CN106026080A - System and method for automatically controlling generating capacity of power plant - Google Patents

System and method for automatically controlling generating capacity of power plant Download PDF

Info

Publication number
CN106026080A
CN106026080A CN201610342923.4A CN201610342923A CN106026080A CN 106026080 A CN106026080 A CN 106026080A CN 201610342923 A CN201610342923 A CN 201610342923A CN 106026080 A CN106026080 A CN 106026080A
Authority
CN
China
Prior art keywords
unit
load
full factory
strategy
allocation strategy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610342923.4A
Other languages
Chinese (zh)
Other versions
CN106026080B (en
Inventor
张悦
韩璞
董泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201610342923.4A priority Critical patent/CN106026080B/en
Publication of CN106026080A publication Critical patent/CN106026080A/en
Application granted granted Critical
Publication of CN106026080B publication Critical patent/CN106026080B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/005

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a system and a method for automatically controlling the generating capacity of a power plant. The system comprises a whole plant automatic generation control optimizing device and at least one unit optimizing device, wherein the at least one unit optimizing device is respectively connected with the whole plant automatic generation control optimizing device and corresponding external unit controllers; the whole plant automatic generation control optimizing device is further connected with all of the external unit controllers; each unit optimizing device is used for collecting operating parameters from the corresponding unit controller and calculating operating efficiency of the corresponding unit according to the operating parameters; the whole plant automatic generation control optimizing device is used for calculating the loading value of each unit according to received whole plant load total command from a power grid side and received operating efficiency of each unit and forming the load distribution command of each unit to be sent to corresponding unit controllers so that the unit controllers are used for controlling the units to generate electricity according to the load distribution commands. According to the system and the method, the load can be reasonably distributed for each unit according to the operational state of each unit, so that the load loss of the power plant is avoided.

Description

A kind of power generating capacity automatic control system and method
Technical field
The present invention relates to electric power network technical field, be specifically related to a kind of power generating capacity automatic control system And method.
Background technology
At present, the scheduling of power plant units is used AGC directly to adjust mode by grid company mostly, will load Every unit, directly every unit load of scheduling are issued in instruction.This scheduling mode is due to can not be according to respectively The coa consumption rate of platform unit, desulfuration efficiency, the speed of response, range of accommodation, rate for incorporation into the power network, operating condition etc. Performance parameter, automatically, reasonably carries out optimum organization and the sharing of load of full brand-name computer group, causes energy wave Take and unit durability reduces;Simultaneously when the equipment faults such as power plant's single unit machine, stove to be dropped and to be exerted oneself operation, Institute's load down can not be transferred to another unit, cause the loss of power plant load.
Summary of the invention
The technical problem to be solved is to provide a kind of power generating capacity automatic control system and side Method, it is possible to be each unit reasonable distribution load according to the operation conditions of each unit, it is to avoid power plant load Loss.
The technical scheme is that a kind of power generating capacity automatically controls is System, optimizes device and at least one set optimization device, described machine including full factory AGC Automatic Generation Control Group optimizes device and is connected with described full factory Automatic Generation Control optimization device, described set optimization device also with Outside corresponding generator set controller connects;Described full factory Automatic Generation Control optimize device also with outside institute Generator set controller is had to connect;
Described set optimization device, is used for from corresponding generator set controller collection operational factor, and according to Described operational factor calculates the operational efficiency of corresponding unit;
Described full factory Automatic Generation Control optimizes device, for bearing according to the full factory from grid side received The operational efficiency of each unit that lotus always instructs and receives calculates the load value of each unit, and forms each The sharing of load instruction of unit is sent to corresponding generator set controller, so that generator set controller divides according to load Join instruction and control corresponding unit generation.
The invention has the beneficial effects as follows: run from corresponding generator set controller collection by set optimization device Parameter, and the operational efficiency of corresponding unit is calculated according to described operational factor, and then Shi Quan factory is sent out automatically Electric control optimizes device and always instructs the fortune with each unit according to the full factory load from grid side received Line efficiency calculates the load value of each unit, and the sharing of load instruction of each unit formed is sent to Corresponding generator set controller, sends out so that generator set controller controls corresponding unit according to sharing of load instruction Electricity, thus realize automatically, reasonably carrying out optimum organization and the sharing of load of full brand-name computer group, it is to avoid the energy Waste and unit durability reduce.
On the basis of technique scheme, the present invention can also do and improve as follows:
Further, described full factory Automatic Generation Control optimization device includes control strategy module;
Described control strategy module, for always instructing the full factory load from grid side received and each The operational efficiency of unit, calculates the load value of each unit according to load distribution strategy.
Further, described load distribution strategy particularly as follows:
After full factory Automatic Generation Control optimizes the full factory load instruction that device receives grid side, according to connecing The full factory load instruction of the grid side received and the full factory load instruction meter of the last grid side received Calculate load variations value, and as load variations value >=(operating unit number of units × 10) MW, the most all units Total rate of change be (operating unit number of units × single-machine capacity × 1%) MW/min, need to meet during distribution Single unit speed >=(single-machine capacity × 1.5%) MW/min;
When full factory Automatic Generation Control optimize load variations value < that device receives (operating unit number of units × 10) during MW, then total rate of change be (operating unit number of units × single-machine capacity × 1.5% (MW/min, Single unit speed >=(single-machine capacity × 1.5%) MW/min need to be met during distribution.
Further, described load distribution strategy is unit generation efficiency allocation strategy, regulations speed distribution plan Summary, pondage allocation strategy, normalization index allocation strategy and fixed point power distribution strategies in arbitrary Plant strategy;
Described unit generation efficiency allocation strategy is particularly as follows: by the generating efficiency of each unit at all units Ratio in generating aggregate efficiency always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described regulations speed allocation strategy is particularly as follows: by the regulations speed of each unit at the tune of all units The ratio in total speed of saving always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described pondage allocation strategy is particularly as follows: by the pondage of each unit at the tune of all units Ratio in joint total capacity always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described normalization index allocation strategy particularly as follows: by the weights coefficient of each unit set in advance with Full factory load always instructs and is multiplied, and obtains the load value of each unit;
Described fixed point power distribution strategies is particularly as follows: by the fixed point power difference of each unit at all units Fixed point power difference in accounting always instruct with full factory load and be multiplied, obtain the load value of each unit; Described fixed point power difference is fixed point performance number set in advance and the difference of actually measured fixed point performance number.
Further, described system management module, for obtaining the operational factor of unit from set optimization device And classify;
Described data base, for the real-time and operational factor of classification storage unit;
Described historical data base, for transferring corresponding operation from data base according to the record format set Parameter stores as historical record.
Further, described full factory Automatic Generation Control optimization device (1) also includes alarm module and form Module;
Described alarm module, for judging whether according to the data point operational factor of storage in historical data base For default normal operational parameters value, if it is not, be then judged as fault, and report to the police;Otherwise, do not do and locate Reason.
Described Reports module, for by data base in real time and the unit operation parameter of classification storage and/or Historical record in historical data base exports in the Excel template pre-set.
Further, described full factory Automatic Generation Control optimizes device and also includes trend display module, and being used for will Parameter forming curves figure in data base and/or historical data base shows.
The another kind of technical scheme that the present invention solves above-mentioned technical problem is as follows: a kind of power generating capacity is automatic Control method, comprises the following steps:
Set optimization device gathers operational factor from corresponding generator set controller, and runs ginseng according to described Number calculates the operational efficiency of corresponding unit;
It is total according to the full factory load from grid side received that described full factory Automatic Generation Control optimizes device The operational efficiency of each unit of instruction and reception calculates the load value of each unit, and forms each unit Sharing of load instruction be sent to corresponding generator set controller, so that generator set controller refers to according to sharing of load Order controls corresponding unit generation.
The invention has the beneficial effects as follows: run from corresponding generator set controller collection by set optimization device Parameter, and the operational efficiency of corresponding unit is calculated according to described operational factor, and then Shi Quan factory is sent out automatically Electric control optimizes device and always instructs the fortune with each unit according to the full factory load from grid side received Line efficiency calculates the load value of each unit, and the sharing of load instruction of each unit formed is sent to Corresponding generator set controller, sends out so that generator set controller controls corresponding unit according to sharing of load instruction Electricity, thus realize automatically, reasonably carrying out optimum organization and the sharing of load of full brand-name computer group, it is to avoid the energy Waste and unit durability reduce.
On the basis of technique scheme, the present invention can also do and improve as follows:
Further, described load distribution strategy particularly as follows:
After full factory Automatic Generation Control optimizes the full factory load instruction that device receives grid side, according to connecing The full factory load instruction of the grid side received and the full factory load instruction meter of the last grid side received Calculate load variations value, and as load variations value >=(operating unit number of units × 10) MW, the most all units Total rate of change be (operating unit number of units × single-machine capacity × 1%) MW/min, need to meet during distribution Single unit speed >=(single-machine capacity × 1.5%) MW/min;
When full factory Automatic Generation Control optimize load variations value < that device receives (operating unit number of units × 10) during MW, then total rate of change be (operating unit number of units × single-machine capacity × 1.5% (MW/min, Single unit speed >=(single-machine capacity × 1.5%) MW/min need to be met during distribution.
Further, described load distribution strategy is unit generation efficiency allocation strategy, regulations speed distribution plan Summary, pondage allocation strategy, normalization index allocation strategy and fixed point power distribution strategies in arbitrary Plant strategy;
Described unit generation efficiency allocation strategy is particularly as follows: by the generating efficiency of each unit at all units Generating aggregate efficiency in ratio always instruct with full factory load and be multiplied, obtain the load value of each unit;
Described regulations speed allocation strategy is particularly as follows: by the regulations speed of each unit at the tune of all units The ratio in total speed of saving always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described pondage allocation strategy is particularly as follows: by the pondage of each unit at the tune of all units Ratio in joint total capacity always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described normalization index allocation strategy particularly as follows: by the weights coefficient of each unit set in advance with Full factory load always instructs and is multiplied, and obtains the load value of each unit;
Described fixed point power distribution strategies is particularly as follows: by the fixed point power difference of each unit at all units Fixed point power difference in accounting always instruct with full factory load and be multiplied, obtain the load value of each unit; Described fixed point power difference is fixed point performance number set in advance and the difference of actually measured fixed point performance number.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention a kind of power generating capacity automatic control system;
Fig. 2 is the schematic flow sheet of the present invention a kind of power generating capacity autocontrol method.
Detailed description of the invention
Being described principle and the feature of the present invention below in conjunction with accompanying drawing, example is served only for explaining this Invention, is not intended to limit the scope of the present invention.
Fig. 1 is the structural representation of the present invention a kind of power generating capacity automatic control system.
As it is shown in figure 1, a kind of power generating capacity automatic control system, including full factory AGC automatic generation control System optimizes device 1 and at least one set optimization device 2, described set optimization device 2 and described full factory Automatic Generation Control optimizes device 1 and connects, also corresponding with the outside unit control of described set optimization device 2 Device processed connects;Described full factory Automatic Generation Control optimizes device 1 also with outside all generator set controllers even Connect;
Described set optimization device 2, for gathering operational factor, Yi Jigen from corresponding generator set controller The operational efficiency of corresponding unit is calculated according to described operational factor;
Described full factory Automatic Generation Control optimizes device 1, for according to the full factory from grid side received The operational efficiency of each unit that load always instructs and receives calculates the load value of each unit, and is formed each The sharing of load instruction of individual unit is sent to corresponding generator set controller, so that generator set controller is according to load Distribution instruction controls corresponding unit generation.
Wherein, full factory Automatic Generation Control optimization device includes system management module, data base, control plan Slightly module, graphic interface module, historical data base and trend display module;
Described system management module, for collecting the fortune of unit when set optimization device from generator set controller After line parameter, from described set optimization device, obtain the operational factor of unit in real time, and to each machine The operational factor of group is classified;The operational factor of unit include coa consumption rate, desulfuration efficiency, the speed of response, The performance parameters such as range of accommodation, rate for incorporation into the power network, operating condition;
Described data base, for the real-time and operational factor of classification storage unit;
Described graphic interface module, is used for providing drawing function, makes user draw and includes being suitable for power plant's requirement All kinds operation screen, and preserve to picture library with the form of pel, wherein, data base includes figure Storehouse;
Graphical interfaces module provides the user workbox, and user only needs to choose corresponding instrument, applies Mus Mark just can make monitored picture according to the demand of oneself.
Graphical interfaces module has a following functions:
1) MDI is provided;
2) provide multiple basic drawing instrument, including straight line, rectangle, round rectangle, ellipse, sector, Polygon, broken line, word and bitmap;
3) provide dynamic data point fastening means, as analog quantity point, switching value point, rod figure, pointer, Real-time curve, XY curve and warning etc.;
4) can be by regulation after each element figure has abundant dynamic characteristic, and dynamic data connection Condition is changed color, flashes, hides and the operation such as mobile;
5) provide editting function, as copy, paste, in groups, division, redo, undo, upset, Left and right consistency from top to bottom, same high same width are with size and equally spaced editting function.So can be greatly improved work Make efficiency;
6) figure library facility is provided.The complex figure that user makes can be saved in picture library with the form of pel In, including be suitable for power plant require all kinds operation screen (as Electrically operated gate, electromagnetic valve, motor, Electric switch, program control, help screen etc.), only need to recall from picture library when reusing, picture connects Should be easy, greatly reduce repeated labor.
7) solid figure can be made.
8) button of feature richness and focus instrument, can realize base map switching easily, issue life Make, the function such as ejection operation window.
9) pop-up window function flexibly, can configuration picture, order etc. in pop-up window, and carry There is simulation numeric keypad.
Described historical data base, for transferring corresponding operation from data base according to the record format set Parameter stores as historical record;
Historical data base is to choose from data base according to the record format set to need the data point of record Operational factor, the record format of setting includes: common gather moment record, hour record, day entry, Recollect record, SOE records (Sequence Of Event, sequence of events recording).In historical data base The storage of historical record and process have two ways, and a kind of is the form using and writing fixed disk file, another kind of It it is the form using private database.Common collection moment record, refers to adopting of the data point according to acquiescence The collection moment goes to gather data point;
Historical data base consists of the following components:
Periodic recording: the point of all entrance data bases all enters historical data base, records the change of point per second.
Recollect record: record (amount of logic change) before and after certain event occurs, it is intended that the data in the time Change, an event can be made up of the inclusive-OR operation relation of most 8 amount of logic changes, each thing Part at most can record 128 data points, and the record period of each point is the second, and the minimum period is 1 second, Totally 20 minute data before and after each most recording events of point.One file record data of a day, write File with the name of date on the same day.
Isolated cases record: indicate, in alarm logging, record system database, the alarm logging that need to deposit, Every month one log file.
Trend display module, for showing the data forming curves figure in data base and/or historical data base Show.
Full factory Automatic Generation Control optimizes device and also includes alarm module, for depositing according in historical data base The operational factor of storage determines whether the normal operational parameters preset, if it is not, be then judged as fault, and Report to the police to user in a voice form;Otherwise, do not process.
Enable operations staff to pinpoint the problems in time by alarm module, quickly properly process problem, and Can reliably record alarm procedure.
Wherein, warning message can also be shown by alarm module, warning message include alarm point title, Type of alarm, currency, state, warning date, time, place process station number, warning group number, card Piece number.
Full factory Automatic Generation Control optimizes device 1 and also includes Reports module, for by data base in real time and Historical record in the unit operation parameter of classification storage and/or historical data base exports to pre-set Excel template in.
