CN106040958A - Machining technology of large holding clamp on electro-hydraulic hammer - Google Patents

Machining technology of large holding clamp on electro-hydraulic hammer Download PDF

Info

Publication number
CN106040958A
CN106040958A CN201610454000.8A CN201610454000A CN106040958A CN 106040958 A CN106040958 A CN 106040958A CN 201610454000 A CN201610454000 A CN 201610454000A CN 106040958 A CN106040958 A CN 106040958A
Authority
CN
China
Prior art keywords
temperature
blank
heating
carries out
hours
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610454000.8A
Other languages
Chinese (zh)
Inventor
吕美莲
刘春超
冯宝倪
吕俊
吕诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Auspicious Outstanding Co Ltd Of Forging Of Anhui Province
Original Assignee
Auspicious Outstanding Co Ltd Of Forging Of Anhui Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Auspicious Outstanding Co Ltd Of Forging Of Anhui Province filed Critical Auspicious Outstanding Co Ltd Of Forging Of Anhui Province
Priority to CN201610454000.8A priority Critical patent/CN106040958A/en
Publication of CN106040958A publication Critical patent/CN106040958A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K5/00Making tools or tool parts, e.g. pliers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J1/00Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
    • B21J1/06Heating or cooling methods or arrangements specially adapted for performing forging or pressing operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/06Methods for forging, hammering, or pressing; Special equipment or accessories therefor for performing particular operations
    • B21J5/08Upsetting

Abstract

The invention relates to a machining technology of a large holding clamp on an electro-hydraulic hammer, and belongs to the technical field of machining of large holding clamps on electro-hydraulic hammers. The technology comprises the following steps that (1) a blank is selected, and the blank is placed on a sawing machine to be subjected to rough machining; (2) the blank is placed in a heating furnace to be preheated; (3) the blank is subjected to primary heating, then primary heat preservation is carried out, and then the blank is subjected to upsetting; (4) the blank obtained after upsetting is subjected to secondary heating, then secondary heat preservation is carried out, and then the blank is drawn; (5) the blank obtained after upsetting is subjected to tertiary heating, then tertiary heat preservation is carried out, and then the blank is subjected to bend forging; and (6) the blank is subjected to quartus heating, then quartus heat preservation is carried out, the blank is cooled in the furnace till the temperature ranges from 550 DEG C to 600 DEG C, and then the blank is discharged out of the furnace for air cooling till the room temperature is achieved. The large holding clamp on the electro-hydraulic hammer saves raw materials and is not prone to being broken off, good in product quality and good in holding-on performance.

