CN104325061B CN201410530480.2A CN201410530480A CN104325061B CN 104325061 B CN104325061 B CN 104325061B CN 201410530480 A CN201410530480 A CN 201410530480A CN 104325061 B CN104325061 B CN 104325061B
Authority
CN
China
Prior art keywords
nickel
base alloy
hammering block
welding
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410530480.2A
Other languages
Chinese (zh)
Other versions
CN104325061A (en
Inventor
游永忠
裴宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201410530480.2A priority Critical patent/CN104325061B/en
Publication of CN104325061A publication Critical patent/CN104325061A/en
Application granted granted Critical
Publication of CN104325061B publication Critical patent/CN104325061B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J13/00Details of machines for forging, pressing, or hammering
    • B21J13/06Hammers tups; Anvils; Anvil blocks
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/44Ferrous alloys, e.g. steel alloys containing chromium with nickel with molybdenum or tungsten
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/46Ferrous alloys, e.g. steel alloys containing chromium with nickel with vanadium

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

A nickel-base alloy hammering block for the side's of forging band steel, belongs to metallurgical production auxiliary equipment, and it is made up of nickel base alloy layer and overlay cladding, described nickel base alloy layer chemical composition mass percent is: C:0.50 ~ 0.60, Si:0.10 ~ 0.40, Mn:0.65 ~ 0.95, P :≤0.030, S :≤0.030, Cr:1.00 ~ 1.30, Mo:0.45 ~ 0.55, Ni:1.50 ~ 1.80, V:0.07 ~ 0.12, all the other are iron and inevitable impurity; It is characterized in that its preparation method digs groove at the sub-upper surface of nickel-base alloy flat anvil; Nickel-base alloy flat anvil is heated to 350 degree and in groove, carries out three built-up welding with Ni847 welding rod under keeping the temperature of 350 degree; After built-up welding completes, hammering block is put in annealing furnace and be heated to 550 DEG C, carry out constant temp. heating process in 24 hours; Hammering block is also naturally cooled 10 ~ 12 hours by power-off in stove.Long service life of the present invention.

