CN106119476B - A kind of hardening and tempering process of 42CrMo large forgings - Google Patents
A kind of hardening and tempering process of 42CrMo large forgings Download PDFInfo
- Publication number
- CN106119476B CN106119476B CN201610454355.7A CN201610454355A CN106119476B CN 106119476 B CN106119476 B CN 106119476B CN 201610454355 A CN201610454355 A CN 201610454355A CN 106119476 B CN106119476 B CN 106119476B
- Authority
- CN
- China
- Prior art keywords
- 42crmo
- large forgings
- temperature
- small
- water cooling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
- C21D1/18—Hardening; Quenching with or without subsequent tempering
- C21D1/25—Hardening, combined with annealing between 300 degrees Celsius and 600 degrees Celsius, i.e. heat refining ("Vergüten")
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Heat Treatment Of Steel (AREA)
- Forging (AREA)
Abstract
A kind of hardening and tempering process of 42CrMo large forgings, belongs to 42CrMo large forgings processing technique fields, which is to comprise the steps of:(1) 42CrMo large forgings is air-cooled to 600~750 DEG C;(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove;(3) the 42CrMo large forgings shove charges after normalizing are waited to expect;(4) 700~800 DEG C are heated to after 42CrMo large forgings temperature is uniform, is then once kept the temperature;(5) the 42CrMo large forgings after once keeping the temperature is heated to 830~850 DEG C, then carries out secondary insulation;(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, then water outlet;(7) the 42CrMo large forgings shove charge after water cooling is tempered, progress secondary water is cold after tempering, and then water outlet, obtains 42CrMo large forgings.The present invention can eliminate the interior forging stress and structural stress of 42CrMo large forgings;The present invention can be with crystal grain thinning, uniform texture;Crystallization, phase transformation the invention enables 42CrMo large forgings is easy, and diffusion inside is easy.
Description
Technical field
The invention belongs to 42CrMo large forgings processing technique fields, more particularly to a kind of 42CrMo large forgings is quenched
Technique.
Background technology
42CrMo is that a kind of comprehensive mechanical performance is good, and intensity is high, the good medium carbon alloy steel of quenching property, in machine-building
Industry is used to manufacture the important components such as macrotype axes series, large gear.Since 42CrMo large forgings feature dimensions are big, defect is more,
Internal stress is big, temperature distributing disproportionation, and crystallization, mutually complicate, and diffusion inside is difficult, and 42CrMo large forgings in addition is mostly important portion
Position workpiece, stress is heavy, and technical requirement is high, therefore 42CrMo heavy forgings not only want crystal grain thinning, and uniform texture, disappears
Except internal stress, also to reach necessary performance requirement, it is necessary to realize by rational heat treatment process.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of hardening and tempering process of 42CrMo large forgings.
To solve the above problems, a kind of hardening and tempering process of 42CrMo large forgings of the present invention, the technique be by with
Lower step composition:
(1) 42CrMo large forgings is air-cooled to 600~750 DEG C;
(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;
(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 300~400 DEG C to treat material temperature degree, the supply delay time 2
~4 it is small when;
(4) 700~800 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 70~90 DEG C/h, then
Once kept the temperature, when soaking time is 2~4 small;
(5) the 42CrMo large forgings after once keeping the temperature is heated to 830~850 DEG C, then carries out secondary insulation, kept the temperature
When time is T small, soaking time is calculated with 100mm/h;
(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 160~200 DEG C, then water outlet;
(7) by the 42CrMo large forgings after water cooling, when 4~6 is small, interior shove charge is tempered, and temperature is 550~570 DEG C,
Soaking time is calculated by 100mm/1.5h, and progress secondary water is cold after tempering, and water cooling to room temperature, then water outlet, obtains hardness HRC30
~35, it is organized as the 42CrMo large forgings of tempered sorbite.
Compared with prior art, the present invention has the following advantages:The present invention can eliminate the interior forging of 42CrMo large forgings
Make stress and structural stress;The present invention can be with crystal grain thinning, uniform texture;The invention enables the knot of 42CrMo large forgings
Crystalline substance, phase transformation are easy, and diffusion inside is easy.
Embodiment
Embodiment 1
A kind of hardening and tempering process of 42CrMo large forgings, which is to comprise the steps of:
(1) 42CrMo large forgings is air-cooled to 600 DEG C;
(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;
(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 300 DEG C to treat material temperature degree, when the supply delay time is 2 small;
(4) 700 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 70 DEG C/h, is then carried out once
Insulation, when soaking time is 2 small;
(5) the 42CrMo large forgings after once keeping the temperature is heated to 830 DEG C, then carries out secondary insulation, soaking time
For T it is small when, soaking time is calculated with 100mm/h;
(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 160 DEG C, then water outlet;
(7) by the 42CrMo large forgings after water cooling, when 4 is small, interior shove charge is tempered, and temperature is 550 DEG C, soaking time
Calculated by 100mm/1.5h, progress secondary water is cold after tempering, and water cooling to room temperature, then water outlet, obtains hardness HRC30, be organized as
The 42CrMo large forgings of tempered sorbite.
It is demonstrated experimentally that the interior forging stress and structural stress of 42CrMo large forgings are smaller under this parameter, crystallization and phase transformation
It is easier to.
Embodiment 2
A kind of hardening and tempering process of 42CrMo large forgings, which is to comprise the steps of:
(1) 42CrMo large forgings is air-cooled to 640 DEG C;
(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;
(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 325 DEG C to treat material temperature degree, and the supply delay time is small for 2.5
When;
(4) 730 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 75 DEG C/h, is then carried out once
Insulation, when soaking time is 2.5 small;
(5) the 42CrMo large forgings after once keeping the temperature is heated to 835 DEG C, then carries out secondary insulation, soaking time
For T it is small when, soaking time is calculated with 100mm/h;
(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 170 DEG C, then water outlet;
(7) by the 42CrMo large forgings after water cooling, when 4.5 is small, interior shove charge is tempered, and temperature is 555 DEG C, during insulation
Between by 100mm/1.5h calculate, after tempering carry out secondary water it is cold, water cooling to room temperature, then water outlet, obtains hardness HRC32, tissue
For the 42CrMo large forgings of tempered sorbite.
It is demonstrated experimentally that the interior forging stress and structural stress of 42CrMo large forgings are small under this parameter, crystallization and phase transformation compared with
Easily.
Embodiment 3
A kind of hardening and tempering process of 42CrMo large forgings, which is to comprise the steps of:
(1) 42CrMo large forgings is air-cooled to 675 DEG C;
(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;
(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 350 DEG C to treat material temperature degree, when the supply delay time is 3 small;
(4) 750 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 80 DEG C/h, is then carried out once
Insulation, when soaking time is 3 small;
(5) the 42CrMo large forgings after once keeping the temperature is heated to 840 DEG C, then carries out secondary insulation, soaking time
For T it is small when, soaking time is calculated with 100mm/h;
(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 180 DEG C, then water outlet;
(7) by the 42CrMo large forgings after water cooling, when 5 is small, interior shove charge is tempered, and temperature is 560 DEG C, soaking time
Calculated by 100mm/1.5h, progress secondary water is cold after tempering, and water cooling to room temperature, then water outlet, obtains hardness HRC33, be organized as
The 42CrMo large forgings of tempered sorbite.
It is demonstrated experimentally that the interior forging stress and structural stress of 42CrMo large forgings are minimum under this parameter, crystallization and phase transformation
It is easiest to.
Therefore, the present embodiment is preferred embodiment.
Embodiment 4
A kind of hardening and tempering process of 42CrMo large forgings, which is to comprise the steps of:
(1) 42CrMo large forgings is air-cooled to 720 DEG C;
(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;
(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 370 DEG C to treat material temperature degree, and the supply delay time is small for 3.5
When;
(4) 770 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 85 DEG C/h, is then carried out once
Insulation, when soaking time is 3.5 small;
(5) the 42CrMo large forgings after once keeping the temperature is heated to 845 DEG C, then carries out secondary insulation, soaking time
For T it is small when, soaking time is calculated with 100mm/h;
(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 190 DEG C, then water outlet;
(7) by the 42CrMo large forgings after water cooling, when 5.5 is small, interior shove charge is tempered, and temperature is 565 DEG C, during insulation
Between by 100mm/1.5h calculate, after tempering carry out secondary water it is cold, water cooling to room temperature, then water outlet, obtains hardness HRC34, tissue
For the 42CrMo large forgings of tempered sorbite.
It is demonstrated experimentally that the interior forging stress and structural stress of 42CrMo large forgings are small under this parameter, crystallization and phase transformation compared with
Easily.
Embodiment 5
A kind of hardening and tempering process of 42CrMo large forgings, which is to comprise the steps of:
(1) 42CrMo large forgings is air-cooled to 750 DEG C;
(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;
(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 400 DEG C to treat material temperature degree, when the supply delay time is 4 small;
(4) 800 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 90 DEG C/h, is then carried out once
Insulation, when soaking time is 4 small;
(5) the 42CrMo large forgings after once keeping the temperature is heated to 850 DEG C, then carries out secondary insulation, soaking time
For T it is small when, soaking time is calculated with 100mm/h;
(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 200 DEG C, then water outlet;
(7) by the 42CrMo large forgings after water cooling, when 6 is small, interior shove charge is tempered, and temperature is 570 DEG C, soaking time
Calculated by 100mm/1.5h, progress secondary water is cold after tempering, and water cooling to room temperature, then water outlet, obtains hardness HRC35, be organized as
The 42CrMo large forgings of tempered sorbite.
It is demonstrated experimentally that the interior forging stress and structural stress of 42CrMo large forgings are smaller under this parameter, crystallization and phase transformation
It is easier to.
Claims (5)
- A kind of 1. hardening and tempering process of 42CrMo large forgings, it is characterised in that:The technique is to comprise the steps of:(1) 42CrMo large forgings is air-cooled to 600~750 DEG C;(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 300~400 DEG C to treat material temperature degree, and the supply delay time is small for 2~4 When;(4) 700~800 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 70~90 DEG C/h, is then carried out Once keep the temperature, when soaking time is 2~4 small;(5) the 42CrMo large forgings after once keeping the temperature is heated to 830~845 DEG C, then carries out secondary insulation, soaking time For T it is small when, soaking time is calculated with 100mm/h;(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 160~200 DEG C, then water outlet;(7) by the 42CrMo large forgings after water cooling, when 4~6 is small, interior shove charge is tempered, and temperature is 550~570 DEG C, insulation Time by 100mm/1.5h calculate, after tempering carry out secondary water it is cold, water cooling to room temperature, then water outlet, obtain hardness HRC30~ 35, it is organized as the 42CrMo large forgings of tempered sorbite.
- A kind of 2. hardening and tempering process of 42CrMo large forgings according to claim 1, it is characterised in that:The technique is by following Step forms:(1) 42CrMo large forgings is air-cooled to 600 DEG C;(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 300 DEG C to treat material temperature degree, when the supply delay time is 2 small;(4) 700 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 70 DEG C/h, is then once kept the temperature, When soaking time is 2 small;(5) the 42CrMo large forgings after once keeping the temperature is heated to 830 DEG C, then carries out secondary insulation, soaking time is small for T When, soaking time is calculated with 100mm/h;(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 160 DEG C, then water outlet;(7) by the 42CrMo large forgings after water cooling, when 4 is small, interior shove charge is tempered, and temperature is 550 DEG C, and soaking time is pressed 100mm/1.5h is calculated, and progress secondary water is cold after tempering, and water cooling to room temperature, then water outlet, obtains hardness HRC30, be organized as back The sorbitic 42CrMo large forgings of fire.
- A kind of 3. hardening and tempering process of 42CrMo large forgings according to claim 1, it is characterised in that:The technique is by following Step forms:(1) 42CrMo large forgings is air-cooled to 640 DEG C;(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 325 DEG C to treat material temperature degree, when the supply delay time is 2.5 small;(4) 730 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 75 DEG C/h, is then once kept the temperature, When soaking time is 2.5 small;(5) the 42CrMo large forgings after once keeping the temperature is heated to 835 DEG C, then carries out secondary insulation, soaking time is small for T When, soaking time is calculated with 100mm/h;(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 170 DEG C, then water outlet;(7) by the 42CrMo large forgings after water cooling, when 4.5 is small, interior shove charge is tempered, and temperature is 555 DEG C, and soaking time is pressed 100mm/1.5h is calculated, and progress secondary water is cold after tempering, and water cooling to room temperature, then water outlet, obtains hardness HRC32, be organized as back The sorbitic 42CrMo large forgings of fire.
- A kind of 4. hardening and tempering process of 42CrMo large forgings according to claim 1, it is characterised in that:The technique is by following Step forms:(1) 42CrMo large forgings is air-cooled to 675 DEG C;(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 350 DEG C to treat material temperature degree, when the supply delay time is 3 small;(4) 750 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 80 DEG C/h, is then once kept the temperature, When soaking time is 3 small;(5) the 42CrMo large forgings after once keeping the temperature is heated to 840 DEG C, then carries out secondary insulation, soaking time is small for T When, soaking time is calculated with 100mm/h;(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 180 DEG C, then water outlet;(7) by the 42CrMo large forgings after water cooling, when 5 is small, interior shove charge is tempered, and temperature is 560 DEG C, and soaking time is pressed 100mm/1.5h is calculated, and progress secondary water is cold after tempering, and water cooling to room temperature, then water outlet, obtains hardness HRC33, be organized as back The sorbitic 42CrMo large forgings of fire.
- A kind of 5. hardening and tempering process of 42CrMo large forgings according to claim 1, it is characterised in that:The technique is by following Step forms:(1) 42CrMo large forgings is air-cooled to 720 DEG C;(2) the 42CrMo large forgings after will be air-cooled is fitted into normalizing in stove, prevents from cracking, crystal grain thinning;(3) the 42CrMo large forgings shove charges after normalizing are waited to expect, it is 370 DEG C to treat material temperature degree, when the supply delay time is 3.5 small;(4) 770 DEG C are heated to after 42CrMo large forgings temperature is uniform, firing rate is 85 DEG C/h, is then once kept the temperature, When soaking time is 3.5 small;(5) the 42CrMo large forgings after once keeping the temperature is heated to 845 DEG C, then carries out secondary insulation, soaking time is small for T When, soaking time is calculated with 100mm/h;(6) the 42CrMo large forgings of secondary insulation is subjected to a water cooling, water cooling is to 190 DEG C, then water outlet;(7) by the 42CrMo large forgings after water cooling, when 5.5 is small, interior shove charge is tempered, and temperature is 565 DEG C, and soaking time is pressed 100mm/1.5h is calculated, and progress secondary water is cold after tempering, and water cooling to room temperature, then water outlet, obtains hardness HRC34, be organized as back The sorbitic 42CrMo large forgings of fire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610454355.7A CN106119476B (en) | 2016-06-20 | 2016-06-20 | A kind of hardening and tempering process of 42CrMo large forgings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610454355.7A CN106119476B (en) | 2016-06-20 | 2016-06-20 | A kind of hardening and tempering process of 42CrMo large forgings |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106119476A CN106119476A (en) | 2016-11-16 |
CN106119476B true CN106119476B (en) | 2018-04-24 |
Family
ID=57470463
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610454355.7A Active CN106119476B (en) | 2016-06-20 | 2016-06-20 | A kind of hardening and tempering process of 42CrMo large forgings |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106119476B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106755863A (en) * | 2016-12-15 | 2017-05-31 | 通裕重工股份有限公司 | Solve the process that heavy in section square forging produces flaw detection coarse-grain |
CN107511456A (en) * | 2017-08-03 | 2017-12-26 | 六安万邦机械科技有限公司 | A kind of casting technique of evaporative pattern |
CN107828956A (en) * | 2017-10-17 | 2018-03-23 | 九江学院 | A kind of interactive combination Technology for Heating Processing of diesel vehicle 42CrMo crankshaft forging blanks |
CN110695279B (en) * | 2019-09-20 | 2021-01-29 | 张家港中环海陆高端装备股份有限公司 | Method for avoiding folding and skin-clamping and harmful tissue during ring forging |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102925657A (en) * | 2012-11-06 | 2013-02-13 | 武汉理工大学 | Rolling deformation quenching composite reinforcing method of middle carbon alloyed steel bearing ring piece |
CN102952926A (en) * | 2012-10-24 | 2013-03-06 | 荣成锻压机床有限公司 | Thermal refining method of press eccentric body made from 35CrMo |
CN104831048A (en) * | 2015-05-13 | 2015-08-12 | 广西梧州运龙港船机械制造有限公司 | Heat treatment process for hull steel crankshaft |
CN105603165A (en) * | 2014-11-19 | 2016-05-25 | 重庆江东摩托车配件有限公司 | 42CrMo steel heat treatment process |
-
2016
- 2016-06-20 CN CN201610454355.7A patent/CN106119476B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102952926A (en) * | 2012-10-24 | 2013-03-06 | 荣成锻压机床有限公司 | Thermal refining method of press eccentric body made from 35CrMo |
CN102925657A (en) * | 2012-11-06 | 2013-02-13 | 武汉理工大学 | Rolling deformation quenching composite reinforcing method of middle carbon alloyed steel bearing ring piece |
CN105603165A (en) * | 2014-11-19 | 2016-05-25 | 重庆江东摩托车配件有限公司 | 42CrMo steel heat treatment process |
CN104831048A (en) * | 2015-05-13 | 2015-08-12 | 广西梧州运龙港船机械制造有限公司 | Heat treatment process for hull steel crankshaft |
Non-Patent Citations (1)
Title |
---|
42CrMo钢高频感应淬火及回火对组织及硬度的影响;顾俊杰 等;《42CrMo钢高频感应淬火及回火对组织及硬度的影响》;20101130;160-162 * |
Also Published As
Publication number | Publication date |
---|---|
CN106119476A (en) | 2016-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106119476B (en) | A kind of hardening and tempering process of 42CrMo large forgings | |
CN103643243A (en) | Method for modifying high-toughness surfaces of metal materials | |
MX2012002229A (en) | Method for manufacturing thick-walled seamless steel pipe. | |
CN105779716A (en) | Heat treatment process for bearing steel | |
CN106119472A (en) | Bolt Technology for Heating Processing | |
CN101906518B (en) | Post-forging heat treatment process for nickeliferous dilute alloy round steel | |
CN104451438A (en) | Production method of high-strength gear | |
CN104498966A (en) | Process for tufftriding amino gas | |
CN107716840B (en) | Production process of ring forging | |
CN105755266A (en) | Gear quenching technology | |
CN105695701A (en) | 40Cr quenching and tempering technology | |
CN104313258A (en) | Spanner quenching method | |
CN104894574A (en) | Cemented quenching method of cylinder gear | |
CN106319186B (en) | A kind of 45 steel roller axis high temperature, short time Q-tempering techniques | |
CN103820608B (en) | Heat treating method and the 35CrMnSi steel that temper brittleness improves toughness eliminated by 35CrMnSi steel | |
CN105755240A (en) | 5CrNiMo tempering process | |
CN104894573A (en) | Method for carburizing and quenching of cylindrical gear | |
CN107245681B (en) | A kind of optimization heat treatment process of high corrosion resistance magnesium alloy | |
CN105935738B (en) | A kind of forging technology of ledeburite steel shaft | |
CN100434541C (en) | Annealing process of 20CrMnTi steel for cold extrusion | |
CN102719645B (en) | Heat treatment method for twist drills | |
CN103290179B (en) | Thermal treatment method for medium carbon structural alloy steel with low hardenability | |
CN106609318A (en) | Refining method for grain size of 32Cr3MoVE forge piece | |
CN106755789A (en) | The Technology for Heating Processing of rich chromium cast iron | |
CN105779709A (en) | Quenching and tempering technology for 5CrNiMo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |