CN106039857A - Efficient dust removal device for building site - Google Patents

Efficient dust removal device for building site Download PDF

Info

Publication number
CN106039857A
CN106039857A CN201610625242.9A CN201610625242A CN106039857A CN 106039857 A CN106039857 A CN 106039857A CN 201610625242 A CN201610625242 A CN 201610625242A CN 106039857 A CN106039857 A CN 106039857A
Authority
CN
China
Prior art keywords
framework
fixing
spring
support
drainage screen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610625242.9A
Other languages
Chinese (zh)
Inventor
安双志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610625242.9A priority Critical patent/CN106039857A/en
Publication of CN106039857A publication Critical patent/CN106039857A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D46/00Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
    • B01D46/56Filters or filtering processes specially modified for separating dispersed particles from gases or vapours with multiple filtering elements, characterised by their mutual disposition
    • B01D46/62Filters or filtering processes specially modified for separating dispersed particles from gases or vapours with multiple filtering elements, characterised by their mutual disposition connected in series
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D46/00Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
    • B01D46/24Particle separators, e.g. dust precipitators, using rigid hollow filter bodies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D46/00Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
    • B01D46/28Particle separators, e.g. dust precipitators, using filter brushes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D46/00Filters or filtering processes specially modified for separating dispersed particles from gases or vapours
    • B01D46/30Particle separators, e.g. dust precipitators, using loose filtering material

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The invention relates to an efficient dust removal device for a building site. The efficient dust removal device comprises an air inlet device, a first filtering device, an air extraction device, a second filtering device, a connection device and a third filtering device, wherein the air inlet device comprises an air inlet hopper, an air inlet pipe, a first support frame and a first transverse rod; the first filtering device comprises a first frame body, a first filtering screen, a baffle plate, a first spring, a second spring, a second filtering screen and a first sponge block; the air extraction device comprises a first pipeline, a fan, a first valve and a second support frame; the second filtering device comprises a second frame body, a flow division block, a first support block, a third filtering screen, brush hair, a separation plate, a fourth filtering screen and a third spring; the connection device comprises a second pipeline, a second transverse rod, a first vertical rod, a first inclined rod and a third support frame; the third filtering device comprises a third frame body, a second sponge block, a jacking and leaning block, a positioning frame and a fourth spring. The efficient dust removal device has the advantages that dust on the building site can be sucked into the efficient dust removal device; then, the dust is filtered; the filtering effect is obvious; in addition, the filtering efficiency is high.

Description

The efficient dust arrester in a kind of construction site
Technical field
The present invention relates to building machinery technical field, particularly relate to the efficient dust arrester in a kind of construction site.
Background technology
Construction site turnover material is the most common phenomenon.After vehicle-mounted dregs, building waste appear on the scene, must if do not carried out The process wanted, will necessarily produce substantial amounts of dust pollution in transit, be unfavorable for the health of workmen and surrounding resident.At present A lot of building sites have had taken up the measure of necessity, such as method for washing.This method is only the process to vehicle wheel belt position, There is certain limitation, it is impossible to the effective dust removing bodywork surface.Also taking full car to spray mode, the deficiency existed is The water yield is relatively big, the problem that there is water waste.
Accordingly, it is desirable to provide a kind of new technical scheme solves above-mentioned technical problem.
Summary of the invention
It is an object of the invention to provide a kind of construction site that can effectively solve above-mentioned technical problem to fill with efficient dedusting Put.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
The efficient dust arrester in a kind of construction site, with efficient dust arrester, described construction site includes that air inlet fills Put, be positioned at the first defecator on the right side of described air intake installation, be positioned at the air extractor on the right side of described first defecator, be positioned at The second defecator below described air extractor, it is positioned at the attachment means below described second defecator, is positioned at described company The 3rd defecator on the left of connection device, described air intake installation includes air inlet bucket, is positioned at the air inlet pipe on the right side of described air inlet bucket, position The first support in the upper and lower both sides of described air inlet pipe and be positioned at the first cross bar on the left of described first support, described first filters dress Put include the first framework, the first drainage screen being contained in described first framework, be positioned at the baffle plate on the right side of described first drainage screen, The second spring of be positioned at the first spring above described baffle plate, being positioned on described baffle plate, it is positioned at below described second spring Two drainage screens, being positioned at the first sponge block on the right side of described second drainage screen, described air extractor includes the first pipeline, is arranged at institute Stating the blower fan on the first pipeline, the first valve and be positioned at the second support above described blower fan, described second defecator includes Second framework, the branching block being contained in described second framework, be positioned at first bracer below described branching block, be positioned at described The 3rd drainage screen, the bristle being arranged on described second framework inner surface below first bracer, it is positioned at described 3rd filtration The dividing plate of side off the net, it is positioned at the 4th drainage screen of the described dividing plate left and right sides, is positioned at the 3rd bullet below described 4th drainage screen Spring, described attachment means includes second pipe, is positioned at the second cross bar above described second pipe, is positioned on described second cross bar First montant of side, it is positioned at the first brace above described second cross bar, is positioned at the 3rd support above described first brace, position The second brace on the left of described 3rd support and be positioned at the 4th support below described second brace, described 3rd defecator The second sponge block of including the 3rd framework, being contained in described 3rd framework, be positioned on the left of described second sponge block lean block, Lean the locating rack on the left of block, the 4th spring, the 5th spring described in being positioned at, be positioned at the sponge ring on the left of described 5th spring, position Discharge pipe on the left of described 3rd framework and the second valve being arranged on described discharge pipe.
Described air inlet bucket is hollow round table-like, and the surface, left and right of described air inlet bucket communicates.Described air inlet pipe is horizontal, The left surface of described air inlet pipe is fixing with the right surface of described air inlet bucket to be connected, and described first support is provided with two, and described first One end of support is fixing with described air inlet pipe to be connected, and the other end of described first support is horizontal, and described first cross bar is provided with Two, the right-hand member of described first cross bar is fixing with described first support to be connected, the left end of described first cross bar and described air inlet bucket Fixing connection.
Described first framework is hollow cuboid, described first framework be provided be positioned at its left surface the first through hole and Being positioned at second through hole on its right surface, the right-hand member of described air inlet pipe is directed at described first through hole and the left-handed watch with described first framework Face is fixing to be connected, and described first support is fixing with the left surface of described first framework to be connected, and described first drainage screen is hollow Hemispherical, the inner surface of the left surface of described first drainage screen and described first framework is fixing to be connected, the upper end of described baffle plate in Skewed, the upper end of described baffle plate is fixing with the inner surface of described first framework to be connected, and the lower end of described baffle plate is vertical shape, institute Stating the first drainage screen and act against on the left surface of described baffle plate, described first spring is vertical shape, described first spring Lower end is fixing with described baffle plate to be connected, and the upper end of described first spring is fixing with the inner surface of described first framework to be connected, described Second spring is horizontal, and the right-hand member of described second spring is fixing with the inner surface of described first framework to be connected, described second bullet The left end of spring is fixing with described baffle plate to be connected, and described second drainage screen is cuboid, and described second drainage screen is vertically placed, described The lower end of the second drainage screen is fixing with the inner surface of described first framework to be connected, the left surface of described second drainage screen and described gear The right surface contact of plate, described first sponge block is cuboid, the lower surface of described first sponge block and described first framework Inner surface is fixing to be connected, and the right surface of described first sponge block is fixing with the inner surface of described first framework to be connected.
Described first pipeline is L-shaped, the upper end of described first pipeline be directed at described second through hole and with described first framework Right surface fixing connect, described second support is L-shaped, and one end of described second support is fixed with described blower fan and is connected, described The other end of the second support is fixing with the right surface of described first framework to be connected.
Described second framework is hollow cuboid, and described second framework is vertically placed, and described second framework is provided with position The third through-hole on surface and be positioned at the fourth hole of its lower surface thereon, threeway described in the lower end aligned of described first pipeline Hole and fixing with the upper surface of described second framework be connected, described branching block be cross section be the cylinder of triangle, described shunting Block is positioned at the lower section of described third through-hole, and described first bracer is cuboid, and the upper surface of described first bracer is with described The lower surface of branching block is fixing to be connected, and the lower surface of described first bracer is fixing with the upper surface of described 3rd drainage screen to be connected Connecing, described 3rd drainage screen is cuboid and horizontal positioned, the side of described 3rd drainage screen and the interior table of described second framework Face is fixing to be connected, and described bristle is provided with several, and described bristle is horizontal, one end of described bristle and described second framework Inner surface is fixing to be connected.
Described dividing plate is cuboid and vertically places, and the upper surface of described dividing plate is solid with the lower surface of described 3rd drainage screen Fixed connection, the lower end of described dividing plate is fixing with the inner surface of described second framework to be connected, and it is recessed that the lower end of described dividing plate is provided with first Groove, described 4th drainage screen is provided with two, and described 4th drainage screen is cuboid and horizontal positioned, the side of described 4th drainage screen Face is slidably connected with the inner surface of described second framework, and the side of described 4th drainage screen connects with the side slip of described dividing plate Connecing, described 3rd spring is provided with two, and described 3rd spring is vertical shape, the lower end of described 3rd spring and described second framework Inner surface fixing connect, the upper end of described 3rd spring is fixed with the lower surface of described 4th drainage screen and is connected.
The upper end of described second pipe is directed at described fourth hole and fixing with the lower surface of described second framework is connected, institute Stating the second cross bar horizontal, the right-hand member of described second cross bar is fixing with the left surface of described second framework to be connected, and described first Montant is vertical shape, and the lower surface of the upper end of described first montant and described 3rd support is fixing to be connected, described first brace in Skewed, the left surface of the lower end of described first brace and described second framework is fixing to be connected, the upper end of described first brace and The lower surface of described 3rd support is fixing to be connected, and described 3rd support is L-shaped, the right-hand member of described 3rd support and described second frame The left surface of body is fixing to be connected, the left end of described 3rd support be vertical shape and with the lower surface of described first framework fixing even Connecing, the described second inclined shape of brace, the lower end of described second brace is fixing with the left surface of described 3rd support to be connected, described The upper end of the second brace is fixing with the lower surface of described first framework to be connected, and described 4th support is L-shaped, described 4th support Upper end is horizontal, and the upper end of described 4th support is fixing with the left surface of described 3rd support to be connected, described 4th support Lower end is vertical shape.
Described 3rd framework is hollow cylinder, described 3rd framework horizontal positioned, and described 3rd framework is provided with Five through holes and clematis stem hole, the left end of described second pipe is directed at described fifth hole and the outer surface with described 3rd framework is consolidated Fixed connection, the lower end of described first montant is fixing with described 3rd framework to be connected, the left end of described second cross bar and the described 3rd Framework is fixing to be connected, and the lower end of described 4th support is fixing with described 3rd framework to be connected, and described second sponge block is bending, The inner surface of the right surface of described second sponge block and described 3rd framework is fixing to be connected, and described second sponge block blocks described the Five through holes, the left surface of described second sponge block is fixing with the described right surface leaning block to be connected, described in lean the cross section of block Semicircular in shape, described in lean block and act against to the right on described second sponge block, described locating rack is provided with two and lays respectively at institute Stating the both sides up and down in the 3rd framework, described locating rack is L-shaped, one end of described locating rack and the inner surface of described 3rd framework Fixing connection, the other end of described locating rack is horizontal.
Described 4th spring is provided with two, and described 4th spring horizontal is placed, the right-hand member of described 4th spring and described top Connecting by the left surface of block is fixing, the left end of described 4th spring is fixed with the inner surface of described 3rd framework and is connected, and described the Five springs are horizontal, and the right-hand member of described 5th spring is fixed with the described left surface leaning block and is connected, described 5th spring Left end and described sponge ring are fixing to be connected, described sponge ring be cross section be the cylinder of annulus, described sponge ring horizontal positioned, institute Stating sponge ring to act against on the inner surface of described 3rd framework, described discharge pipe is horizontal, the right-hand member alignment of described discharge pipe Described clematis stem hole and fixing with the outer surface of described 3rd framework be connected.
After using technique scheme, present invention have the advantage that
Construction site of the present invention is by efficient dust arrester simple in construction, easy to use, it is possible to inhaled by the dust on building site Entering inside it, then filter dust, filter effect is notable, and filter efficiency is high, can effectively remove air In dust, then will purify after air discharge, prevent to pollute pollution, environment is served the effect of protection.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings the construction site of the present invention detailed description of the invention of efficient dust arrester is made furtherly Bright:
Fig. 1 is the construction site of the present invention structural representation with efficient dust arrester;
Detailed description of the invention
As it is shown in figure 1, construction site of the present invention includes air intake installation 1 with efficient dust arrester, is positioned at described air inlet dress Put the first defecator 2 on the right side of in the of 1, be positioned at the air extractor 3 on the right side of described first defecator 2, be positioned at described air extractor 3 Second defecator 4 of lower section, be positioned at the attachment means 5 below described second defecator 4, to be positioned at described attachment means 5 left 3rd defecator 6 of side.
As it is shown in figure 1, described air intake installation 1 includes air inlet bucket 11, is positioned at the air inlet pipe 12 on the right side of described air inlet bucket 11, position The first support 13 in described air inlet pipe about 12 both sides and be positioned at the first cross bar 14 on the left of described first support 13.Described enter Gas bucket 11 is in hollow round table-like, and the surface, left and right of described air inlet bucket 11 communicates.Described air inlet pipe 12 is horizontal, described air inlet The left surface of pipe 12 is fixing with the right surface of described air inlet bucket 11 to be connected so that the inside of described air inlet pipe 12 and described air inlet bucket The inside of 11 communicates.Described first support 13 is provided with two, and one end of described first support 13 is fixing even with described air inlet pipe 12 Connecing, the other end of described first support 13 is horizontal.Described first cross bar 14 is provided with two, the right-hand member of described first cross bar 14 Fixing with described first support 13 and be connected, the left end of described first cross bar 14 is fixing with described air inlet bucket 11 to be connected.
As it is shown in figure 1, described first defecator 2 include the first framework 21, be contained in described first framework 21 One drainage screen 22, it is positioned at the baffle plate 23 on the right side of described first drainage screen 22, is positioned at the first spring 24 above described baffle plate 23, position The second spring 25 on described baffle plate 23, it is positioned at the second drainage screen 26 below described second spring 25, is positioned at described second The first sponge block 27 on the right side of drainage screen 26.Described first framework 21 is in hollow cuboid, and described first framework 21 is provided with Being positioned at the first through hole 211 of its left surface and be positioned at second through hole 212 on its right surface, described first through hole 211 and second leads to Rounded and with described first framework 21 inside, hole 212 communicates, and the right-hand member of described air inlet pipe 12 is directed at described first through hole 211 And fixing with the left surface of described first framework 21 be connected so that the inside of described air inlet pipe 12 is interior with described first framework 21 Portion communicates, and described first support 13 is fixing with the left surface of described first framework 21 to be connected.Described first drainage screen 22 is in hollow Hemispherical, the inner surface of the left surface of described first drainage screen 22 and described first framework 21 is fixing to be connected, described first mistake Filter screen 22 is positioned at the right side of described first through hole 211.The inclined shape in upper end of described baffle plate 23, the upper end of described baffle plate 23 and institute Stating the fixing connection of inner surface of the first framework 21, the lower end of described baffle plate 23 is vertical shape, and described first drainage screen 22 acts against On the left surface of described baffle plate 23.Described first spring 24 in vertical shape, the lower end of described first spring 24 and described gear Plate 23 is fixing to be connected, and the upper end of described first spring 24 is fixing with the inner surface of described first framework 21 to be connected.Described second bullet Spring 25 is horizontal, and the right-hand member of described second spring 25 is fixing with the inner surface of described first framework 21 to be connected, described second bullet The left end of spring 25 is fixing with described baffle plate 23 to be connected, thus plays a supporting role described baffle plate 23.Described second drainage screen 26 In cuboid, described second drainage screen 26 is vertically placed, and the lower end of described second drainage screen 26 is interior with described first framework 21 Surface is fixing to be connected, and the left surface of described second drainage screen 26 contacts with the right surface of described baffle plate 23.Described first sponge block 27 in cuboid, and the lower surface of described first sponge block 27 is fixing with the inner surface of described first framework 21 to be connected, and described first The right surface of sponge block 27 is fixing with the inner surface of described first framework 21 to be connected, and described first sponge block 27 blocks described second Through hole 212.
As it is shown in figure 1, described air extractor 3 include the first pipeline 32, the blower fan 31 being arranged on described first pipeline 32, First valve 33 and be positioned at the second support 34 above described blower fan 31.Described first pipeline 32 is L-shaped, described first pipeline 32 Upper end be directed at described second through hole 212 and fixing with the right surface of described first framework 21 be connected so that described first pipeline The inside of 32 communicates with the inside of described first framework 21.Described blower fan 31 is electrically connected with the power supply so that described first framework Air in 21 is drawn in described first pipeline 32.Described first valve 33 is used for controlling gas in described first pipeline 32 Flow.Described second support 34 is L-shaped, and one end of described second support 34 is fixing with described blower fan 31 to be connected, and described second The other end of support 34 is fixing with the right surface of described first framework 21 to be connected.
As it is shown in figure 1, described second defecator 4 include the second framework 41, be contained in described second framework 41 point Stream block 42, it is positioned at first bracer 43 below described branching block 42, is positioned at the 3rd filtration below described first bracer 43 Net 44, the bristle 45 being arranged on described second framework 41 inner surface, it is positioned at the dividing plate 46 below described 3rd drainage screen 44, position The 4th drainage screen 47 in described dividing plate 46 left and right sides, it is positioned at the 3rd spring 48 below described 4th drainage screen 47.Described Second framework 41 is in hollow cuboid, and described second framework 41 is vertically placed, and described second framework 41 is provided with position thereon The third through-hole 411 on surface and be positioned at the fourth hole 412 of its lower surface, described third through-hole 411 and fourth hole 412 are in circle Shape and the inside with described second framework 41 communicate, third through-hole 411 described in the lower end aligned of described first pipeline 32 and with institute State that the upper surface of the second framework 41 is fixing to be connected so that the inside phase of the inside of described first pipeline 32 and described second framework 41 Logical.Described branching block 42 is the cylinder of triangle in cross section, and described branching block 42 is positioned at the lower section of described third through-hole 411, The gas sprayed from third through-hole 411 is divided into left and right two parts.Described first bracer 43 is in cuboid, and described first supports The upper surface of block 43 is fixing with the lower surface of described branching block 42 to be connected, the lower surface of described first bracer 43 and the described 3rd The upper surface of drainage screen 44 is fixing to be connected.Described 3rd drainage screen 44 is in cuboid and horizontal positioned, described 3rd drainage screen 44 The inner surface of side and described second framework 41 fixing be connected.Described bristle 45 is provided with several, and described bristle 45 is in level Shape, one end of described bristle 45 is fixing with the inner surface of described second framework 41 to be connected, thus plays the gas entered necessarily Filtration.Described dividing plate 46 in cuboid and is vertically placed, the upper surface of described dividing plate 46 and described 3rd drainage screen 44 Lower surface fixing connect, the lower end of described dividing plate 46 is fixed with the inner surface of described second framework 41 and is connected, described dividing plate 46 Lower end be provided with the first groove 461, described first groove 461 is in rectangular-shaped and run through the surface, left and right of described dividing plate 46.Institute State the 4th drainage screen 47 and be provided with two, described 4th drainage screen 47 in cuboid and horizontal positioned, described 4th drainage screen 47 Side is slidably connected with the inner surface of described second framework 41, the side of described 4th drainage screen 47 and the side of described dividing plate 46 It is slidably connected so that described 4th drainage screen 47 can move up and down.Described 3rd spring 48 is provided with two, described 3rd spring 48 in vertical shape, and the lower end of described 3rd spring 48 is fixing with the inner surface of described second framework 41 to be connected, described 3rd spring The upper end of 48 is fixing with the lower surface of described 4th drainage screen 47 to be connected, thus described 4th drainage screen 47 plays support and makees With.
As it is shown in figure 1, described attachment means 5 includes second pipe 51, is positioned at the second horizontal stroke above described second pipe 51 Bar 52, it is positioned at the first montant 53 above described second cross bar 52, is positioned at the first brace 54 above described second cross bar 52, position The 3rd support 55 above described first brace 54, it is positioned at the second brace 56 on the left of described 3rd support 55 and is positioned at described The 4th support 57 below second brace 56.The upper end of described second pipe 51 is directed at described fourth hole 412 and with described the The lower surface of two frameworks 41 is fixing to be connected so that the inside of described second pipe 51 communicates with the inside of described second framework 41. Described second cross bar 52 is horizontal, and the right-hand member of described second cross bar 52 is fixing with the left surface of described second framework 41 to be connected. Described first montant 53 is in vertical shape, and the upper end of described first montant 53 is fixing with the lower surface of described 3rd support 55 to be connected. The described first inclined shape of brace 54, the lower end of described first brace 54 is fixing with the left surface of described second framework 41 to be connected, The upper end of described first brace 54 is fixing with the lower surface of described 3rd support 55 to be connected.Described 3rd support 55 is L-shaped, described The right-hand member of the 3rd support 55 is fixing with the left surface of described second framework 41 to be connected, and the left end of described 3rd support 55 is vertical shape And fixing with the lower surface of described first framework 21 be connected.The described second inclined shape of brace 56, described second brace 56 times Hold the left surface with described 3rd support 55 to fix to be connected, the upper end of described second brace 56 and the following table of described first framework 21 Face is fixing to be connected.Described 4th support 57 is L-shaped, and the upper end of described 4th support 57 is horizontal, described 4th support 57 Upper end is fixing with the left surface of described 3rd support 55 to be connected, and the lower end of described 4th support 57 is vertical shape.
As it is shown in figure 1, described 3rd defecator 6 include the 3rd framework 61, be contained in described 3rd framework 61 Two sponge blocks 62, be positioned on the left of described second sponge block 62 lean block 63, be positioned at described in lean the locating rack 64 on the left of block 63, 4th spring the 65, the 5th spring 66, it is positioned at the sponge ring 67 on the left of described 5th spring 66, is positioned on the left of described 3rd framework 61 Discharge pipe 68 and the second valve 69 of being arranged on described discharge pipe 68.Described 3rd framework 61 in hollow cylinder, institute Stating the 3rd framework 61 horizontal positioned, described 3rd framework 61 is provided with fifth hole 611 and clematis stem hole 612, described five-way Hole 611 and clematis stem hole 612 communicate with the inside of described 3rd framework 61, the left end alignment the described 5th of described second pipe 51 Through hole 611 and fixing with the outer surface of described 3rd framework 61 be connected so that the inside of described second pipe 51 and the described 3rd The inside of framework 61 communicates, and the lower end of described first montant 53 is fixing with described 3rd framework 61 to be connected, described second cross bar 52 Left end fixing with described 3rd framework 61 is connected, the lower end of described 4th support 57 is fixed with described 3rd framework 61 and is connected. Described second sponge block 62 is in bending, and the right surface of described second sponge block 62 is fixed with the inner surface of described 3rd framework 61 Connecting, described second sponge block 62 blocks described fifth hole 611, and the left surface of described second sponge block 61 leans block with described The right surface of 63 is fixing to be connected.The described cross section semicircular in shape leaning block 63, described in lean block 63 and act against to the right described On two sponge blocks 61.Described locating rack 64 is provided with two and lays respectively at the both sides up and down in described 3rd framework 61, described fixed Position frame 64 is L-shaped, and one end of described locating rack 64 is fixing with the inner surface of described 3rd framework 61 to be connected, described locating rack 64 The other end is horizontal, the setting of described locating rack 64 be possible to prevent described in lean block 63 and be excessively moved to the left.Described 4th bullet Spring 65 is provided with two, described 4th spring 65 horizontal positioned, the right-hand member of described 4th spring 65 and the described left-handed watch leaning block 63 Face is fixing to be connected, and the left end of described 4th spring 65 is fixing with the inner surface of described 3rd framework 61 to be connected, described 4th spring 65 are in compressive state so that described in lean block 63 steadily act against on described second sponge block 62, by described second sponge Block 62 flattens so that it is density diminishes, and filter effect is more preferable.Described 5th spring 66 is horizontal, the right side of described 5th spring 66 Holding to fix with the described left surface leaning block 63 and be connected, the left end of described 5th spring 66 is fixing with described sponge ring 67 to be connected. Described sponge ring 67 is the cylinder of annulus in cross section, described sponge ring 67 horizontal positioned, and described sponge ring 67 gets lodged in described The right side in clematis stem hole 612, described sponge ring 67 acts against on the inner surface of described 3rd framework 61 so that enter into the described 6th The double filtration through sponge ring 67 is needed in through hole 612.Described discharge pipe 68 is horizontal, the right-hand member pair of described discharge pipe 68 Accurate described clematis stem hole 612 and fixing with the outer surface of described 3rd framework 61 is connected so that the inside of described discharge pipe 68 and The inside of described 3rd framework 61 communicates.Described second valve 69 flow of gas in controlling described discharge pipe 68.
During as it is shown in figure 1, described construction site of the present invention uses with efficient dust arrester, first place it in needs On the building site of dedusting.Then blower fan 31 is started so that extraneous air communication dust enters in described air inlet bucket 11, so together After enter in described air inlet pipe 12, be then passed through the first through hole 211 and enter in described first framework 21.It is then passed through described Flow downward after the filtration of the first drainage screen 22, after being then passed through the filtration of the second drainage screen 26, flow to described second drainage screen The right side of 26, described first drainage screen 22 and the second drainage screen 26 can be by impurity particles bigger for the most of particle diameter in air Filtering out, the setting of described baffle plate 23 is so that air flows down, and through the filtration of the second drainage screen 26.Then empty Gas enters in described first pipeline 32 after the filtration of described first sponge block 27, and described first sponge block 27 can be by sky The dust contaminant filter that particle diameter in gas is less falls.Then the first valve 33 is opened so that the first rack plating makes a noise the air warp in 32 Cross third through-hole 411 to enter in described second framework 41.Shunting backward both sides flowing through branching block 42, is then passed through brush Flowing downward after the filtration of hair 45 and the 3rd drainage screen 44, described bristle 45 and the 3rd drainage screen 44 can be again to grains in air The less impurity in footpath filters, and described bristle 45 can be stained with glue so that it is adhere to the impurity dust in air so that it is mistake Filter effect is more preferable.Then air enters into below after the filtration of the 4th drainage screen 47, and described 4th drainage screen 47 is permissible Moving down, when air pressure is bigger, described 4th drainage screen 47 moves down, and plays the effect of buffering.Then air is through Four through holes 412 enter in described second pipe 51, then in described fifth hole 611, through the second sea flattened Leaning the left side of block 63 described in entering into after the filtration of continuous block 62, the second sponge block 62 of flattening can be by less for particle diameter in air Impurity dispose major part, filter effect is preferable.Then air enters into described row after the double filtration of sponge ring 67 Going out in pipe 68, open the second valve 69, the air after filtering is discharged, and now the dust impurity in air is less, will not be to ring Border pollutes.The double filtration of described sponge ring 67 refers to that air first passes around the filtration of its outer surface and enters into inside it, Filtration through its inner surface enters into outside it the most again.So far, construction site of the present invention uses with efficient dust arrester Process prescription is complete.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is not limited thereto, and any Those skilled in the art, in the technical scope that the invention discloses, can readily occur in change or replace, should contain Within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with described scope of the claims.

Claims (9)

1. the efficient dust arrester in construction site, it is characterised in that: described construction site is with efficient dust arrester bag Include air intake installation, be positioned at the first defecator on the right side of described air intake installation, be positioned at bleeding on the right side of described first defecator Device, it is positioned at the second defecator below described air extractor, is positioned at the attachment means below described second defecator, position The 3rd defecator on the left of described attachment means, described air intake installation includes air inlet bucket, is positioned on the right side of described air inlet bucket Air inlet pipe, it is positioned at the first support of the upper and lower both sides of described air inlet pipe and is positioned at the first cross bar on the left of described first support, described First defecator includes the first framework, the first drainage screen being contained in described first framework, is positioned at described first drainage screen The baffle plate on right side, it is positioned at the first spring above described baffle plate, the second spring of being positioned on described baffle plate, is positioned at described second bullet The second drainage screen below spring, being positioned at the first sponge block on the right side of described second drainage screen, described air extractor includes the first pipe Road, the blower fan being arranged on described first pipeline, the first valve and be positioned at the second support above described blower fan, described second mistake Filter device includes the second framework, the branching block being contained in described second framework, is positioned at the first support below described branching block Block, it is positioned at the 3rd drainage screen below described first bracer, the bristle being arranged on described second framework inner surface, is positioned at institute State the dividing plate below the 3rd drainage screen, be positioned at the 4th drainage screen of the described dividing plate left and right sides, be positioned under described 4th drainage screen 3rd spring of side, described attachment means include second pipe, be positioned at the second cross bar above described second pipe, be positioned at described The first montant above second cross bar, it is positioned at the first brace above described second cross bar, is positioned at above described first brace 3rd support, it is positioned at the second brace on the left of described 3rd support and is positioned at the 4th support below described second brace, described 3rd defecator includes the 3rd framework, the second sponge block being contained in described 3rd framework, is positioned at described second sponge block Left side lean block, be positioned at described in lean the locating rack on the left of block, the 4th spring, the 5th spring, to be positioned at described 5th spring left The sponge ring of side, it is positioned at the discharge pipe on the left of described 3rd framework and the second valve being arranged on described discharge pipe.
The efficient dust arrester in construction site the most according to claim 1, it is characterised in that: described air inlet bucket is hollow Round table-like, the surface, left and right of described air inlet bucket communicates.Described air inlet pipe is horizontal, and the left surface of described air inlet pipe is with described The right surface of air inlet bucket is fixing to be connected, and described first support is provided with two, and one end of described first support is solid with described air inlet pipe Fixed connecting, the other end of described first support is horizontal, and described first cross bar is provided with two, the right-hand member of described first cross bar with Described first support is fixing to be connected, and the left end of described first cross bar is fixing with described air inlet bucket to be connected.
The efficient dust arrester in construction site the most according to claim 2, it is characterised in that: described first framework is sky The cuboid of the heart, described first framework is provided with the first through hole being positioned at its left surface and the second through hole being positioned at its right surface, The right-hand member of described air inlet pipe is directed at described first through hole and fixing with the left surface of described first framework is connected, described first support Fixing with the left surface of described first framework being connected, described first drainage screen is hollow hemispherical, described first drainage screen The inner surface of left surface and described first framework is fixing to be connected, the inclined shape in upper end of described baffle plate, the upper end of described baffle plate and The inner surface of described first framework is fixing to be connected, and the lower end of described baffle plate is vertical shape, and described first drainage screen acts against described On the left surface of baffle plate, described first spring is vertical shape, and the lower end of described first spring is fixing with described baffle plate to be connected, The inner surface of the upper end of described first spring and described first framework is fixing to be connected, and described second spring is horizontal, and described the The right-hand member of two springs is fixing with the inner surface of described first framework to be connected, and the left end of described second spring is fixing with described baffle plate even Connecing, described second drainage screen is cuboid, and described second drainage screen is vertically placed, the lower end of described second drainage screen and described the The inner surface of one framework is fixing to be connected, and the left surface of described second drainage screen contacts with the right surface of described baffle plate, and described first Sponge block is cuboid, and the lower surface of described first sponge block is fixing with the inner surface of described first framework to be connected, and described first The right surface of sponge block is fixing with the inner surface of described first framework to be connected.
The efficient dust arrester in construction site the most according to claim 3, it is characterised in that: described first pipeline is L Type, the upper end of described first pipeline is directed at described second through hole and fixing with the right surface of described first framework is connected, and described the Two supports are L-shaped, and one end of described second support and described blower fan are fixing to be connected, the other end of described second support and described the The right surface of one framework is fixing to be connected.
The efficient dust arrester in construction site the most according to claim 4, it is characterised in that: described second framework is sky The cuboid of the heart, described second framework vertically places, and described second framework is provided with third through-hole and the position being positioned at its upper surface In the fourth hole of its lower surface, third through-hole and the upper table with described second framework described in the lower end aligned of described first pipeline Face is fixing to be connected, described branching block be cross section be the cylinder of triangle, described branching block is positioned at the lower section of described third through-hole, Described first bracer is cuboid, and the upper surface of described first bracer is fixing with the lower surface of described branching block to be connected, institute State that the upper surface of the lower surface of first bracer and described 3rd drainage screen is fixing to be connected, described 3rd drainage screen be cuboid and Horizontal positioned, the side of described 3rd drainage screen is fixing with the inner surface of described second framework to be connected, and described bristle is provided with some Individual, described bristle is horizontal, and one end of described bristle is fixing with the inner surface of described second framework to be connected.
The efficient dust arrester in construction site the most according to claim 5, it is characterised in that: described dividing plate is cuboid And vertically place, the lower surface of the upper surface of described dividing plate and described 3rd drainage screen is fixing to be connected, the lower end of described dividing plate and The inner surface of described second framework is fixing to be connected, and the lower end of described dividing plate is provided with the first groove, and described 4th drainage screen is provided with two Individual, described 4th drainage screen is cuboid and horizontal positioned, the side of described 4th drainage screen and the interior table of described second framework Face is slidably connected, and the described side of the 4th drainage screen is connected with the side slip of described dividing plate, and described 3rd spring is provided with two, Described 3rd spring is vertical shape, and the lower end of described 3rd spring and the inner surface of described second framework are fixing to be connected, and described the The upper end of three springs is fixing with the lower surface of described 4th drainage screen to be connected.
The efficient dust arrester in construction site the most according to claim 6, it is characterised in that: described second pipe upper End is directed at described fourth hole and fixing with the lower surface of described second framework is connected, and described second cross bar is horizontal, described The right-hand member of the second cross bar is fixing with the left surface of described second framework to be connected, and described first montant is vertical shape, and described first erects The upper end of bar is fixing with the lower surface of described 3rd support to be connected, and the described first inclined shape of brace, under described first brace End is fixed with the left surface of described second framework and is connected, and the lower surface of the upper end of described first brace and described 3rd support is fixed Connecting, described 3rd support is L-shaped, and the right-hand member of described 3rd support is fixing with the left surface of described second framework to be connected, described The left end of the 3rd support is vertical shape and fixing with the lower surface of described first framework is connected, the described second inclined shape of brace, The lower end of described second brace is fixing with the left surface of described 3rd support to be connected, the upper end of described second brace and described first The lower surface of framework is fixing to be connected, and described 4th support is L-shaped, and the upper end of described 4th support is horizontal, described 4th The upper end of frame is fixing with the left surface of described 3rd support to be connected, and the lower end of described 4th support is vertical shape.
The efficient dust arrester in construction site the most according to claim 7, it is characterised in that: described 3rd framework is sky The cylinder of the heart, described 3rd framework horizontal positioned, described 3rd framework is provided with fifth hole and clematis stem hole, and described second The left end of pipeline is directed at described fifth hole and fixing with the outer surface of described 3rd framework is connected, the lower end of described first montant Fixing with described 3rd framework and be connected, the left end of described second cross bar is fixing with described 3rd framework to be connected, described 4th support Lower end and described 3rd framework fixing is connected, described second sponge block is bending, the right surface of described second sponge block and The inner surface of described 3rd framework is fixing to be connected, and described second sponge block blocks described fifth hole, described second sponge block Left surface is fixing with the described right surface leaning block to be connected, described in lean the cross section semicircular in shape of block, described in lean block to the right Acting against on described second sponge block, described locating rack is provided with two and lays respectively at the both sides up and down in described 3rd framework, Described locating rack is L-shaped, and the inner surface of one end of described locating rack and described 3rd framework is fixing to be connected, described locating rack another One end is horizontal.
The efficient dust arrester in construction site the most according to claim 8, it is characterised in that: described 4th spring is provided with Two, described 4th spring horizontal is placed, and the right-hand member of described 4th spring is fixed with the described left surface leaning block and is connected, described The left end of the 4th spring is fixing with the inner surface of described 3rd framework to be connected, and described 5th spring is horizontal, described 5th bullet The right-hand member of spring is fixed with the described left surface leaning block and is connected, and the left end of described 5th spring is fixing with described sponge ring to be connected, Described sponge ring be cross section be the cylinder of annulus, described sponge ring horizontal positioned, described sponge ring acts against described 3rd frame On the inner surface of body, described discharge pipe is horizontal, and the right-hand member of described discharge pipe is directed at described clematis stem hole and with the described 3rd The outer surface of framework is fixing to be connected.
CN201610625242.9A 2016-08-01 2016-08-01 Efficient dust removal device for building site Pending CN106039857A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610625242.9A CN106039857A (en) 2016-08-01 2016-08-01 Efficient dust removal device for building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610625242.9A CN106039857A (en) 2016-08-01 2016-08-01 Efficient dust removal device for building site

Publications (1)

Publication Number Publication Date
CN106039857A true CN106039857A (en) 2016-10-26

Family

ID=57197261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610625242.9A Pending CN106039857A (en) 2016-08-01 2016-08-01 Efficient dust removal device for building site

Country Status (1)

Country Link
CN (1) CN106039857A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106606912A (en) * 2016-12-07 2017-05-03 长泰惠龙新材料科技有限公司 Concrete asphalt mixing and dedusting device for building
CN106731277A (en) * 2017-02-22 2017-05-31 惠安灿锐信息技术咨询有限公司 A kind of cleaner for ceramic making of environmental protection
CN108187416A (en) * 2018-03-05 2018-06-22 北京弘纳绿源科技发展有限公司 A kind of haze administering method and dedusting filter

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100218469A1 (en) * 2007-10-02 2010-09-02 Rd42 Technologies S.R.L. A Socio Unico Bag filter and method for its construction
CN204656192U (en) * 2015-05-05 2015-09-23 优胜美特制药有限公司 A kind of circle bag dust pelletizing system
CN104958977A (en) * 2015-06-05 2015-10-07 成都赋阳技术开发有限公司 Air-cleaning and dedusting apparatus
CN105311919A (en) * 2015-12-01 2016-02-10 张萍 Electric wire burning gas purification treatment device
CN205252789U (en) * 2015-11-08 2016-05-25 蔡旭东 Industrial gas purification and dust removal equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100218469A1 (en) * 2007-10-02 2010-09-02 Rd42 Technologies S.R.L. A Socio Unico Bag filter and method for its construction
CN204656192U (en) * 2015-05-05 2015-09-23 优胜美特制药有限公司 A kind of circle bag dust pelletizing system
CN104958977A (en) * 2015-06-05 2015-10-07 成都赋阳技术开发有限公司 Air-cleaning and dedusting apparatus
CN205252789U (en) * 2015-11-08 2016-05-25 蔡旭东 Industrial gas purification and dust removal equipment
CN105311919A (en) * 2015-12-01 2016-02-10 张萍 Electric wire burning gas purification treatment device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106606912A (en) * 2016-12-07 2017-05-03 长泰惠龙新材料科技有限公司 Concrete asphalt mixing and dedusting device for building
CN106731277A (en) * 2017-02-22 2017-05-31 惠安灿锐信息技术咨询有限公司 A kind of cleaner for ceramic making of environmental protection
CN108187416A (en) * 2018-03-05 2018-06-22 北京弘纳绿源科技发展有限公司 A kind of haze administering method and dedusting filter

Similar Documents

Publication Publication Date Title
CN205760187U (en) Pulsed jet cloth filter
CN105879491A (en) Sewage purification treatment equipment for ore production
CN105126440B (en) A kind of rainwater-collecting purifier
CN207287019U (en) A kind of multistage environmental protection type dust-extraction unit
CN106039857A (en) Efficient dust removal device for building site
CN105771530A (en) Dust removal system for mineral production workshop
CN203993414U (en) Slabstone grinding process device
CN106582173B (en) A kind of water-saving processing of stone dust collection processing equipment
CN104096444B (en) Workshop dust filter unit
CN107088328A (en) A kind of stone oil well drilling sullage processing equipment
CN108096974A (en) A kind of adjustable for height mining dust-extraction unit of dust suction
CN105171612A (en) Wet type grinding table
CN106223401A (en) A kind of rainwater-collecting filter
CN105879510A (en) Environment-friendly and efficient industrial-dust removing device
CN109173363A (en) Continuous activated carbon filter device and its operation method
CN105275392B (en) A kind of hydraulic drill rig of good dustproof effect
CN209156210U (en) A kind of coating painting area powder recovering device
CN106237734A (en) A kind of efficient dedusting and purifying air system
CN204546299U (en) A kind of dust pelletizing system
CN106310795A (en) Air filtering and purifying treatment system
CN106606913A (en) Dust purification equipment for furniture and building material production
CN208020518U (en) A kind of stone cutting device
CN104841235B (en) A kind of dismountable dust purification device
CN208390528U (en) Cleaning device is used in a kind of processing of new energy tricycle wheel
CN207694448U (en) A kind of bag filter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026

RJ01 Rejection of invention patent application after publication