Description

The nickel-base alloy hammering block of a kind of side of forging band steel
Technical field
The invention belongs to metallurgical production auxiliary equipment, be specifically related to a kind of quick forging machine nickel-base alloy flat anvil.
Background technology
The special hammering block of quick forging machine belongs to the large-scale tool of production in the steel ingot side of forging band steel production process, mainly bears quick forging machine to pressure distortion in steel ingot forging process.Quick forging machine is by the square band steel forging deformation of hammering block to different size.Along with the change in market, user requires to improve constantly, when forging side's band steel, because of hammering block be in the condition of high temperature always under work, hammering block surface temperature distortion is serious, causing the defect such as surface indentation, crackle to produce because being heated simultaneously, during forging, hammering block blemish being taken on product, affect the product quality of dispatching from the factory.
Though through post employee to measures such as inspection, polishings in time, DeGrain, the square band steel after often forging is because of the quality problems such as surface quality, dimensional tolerance, and lower operation is had strong complaints.
Summary of the invention
In order to avoid the surface quality defect of the quick forging machine side of forging band steel, the present invention proposes a kind of forging side band steel nickel-base alloy hammering block.
Technical scheme of the present invention: the nickel-base alloy hammering block of a kind of side of forging band steel, be made up of nickel base alloy layer and overlay cladding, described nickel base alloy layer chemical composition mass percent is: C:0.50 ~ 0.60, Si:0.10 ~ 0.40, Mn:0.65 ~ 0.95, P :≤0.030, S :≤0.030, Cr:1.00 ~ 1.30, Mo:0.45 ~ 0.55, Ni:1.50 ~ 1.80, V:0.07 ~ 0.12, all the other are iron and inevitable impurity; It is characterized in that its preparation method digs groove at the sub-upper surface of nickel-base alloy flat anvil; Nickel-base alloy flat anvil is heated to 350 DEG C and in groove, carries out three built-up welding with Ni847 welding rod under keeping the temperature of 350 DEG C; After a front built-up welding completes, a rear overlay-operation is carried out at interval for 4 ~ 5 hours; After built-up welding completes, hammering block is put in annealing furnace and be heated to 550 DEG C, carry out constant temp. heating process in 24 hours; Hammering block is also naturally cooled 10 ~ 12 hours by power-off in stove.
Described nickel-base alloy flat anvil is cube.
Described overlay cladding is made up of transition zone, intermediate layer and grinding layer, and wherein the thickness of transition zone is 4mm, and the thickness in intermediate layer is 6mm, and the thickness of grinding layer is 31mm.
Surface meets the band steel instructions for use of forging side, and will heat Ni base alloy before forging, hammering block overlay cladding is high temperature alloy, and feature is high temperature red hardness, resistance to impact.
After hammering block installation, before every use, must with old steel ingot or workpiece heat to 1100 DEG C, then clamp heated steel ingot with 2 hammering blocks or workpiece carries out preheating, summer preheating time need be greater than 30 minutes, and winter need be greater than 45 minutes, can forge and press after hammering block preheating, make the red hardness of hammering block to give full play to like this, the normal use of guarantee hammering block, meets the requirement of Forging Technology.
The present invention due to surface has can the nickel-base alloy layer of resistance to about 800 degree, the deflection produced in forging process is less, greatly reduces the time changing hammering block and reconditioning hammering block; Hammering block extends service life, and average one secondary service life was at about 9 months.
Existing hammering block makes the life-span be about 1 month.
Detailed description of the invention
1, nickel-base alloy (Ni847) welding rod built-up welding transition zone (transition region thickness is 4mm) is used
A) doing the degree of depth at the upper surface of 56NiCrMoV7 flat anvil is 41mm, and width is the groove of 300mm.
B) carry out clean to hammering block surface before welding and checked whether be full of cracks;
C) 56NiCrMoV7 hammering block is heated to 350 DEG C, and welds at the temperature of 350 DEG C.
2,4 to 5 hours, interval, uses nickel-base alloy (Ni847) welding rod built-up welding intermediate layer (intermediate layer thickness is 6mm)
A) carry out clean to hammering block surface before welding and checked whether be full of cracks;
B) hammering block is heated to 350 DEG C, and welds at the temperature of 350 DEG C.
3, in like manner built-up welding grinding layer (grinding layer thickness is 33mm)
After built-up welding completes, put in annealing furnace and be heated to 550 DEG C and heat-treat, constant temperature eliminates internal stress in 24 hours, cooling 10 ~ 12 hours naturally in stove after power-off.
4, the compound hammering block intensity after Overheating Treatment is 900 ~ 1050N/mm 2.
5, control: check whether surface has be full of cracks.
Ni847 welding rod chemical composition is as following table:

Claims (2)

1. the nickel-base alloy hammering block of the side's of forging band steel, be made up of nickel base alloy layer and overlay cladding, described nickel base alloy layer chemical composition mass percent is: C:0.50 ~ 0.60, Si:0.10 ~ 0.40, Mn:0.65 ~ 0.95, P :≤0.030, S :≤0.030, Cr:1.00 ~ 1.30, Mo:0.45 ~ 0.55, Ni:1.50 ~ 1.80, V:0.07 ~ 0.12, all the other are iron and inevitable impurity; It is characterized in that its preparation method digs groove at the sub-upper surface of nickel-base alloy flat anvil; Nickel-base alloy flat anvil is heated to 350 DEG C and in groove, carries out three built-up welding with Ni847 welding rod under keeping the temperature of 350 DEG C; After a front built-up welding completes, a rear overlay-operation is carried out at interval for 4 ~ 5 hours; After built-up welding completes, hammering block is put in annealing furnace and be heated to 550 DEG C, carry out constant temp. heating process in 24 hours; Hammering block is also naturally cooled 10 ~ 12 hours by power-off in stove.
2. the nickel-base alloy hammering block of a kind of side of forging according to claim 1 band steel, it is characterized in that described overlay cladding is made up of transition zone, intermediate layer and grinding layer, wherein the thickness of transition zone is 4mm, and the thickness in intermediate layer is 6mm, and the thickness of grinding layer is 31mm.
CN201410530480.2A 2014-10-10 2014-10-10 The nickel-base alloy hammering block of a kind of side of forging band steel Active CN104325061B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410530480.2A CN104325061B (en) 2014-10-10 2014-10-10 The nickel-base alloy hammering block of a kind of side of forging band steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410530480.2A CN104325061B (en) 2014-10-10 2014-10-10 The nickel-base alloy hammering block of a kind of side of forging band steel

Publications (2)

Publication Number Publication Date
CN104325061A CN104325061A (en) 2015-02-04
CN104325061B true CN104325061B (en) 2016-03-09

Family

ID=52399932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410530480.2A Active CN104325061B (en) 2014-10-10 2014-10-10 The nickel-base alloy hammering block of a kind of side of forging band steel

Country Status (1)

Country Link
CN (1) CN104325061B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106246804B (en) * 2016-08-29 2018-10-09 宁波胜景传动科技有限公司 A kind of worm-gear speed reducer
CN114054661A (en) * 2020-07-29 2022-02-18 上海五钢设备工程有限公司 Precision forging machine tup structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60116740A (en) * 1983-11-30 1985-06-24 Daido Steel Co Ltd Anvil for forging
JP2001071086A (en) * 1999-09-01 2001-03-21 Hitachi Metals Ltd Anvil for high speed four-surface forging apparatus and high speed four-surface forging apparatus
CN101491822A (en) * 2009-03-12 2009-07-29 西南铝业(集团)有限责任公司 Free-forging shortening method and anvil at ultralimit aspect ratio
CN201880840U (en) * 2010-11-24 2011-06-29 山西太钢不锈钢股份有限公司 Special-shaped anvil for forging
CN201900210U (en) * 2010-12-23 2011-07-20 中原特钢股份有限公司 Insert type forging flat anvil

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60116740A (en) * 1983-11-30 1985-06-24 Daido Steel Co Ltd Anvil for forging
JP2001071086A (en) * 1999-09-01 2001-03-21 Hitachi Metals Ltd Anvil for high speed four-surface forging apparatus and high speed four-surface forging apparatus
CN101491822A (en) * 2009-03-12 2009-07-29 西南铝业(集团)有限责任公司 Free-forging shortening method and anvil at ultralimit aspect ratio
CN201880840U (en) * 2010-11-24 2011-06-29 山西太钢不锈钢股份有限公司 Special-shaped anvil for forging
CN201900210U (en) * 2010-12-23 2011-07-20 中原特钢股份有限公司 Insert type forging flat anvil

Also Published As

Publication number Publication date
CN104325061A (en) 2015-02-04

Similar Documents

Publication Publication Date Title
JP2011001573A (en) Tool steel for hot work and steel product using the same
JP2011001572A (en) Tool steel for hot work and steel product using the same
CN104801922A (en) Method for repairing fractured roller way spindle nose
CN108396128A (en) A kind of control method of bloom alloy tool steel wire surface decarburization
CN102581145A (en) Method for manufacturing high-hardness and high-abrasion-resistant pre-bending machine lower die
JP2017043814A (en) Die steel and die
CN104440009A (en) Iron sheet cutter manufacturing method
JP5716996B2 (en) Wear resistant low alloy cast steel
CN104593696B (en) A kind of station boiler heat-resisting steel sheet and plate and manufacture method thereof
CN109868469B (en) Powder material for laser manufacturing mill housing and roller bearing seat composite lining plate and manufacturing method thereof
CN104325061B (en) The nickel-base alloy hammering block of a kind of side of forging band steel
CN109825771B (en) Medium-manganese wear-resistant steel plate
JPH0480110B2 (en)
CN105436699B (en) A kind of the high nitrogen steel stirring-head and its manufacturing process of agitating friction weldering
CN104209639A (en) Mold cutting edge repair welding process
CN102126007A (en) Method for manufacturing compound blade of agricultural harvester
CN104999228A (en) Steel casting surface quality processing technology
CN102989982B (en) Forging method of driving shaft for gearbox
CN104372144A (en) Heat treatment method
CN116441862A (en) Process for prolonging service life of lining plate
JP2008202078A (en) Hot-working die steel
CN103740898B (en) Pressure quenching method of high-hardness 5Cr13MoV wearable liner
CN105441809A (en) Super-hard high-speed steel and preparation method thereof
CN104726674A (en) Vacuum quenching thermal treatment process for stainless steel thin parts
CN104128777A (en) Turning tool machining technology capable of reducing heat damage and improving tempering quality

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant