CN106049666A CN201610636485.2A CN201610636485A CN106049666A CN 106049666 A CN106049666 A CN 106049666A CN 201610636485 A CN201610636485 A CN 201610636485A CN 106049666 A CN106049666 A CN 106049666A
Authority
CN
China
Prior art keywords
grouting
assembled
assembled architecture
slurry
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610636485.2A
Other languages
Chinese (zh)
Inventor
郭洪
鲁斌
张胜利
张新羽
马冲
范再新
叶都
江国祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING URBAN CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
BEIJING URBAN CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING URBAN CONSTRUCTION ENGINEERING Co Ltd filed Critical BEIJING URBAN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201610636485.2A priority Critical patent/CN106049666A/en
Publication of CN106049666A publication Critical patent/CN106049666A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/043Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/383Connection of concrete parts using adhesive materials, e.g. mortar or glue
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/26Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
    • E04C2/284Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
    • E04C2/288Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material
    • E04C2/2885Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material with the insulating material being completely surrounded by, or embedded in, a stone-like material, e.g. the insulating material being discontinuous

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to the field of building construction, in particular to a prefabricated assembled concrete structure and a construction method thereof. The prefabricated assembled concrete structure comprises assembled building components and a body structure, and further comprises bed-mortar and mortar cabin separating strips and grouting cavities. The bed-mortar and mortar cabin separating strips are located between the assembled building components and horizontally arranged; the grouting cavities are cavity portions defined by the bed-mortar and mortar cabin separating strips and the assembled building components, and the assembled building components are provided with grouting holes communicated with the grouting cavities. The construction method includes the steps of 1, installing the assembled building components; 2, preparing grouting mortar; 3, defoaming the mortar; 4, manufacturing low-pressure grouting test pieces; 5, carrying out grouting, and meanwhile shooting a video or a picture; 6, filling in a construction record, and carrying out supervisor signing; 7, sorting data. According to the prefabricated assembled concrete structure and the construction method, the technologies of all stages of the grouting construction process of the assembled building components are strictly controlled, key factors affecting grouting quality are eliminated, and the grouting construction quality is guaranteed to the maximum degree.

Description

A kind of prefabricated assembled concrete structure and construction method thereof
Technical field
The present invention relates to the realm of building construction, be specially a kind of assembled architecture PC structure and construction method thereof.
Background technology
This project is the first batch of engineering that fabricated construction construction technology applies to security housing project, and this engineering is a large amount of Use precast concrete sandwich heat preservation wallboard (vertical supporting member), balcony handrail plate (nonload bearing element), the anti-fire screen of staircase Wall (nonload bearing element) three major types component, and these components are in the milk, grouting amount has reached 63 tons.
At present, grouting technique is not the most very skilled, and in addition, the quality testing after grouting does not also have effective method And instrument and equipment.So, in order to ensure the grouting construction quality of engineering, the quality monitoring to whole filling process is very requirement 's.
At present, owing to control and the detection method of prefabricated assembled concrete structure mortar depositing construction quality do not determine, and And for grouting construction neither one effectively, working procedure easily, add grouting material when outside air temperature is less than 5 DEG C the most not Can carry out grouting construction, filled the temperature at post-grouting position of slurry in 48h must not less than 10 DEG C etc. various execution conditions Limiting, complete grouting construction is the problem that construction needs to solve at present high-quality and high-efficiency.
Summary of the invention
The present invention is directed to problem present in existing construction, it is proposed that prefabricated assembled concrete structure and strictly regulating Working procedure, strictly monitors work progress, ensure that the quality of grouting construction well.
Concrete solution is: a kind of prefabricated assembled concrete structure, including assembled architecture component and agent structure, Also include seat slurry mortar point storehouse bar and grouting chamber, seat slurry mortar divide storehouse bar between assembled architecture component, along assembled The width of building element be horizontally disposed with and along assembled architecture component length direction parallel interval be distributed;Grouting chamber The re-entrant portion surrounded for seat slurry mortar point storehouse bar and assembled architecture component, assembled architecture component offers connection grouting The grout hole in chamber.
Described assembled architecture component is precast concrete sandwich heat preservation wallboard, balcony handrail plate or the anti-fire screen of staircase Wall.
Described precast concrete sandwich heat preservation wallboard includes that load-bearing concrete layer, heat-insulation layer and non-bearing are prefabricated successively Concrete layer, wherein precast concrete sandwich heat preservation wallboard thickness is 300~350mm, and load-bearing precast concrete layer thickness is 180 ~220mm, insulation layer thickness is 50~100mm, and non-bearing precast concrete layer thickness is 30~80mm.
Described seat slurry mortar point storehouse bar is arranged on Fen Cang position, its a height of 20~40mm, a width of 10~30mm, a length of 150~250mm, the gap between assembled architecture component is divided into chamber of being in the milk one by one;Described grouting chamber is divided into pure bin to note Slurry and grout sleeve are in the milk.
A kind of construction method of prefabricated assembled concrete structure, described construction method is:
(1) assembled architecture component is installed: on-the-spot slip casting position divides storehouse complete, and assembled architecture lifting component completes, seam crossing Filleting is complete, forms airtight bin, chamber of being i.e. in the milk;Get out relevant device, whether check in grouting chamber whether spillage and cavity Moistening.
(2) preparation grouting slurry: by design proportioning preparation grouting material, be initially charged the water of 80% during the mix of grouting material, Add the water of residue 20% after stirring, stir.
(3) slurry froth breaking: slurry stands 2 minutes, eliminates the bubble within grouting material, prepares in being subsequently poured into low pressure vessel Grouting.
(4) assembled architecture component low pressure grouting material test specimen is made: grouting material needs indwelling test cube in the same condition, Mei Donglou, every Layer, often construction one group of test block of flowing water section indwelling, the test block witness sampling that assembled architecture component low pressure is in the milk by management, and retain Image data.
(5) it is in the milk: same layer assembled architecture component grouting chamber number plate, grout sleeve, the bin that divided are entered Row grouting;First inject at grout hole, treat that grouting material is emerged from spout hole and continues several seconds, represent that prefabricated components have been in the milk Full, utilize rubber stopper to block tight by grout hole and spout hole after filling;In this step implementation process, grouting material is at outside air temperature Can not carry out grouting construction during less than 5 DEG C, the ambient temperature at the post-grouting position of grouting must not be less than 10 DEG C in 48h, to filling Slurry position carries out the side reporting of overall process, and the moment pays close attention to the change of outside air temperature, when outside air temperature is less than 10 DEG C, and position of being in the milk Insulation is taked in 48h.Grouting overall process video to be shot or photo.
In step (1), PE bar is pasted in the outside of adjacent assembled architecture panels seam, and present slurry mortar point storehouse bar does not has Placing assembled architecture component before initial set, now the reinforcing bar of lower floor's assembled architecture component is inserted into upper strata assembled architecture structure In the steel bushing of part, steel bushing forms entirety with grouting chamber, forms cavity with seat slurry mortar filleting.
After step (5), also include that (6) fill in assembled architecture component low pressure grouting construction record management signature; (7) array data.
In described step (4) implementation process, often group 3 pieces of test specimens of test block, test block specification is 40 × 40 × 160mm;Grouting Operation often completes 500 concrete-steel sleeve grouting jointings and does one group of test specimen, often group 3 joints of test specimen, needs during test specimen indwelling Dispenser operates grouting, and has carried out the foster maintenance of mark in 28 days.
Grouting before tissue management, unit in charge of construction Quality Inspector to grouting region carry out an acceptance inspection, check and accept by after can carry out under Procedure.
Within being in the milk latter 12 hours, component and grouting jointing must not vibrated and impacts;
Cleaning blender, agitator, grouting cylinder after grouting immediately, grouting cylinder need to clean once after often having irrigated one, Can reuse after cleaning.
Beneficial effect: devise low-pressure grouting technique in the present invention, utilizes seat slurry mortar point storehouse bar to be divided into slip casting position Each bin carries out a point storehouse slip casting, and the bin that bigger is divided into a limited number of little bin by point storehouse, and such workman just may be used Quickly to have noted a little bin, so complete one piece of precast concrete the slip casting of grouting chamber;One grouting chamber is big About between 2.5m~5.0, being divided into several little bins grouting works for grouting workman and be easier to operate to, quality is more held Easy to control;It control effectively additionally, this form of construction work also helps the technique to each stage during grouting construction, Eliminate the effects of the act the key factor of grouting quality, it is possible to ensure the construction quality of grouting to greatest extent.
Accompanying drawing explanation
Fig. 1 is grouting construction process flow chart;
Fig. 2 is prefabricated assembled concrete structure partial plane graph;
Fig. 3 is prefabricated assembled concrete structure vertical 1-1 profile;
Fig. 4 is prefabricated assembled concrete structure vertical 2-2 profile;
In figure, 1-precast concrete sandwich heat preservation wallboard;2-seat slurry mortar divides storehouse bar;3-agent structure;4-cast-in-place concrete is tied Structure.
Detailed description of the invention
This project is the engineering of security housing project, a large amount of employing PC plate, balcony handrail plate, newel wall three major types structures Part, and these components are in the milk.The grouting pressure that the slip casting of this engineering uses is 0.2 MPa, arranges at low pressure air compressor In the range of atmospheric pressure, and the type of the air compressor that we use belongs to low pressure air compressor.
As depicted in figs. 1 and 2, this prefabricated assembled concrete structure, including precast concrete sandwich heat preservation wallboard 1 He Floor, also include seat slurry mortar point storehouse bar 2 and grouting chamber, seat slurry mortar divide storehouse bar 2 between assembled architecture component, along The width of assembled architecture component be horizontally disposed with and along assembled architecture component length direction parallel interval be distributed;; The re-entrant portion that grouting chamber is seat slurry mortar point storehouse bar 2 and assembled architecture component surrounds, is divided into pure bin slip casting and grouting set Cylinder grouting, grout sleeve usually communicates with the bin divided, and having the bin top at some positions is not have grout sleeve , so being called pure bin, assembled architecture component offers the grout hole in connection grouting chamber.
Precast concrete sandwich heat preservation wallboard 1 includes that load-bearing concrete layer, heat-insulation layer and non-bearing are prefabricated mixed successively Solidifying soil layer, wherein precast concrete sandwich heat preservation wallboard thickness is 320mm, and load-bearing precast concrete layer thickness is 200mm, insulation Layer thickness is 70mm, and non-bearing precast concrete layer thickness is 50mm.
Described seat slurry mortar point storehouse bar 2 is arranged on Fen Cang position, its a height of 30mm, a width of 20mm, a length of 200mm, edge The width of wall is arranged, and the gap between assembled architecture component is divided into chamber of being in the milk one by one.
When precast concrete sandwich heat preservation wallboard is installed, can be formed between precast concrete sandwich heat preservation wallboard and floor The gap of width about 20mm, cry again grouting chamber.PE bar, PE bar are pasted in the outside placing precast concrete sandwich heat preservation position of wallboards Size: 30mm is thick, 70mm width, and Fen Cang position is placed the seat slurry mortar of high 30mm, wide 20mm, long 200mm that seat slurry is made and divided Storehouse bar, present slurry mortar point storehouse bar places precast concrete sandwich heat preservation wallboard before not having initial set.Now lower floor's concrete The reinforcing bar of soil sandwich heat preservation wallboard is inserted in the steel bushing of upper strata precast concrete sandwich heat preservation wallboard, steel bushing and grouting chamber Forming entirety, with sitting slurry, 20mm stitches filleting, closure forms cavity, then needs grouting chamber is carried out grouting construction.
Preparation grouting material, the ratio of mud (water and the ratio of dry-mixed mortar) of grouting material is 0.12:1, the mix process of grouting material In be initially charged 80% water, add after stirring residue 20% water, stir, stand 2 minutes, elimination grouting material inside Bubble, be subsequently poured in low pressure vessel and prepare grouting.
Grouting first should be injected according to grouting point storehouse situation at grout hole, treats that grouting material is emerged from spout hole and continues Several seconds, represent that the grouting such as precast concrete sandwich heat preservation wallboard, balcony handrail plate, staircase fire partition are the fullest.Prefabricated mixed The grout sleeve grouting of solidifying soil sandwich heat preservation wallboard etc., bottom grout sleeve, grout hole is implanted sequentially, and treats the top of its correspondence Spout hole emerge grouting material time and continue several seconds, represent in steel bushing and fill, utilize rubber stopper by grout hole after filling and Spout hole closure is tight.
Under preference temperature, use the technology of low-pressure grouting, grouting steel bushing, the bin that divide are in the milk: be in the milk Expect outside air temperature less than 5 DEG C time cannot carry out grouting construction, the ambient temperature at the post-grouting position of grouting in 48h not Must be less than 10 DEG C, therefore we carry out the side reporting of overall process to grouting position, and the moment pays close attention to the change of outside air temperature.Outdoor Not carrying out cementing operations when temperature is less than 5 DEG C, when outside air temperature is less than 10 DEG C, Insulation is taked at grouting position in 48h.Fill Within having starched latter 12 hours, component and steel bushing grouting jointing must not vibrated and impacts.
The utensils such as blender, agitator, grouting cylinder are cleaned immediately after grouting, in order to avoid grouting material solidification, cleaning difficulty. Notice that grouting cylinder need to clean once after often having irrigated one, can reuse after cleaning.So being in the milk in each teams and groups Must at least prepare two grouting pressure tanks during operation, one of them is standby.
During grouting construction, test cube in the same condition and test specimen need to be made.Grouting material needs indwelling test cube in the same condition, Mei Donglou, Every layer, often construction one group of test block of flowing water section indwelling, often group 3 pieces, test block specification is 40 × 40 × 160mm;Grouting operation often completes 500 concrete-steel sleeve grouting jointings do one group of test specimen, often group 3 joints of test specimen, during test specimen indwelling, and need to be on dispenser Operate grouting, and carry out the foster maintenance of mark in 28 days.
Management, unit in charge of construction Quality Inspector should be organized before the grouting constructions such as precast concrete sandwich heat preservation wallboard to grouting region Carry out an acceptance inspection, check and accept by after can carry out next procedure.
This technology can ensure the construction quality of grouting to greatest extent.

Claims (10)

1. a prefabricated assembled concrete structure, including assembled architecture component and agent structure, is characterized in that, also includes seat Slurry mortar divides storehouse bar (2) and grouting chamber, seat slurry mortar to divide storehouse bar (2) between assembled architecture component, build along assembled Build the width of component be horizontally disposed with and be distributed along the length direction parallel interval of assembled architecture component;Grouting chamber is The re-entrant portion that seat slurry mortar point storehouse bar (2) and assembled architecture component surround, assembled architecture component offers connection and fills The grout hole in slurry chamber.
Prefabricated assembled concrete structure the most according to claim 1, is characterized in that, described assembled architecture component is pre- Concrete sandwich heat-insulation wall plate (1) processed, balcony handrail plate or staircase fire partition.
Prefabricated assembled concrete structure the most according to claim 2, is characterized in that, described precast concrete sandwich heat preservation Wallboard (1) includes load-bearing concrete layer, heat-insulation layer and non-bearing concrete layer successively, and wherein precast concrete is sandwich Heat-insulation wall plate thickness is 300~350mm, and load-bearing precast concrete layer thickness is 180~220mm, insulation layer thickness be 50~ 100mm, non-bearing precast concrete layer thickness is 30~80mm.
4. according to the prefabricated assembled concrete structure described in claims 1 to 3 any one, it is characterized in that, described seat slurry Mortar point storehouse bar (2) is arranged on Fen Cang position, its a height of 20~40mm, a width of 10~30mm, a length of 150~250mm, will assembling Gap between formula building element is divided into chamber of being in the milk one by one;Described grouting chamber is divided into pure bin slip casting and grout sleeve slip casting.
5. a construction method for prefabricated assembled concrete structure, is characterized in that, described construction method is:
(1) assembled architecture component is installed: on-the-spot slip casting position divides storehouse complete, and assembled architecture lifting component completes, seam crossing Filleting is complete, forms airtight bin, chamber of being i.e. in the milk;Get out relevant device, whether check in grouting chamber whether spillage and cavity Moistening;
(2) preparation grouting slurry: by design proportioning preparation grouting material, be initially charged the water of 80% during the mix of grouting material, stirring Add the water of residue 20% after Jun Yun, stir;
(3) slurry froth breaking: slurry stands 2 minutes, eliminates the bubble within grouting material, prepares to fill in being subsequently poured into low pressure vessel Slurry;
(4) make assembled architecture component low pressure grouting material test specimen: grouting material needs indwelling test cube in the same condition, Mei Donglou, every layer, every Construction one group of test block of flowing water section indwelling, the test block witness sampling that assembled architecture component low pressure is in the milk by management, and retain image Data;
(5) it is in the milk: same layer assembled architecture component grouting chamber number plate, grout sleeve, the bin that divided are filled Slurry;First inject at grout hole, treat that grouting material is emerged from spout hole and continues several seconds, represent that prefabricated components grouting is the fullest, Rubber stopper is utilized to block tight by grout hole and spout hole after filling;In this step implementation process, grouting material is low at outside air temperature Can not carry out grouting construction in 5 DEG C time, the ambient temperature at the post-grouting position having filled slurry must not be less than 10 DEG C in 48h, to note Slurry position carries out the side reporting of overall process, and the moment pays close attention to the change of outside air temperature, when outside air temperature is less than 10 DEG C, and position of being in the milk Insulation is taked in 48h;
Grouting overall process video to be shot or photo.
Construction method the most according to claim 5, is characterized in that, in step (1), adjacent assembled architecture panels stitches Outside paste PE bar, present slurry mortar point storehouse bar places assembled architecture component, now lower floor's assembled before not having initial set The reinforcing bar of building element is inserted in the steel bushing of upper strata assembled architecture component, and steel bushing connects with grouting chamber, starches sand with seat Slurry filleting forms cavity.
Construction method the most according to claim 5, is characterized in that, after step (5), also includes that (6) fill in assembled Building element low-pressure grouting construction note management signature;(7) array data.
Assembled architecture component low pressure grouting process the most according to claim 5, is characterized in that, real in described step (4) During executing, often group 3 pieces of test specimens of test block, test block specification is 40 × 40 × 160mm;Grouting operation often completes 500 reinforcing bar steel bushings Cylinder grouting jointing makees one group of parallel test specimen, and often group 3 joints of test specimen, during test specimen indwelling, need to operate on dispenser Grouting, and carry out the foster maintenance of mark in 28 days.
Construction method the most according to claim 5, is characterized in that, before grouting, tissue management, unit in charge of construction Quality Inspector are to filling Slurry region carry out an acceptance inspection, check and accept by after can carry out next procedure.
Construction method the most according to claim 5, is characterized in that, within being in the milk latter 12 hours, and component and steel bushing Grouting jointing must not vibrated and impact;
Cleaning blender, agitator, grouting cylinder after grouting immediately, grouting cylinder need to clean once after often having irrigated one, Can reuse after cleaning.
CN201610636485.2A 2016-08-05 2016-08-05 Prefabricated assembled concrete structure and construction method thereof Pending CN106049666A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610636485.2A CN106049666A (en) 2016-08-05 2016-08-05 Prefabricated assembled concrete structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610636485.2A CN106049666A (en) 2016-08-05 2016-08-05 Prefabricated assembled concrete structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN106049666A true CN106049666A (en) 2016-10-26

Family

ID=57480941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610636485.2A Pending CN106049666A (en) 2016-08-05 2016-08-05 Prefabricated assembled concrete structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN106049666A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948493A (en) * 2017-04-05 2017-07-14 桂林理工大学 A kind of pre- seat slurry fabricated construction component connection method
CN110820990A (en) * 2019-11-28 2020-02-21 中煤第三建设(集团)有限责任公司 Embedded steel bar positioning and grouting method for PC component construction
CN111472548A (en) * 2020-04-27 2020-07-31 贵州建工集团第三建筑工程有限责任公司 High-rise building assembly type prefabricated wallboard reinforcing steel bar grouting process
CN114086773A (en) * 2021-11-25 2022-02-25 赣州建工集团有限公司 Construction process for prefabricated building concrete structure
CN114592689A (en) * 2022-02-11 2022-06-07 瑞洲建设集团有限公司 Fabricated building construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202010014219U1 (en) * 2010-10-12 2011-02-17 Lehnhart, Thorsten joint sealing
WO2014067924A1 (en) * 2012-11-02 2014-05-08 Hilti Aktiengesellschaft Method for connecting prefabricated concrete elements
CN204960120U (en) * 2015-08-24 2016-01-13 北京珠穆朗玛绿色建筑科技有限公司 Precast reinforced concrete component and assembly type structure who constitutes thereof
CN105804290A (en) * 2016-03-09 2016-07-27 河北安能绿色建筑科技有限公司 Building heat-insulation and formwork integrated wall structure and construction method thereof
CN205894276U (en) * 2016-08-05 2017-01-18 北京城建建设工程有限公司 Prefabricated prefabricated concrete structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202010014219U1 (en) * 2010-10-12 2011-02-17 Lehnhart, Thorsten joint sealing
WO2014067924A1 (en) * 2012-11-02 2014-05-08 Hilti Aktiengesellschaft Method for connecting prefabricated concrete elements
CN204960120U (en) * 2015-08-24 2016-01-13 北京珠穆朗玛绿色建筑科技有限公司 Precast reinforced concrete component and assembly type structure who constitutes thereof
CN105804290A (en) * 2016-03-09 2016-07-27 河北安能绿色建筑科技有限公司 Building heat-insulation and formwork integrated wall structure and construction method thereof
CN205894276U (en) * 2016-08-05 2017-01-18 北京城建建设工程有限公司 Prefabricated prefabricated concrete structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐巍等: "钢筋套筒灌浆连接技术在装配整体式混凝土结构中的应用", 《施工技术》 *
鲁斌: "郭公庄一期公共租赁住房项目装配整体式剪力墙结构施工技术研究", 《城市住宅》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948493A (en) * 2017-04-05 2017-07-14 桂林理工大学 A kind of pre- seat slurry fabricated construction component connection method
CN110820990A (en) * 2019-11-28 2020-02-21 中煤第三建设(集团)有限责任公司 Embedded steel bar positioning and grouting method for PC component construction
CN111472548A (en) * 2020-04-27 2020-07-31 贵州建工集团第三建筑工程有限责任公司 High-rise building assembly type prefabricated wallboard reinforcing steel bar grouting process
CN114086773A (en) * 2021-11-25 2022-02-25 赣州建工集团有限公司 Construction process for prefabricated building concrete structure
CN114592689A (en) * 2022-02-11 2022-06-07 瑞洲建设集团有限公司 Fabricated building construction method

Similar Documents

Publication Publication Date Title
CN106049666A (en) Prefabricated assembled concrete structure and construction method thereof
CN103821364B (en) The construction method of reinforced concrete water pond
CN208056651U (en) Concrete placing installation
CN105666687B (en) Prestressing force Reactive Powder Concrete box girder construction technique
CN103898831A (en) Prefabricated assembled arch rib of ultrahigh-performance concrete and manufacturing and mounting method thereof
CN205894276U (en) Prefabricated prefabricated concrete structure
CN109537895A (en) Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame
CN104264676A (en) Construction method of mass concrete of high-rise building foundations
CN106088493A (en) A kind of pin key connects mounting structure and the construction thereof of prefabricated bench
CN104452591A (en) Cast-in-place box beam construction technology applied to bridge constructions
CN109338874A (en) The compound pillarwork of bridge and construction technology based on orientation ECC
CN106836551A (en) Infill Wall with Aerated Concrete Block construction method
CN104499498A (en) Construction method of mass concrete construction
CN210767886U (en) Vibrating device for sleeve grouting and sleeve grouting system
US7665710B2 (en) Contoured concrete form
CN110485463A (en) Vertically to wall pouring construction method and pouring construction device
CN110835979A (en) Assembled wall reinforcing steel sleeve grouting process
CN205444590U (en) Cast -in -place compound incubation concrete shear force wall
CN103883022A (en) Earthquake-resistant, sound-insulating and crack-resistant integrated structure for inner wall and outer wall of enclosure structure and construction method thereof
CN206174295U (en) Steel pipe concrete assembly type structure concreting device
CN108978946A (en) A kind of autoclave aerated concrete building block filling wall and its construction method
CN105755979A (en) Process for constructing cement concrete guardrails
CN107165306B (en) Construction wall construction method
CN109577498A (en) A kind of plugging device suitable for small area floor hole
CN108951439A (en) A kind of prefabricated assembled box culvert construction of waterproof layer method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026