CN106026052A - Fault processing method and device of feeder automation system under switchgear malfunction condition - Google Patents
Fault processing method and device of feeder automation system under switchgear malfunction condition Download PDFInfo
- Publication number
- CN106026052A CN106026052A CN201610608401.4A CN201610608401A CN106026052A CN 106026052 A CN106026052 A CN 106026052A CN 201610608401 A CN201610608401 A CN 201610608401A CN 106026052 A CN106026052 A CN 106026052A
- Authority
- CN
- China
- Prior art keywords
- switch
- distribution network
- protection
- failure
- fault
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention relates to a fault processing method and device of a feeder automation system under a switchgear malfunction condition. The method comprises a step of judging whether a distribution network is failed or not, a step of determining a distribution network fault area, a step of controlling the protection switch in the distribution network fault area to trip, a step of judging whether the protection switch in the distribution network fault area has switchgear malfunction, a step of controlling a switch adjacent to the protection switch with the switchgear malfunction to trip, wherein the adjacent switch is outside the distribution network fault area, and a step of carrying out fault recovery through a recovery module. The device comprises a detection module which is connected to the distribution network and the protection switch, a protection module which is connected to the detection module and the protection switch, and the recovery module which is connected to the protection switch. Compared with the prior art, the method and the device have the advantages of high fault tolerance ability, strong automatic performance, simple method, and high robustness.
Description
Technical field
The present invention relates to power system automatic field, in the case of especially relating to a kind of switch failure, feeder line is automatic
The fault handling method of change system and device.
Background technology
The feeder automation of distribution network systems can be divided into distributed feeder automation and centralized feeder automation, works as distribution
Net be short-circuited fault, singlephase earth fault time, feed line automatization system by distribution terminal detect fault, according to
Feeder automation algorithm by main website or Distributed power terminal realize the automatically excision of fault, fault section automatic
Isolation, the problem such as be automatically positioned of the automatic recovery of power supply in non-faulting region and trouble point, improve power supply reliability.
It is good that current feed line automatization system is all based on signal intelligence, real under the conditions of power equipment normal operation etc.
Existing fault detect, Fault Isolation and fault recovery.But still suffer from actual distribution network systems substantial amounts of always
Old power equipment, often occurs that protection switchs the situation of interim tripping, and current feed line automatization system is to switch
The situation of tripping is without solution, and when switch occurs tripping, Distribution Network Failure cannot excise, now feeder automation system
System enters blocking, no longer carries out Fault Isolation and fault recovery, finally causes transformer station's outlet switch tripping operation to make
Whole piece distribution line dead electricity.
Summary of the invention
It is an object of the invention to provide a kind of fault-tolerant ability height for the problems referred to above, automatization's performance is strong, method is simple
The fault handling method of feed line automatization system and device in the case of easy row and the high switch failure of robustness.
The purpose of the present invention can be achieved through the following technical solutions:
The fault handling method of feed line automatization system in the case of a kind of switch failure, is used for preventing protection in power distribution network
Switch failure and the transformer station outlet switch tripping operation that causes, it is characterised in that described method comprises the following steps:
1) judge whether power distribution network breaks down, if then entering step 2), if otherwise returning step 1);
2) distribution network failure region is determined;
3) the protection switch trip in distribution network failure region is controlled;
4) judge whether the switch of the protection in distribution network failure region occurs switch failure, if then entering step 5),
If otherwise returning step 1);
5) controlling to occur the adjacent switch tripping operation of the protection switch of switch failure, described adjacent switch is positioned at power distribution network
Outside fault zone;
6) distribution network failure recovery is carried out;
7) carry out protection switch to recover.
Described step 5) particularly as follows:
51) the physical topology information of the protection switch that switch failure occurs is obtained;
52) there are all adjacent switches that the protection of switch failure switchs in inquiry;
53) judge whether adjacent switch is positioned at beyond distribution network failure region, and will determine that result is sent to protect mould
Block, if then protection module controls adjacent switch tripping operation, if otherwise protection module does not control adjacent switch tripping operation.
Described step 7) particularly as follows:
71) judge that distribution network failure region is recovered the most completely, if then entering step 72), if otherwise returning step
Rapid 6);
72) the protection switch request successively controlling tripping operation restores electricity;
73) judge the protection of tripping operation switchs whether full recovery is powered, if then showing that fault solves, if otherwise returning
Return step 72).
The fault treating apparatus of feed line automatization system in the case of a kind of switch failure, it is characterised in that described device
Including:
Detection module, is connected with power distribution network and protection switch respectively, is used for detecting distribution network failure, detects switch and refuse
Move, judge distribution network failure scope and obtain the physical topology information of protection switch;
Protection module, is connected with detection module and protection switch respectively, is used for controlling to protect switch trip;
Recover module, be connected with power distribution network, protection module and protection switch respectively, be used for recovering distribution network failure,
Judge that distribution network failure region is recovered state and controls to protect switch to restore electricity.
Described detection module includes:
Distribution network failure detector unit, is connected with power distribution network, is used for detecting distribution network failure and determining distribution network failure
Scope;
Protection switch detector unit, is connected with protection switch, for detecting switch failure and obtaining the thing of protection switch
Reason topology information.
Described recovery module includes:
Fault recovery unit, is connected with power distribution network, is used for recovering distribution network failure;
Recover judging unit, be connected with fault recovery unit and protection module respectively, be used for judging distribution network failure district
Territory is recovered the most completely;
Switch recovery unit, is connected with recovery judging unit and protection switch respectively, is recovering sentencing of judging unit
Response when disconnected result is for being, restores electricity for controlling protection switch according to the feedback result recovering judging unit.
Compared with prior art, the method have the advantages that
(1) by controlling to occur the protection adjacent switch trip of switch of switch failure to reach to expand fault model
Enclosing, it is ensured that the purpose of failure removal, it can be ensured that Fault Isolation, fault-tolerant ability is high.
(2) this method just can complete from distribution network failure to fault recovery a series of dynamic without artificial monitoring
Making, automatization's performance is strong, it is simple to realize.
(3) complete the most only need to control protect switch trip can realize, method is simple, save people
Power and power cost.
(4) owing to expanding fault coverage, it is hereby ensured that the circuit that will not break down does not has isolated
Situation, has ensured stablizing of whole power distribution network, and robustness is high.
(5) whole device is provided with detection module, protection module and recovers 3 modules of module, and the degree of modularity is high,
Convenient to operate and maintenance.
Accompanying drawing explanation
Fig. 1 is the method flow diagram of the present invention;
Fig. 2 is the schematic diagram that only one of which protection switch occurs switch failure;
Fig. 3 is the schematic diagram having two protection switches that switch failure occurs.
Detailed description of the invention
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with the technology of the present invention side
Implement premised on case, give detailed embodiment and concrete operating process, but the protection model of the present invention
Enclose and be not limited to following embodiment.
The present embodiment provides fault handling method and the device of feed line automatization system in the case of a kind of switch failure, should
Method realizes based on feeder automation.In power distribution network runs, according to the topology information of feed line automatization system,
Every protection switch has adjacent switch, according to the algorithm of feed line automatization system, if certain switch is in fault zone,
The then adjacent switch of its both sides, inevitable side is in fault zone, and opposite side is in non-faulting region.
The fault handling method of feed line automatization system in the case of a kind of switch failure has been obtained according to above-mentioned principle, as
Shown in Fig. 1, the method comprises the following steps:
1) judge whether power distribution network breaks down, if then entering step 2), if otherwise returning step 1);
2) distribution network failure region is determined;
3) the protection switch trip in distribution network failure region is controlled;
4) judge whether the switch of the protection in distribution network failure region occurs switch failure, if then entering step 5),
If otherwise returning step 1);
5) controlling to occur the adjacent switch tripping operation of the protection switch of switch failure, described adjacent switch is positioned at power distribution network
Outside fault zone:
51) the physical topology information of the protection switch that switch failure occurs is obtained;
52) there are all adjacent switches that the protection of switch failure switchs in inquiry;
53) judge whether adjacent switch is positioned at beyond distribution network failure region, and will determine that result is sent to protect mould
Block, if then protection module controls adjacent switch tripping operation, if otherwise protection module does not control adjacent switch tripping operation;
6) distribution network failure recovery is carried out;
7) carry out protection switch to recover:
71) judge that distribution network failure region is recovered the most completely, if then entering step 72), if otherwise returning step
Rapid 6);
72) the protection switch request successively controlling tripping operation restores electricity;
73) judge the protection of tripping operation switchs whether full recovery is powered, if then showing that fault solves, if otherwise returning
Return step 72).
