CN106049806A - Laminar structure for fast spreading and laying ground tiles - Google Patents

Laminar structure for fast spreading and laying ground tiles Download PDF

Info

Publication number
CN106049806A
CN106049806A CN201610516728.9A CN201610516728A CN106049806A CN 106049806 A CN106049806 A CN 106049806A CN 201610516728 A CN201610516728 A CN 201610516728A CN 106049806 A CN106049806 A CN 106049806A
Authority
CN
China
Prior art keywords
paves
brick
ceramic tile
groove
quickly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610516728.9A
Other languages
Chinese (zh)
Inventor
崔松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHAOJIA BUILDING MATERIALS TECHNOLOGY CO LTD
Original Assignee
JIANGSU ZHAOJIA BUILDING MATERIALS TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHAOJIA BUILDING MATERIALS TECHNOLOGY CO LTD filed Critical JIANGSU ZHAOJIA BUILDING MATERIALS TECHNOLOGY CO LTD
Priority to CN201610516728.9A priority Critical patent/CN106049806A/en
Publication of CN106049806A publication Critical patent/CN106049806A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/0215Flooring or floor layers composed of a number of similar elements specially adapted for being adhesively fixed to an underlayer; Fastening means therefor; Fixing by means of plastics materials hardening after application
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/08Flooring or floor layers composed of a number of similar elements only of stone or stone-like material, e.g. ceramics, concrete; of glass or with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass
    • E04F15/082Flooring or floor layers composed of a number of similar elements only of stone or stone-like material, e.g. ceramics, concrete; of glass or with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass with a top layer of stone or stone-like material, e.g. ceramics, concrete or glass in combination with a lower layer of other material

Abstract

The invention relates to a laminar structure for fast spreading and laying ground tiles. The structure comprises a leveling layer (4), wherein a self-leveling mortar fixing layer (3) is arranged on the leveling layer (4); a spreading brick (2) is fixed in the fixing layer (3); the top end of the spreading brick (2) is provided with a groove (21); a vertical wall (23) is formed on the periphery of the groove (21); a tile (1) is put on the vertical wall (22); and the groove (21) is filled with bonding agents. The structure has the advantages that the fast spreading and laying of the ground tiles can be realized; and the labor investment can be greatly reduced.

Description

A kind of floor ceramic tile quickly paves layer structure
Technical field
The present invention relates to a kind of quick lying device of floor ceramic tile, be specifically related to one and realize bottom surface ceramic tile and quickly pave, Reduce the brick that quickly paves of ceramic tile pavement technique difficulty.
Background technology
The paving process of present stage floor tile is the most loaded down with trivial details, and workload is big:
Should check before construction whether basic unit's performance meets design and code requirement, basic unit is the most smooth, if any injustice Whole should carrying carries out picking chisel and repairing treatment the previous day, performs handing-over inspection formality with upper one procedure;Check the specification of floor tile Whether meet the modulo relationship between design and on-the-spot actual size;(winter temperature is low to check the most beneficially construction of construction surface temperature Construction should be stopped) in 0 DEG C time;It is familiar with drawing and field condition.
Selecting brick by acceptance of materials standard, typically select 3~4 kind of specification by differential 1MM classification, all size is required to Founder Straight, corner is intact, and color pattern is consistent, and flawless, surfacing are without convex-concave and warped.(floor tile is the most soaked before construction It is as the criterion with producer's explanation of dispatching from the factory)
Checking that basic unit is the most smooth, wall, post and ground join whether hole, pipeline, privileged sites (stair, elevator Mouth, staircase, stretch seam contracting seam etc.) whether by drawing construction, if reach construction requirement, as ungratified in requirements above has, Should carry out picking chisel or repairing, make up to construction requirement.
The basic unit cleaned out cleans up, and pays special attention to the cleaning hour to the privileged sites in " 5-3 to be put ", clearly To basic unit's watering maintenance 24 hours after sweeping.
Construction control line is put according to drawing and the various datum lines (must check in advance) performed, (special at main portions Position and have different pattern, material, material junction) eject mutually perpendicular ten word control lines, in order to control and to check position And construction quality.Should be checked the various control lines that bullet is good note down, the control line through checking should be protected by, and is allowed to Effectively use.
Absolute altitude floating screed according to drawing requirement, spacing is as the criterion with no more than 1.5M, and the floating screed at different level should be to control Line is as the criterion.Use 1:2 or 1:2.5 cement mortar floating screed, and draw the most logical line meets the requirements to check.
Uniform pulp sweeping (ratio of mud 0.5 plain-water slurry) in the basic unit cleaned out.
Tack coat is made, it is desirable to strike off with bar, ferrum with in 1:2 or 1:2.5 dry cement mortar basic unit after having swept slurry Trowel makes real, and makes mortar bond closely knit with basic unit.
Floor tile should be placed directly on tack coat by the requirement of real paving, uses rubber hammer jolt ramming by floor tile examination paving before real paving.One side Face ensures that floor tile is smooth, and gap is straight, and on the other hand bonding lamination calamity, needs stop-off to starch as unreal, crosses shovel at most and falls unnecessary mortar.
The brick back side is smeared element cement and adds 107 glue (in right amount) binder course, it is desirable to thickness 10MM~15MM, smear uniformly.
In real paving, apply rubber hammer jolt ramming, the most uniformly, with anti-tamper floor tile, check flatness with horizon rule, with logical Cross the smoothness checking brickwork joint, it is desirable to surfacing, solid colour, brickwork joint, cross crotch smoothness, seam height is the most smooth, bonding Closely knit firm without hollowing, reach finished surface absolute altitude and design requirement.
Finished surface must be cleaned out after laying by the same day, and is cleaned up by the foreign material in brickwork joint, after 48 hours Watering maintenance (watering number of times is no less than 2 times) more than 24 hours.
Brickwork joint is processed after maintenance.Design requires that brickwork joint is more than 3MM, the method using jointing, and material is white cement: Fine sand=1:1;Brickwork joint has special color requirement, allocates suitable toner with white cement and hooks/wipe seam.Require brickwork joint color, the depth Unanimously.
At the reserving hole of ground, floor tile perforate should clear and coherent attractive in appearance be completely embedded.
Meeting the privileged sites such as expansion joint, subsiding crack, application 1:2 or 1:2.5 cement mortar adds 107 glue and makees tack coat, table Playing Mah-Jong face in face, remaining practice is with " five ", and notably both sides stay the modulus of brick identical.
Wall, post and junction, ground typically should use wall, cylinder to press the ground practice, to ensure to be completely embedded.
The existing floor ceramic tile voucher needing technical professional could realize ceramic tile that paves paves.Pave middle workman Need to stir paste inductile paved ceramic tile.Paving process needs the most careful docking ceramic tile and keeps ceramic tile water Flat.Difficulty of construction is big, and workload is the biggest.Because the stirring of inductile mortar needs to consume substantial amounts of manpower, and needs Rapid construction, because the moisture of inductile mortar evaporates the reduction of the plasticity to mortar clearly, needs constantly stirring fast Speed paves, and quickly splices ceramic tile, and especially in summer, temperature is high, and moisture evaporation is fast, and difficulty of construction is bigger.
Summary of the invention
It is an object of the invention to provide a kind of bottom surface ceramic tile that can reduce difficulty of construction and workload quickly to pave knot Structure.
To achieve these goals, the present invention includes a screed-coat, and this screed-coat has a gravity flowing levelling mortar fixed layer, The fixing brick that paves in fixed layer, there is a groove on this brick top that paves, and the surrounding of groove is wall, and wall is placed ceramic tile, groove Middle filling adhesive.
At screed-coat after-pouring gravity flowing levelling mortar after levelling, then smooth for the brick that paves is piled up on screed-coat.Pave Brick ensure that the stability and necessary bearing strength that ceramic tile paves, and the brick that paves can be concrete brick or clay brick.Pave brick Being standard component, can realize quickly paving, gravity flowing levelling mortar does not interferes with energy after the flatness of the brick that paves, and gravity flowing levelling mortar hardening Enough fixing bricks that paves, accomplish fluently firm basis to the ceramic tile that paves.During the two, the stirring of mortar is for from disposably making With, the overall seriality for rapid construction and guarantee material is highly beneficial.Substantial amounts of manpower can be saved.After the brick that paves is fixing Injecting binding agent in groove, under tension force effect, binding agent can form a convex surface, now directly by ceramic tile on the top of groove Being placed on the wall of the brick that paves, after waiting binding agent hardening, ceramic tile has i.e. paved.Whole work progress is not required to long The training of time, the requirement to construction technology is the lowest, artificial less investment, and construction technology is simple, takes few.
Further, pave described on brick wall with horizontal groove or through hole.Groove or through hole are capable of binding agent Pour on a large scale, it is possible to improve efficiency of construction further.
Preferably, described binding agent is gravity flowing levelling mortar.Gravity flowing levelling mortar is good by property, and caking property is strong, low cost, construction Simply.
Further, the Corner Strapped of bottom surface of brick of paving described in has four base angles.With base angle so that the brick that paves is with solid Given layer cementing more firm.
Further, described base angle is hollow-core construction, and there is a upwardly extending blind hole bottom surface.With blind hole fixed layer from Levelling mortar can enter blind hole, improves cementing strength further.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention.
Fig. 2 is the brick top view that paves.
Fig. 3 base angle upward view.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is described in detail.
As it can be seen, the present invention includes, a screed-coat 4, this screed-coat 4 has a gravity flowing levelling mortar fixed layer 3, fixing The fixing brick 2 that paves in layer 3, there is a groove 21 on this brick 2 top that paves, and the surrounding of groove 21 is wall 23, and wall 22 is placed porcelain Brick 1, filling adhesive in groove 21.
With horizontal groove or through hole 22 on described brick 2 wall that paves.
Described binding agent is gravity flowing levelling mortar.
The Corner Strapped of the bottom surface of the described brick 2 that paves has four base angles 24.
Described base angle 24 is hollow-core construction, and there is a upwardly extending blind hole bottom surface.
At screed-coat after-pouring gravity flowing levelling mortar after levelling, then smooth for the brick that paves is piled up on screed-coat.Pave Brick ensure that the stability and necessary bearing strength that ceramic tile paves, and the brick that paves can be concrete brick or clay brick.Pave brick Being standard component, can realize quickly paving, gravity flowing levelling mortar does not interferes with energy after the flatness of the brick that paves, and gravity flowing levelling mortar hardening Enough fixing bricks that paves, accomplish fluently firm basis to the ceramic tile that paves.During the two, the stirring of mortar is for from disposably making With, the overall seriality for rapid construction and guarantee material is highly beneficial.Substantial amounts of manpower can be saved.After the brick that paves is fixing Injecting binding agent in groove, under tension force effect, binding agent can form a convex surface, now directly by ceramic tile on the top of groove Being placed on the wall of the brick that paves, after waiting binding agent hardening, ceramic tile has i.e. paved.Whole work progress is not required to long The training of time, the requirement to construction technology is the lowest, artificial less investment, and construction technology is simple, takes few.

Claims (5)

1. floor ceramic tile quickly paves a layer structure, and including a screed-coat (4), this screed-coat has a Self-leveling on (4) Mortar fixed layer (3), the fixing brick (2) that paves in fixed layer (3), there is a groove (21) on this brick that paves (2) top, groove (21) Surrounding is wall (23), and wall (22) is placed ceramic tile (1), filling adhesive in groove (21).
Floor ceramic tile the most according to claim 1 quickly paves layer structure, it is characterised in that described in the brick (2) that paves stand With horizontal groove or through hole (22) on wall.
Floor ceramic tile the most according to claim 1 and 2 quickly paves layer structure, it is characterised in that described binding agent is Gravity flowing levelling mortar.
Floor ceramic tile the most according to claim 3 quickly paves layer structure, it is characterised in that described in pave brick (2) The Corner Strapped of bottom surface has four base angles (24).
Floor ceramic tile the most according to claim 4 quickly paves layer structure, it is characterised in that described base angle (24) are empty Core structure, there is a upwardly extending blind hole bottom surface.
CN201610516728.9A 2016-07-01 2016-07-01 Laminar structure for fast spreading and laying ground tiles Pending CN106049806A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610516728.9A CN106049806A (en) 2016-07-01 2016-07-01 Laminar structure for fast spreading and laying ground tiles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610516728.9A CN106049806A (en) 2016-07-01 2016-07-01 Laminar structure for fast spreading and laying ground tiles

Publications (1)

Publication Number Publication Date
CN106049806A true CN106049806A (en) 2016-10-26

Family

ID=57201894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610516728.9A Pending CN106049806A (en) 2016-07-01 2016-07-01 Laminar structure for fast spreading and laying ground tiles

Country Status (1)

Country Link
CN (1) CN106049806A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006169810A (en) * 2004-12-15 2006-06-29 Kaneka Corp Floor structure of building, and its construction method
CN2804248Y (en) * 2005-06-23 2006-08-09 北京克诺森华地板有限公司 Floor structure with aluminum alloy luminous tunner
JP2010106470A (en) * 2008-10-28 2010-05-13 Panasonic Electric Works Co Ltd Floor panel system
US20110146200A1 (en) * 2009-12-17 2011-06-23 Dang Tuan N Tile leveling process and apparatus
CN201972361U (en) * 2010-12-29 2011-09-14 梁勇乾 Wood and ceramic composite floor tile
CN102251649A (en) * 2010-05-17 2011-11-23 王广武 Wood board and wood plastic combined board
CN202899562U (en) * 2012-07-30 2013-04-24 苏州苏明装饰股份有限公司 Paving structure of thin-type floor decorative materials
CN203008328U (en) * 2013-01-21 2013-06-19 王安全 Floor installation structure
CN203113714U (en) * 2012-12-24 2013-08-07 广东塔牌集团股份有限公司惠州龙门分公司 Cement floor split block
CN204626865U (en) * 2015-05-22 2015-09-09 傅少青 A kind of novel compound ceramics

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006169810A (en) * 2004-12-15 2006-06-29 Kaneka Corp Floor structure of building, and its construction method
CN2804248Y (en) * 2005-06-23 2006-08-09 北京克诺森华地板有限公司 Floor structure with aluminum alloy luminous tunner
JP2010106470A (en) * 2008-10-28 2010-05-13 Panasonic Electric Works Co Ltd Floor panel system
US20110146200A1 (en) * 2009-12-17 2011-06-23 Dang Tuan N Tile leveling process and apparatus
CN102251649A (en) * 2010-05-17 2011-11-23 王广武 Wood board and wood plastic combined board
CN201972361U (en) * 2010-12-29 2011-09-14 梁勇乾 Wood and ceramic composite floor tile
CN202899562U (en) * 2012-07-30 2013-04-24 苏州苏明装饰股份有限公司 Paving structure of thin-type floor decorative materials
CN203113714U (en) * 2012-12-24 2013-08-07 广东塔牌集团股份有限公司惠州龙门分公司 Cement floor split block
CN203008328U (en) * 2013-01-21 2013-06-19 王安全 Floor installation structure
CN204626865U (en) * 2015-05-22 2015-09-09 傅少青 A kind of novel compound ceramics

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
鄢朝勇,许孝春,杜红伟主编: "《土木工程材料 高等院校"十二五"(精品)规划教材》", 31 July 2014, 中国建材工业出版社 *

Similar Documents

Publication Publication Date Title
CN109838065B (en) Floor tile ground paving construction method
CN106381980B (en) A kind of ground tile paving technique
US20140000214A1 (en) Decorative aggregate concrete surface preparation process
US9909322B1 (en) System and method for installing tile
CN108625252A (en) Urban road laying construction method
US20060251862A1 (en) Composite shaped block
CN112282294A (en) Construction method of steel fiber wear-resistant terrace
KR101030221B1 (en) Method for manufacturing composite block composed of natural stone plate and cement mortar block integrally fixed to underside of the natural stone plate and composite block made by the method
CN104831926B (en) A kind of tenon joint type bulk surface layer flooring method for paving
US20200130258A1 (en) Method and device for producing a paving area
CN106013703A (en) Quick paving structure of ground tile
KR101134498B1 (en) Construction method of eco-friendly flooring of parking garage
CN108486978A (en) The wing square stone material of the good severe cold area large area of effect is mated formation prevention and cure of crack method
CN106186942A (en) A kind of self-compacting mortar and grout construction method thereof
JP2009518564A (en) Concrete floor equipment
CN205330078U (en) Ground composite decoration board's structure of mating formation
CN111255191A (en) Semi-pre-pasted ceramic tile and paving method thereof
CN111962348A (en) Concrete floor construction process
CN206144090U (en) Ground tile structure that paves fast
CN206144095U (en) Ground tile structure of mating formation fast
CN106049806A (en) Laminar structure for fast spreading and laying ground tiles
CN214169786U (en) Terrazzo floor used in shopping center
CN115749193A (en) Flatness and anti-cracking control construction method for super-large-area terrace
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
CN106013719A (en) Quick paving structure of ground tile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026