with mining
Railway carriage feed, railway carriage stops in orbit, and in figure, filling pump (8) is placed on centre, first, second material be individually placed to first material agitator (10),
Second material agitator (11) stirs, and this equipment is positioned in stirring pool (12), and first, second material is watered the most by a certain percentage, stirs 3-5
Minute, work surface filling bag Zhi Haohou opens pressure-oil tank (9), and due to pressure effect, first, second serosity is respectively by pulp-absorbing pipe (7)
Sucking, the most filled pipeline (6) is transported to work surface, connects one between filling bag pipeline and first, second filling pipeline
Individual blender, makes two kinds of serosity reinject filling bag after being sufficiently mixed.After filling operation completes, with clean water pump and pipeline,
Making full use of the serosity in pipeline, prevent serosity plugging, cleaned water from injecting work surface, remaining water passes through rhone (13)
Being discharged in water channel, mixed serosity solidified about half an hour, within one day, i.e. can reach certain comprcssive strength, within seven days, reached maximum
Comprcssive strength.
Claims (3)
1. underworkings method for blocking and a device, when plugged and abandoned tunnel, utilizes a kind of filler, from adapting to pipeline
The angle of transport features proposes a kind of new method, it is characterised in that: utilize steel rod, plank, bar-mat reinforcement to construct the framework of block wall,
Then being arranged in framework by filling bag, arranging pumping plant stirring high-water material in framework certain distance, bag to be filled props up
Injecting in filling bag by pipeline by filler afterwards, filler solidification can be by laneway plugging.
Underworkings method for blocking the most according to claim 1 and device, it is characterised in that: Gao Shuicai selected by filler
Material, it is simple to transport, filling pumping plant is placed on the correct position in tunnel.
Underworkings method for blocking the most according to claim 1 and device, it is characterised in that: the closure framework of filling bag by
The compositions such as easy steel rod, plank, bar-mat reinforcement, simple and convenient, stable firm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610619209.5A CN106050303A (en) | 2016-07-29 | 2016-07-29 | Underground roadway plugging method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610619209.5A CN106050303A (en) | 2016-07-29 | 2016-07-29 | Underground roadway plugging method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106050303A true CN106050303A (en) | 2016-10-26 |
Family
ID=57196099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610619209.5A Pending CN106050303A (en) | 2016-07-29 | 2016-07-29 | Underground roadway plugging method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106050303A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107387162A (en) * | 2017-06-29 | 2017-11-24 | 山东科技大学 | A kind of tunnel hermatic door, tunnel brattice and preparation method thereof |
CN112065503A (en) * | 2020-08-31 | 2020-12-11 | 西山煤电(集团)有限责任公司 | Mine roadway rapid sealing method |
CN112196610A (en) * | 2020-09-23 | 2021-01-08 | 贵州大学 | Water drilling mining structure for eliminating gas outburst of inclined coal seam and mining method thereof |
CN112627892A (en) * | 2020-12-21 | 2021-04-09 | 中国矿业大学 | Closed wall construction method based on reinforcing mesh and high-water-content material |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4001629A (en) * | 1974-08-26 | 1977-01-04 | Panel Technology, Inc. | Segmented gas discharge display panel |
CN102777208A (en) * | 2012-08-02 | 2012-11-14 | 兖州煤业股份有限公司 | Method for constructing mining impact-resisting sealed wall |
CN103397906A (en) * | 2013-08-05 | 2013-11-20 | 北京科技大学 | Grouting type filling retaining wall, construction method of grouting type filling retaining wall and goaf filling system and method |
CN103711518A (en) * | 2014-01-03 | 2014-04-09 | 山东汇发矿业科技有限公司 | Portable mine filling retaining wall |
CN105736046A (en) * | 2016-02-25 | 2016-07-06 | 北京瑞诺安科新能源技术有限公司 | Coal mine underground sealed wall body and construction method thereof |
-
2016
- 2016-07-29 CN CN201610619209.5A patent/CN106050303A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4001629A (en) * | 1974-08-26 | 1977-01-04 | Panel Technology, Inc. | Segmented gas discharge display panel |
CN102777208A (en) * | 2012-08-02 | 2012-11-14 | 兖州煤业股份有限公司 | Method for constructing mining impact-resisting sealed wall |
CN103397906A (en) * | 2013-08-05 | 2013-11-20 | 北京科技大学 | Grouting type filling retaining wall, construction method of grouting type filling retaining wall and goaf filling system and method |
CN103711518A (en) * | 2014-01-03 | 2014-04-09 | 山东汇发矿业科技有限公司 | Portable mine filling retaining wall |
CN105736046A (en) * | 2016-02-25 | 2016-07-06 | 北京瑞诺安科新能源技术有限公司 | Coal mine underground sealed wall body and construction method thereof |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107387162A (en) * | 2017-06-29 | 2017-11-24 | 山东科技大学 | A kind of tunnel hermatic door, tunnel brattice and preparation method thereof |
CN107387162B (en) * | 2017-06-29 | 2020-02-18 | 山东科技大学 | Roadway sealing door, roadway air wall and manufacturing method thereof |
CN112065503A (en) * | 2020-08-31 | 2020-12-11 | 西山煤电(集团)有限责任公司 | Mine roadway rapid sealing method |
CN112196610A (en) * | 2020-09-23 | 2021-01-08 | 贵州大学 | Water drilling mining structure for eliminating gas outburst of inclined coal seam and mining method thereof |
CN112627892A (en) * | 2020-12-21 | 2021-04-09 | 中国矿业大学 | Closed wall construction method based on reinforcing mesh and high-water-content material |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967992B (en) | Different-strength bearing roadside filler for pillar-free mining of thin coal bed | |
JP7257086B2 (en) | Comprehensive Construction Method for Low Overburden Sections of Tunnels | |
CN106050303A (en) | Underground roadway plugging method and device | |
CN106837418B (en) | Mining explosion-proof trapezoidal sealing wall and construction method thereof | |
CN101858215B (en) | Road retained method for extrusion molding of waste rock | |
CN108999188A (en) | Crushing device, restructuring bankrupt and the application of cast-in-situ bored pile pile crown | |
CN206495682U (en) | A kind of stand quickly handled for Tunnel Landslide | |
CN101949301A (en) | Different-strength bearing roadway-beside filling body of gob-side entry under coal mine | |
CN104653198B (en) | Method for filling and constructing foam concrete in coal mine soft rock largely-deformed roadway supporter | |
CN110761797B (en) | Construction method for shield air-pushing through mine tunnel | |
CN106089252B (en) | Grouting reinforcement method for inhomogeneous loose bodies | |
CN102852551A (en) | Gob-side entry retaining method using high-water material filling columns | |
CN203756230U (en) | Mold bag type sealed retaining wall capable of being quickly formed | |
CN107448234A (en) | A kind of colliery pours closed wall construction method | |
CN207620844U (en) | A kind of mine high-water material filling unit | |
CN101439950A (en) | Flexible coal powder foam concrete and preparation thereof | |
CN110578532A (en) | Gob-side entry retaining arrangement method | |
CN207620842U (en) | A kind of mine high-water material filling bag fixed frame | |
CN113756868A (en) | Geotechnical engineering underground side wall construction method | |
CN105937400B (en) | It is a kind of once to tunnel Liu Sheshuan lanes digging operation production line | |
CN112196617A (en) | Simple combined filling retaining wall construction method | |
CN110863856A (en) | Road-entering type cemented filling plugging wall and construction method thereof | |
CN104594369B (en) | Karst region high-pressure group hole replacement grouting method and structure thereof | |
CN113803092B (en) | Supporting device and method for broken soft rock roadway based on steel pipe concrete support | |
CN110056372A (en) | Concrete pouring method in lining construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161026 |
|
WD01 | Invention patent application deemed withdrawn after publication |