In order to realize said method, the present embodiment additionally provides feed line automatization system in the case of a kind of switch failure
Fault treating apparatus, this device includes: detection module, respectively with power distribution network and protection switch be connected, be used for examining
It is measured electric network fault, detection switch failure, judges distribution network failure scope and obtain the physical topology letter of protection switch
Breath;Protection module, is connected with detection module and protection switch respectively, is used for controlling to protect switch trip;Recover mould
Block, is connected with power distribution network, protection module and protection switch respectively, is used for recovering distribution network failure, judging power distribution network
Fault zone is recovered state and controls to protect switch to restore electricity.
Wherein, detection module includes: distribution network failure detector unit, is connected with power distribution network, is used for detecting power distribution network
Fault and determine distribution network failure scope;Protection switch detector unit, is connected with protection switch, is used for detecting switch
Tripping and the physical topology information of acquisition protection switch.Recover module to include: fault recovery unit, with power distribution network even
Connect, be used for recovering distribution network failure;Recover judging unit, be connected with fault recovery unit and protection module respectively,
For judging that distribution network failure region is recovered the most completely;Switch recovery unit, respectively with recovery judging unit and guarantor
Protect switch to connect, the response when the judged result of recovery judging unit is for being, for according to recovering the anti-of judging unit
Feedback output control protection switch restores electricity.
The present embodiment uses 8 FTU imitate on-the-spot line to be tested, simulated field feeder automation
Fault detect, Fault Isolation and the recovery process in non-faulting region.The experiment system built with the DTU of laboratory
As a example by system, being artificially introduced switch fault in the different position of the switch in experimentation, system can be by the present invention
The method in the expansion Fault Isolation region proposed realizes isolation and the recovery in non-faulting region in region, trouble point.
As in figure 2 it is shown, A1-A8 is load switch, A6 is contact, and wherein A3 exists switch failure.S1、
S2 is protection exit switch.Fault occurs between A3 and A4, and system first determines whether A3 and A4 switch region
Between be fault zone, after A3 tripping being detected, system extract A3 adjacent switch information, find A2 exist
In non-faulting region, system controls A2 and has tripped Fault Isolation.A6 is asked to restore electricity after A4 Fault Isolation.
A2-A4 section is expanded as by original A3-A4 section in fault zone, and the non-faulting section of A2-A3 is also included into faulty section
Dead electricity.
As it is shown on figure 3, A1-A8 is load switch, A6 is contact, and wherein A3 and A4 all exists switch failure.
S1, S2 are protection exit switch.Fault occurs between A3 and A4, and system first determines whether that A3 and A4 opens
Closing interval is fault zone, and after A3 tripping being detected, system extracts the adjacent switch information of A3, finds A2
In non-faulting region, system controls A2 tripping operation, and after A4 tripping being detected, system extracts the adjacent of A4
Switching information, A5 is in non-faulting region in discovery, and system controls A5 tripping operation, asks A6 extensive after A5 Fault Isolation
Multiple power supply.A2-A5 section is expanded as by original A3-A4 section in fault zone.
Test result indicate that the method in the expansion Fault Isolation region that the present invention proposes can effectively strengthen feeder line automatic
Change fault-tolerant ability in performing process of fault isolation, reduce artificial participation and coordinate to control, improve the robustness of system.
Claims (6)
1. a fault handling method for feed line automatization system in the case of switch failure, in being used for preventing power distribution network
Protection switch failure and the transformer station outlet switch tripping operation that causes, it is characterised in that described method comprises the following steps:
1) judge whether power distribution network breaks down, if then entering step 2), if otherwise returning step 1);
2) distribution network failure region is determined;
3) the protection switch trip in distribution network failure region is controlled;
4) judge whether the switch of the protection in distribution network failure region occurs switch failure, if then entering step 5),
If otherwise returning step 1);
5) controlling to occur the adjacent switch tripping operation of the protection switch of switch failure, described adjacent switch is positioned at power distribution network
Outside fault zone;
6) distribution network failure recovery is carried out;
7) carry out protection switch to recover.
The fault handling method of feed line automatization system in the case of switch failure the most according to claim 1,
It is characterized in that, described step 5) particularly as follows:
51) the physical topology information of the protection switch that switch failure occurs is obtained;
52) there are all adjacent switches that the protection of switch failure switchs in inquiry;
53) judge whether adjacent switch is positioned at beyond distribution network failure region, and will determine that result is sent to protect mould
Block, if then protection module controls adjacent switch tripping operation, if otherwise protection module does not control adjacent switch tripping operation.
The fault handling method of feed line automatization system in the case of switch failure the most according to claim 1,
It is characterized in that, described step 7) particularly as follows:
71) judge that distribution network failure region is recovered the most completely, if then entering step 72), if otherwise returning step
Rapid 6);
72) the protection switch request successively controlling tripping operation restores electricity;
73) judge the protection of tripping operation switchs whether full recovery is powered, if then showing that fault solves, if otherwise returning
Return step 72).
4. the fault treating apparatus of feed line automatization system in the case of a switch failure, it is characterised in that described
Device includes:
Detection module, is connected with power distribution network and protection switch respectively, is used for detecting distribution network failure, detects switch and refuse
Move, judge distribution network failure scope and obtain the physical topology information of protection switch;
Protection module, is connected with detection module and protection switch respectively, is used for controlling to protect switch trip;
Recover module, be connected with power distribution network, protection module and protection switch respectively, be used for recovering distribution network failure,
Judge that distribution network failure region is recovered state and controls to protect switch to restore electricity.
The fault treating apparatus of feed line automatization system in the case of switch failure the most according to claim 4,
It is characterized in that, described detection module includes:
Distribution network failure detector unit, is connected with power distribution network, is used for detecting distribution network failure and determining distribution network failure
Scope;
Protection switch detector unit, is connected with protection switch, for detecting switch failure and obtaining the thing of protection switch
Reason topology information.
The fault treating apparatus of feed line automatization system in the case of switch failure the most according to claim 4,
It is characterized in that, described recovery module includes:
Fault recovery unit, is connected with power distribution network, is used for recovering distribution network failure;
Recover judging unit, be connected with fault recovery unit and protection module respectively, be used for judging distribution network failure district
Territory is recovered the most completely;
Switch recovery unit, is connected with recovery judging unit and protection switch, respectively in the judgement recovering judging unit
Respond when result is for being, restore electricity for controlling protection switch according to the feedback result recovering judging unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610608401.4A CN106026052A (en) | 2016-07-28 | 2016-07-28 | Fault processing method and device of feeder automation system under switchgear malfunction condition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610608401.4A CN106026052A (en) | 2016-07-28 | 2016-07-28 | Fault processing method and device of feeder automation system under switchgear malfunction condition |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106026052A true CN106026052A (en) | 2016-10-12 |
Family
ID=57114228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610608401.4A Pending CN106026052A (en) | 2016-07-28 | 2016-07-28 | Fault processing method and device of feeder automation system under switchgear malfunction condition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106026052A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108347032A (en) * | 2018-03-08 | 2018-07-31 | 山东山矿测控技术有限公司 | A method of preventing protective relaying maloperation work |
CN114142445A (en) * | 2021-11-26 | 2022-03-04 | 贵州电网有限责任公司 | Electrical operation trial sending method for preventing fault amplification |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002084656A (en) * | 2000-09-04 | 2002-03-22 | Hitachi Ltd | Malfunction preventing circuit for grounding protector |
CN101409442A (en) * | 2008-11-25 | 2009-04-15 | 中国南方电网有限责任公司 | Rapid line backup protection method with reliable selection based on wide area measuring system |
CN102005746A (en) * | 2010-11-30 | 2011-04-06 | 南京南瑞继保电气有限公司 | Method based on topology protection of distributing network |
CN104734143A (en) * | 2013-12-23 | 2015-06-24 | 国家电网公司 | Failure processing method and device of voltage and current hybrid line |
-
2016
- 2016-07-28 CN CN201610608401.4A patent/CN106026052A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002084656A (en) * | 2000-09-04 | 2002-03-22 | Hitachi Ltd | Malfunction preventing circuit for grounding protector |
CN101409442A (en) * | 2008-11-25 | 2009-04-15 | 中国南方电网有限责任公司 | Rapid line backup protection method with reliable selection based on wide area measuring system |
CN102005746A (en) * | 2010-11-30 | 2011-04-06 | 南京南瑞继保电气有限公司 | Method based on topology protection of distributing network |
CN104734143A (en) * | 2013-12-23 | 2015-06-24 | 国家电网公司 | Failure processing method and device of voltage and current hybrid line |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108347032A (en) * | 2018-03-08 | 2018-07-31 | 山东山矿测控技术有限公司 | A method of preventing protective relaying maloperation work |
CN114142445A (en) * | 2021-11-26 | 2022-03-04 | 贵州电网有限责任公司 | Electrical operation trial sending method for preventing fault amplification |
CN114142445B (en) * | 2021-11-26 | 2024-04-05 | 贵州电网有限责任公司 | Electrical operation test-feeding method for preventing fault expansion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103606910B (en) | The fault self-recovery method in a kind of outlet of the distribution feeder based on Wide-area Measurement Information dead band | |
CN105866615B (en) | 10kV distribution line disconnection fault determination method based on three-phase voltage current | |
CN104678264B (en) | The online Insulation monitoring of AUV DC power-supply systems and fault treating apparatus and method | |
CN103616579B (en) | Fault diagnosis method used for intelligent substation secondary system | |
CN103490392B (en) | Fault handling method of power distribution network comprising distributed power supplies and microgrids | |
CN102354977B (en) | Feeder fault handling method | |
CN105515188A (en) | Power distribution network centralized feed line automatic fault processing method | |
CN104359196B (en) | Data-center-based multiple-connection air conditioner control system and implementation method | |
KR101514999B1 (en) | Method and system for self-checking and self-separating of fault section by using smart protection devices in a power distribution system | |
CN101718813B (en) | Method for monitoring voltage acquisition circuit of electric power secondary system | |
CN109004631B (en) | Network-based power distribution network self-adaptive backup protection control method | |
CN109581085A (en) | A kind of collection electric wire and fault of interconnected transmission line discriminating direction method | |
CN107144757A (en) | A kind of Buchholz relay oil stream flow velocity on-Line Monitor Device and method | |
CN106026052A (en) | Fault processing method and device of feeder automation system under switchgear malfunction condition | |
CN108089119B (en) | Secondary circuit electrification detection method and system for relay protection secondary equipment of transformer substation | |
CN106610448A (en) | Adaptive overcurrent fault positioning method based on technology of STU recognition network topology | |
CN106018967B (en) | The online insulation against ground safety monitoring assembly of distributed photovoltaic system | |
CN105067959A (en) | Fault positioning method under ring network power supply condition | |
CN108616114B (en) | A kind of power distribution network distributed layer protection system and method for the group containing microgrid | |
CN106529824A (en) | Method for analyzing functional damage degrees of secondary equipment and secondary system of intelligent substation | |
CN104682565B (en) | Automatic acquisition and monitoring system for power grid information | |
CN103955200B (en) | Movable mould test method for self-healing control function of power distribution network | |
CN104092288B (en) | The spare power automatic switching method of intelligent substation and device | |
CN103872661B (en) | Network type protection method based on open-loop mode operation of power network | |
CN106712301B (en) | Fault-tolerance processing method suitable for power distribution network distributed fault self-healing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161012 |