Description

The big processing technique embracing pincers on a kind of Single arm
Technical field
The invention belongs to big embracing on Single arm and clamp processing technique field, particularly relate to the big processing embracing pincers on a kind of Single arm Technique.
Background technology
Single arm is that one utilizes hydraulic system to promote tup, hits a kind of forging equipment of blank molding.On Single arm Big pincers of embracing are usually used in forging the operations such as module, the forging molding of pie heavy in section, annular forging piece ejection.At present, Single arm is embraced greatly Pincers use steel plate excision forming, and waste of raw materials is serious, easily snaps off, poor product quality, and big armful of pincers are easy when operation Blocking operator's sight line, big pincers of embracing are engaged poor performance.
Summary of the invention
The technical problem to be solved is to provide the big processing technique embracing pincers on a kind of Single arm.
For solving the problems referred to above, the big processing technique embracing pincers on a kind of Single arm of the present invention, this technique be by with Lower step forms:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 220~260 DEG C, is then incubated, Holding temperature is 220~260 DEG C, and temperature retention time is 1~1.5 hour;
(3) once being heated by blank, one time heating-up temperature is 1080~1120 DEG C, firing rate is 80~90 DEG C/ H, is the most once incubated, and one time holding temperature is 1080~1120 DEG C, and one time temperature retention time is 5~6 hours, then by base Material carries out jumping-up, and forging ratio is 0.4~0.5;
(4) blank after jumping-up carrying out post bake, post bake temperature is 960~1020 DEG C, then carries out secondary Insulation, secondary holding temperature is 960~1020 DEG C, and secondary temperature retention time is 3~4 hours, then places the blanks on lower flat anvil Pulling out, anvil width ratio is 1.4~1.6;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 850~880 DEG C, then carries out three times and protects Temperature, three times holding temperature is 850~880 DEG C, and three times temperature retention time is 2~3 hours, then places the blanks on and carries out on lower flat anvil Curved forging, two wall the most curved forging molding during forging, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 850~900 DEG C, then carries out four times and is incubated, four times Holding temperature is 850~900 DEG C, and four times temperature retention time is 7~8 hours, is cooled to 550~600 DEG C in stove, sky of then coming out of the stove It is cooled to room temperature, eliminates residualinternal stress.
Compared with prior art, the invention have the advantages that on the Single arm of the present invention, raw material saved by big pincers of embracing;This On the Single arm of invention, big pincers of embracing are not easy to fracture, good product quality;On the Single arm of the present invention, big pincers of embracing will not when operation Block operator's sight line;On the Single arm of the present invention, big armful of pincers occlusion performance is good.
Detailed description of the invention
Embodiment 1
The big processing technique embracing pincers on a kind of Single arm, this technique is to comprise the steps of:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 220 DEG C, is then incubated, insulation temperature Degree is 220 DEG C, and temperature retention time is 1 hour;
(3) once being heated by blank, one time heating-up temperature is 1080 DEG C, and firing rate is 80 DEG C/h, then carries out Once being incubated, one time holding temperature is 1080 DEG C, and one time temperature retention time is 5 hours, then blank is carried out jumping-up, and forging ratio is 0.4;
(4) blank after jumping-up carrying out post bake, post bake temperature is 960 DEG C, then carries out secondary insulation, two Secondary holding temperature is 960 DEG C, and secondary temperature retention time is 3 hours, then places the blanks on and pulls out on lower flat anvil, and anvil width ratio is 1.4;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 850 DEG C, then carries out three times and is incubated, three Secondary holding temperature is 850 DEG C, and three times temperature retention time is 2 hours, then places the blanks on and carries out curved forging on lower flat anvil, during forging two The most curved forging molding of wall, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 850 DEG C, then carries out four insulations, four insulation temperature Degree is 850 DEG C, and four times temperature retention time is 7 hours, is cooled to 550 DEG C in stove, and air cooling of then coming out of the stove, to room temperature, eliminates remaining interior Stress.
It is demonstrated experimentally that on Single arm, raw material relatively saved by big pincers of embracing under this parameter;On Single arm, big pincers of embracing are not easy to fracture, Good product quality.
Embodiment 2
The big processing technique embracing pincers on a kind of Single arm, this technique is to comprise the steps of:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 230 DEG C, is then incubated, insulation temperature Degree is 230 DEG C, and temperature retention time is 1.2 hours;
(3) once being heated by blank, one time heating-up temperature is 1090 DEG C, and firing rate is 83 DEG C/h, then carries out Once being incubated, one time holding temperature is 1090 DEG C, and one time temperature retention time is 5.3 hours, then blank is carried out jumping-up, forging ratio It is 0.4;
(4) blank after jumping-up carrying out post bake, post bake temperature is 970 DEG C, then carries out secondary insulation, two Secondary holding temperature is 970 DEG C, and secondary temperature retention time is 3.3 hours, then places the blanks on and pulls out on lower flat anvil, anvil width ratio It is 1.4;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 860 DEG C, then carries out three times and is incubated, three Secondary holding temperature is 860 DEG C, and three times temperature retention time is 2.3 hours, then places the blanks on and carries out curved forging on lower flat anvil, during forging The two the most curved forging moldings of wall, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 870 DEG C, then carries out four insulations, four insulation temperature Degree is 870 DEG C, and four times temperature retention time is 7.3 hours, is cooled to 560 DEG C in stove, and air cooling of then coming out of the stove, to room temperature, eliminates remnants Internal stress.
It is demonstrated experimentally that on Single arm, raw material relatively saved by big pincers of embracing under this parameter;On Single arm, big pincers of embracing are not easy to fracture, Product quality is preferable.
Embodiment 3
The big processing technique embracing pincers on a kind of Single arm, this technique is to comprise the steps of:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 240 DEG C, is then incubated, insulation temperature Degree is 240 DEG C, and temperature retention time is 1.3 hours;
(3) once being heated by blank, one time heating-up temperature is 1100 DEG C, and firing rate is 85 DEG C/h, then carries out Once being incubated, one time holding temperature is 1100 DEG C, and one time temperature retention time is 5.5 hours, then blank is carried out jumping-up, forging ratio It is 0.5;
(4) blank after jumping-up carrying out post bake, post bake temperature is 990 DEG C, then carries out secondary insulation, two Secondary holding temperature is 990 DEG C, and secondary temperature retention time is 3.5 hours, then places the blanks on and pulls out on lower flat anvil, anvil width ratio It is 1.5;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 865 DEG C, then carries out three times and is incubated, three Secondary holding temperature is 865 DEG C, and three times temperature retention time is 2.5 hours, then places the blanks on and carries out curved forging on lower flat anvil, during forging The two the most curved forging moldings of wall, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 875 DEG C, then carries out four insulations, four insulation temperature Degree is 875 DEG C, and four times temperature retention time is 7.5 hours, is cooled to 575 DEG C in stove, and air cooling of then coming out of the stove, to room temperature, eliminates remnants Internal stress.
Embrace pincers most save raw material it is demonstrated experimentally that big on Single arm under this parameter;On Single arm, big pincers of embracing are not easy to fracture, Product quality is best.
Therefore, the present embodiment is preferred embodiment.
Embodiment 4
The big processing technique embracing pincers on a kind of Single arm, this technique is to comprise the steps of:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 250 DEG C, is then incubated, insulation temperature Degree is 250 DEG C, and temperature retention time is 1.4 hours;
(3) once being heated by blank, one time heating-up temperature is 1110 DEG C, and firing rate is 88 DEG C/h, then carries out Once being incubated, one time holding temperature is 1110 DEG C, and one time temperature retention time is 5.8 hours, then blank is carried out jumping-up, forging ratio It is 0.5;
(4) blank after jumping-up carrying out post bake, post bake temperature is 1005 DEG C, then carries out secondary insulation, Secondary holding temperature is 1005 DEG C, and secondary temperature retention time is 3.8 hours, then places the blanks on and pulls out on lower flat anvil, anvil Wide ratio is 1.5;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 870 DEG C, then carries out three times and is incubated, three Secondary holding temperature is 870 DEG C, and three times temperature retention time is 2.8 hours, then places the blanks on and carries out curved forging on lower flat anvil, during forging The two the most curved forging moldings of wall, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 890 DEG C, then carries out four insulations, four insulation temperature Degree is 890 DEG C, and four times temperature retention time is 7.8 hours, is cooled to 590 DEG C in stove, and air cooling of then coming out of the stove, to room temperature, eliminates remnants Internal stress.
It is demonstrated experimentally that on Single arm, relatively raw material saved by big pincers of embracing under this parameter;On Single arm, big pincers of embracing are not easy to fracture, Product quality is best.
Embodiment 5
The big processing technique embracing pincers on a kind of Single arm, this technique is to comprise the steps of:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 260 DEG C, is then incubated, insulation temperature Degree is 260 DEG C, and temperature retention time is 1.5 hours;
(3) once being heated by blank, one time heating-up temperature is 1120 DEG C, and firing rate is 90 DEG C/h, then carries out Once being incubated, one time holding temperature is 1120 DEG C, and one time temperature retention time is 6 hours, then blank is carried out jumping-up, and forging ratio is 0.5;
(4) blank after jumping-up carrying out post bake, post bake temperature is 1020 DEG C, then carries out secondary insulation, Secondary holding temperature is 1020 DEG C, and secondary temperature retention time is 4 hours, then places the blanks on and pulls out on lower flat anvil, anvil width Ratio is 1.6;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 880 DEG C, then carries out three times and is incubated, three Secondary holding temperature is 880 DEG C, and three times temperature retention time is 3 hours, then places the blanks on and carries out curved forging on lower flat anvil, during forging two The most curved forging molding of wall, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 900 DEG C, then carries out four insulations, four insulation temperature Degree is 900 DEG C, and four times temperature retention time is 8 hours, is cooled to 600 DEG C in stove, and air cooling of then coming out of the stove, to room temperature, eliminates remaining interior Stress.
It is demonstrated experimentally that on Single arm, raw material relatively saved by big pincers of embracing under this parameter;On Single arm, big pincers of embracing are not easy to fracture, Product quality is preferable.

Claims (6)

1. the big processing technique embracing pincers on a Single arm, it is characterised in that: this technique is to comprise the steps of:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 220~260 DEG C, is then incubated, insulation Temperature is 220~260 DEG C, and temperature retention time is 1~1.5 hour;
(3) once being heated by blank, one time heating-up temperature is 1080~1120 DEG C, and firing rate is 80~90 DEG C/h, so After be once incubated, one time holding temperature is 1080~1120 DEG C, and one time temperature retention time is 5~6 hours, is then entered by blank Row jumping-up, forging ratio is 0.4~0.5;
(4) blank after jumping-up carrying out post bake, post bake temperature is 960~1020 DEG C, then carries out secondary insulation, Secondary holding temperature is 960~1020 DEG C, and secondary temperature retention time is 3~4 hours, then places the blanks on and pulls out on lower flat anvil Long, anvil width ratio is 1.4~1.6;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 850~880 DEG C, then carries out three insulations, Three times holding temperature is 850~880 DEG C, and three times temperature retention time is 2~3 hours, then place the blanks on carry out on lower flat anvil curved Forging, two wall the most curved forging molding during forging, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 850~900 DEG C, then carries out four insulations, four insulations Temperature is 850~900 DEG C, and four times temperature retention time is 7~8 hours, is cooled to 550~600 DEG C in stove, then comes out of the stove air cooling extremely Room temperature, eliminates residualinternal stress.
The big processing technique embracing pincers on a kind of Single arm, it is characterised in that: this technique is by following Step forms:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 220 DEG C, is then incubated, and holding temperature is 220 DEG C, temperature retention time is 1 hour;
(3) once being heated by blank, one time heating-up temperature is 1080 DEG C, and firing rate is 80 DEG C/h, then carries out once Insulation, one time holding temperature is 1080 DEG C, and one time temperature retention time is 5 hours, then blank is carried out jumping-up, and forging ratio is 0.4;
(4) blank after jumping-up carrying out post bake, post bake temperature is 960 DEG C, then carries out secondary insulation, and secondary is protected Temperature temperature is 960 DEG C, and secondary temperature retention time is 3 hours, then places the blanks on and pulls out on lower flat anvil, and anvil width ratio is 1.4;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 850 DEG C, then carries out three insulations, protects for three times Temperature temperature is 850 DEG C, and three times temperature retention time is 2 hours, then places the blanks on and carries out curved forging on lower flat anvil, and during forging, two walls are same Time curved forging molding, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 850 DEG C, then carries out four insulations, and four times holding temperature is 850 DEG C, four times temperature retention time is 7 hours, is cooled to 550 DEG C in stove, and air cooling of then coming out of the stove is to room temperature.
The big processing technique embracing pincers on a kind of Single arm, it is characterised in that: this technique is by following Step forms:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 230 DEG C, is then incubated, and holding temperature is 230 DEG C, temperature retention time is 1.2 hours;
(3) once being heated by blank, one time heating-up temperature is 1090 DEG C, and firing rate is 83 DEG C/h, then carries out once Insulation, one time holding temperature is 1090 DEG C, and one time temperature retention time is 5.3 hours, then blank is carried out jumping-up, and forging ratio is 0.4;
(4) blank after jumping-up carrying out post bake, post bake temperature is 970 DEG C, then carries out secondary insulation, and secondary is protected Temperature temperature is 970 DEG C, and secondary temperature retention time is 3.3 hours, then places the blanks on and pulls out on lower flat anvil, and anvil width ratio is 1.4;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 860 DEG C, then carries out three insulations, protects for three times Temperature temperature is 860 DEG C, and three times temperature retention time is 2.3 hours, then places the blanks on and carries out curved forging on lower flat anvil, two wall during forging The most curved forging molding, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 870 DEG C, then carries out four insulations, and four times holding temperature is 870 DEG C, four times temperature retention time is 7.3 hours, is cooled to 560 DEG C in stove, and air cooling of then coming out of the stove is to room temperature.
The big processing technique embracing pincers on a kind of Single arm, it is characterised in that: this technique is by following Step forms:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 240 DEG C, is then incubated, and holding temperature is 240 DEG C, temperature retention time is 1.3 hours;