Reports module is based on Excel application program, by notes various in data base and/or historical data base Record exports to user according in the good Excel template of actual field Demand Design.Excel template be by with Various template is organized at family as requested, and formats.
Described control strategy module, for always instructing the full factory load from grid side received and each The operational efficiency of unit, calculates the load value of each unit according to load distribution strategy;
Described load distribution strategy particularly as follows:
After full factory Automatic Generation Control optimizes the full factory load instruction that device 1 receives grid side, according to The full factory load instruction of the grid side received and the full factory load instruction of the last grid side received Calculated load changing value, and as load variations value >=(operating unit number of units × 10) MW, then institute is organic Total rate of change of group is (operating unit number of units × single-machine capacity × 1%) MW/min, need to expire during distribution Foot single unit speed >=(single-machine capacity × 1.5%) MW/min;
When full factory Automatic Generation Control optimize load variations value < that device 1 receives (operating unit number of units × 10) during MW, then total rate of change be (operating unit number of units × single-machine capacity × 1.5% (MW/min, Single unit speed >=(single-machine capacity × 1.5%) MW/min need to be met during distribution.
Described load distribution strategy is unit generation efficiency allocation strategy, regulations speed allocation strategy, regulation Any one strategy in capacity allocation strategy, normalization index allocation strategy and fixed point power distribution strategies;
Described unit generation efficiency allocation strategy is particularly as follows: by the generating efficiency of each unit at all units Ratio in generating aggregate efficiency always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described regulations speed allocation strategy is particularly as follows: by the regulations speed of each unit at the tune of all units The ratio in total speed of saving always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described pondage allocation strategy is particularly as follows: by the pondage of each unit at the tune of all units Ratio in joint total capacity always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described normalization index allocation strategy particularly as follows: by the weights coefficient of each unit set in advance with Full factory load always instructs and is multiplied, and obtains the load value of each unit;
Described fixed point power distribution strategies is particularly as follows: by the fixed point power difference of each unit at all units Fixed point power difference in accounting always instruct with full factory load and be multiplied, obtain the load value of each unit; Described fixed point power difference is unit load value set in advance and the difference of actually measured unit load value.
Fig. 2 is the schematic flow sheet of the present invention a kind of power generating capacity autocontrol method.
As in figure 2 it is shown, a kind of power generating capacity autocontrol method, comprise the following steps:
Set optimization device 2 gathers operational factor from corresponding generator set controller, and according to described operation Parameter calculates the operational efficiency of corresponding unit;
It is total according to the full factory load from grid side received that described full factory Automatic Generation Control optimizes device 1 The operational efficiency of each unit of instruction and reception calculates the load value of each unit, and forms each unit Sharing of load instruction be sent to corresponding generator set controller, so that generator set controller refers to according to sharing of load Order controls corresponding unit generation.
Wherein, load distribution strategy particularly as follows:
After full factory Automatic Generation Control optimizes the full factory load instruction that device 1 receives grid side, according to The full factory load instruction of the grid side received and the full factory load instruction of the last grid side received Calculated load changing value, and as load variations value >=(operating unit number of units × 10) MW, then institute is organic Total rate of change of group is (operating unit number of units × single-machine capacity × 1%) MW/min, need to expire during distribution Foot single unit speed >=(single-machine capacity × 1.5%) MW/min;
When full factory Automatic Generation Control optimize load variations value < that device 1 receives (operating unit number of units × 10) during MW, then total rate of change be (operating unit number of units × single-machine capacity × 1.5% (MW/min, Single unit speed >=(single-machine capacity × 1.5%) MW/min need to be met during distribution.
Wherein, load distribution strategy is unit generation efficiency allocation strategy, regulations speed allocation strategy, tune Any one plan in joint capacity allocation strategy, normalization index allocation strategy and fixed point power distribution strategies Slightly;
Described unit generation efficiency allocation strategy is particularly as follows: by the generating efficiency of each unit at all units Ratio in generating aggregate efficiency always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described regulations speed allocation strategy is particularly as follows: by the regulations speed of each unit at the tune of all units The ratio in total speed of saving always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described pondage allocation strategy is particularly as follows: by the pondage of each unit at the tune of all units Ratio in joint total capacity always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described normalization index allocation strategy particularly as follows: by the weights coefficient of each unit set in advance with Full factory load always instructs and is multiplied, and obtains the load value of each unit;
Described fixed point power distribution strategies is particularly as follows: by the fixed point power difference of each unit at all units Fixed point power difference in accounting always instruct with full factory load and be multiplied, obtain the load value of each unit; Described fixed point power difference is unit load value set in advance and the difference of actually measured unit load value.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all in the present invention Spirit and principle within, any modification, equivalent substitution and improvement etc. made, should be included in this Within bright protection domain.

Claims (10)

1. a power generating capacity automatic control system, it is characterised in that include that full factory is sent out automatically Electric control optimizes device (1) and at least one set optimization device (2), described set optimization Device (2) is connected with described full factory Automatic Generation Control optimization device (1), and described unit is excellent Also corresponding with the outside generator set controller of gasifying device (2) connects;The automatic generation control of described full factory System optimizes device (1) also all with outside generator set controllers and is connected;
Described set optimization device (2), for running ginseng from corresponding generator set controller collection Number, and the operational efficiency of corresponding unit is calculated according to described operational factor;
Described full factory Automatic Generation Control optimizes device (1), for according to receive from electricity The operational efficiency of each unit that the full factory load of net side always instructs and receives calculates each unit Load value, and formed each unit sharing of load instruction be sent to corresponding generator set controller, So that generator set controller controls corresponding unit generation according to sharing of load instruction.
The most according to claim 1, a kind of power generating capacity automatic control system, its feature exists In, described full factory Automatic Generation Control optimizes device and includes control strategy module;
Described control strategy module, for always instructing the full factory load from grid side received With the operational efficiency of each unit, calculate the load value of each unit according to load distribution strategy.
The most according to claim 2, a kind of power generating capacity automatic control system, its feature exists In, described load distribution strategy particularly as follows:
Receive the full factory load of grid side refer to when full factory Automatic Generation Control optimizes device (1) After order, according to full factory load instruction and the last grid side received of the grid side received Full factory load instruction calculated load changing value, and when load variations value >=(operating unit number of units × 10), during MW, total rate of change of the most all units is that (operating unit number of units × unit holds Amount × 1%) MW/min, single unit speed >=(single-machine capacity × 1.5%) need to be met during distribution MW/min;
When full factory Automatic Generation Control optimizes the load variations value < (operation that device (1) receives Unit number of units × 10) MW time, then total rate of change is (operating unit number of units × single-machine capacity × 1.5% (MW/min need to meet single unit speed >=(single-machine capacity × 1.5%) during distribution MW/min。
The most according to claim 2, a kind of power generating capacity automatic control system, its feature exists In, described load distribution strategy be unit generation efficiency allocation strategy, regulations speed allocation strategy, Appointing in pondage allocation strategy, normalization index allocation strategy and fixed point power distribution strategies A kind of strategy;
Described unit generation efficiency allocation strategy is particularly as follows: by the generating efficiency of each unit in institute There is ratio in unit generation aggregate efficiency always to instruct with full factory load to be multiplied, obtain each unit Load value;
Described regulations speed allocation strategy particularly as follows: by the regulations speed of each unit institute organic The ratio regulated in total speed of group always instructs with full factory load and is multiplied, and obtains bearing of each unit Charge values;
Described pondage allocation strategy particularly as follows: by the pondage of each unit institute organic Ratio in the regulation total capacity of group always instructs with full factory load and is multiplied, and obtains bearing of each unit Charge values;
Described normalization index allocation strategy is particularly as follows: by the weights of each unit set in advance Coefficient always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described fixed point power distribution strategies is particularly as follows: by the fixed point power difference of each unit in institute There is the accounting in the fixed point power difference of unit always to instruct with full factory load to be multiplied, obtain each machine The load value of group;Described fixed point power difference is unit load value set in advance and actually measured The difference of unit load value.
The most according to claim 2, a kind of power generating capacity automatic control system, its feature exists In, described full factory Automatic Generation Control optimizes device (1) and also includes system management module, number According to storehouse and historical data base;
Described system management module, for obtaining the operational factor of unit also from set optimization device Classification;
Described data base, for the real-time and operational factor of classification storage unit;