(3) once being heated by blank, one time heating-up temperature is 1100 DEG C, and firing rate is 85 DEG C/h, then carries out once Insulation, one time holding temperature is 1100 DEG C, and one time temperature retention time is 5.5 hours, then blank is carried out jumping-up, and forging ratio is 0.5;
(4) blank after jumping-up carrying out post bake, post bake temperature is 990 DEG C, then carries out secondary insulation, and secondary is protected Temperature temperature is 990 DEG C, and secondary temperature retention time is 3.5 hours, then places the blanks on and pulls out on lower flat anvil, and anvil width ratio is 1.5;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 865 DEG C, then carries out three insulations, protects for three times Temperature temperature is 865 DEG C, and three times temperature retention time is 2.5 hours, then places the blanks on and carries out curved forging on lower flat anvil, two wall during forging The most curved forging molding, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 875 DEG C, then carries out four insulations, and four times holding temperature is 875 DEG C, four times temperature retention time is 7.5 hours, is cooled to 575 DEG C in stove, and air cooling of then coming out of the stove is to room temperature.
The big processing technique embracing pincers on a kind of Single arm, it is characterised in that: this technique is by following Step forms:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 250 DEG C, is then incubated, and holding temperature is 250 DEG C, temperature retention time is 1.4 hours;
(3) once being heated by blank, one time heating-up temperature is 1110 DEG C, and firing rate is 88 DEG C/h, then carries out once Insulation, one time holding temperature is 1110 DEG C, and one time temperature retention time is 5.8 hours, then blank is carried out jumping-up, and forging ratio is 0.5;
(4) blank after jumping-up carrying out post bake, post bake temperature is 1005 DEG C, then carries out secondary insulation, secondary Holding temperature is 1005 DEG C, and secondary temperature retention time is 3.8 hours, then places the blanks on and pulls out on lower flat anvil, anvil width ratio It is 1.5;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 870 DEG C, then carries out three insulations, protects for three times Temperature temperature is 870 DEG C, and three times temperature retention time is 2.8 hours, then places the blanks on and carries out curved forging on lower flat anvil, two wall during forging The most curved forging molding, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 890 DEG C, then carries out four insulations, and four times holding temperature is 890 DEG C, four times temperature retention time is 7.8 hours, is cooled to 590 DEG C in stove, and air cooling of then coming out of the stove is to room temperature.
The big processing technique embracing pincers on a kind of Single arm, it is characterised in that: this technique is by following Step forms:
(1) select blank, place the blanks on and on sawing machine, carry out roughing;
(2) being put in heating furnace by blank and preheat, pre-heating temperature is 260 DEG C, is then incubated, and holding temperature is 260 DEG C, temperature retention time is 1.5 hours;
(3) once being heated by blank, one time heating-up temperature is 1120 DEG C, and firing rate is 90 DEG C/h, then carries out once Insulation, one time holding temperature is 1120 DEG C, and one time temperature retention time is 6 hours, then blank is carried out jumping-up, and forging ratio is 0.5;
(4) blank after jumping-up carrying out post bake, post bake temperature is 1020 DEG C, then carries out secondary insulation, secondary Holding temperature is 1020 DEG C, and secondary temperature retention time is 4 hours, then places the blanks on and pulls out on lower flat anvil, and anvil width ratio is 1.6;
(5) blank after jumping-up carries out three heating, and three times heating-up temperature is 880 DEG C, then carries out three insulations, protects for three times Temperature temperature is 880 DEG C, and three times temperature retention time is 3 hours, then places the blanks on and carries out curved forging on lower flat anvil, and during forging, two walls are same Time curved forging molding, it is ensured that two-arm flexibility is consistent;
(6) blank carries out four heating, and four times heating-up temperature is 900 DEG C, then carries out four insulations, and four times holding temperature is 900 DEG C, four times temperature retention time is 8 hours, is cooled to 600 DEG C in stove, and air cooling of then coming out of the stove is to room temperature.
CN201610454000.8A 2016-06-20 2016-06-20 Machining technology of large holding clamp on electro-hydraulic hammer Pending CN106040958A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610454000.8A CN106040958A (en) 2016-06-20 2016-06-20 Machining technology of large holding clamp on electro-hydraulic hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610454000.8A CN106040958A (en) 2016-06-20 2016-06-20 Machining technology of large holding clamp on electro-hydraulic hammer

Publications (1)

Publication Number Publication Date
CN106040958A true CN106040958A (en) 2016-10-26

Family

ID=57169271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610454000.8A Pending CN106040958A (en) 2016-06-20 2016-06-20 Machining technology of large holding clamp on electro-hydraulic hammer

Country Status (1)

Country Link
CN (1) CN106040958A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01284449A (en) * 1988-05-10 1989-11-15 Daido Steel Co Ltd Forging method
JPH05261465A (en) * 1992-03-19 1993-10-12 Mitsubishi Materials Corp Cooling prevention tool of blank for forging
CN102764849A (en) * 2012-07-18 2012-11-07 广东省韶铸集团有限公司 Process method for forging lifting hook
CN102989940A (en) * 2012-08-22 2013-03-27 昌利锻造有限公司 Processing method of positioning hook forge piece
CN104148575A (en) * 2014-07-24 2014-11-19 浙江昌利锻造有限公司 Process for forging shifting forks
CN104801643A (en) * 2015-02-01 2015-07-29 江苏金源锻造股份有限公司 Forging technology of lifting hook
CN205217913U (en) * 2015-10-28 2016-05-11 邵阳东方神鹰工具制造有限公司 A pay -off heating device for pliers forging and pressing processing

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01284449A (en) * 1988-05-10 1989-11-15 Daido Steel Co Ltd Forging method
JPH05261465A (en) * 1992-03-19 1993-10-12 Mitsubishi Materials Corp Cooling prevention tool of blank for forging
CN102764849A (en) * 2012-07-18 2012-11-07 广东省韶铸集团有限公司 Process method for forging lifting hook
CN102989940A (en) * 2012-08-22 2013-03-27 昌利锻造有限公司 Processing method of positioning hook forge piece
CN104148575A (en) * 2014-07-24 2014-11-19 浙江昌利锻造有限公司 Process for forging shifting forks
CN104801643A (en) * 2015-02-01 2015-07-29 江苏金源锻造股份有限公司 Forging technology of lifting hook
CN205217913U (en) * 2015-10-28 2016-05-11 邵阳东方神鹰工具制造有限公司 A pay -off heating device for pliers forging and pressing processing

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王华等: "《加热炉》", 30 September 2015, 冶金工业出版社 *
王德拥: "常用工具的锻造(中)", 《机械工人》 *

Similar Documents

Publication Publication Date Title
US8968496B2 (en) Method of press hardening a steel sheet blank
CN101941039B (en) High-strength aluminum alloy isothermal direction-change open die forging method and device
CN103659208B (en) A kind of 4Cr13 ring forging dies technique
US10022769B2 (en) Method for producing a shaped part from an aluminum alloy sheet
CN102225449B (en) Method for forging manganese-containing stainless steel ingot
CN105598328A (en) Die steel forging production method
CN102581187B (en) Method for forging flat steel by using universal hammerhead
CN105624591A (en) Manufacturing method for aluminum targets
CN106119476B (en) A kind of hardening and tempering process of 42CrMo large forgings
CN103567337B (en) Dual-phase steel hot processing method
CN106040958A (en) Machining technology of large holding clamp on electro-hydraulic hammer
CN104325061B (en) The nickel-base alloy hammering block of a kind of side of forging band steel
CN104438885A (en) High-precision bending die manufacturing method
CN106040954A (en) Forging technology of small motor shaft
CN102814439A (en) Hot-forging molding process of large-sized stainless steel nut
CN105063478B (en) A kind of saw blade 50Mn2V steel plates and its production method
CN105755240A (en) 5CrNiMo tempering process
CN105643202A (en) Bending process in iron tower manufacturing
CN104384411A (en) Magnesium alloy slab ingot forging and rolling process
CN102615213A (en) Machining process for multifunctional folding tool shovel blade
CN105935738A (en) Forging process for ledeburite steel shaft
CN106001342A (en) Machining process of electro-hydraulic hammer chambering trestle
CN105499477B (en) Core one-level explosive valve shears cap forging technology
CN106078119A (en) A kind of moulding process of fuel injector
CN105945093A (en) Straightening technology of long shaft type forging piece

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026

RJ01 Rejection of invention patent application after publication