Described historical data base, for transferring according to the record format set from data base accordingly Operational factor as historical record store.
The most according to claim 2, a kind of power generating capacity automatic control system, its feature exists In, described full factory Automatic Generation Control optimizes device (1) and also includes alarm module and form mould Block;
Described alarm module, for judging whether according to the operational factor of storage in historical data base For default normal operational parameters, if it is not, be then judged as fault, and report to the police;Otherwise, no Process;
Described Reports module, for by real-time in data base and the unit operation parameter of classification storage And/or the historical record in historical data base exports in the Excel template pre-set.
The most according to claim 2, a kind of power generating capacity automatic control system, its feature exists In, described full factory Automatic Generation Control optimizes device (1) and also includes trend display module, uses In by the data forming curves figure in data base and/or historical data base and show.
8. a power generating capacity autocontrol method, it is characterised in that comprise the following steps:
Set optimization device (2) gathers operational factor, Yi Jigen from corresponding generator set controller The operational efficiency of corresponding unit is calculated according to described operational factor;
Described full factory Automatic Generation Control optimize device (1) according to receive from grid side The operational efficiency of each unit that full factory load always instructs and receives calculates the load of each unit It is worth, and the sharing of load instruction forming each unit is sent to corresponding generator set controller, so that Generator set controller controls corresponding unit generation according to sharing of load instruction.
The most according to claim 8, a kind of power generating capacity autocontrol method, its feature exists In, described load distribution strategy particularly as follows:
Receive the full factory load of grid side refer to when full factory Automatic Generation Control optimizes device (1) After order, according to full factory load instruction and the last grid side received of the grid side received Full factory load instruction calculated load changing value, and when load variations value >=(operating unit number of units × 10), during MW, total rate of change of the most all units is that (operating unit number of units × unit holds Amount × 1%) MW/min, single unit speed >=(single-machine capacity × 1.5%) need to be met during distribution MW/min;
When full factory Automatic Generation Control optimizes the load variations value < (operation that device (1) receives Unit number of units × 10) MW time, then total rate of change is (operating unit number of units × single-machine capacity × 1.5% (MW/min need to meet single unit speed >=(single-machine capacity × 1.5%) during distribution MW/min。
A kind of power generating capacity autocontrol method, its feature Being, described load distribution strategy is unit generation efficiency allocation strategy, regulations speed distribution plan In summary, pondage allocation strategy, normalization index allocation strategy and fixed point power distribution strategies Any one strategy;
Described unit generation efficiency allocation strategy is particularly as follows: by the generating efficiency of each unit in institute There is ratio in unit generation aggregate efficiency always to instruct with full factory load to be multiplied, obtain each unit Load value;
Described regulations speed allocation strategy particularly as follows: by the regulations speed of each unit institute organic The ratio regulated in total speed of group always instructs with full factory load and is multiplied, and obtains bearing of each unit Charge values;
Described pondage allocation strategy particularly as follows: by the pondage of each unit institute organic Ratio in the regulation total capacity of group always instructs with full factory load and is multiplied, and obtains bearing of each unit Charge values;
Described normalization index allocation strategy is particularly as follows: by the weights of each unit set in advance Coefficient always instructs with full factory load and is multiplied, and obtains the load value of each unit;
Described fixed point power distribution strategies is particularly as follows: by the fixed point power difference of each unit in institute There is the accounting in the fixed point power difference of unit always to instruct with full factory load to be multiplied, obtain each machine The load value of group;Described fixed point power difference is unit load value set in advance and actually measured The difference of unit load value.
CN201610342923.4A 2016-05-23 2016-05-23 A kind of power generating capacity automatic control system and method Active CN106026080B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610342923.4A CN106026080B (en) 2016-05-23 2016-05-23 A kind of power generating capacity automatic control system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610342923.4A CN106026080B (en) 2016-05-23 2016-05-23 A kind of power generating capacity automatic control system and method

Publications (2)

Publication Number Publication Date
CN106026080A true CN106026080A (en) 2016-10-12
CN106026080B CN106026080B (en) 2019-10-22

Family

ID=57096576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610342923.4A Active CN106026080B (en) 2016-05-23 2016-05-23 A kind of power generating capacity automatic control system and method

Country Status (1)

Country Link
CN (1) CN106026080B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107612045A (en) * 2017-10-09 2018-01-19 国网安徽省电力公司 A kind of Power Plant generated energy intelligent dispensing system and method
CN113011724A (en) * 2021-03-04 2021-06-22 国家能源集团国源电力有限公司 Unit load distribution method and device and electronic equipment
CN113266868A (en) * 2021-04-15 2021-08-17 国电汉川发电有限公司 Multi-unit cooperative heat supply heat load intelligent distribution control system and method
CN113300410A (en) * 2021-04-14 2021-08-24 华能国际电力股份有限公司大连电厂 Whole-plant load optimization control system and method for cogeneration unit
CN113346498A (en) * 2021-07-07 2021-09-03 中国电建集团山东电力建设有限公司 IGCC generator set power load distribution method
CN113554251A (en) * 2020-04-23 2021-10-26 中国南方电网有限责任公司 Power generation load deviation distribution method, device, system and computer equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101453188A (en) * 2008-12-30 2009-06-10 上海市电力公司 Indication computing system with dynamic electricity generation side controlling performance standard
CN101840215A (en) * 2009-12-22 2010-09-22 中国南方电网有限责任公司调峰调频发电公司天生桥水力发电总厂 Hydropower station machine unit automatic generation control realization method based on PLC (Programmable Logic Controller) device
CN102593860A (en) * 2012-01-18 2012-07-18 北京四方继保自动化股份有限公司 Automatic generation control and automatic voltage control integrated substation system of power plant
CN203967766U (en) * 2014-02-19 2014-11-26 广东电网公司电力科学研究院 Cogeneration power plant's level of factory load based on level of factory information monitoring system is optimized distributor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101453188A (en) * 2008-12-30 2009-06-10 上海市电力公司 Indication computing system with dynamic electricity generation side controlling performance standard
CN101840215A (en) * 2009-12-22 2010-09-22 中国南方电网有限责任公司调峰调频发电公司天生桥水力发电总厂 Hydropower station machine unit automatic generation control realization method based on PLC (Programmable Logic Controller) device
CN102593860A (en) * 2012-01-18 2012-07-18 北京四方继保自动化股份有限公司 Automatic generation control and automatic voltage control integrated substation system of power plant
CN203967766U (en) * 2014-02-19 2014-11-26 广东电网公司电力科学研究院 Cogeneration power plant's level of factory load based on level of factory information monitoring system is optimized distributor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡伟 等: "基于分层控制的AGC与AVC自动优化协调控制策略", 《电力系统自动化》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107612045A (en) * 2017-10-09 2018-01-19 国网安徽省电力公司 A kind of Power Plant generated energy intelligent dispensing system and method
CN113554251A (en) * 2020-04-23 2021-10-26 中国南方电网有限责任公司 Power generation load deviation distribution method, device, system and computer equipment
CN113011724A (en) * 2021-03-04 2021-06-22 国家能源集团国源电力有限公司 Unit load distribution method and device and electronic equipment
CN113300410A (en) * 2021-04-14 2021-08-24 华能国际电力股份有限公司大连电厂 Whole-plant load optimization control system and method for cogeneration unit
CN113266868A (en) * 2021-04-15 2021-08-17 国电汉川发电有限公司 Multi-unit cooperative heat supply heat load intelligent distribution control system and method
CN113266868B (en) * 2021-04-15 2022-11-29 国电汉川发电有限公司 Multi-unit cooperative heat supply heat load intelligent distribution control system and method
CN113346498A (en) * 2021-07-07 2021-09-03 中国电建集团山东电力建设有限公司 IGCC generator set power load distribution method
CN113346498B (en) * 2021-07-07 2022-11-29 中国电建集团山东电力建设有限公司 IGCC generator set power load distribution method

Also Published As

Publication number Publication date
CN106026080B (en) 2019-10-22

Similar Documents

Publication Publication Date Title
CN106026080A (en) System and method for automatically controlling generating capacity of power plant
CN104578402B (en) For controlling the method and system of electric power networks
CN102193544B (en) Intelligent building energy management system
CN114362189A (en) Calling method, system and device capable of adjusting load participation demand response
CN102637203B (en) Method for processing electric quantity data and monitoring master station for automatic electric energy metering systems
CN112178756B (en) Intelligent heat supply management system and working method thereof
CN103559655B (en) The Forecasting Methodology of the novel feeder line load of microgrid based on data mining
HUE035925T2 (en) Hybrid electric generating power plant that uses a combination of real-time generation facilities and energy storage system
CN102063563B (en) Network-province-local integrative bus load predicting method
CN106451761B (en) Large-area power failure automatic monitoring and analyzing system based on dynamic data driving
CN201789341U (en) Monitoring system of intelligent micro-grid
CN105529793A (en) Control method for electromobile group-charging microgrid simultaneously serving as emergency power supply
CN103092169B (en) Digital camp apparatus management/control device
CN102222906A (en) Laminated and partitioned automatic current control method applicable to multi-target power grid
US11018523B2 (en) Utility grid, intermittent energy management system
CN109697525A (en) A kind of recent life-span prediction method of batch electric energy meter multiple faults mode
CN112950001B (en) Intelligent energy management and control system and method based on cloud edge closed-loop architecture
CN110034561A (en) A kind of wind farm energy storage capacity optimization method based on cloud energy storage lease service
CN102340140A (en) Method for automatically fast calculating stability limit of large-scale interconnected power grid and stability control strategy
CN104868471A (en) Static security aid decision making method for provincial power grid
CN104113140B (en) A kind of industrial enterprise's level of factory power demand control system and device
CN114244679A (en) Layered control method for communication network of virtual power plant under cloud-edge-end architecture
EP3284155A1 (en) Precautionary feeding of temporarily stored power into a power suppy nework based on a prediction of power availability and power supply security
CN115459258A (en) Load accurate regulation and control method and system based on distribution automation
CN117543591B (en) Power grid load management and time-sharing charging system based on mass data analysis and guidance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant