CN106610448A - Adaptive overcurrent fault positioning method based on technology of STU recognition network topology - Google Patents

Adaptive overcurrent fault positioning method based on technology of STU recognition network topology Download PDF

Info

Publication number
CN106610448A
CN106610448A CN201611158743.7A CN201611158743A CN106610448A CN 106610448 A CN106610448 A CN 106610448A CN 201611158743 A CN201611158743 A CN 201611158743A CN 106610448 A CN106610448 A CN 106610448A
Authority
CN
China
Prior art keywords
fault
stu
current
control
failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611158743.7A
Other languages
Chinese (zh)
Inventor
嵇文路
沈培峰
徐丙垠
张海台
王勇
张明
毛小武
罗兴
吴辉
葛夕武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nanjing Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611158743.7A priority Critical patent/CN106610448A/en
Publication of CN106610448A publication Critical patent/CN106610448A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R19/00Arrangements for measuring currents or voltages or for indicating presence or sign thereof
    • G01R19/165Indicating that current or voltage is either above or below a predetermined value or within or outside a predetermined range of values

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Locating Faults (AREA)

Abstract

The invention provides an adaptive overcurrent fault positioning method based on the technology of STU recognition network topology, and the method comprises the steps: 1), building network topology information; 2), carrying out the adaptive fault positioning. The step of adaptive fault positioning mainly comprises the steps of single-power supply and multi-power supply. The single-power supply judgment comprises the steps: 11), intelligent terminal starting; 12), communication with an adjacent terminal; 13), fault criterion. The multi-power supply judgment comprises the steps: 21), intelligent terminal starting; 22), the determining of a fault start moment; 23), fault current phase calculation; 24), fault criterion. After a line has a fault, a proper overcurrent fault positioning method can be adaptively selected according to the real-time network structure of a system, and a distributed algorithm is employed. A main station does not need to participate, and the positioning speed is high. The power supply reliability of the system is improved.

Description

A kind of self adaptation over current fault localization method that network topologies are recognized based on STU
Technical field
The invention provides a kind of over current fault localization method, especially a kind of to recognize network topologies based on STU Self adaptation over current fault localization method.
Background technology
At present, power system usually increases testing equipment using extra, not only increases when over current fault positioning is carried out Monitoring cost, and process complexity is monitored, it is unfavorable for that extension is used.In addition, existing monitoring means during being monitored simultaneously The power supply state that system can not be directed to carrys out adaptively changing monitor mode, causes the reliability decrease for monitoring, it is difficult to meet current The monitoring requirement of power system high reliability.
The content of the invention
The technical problem to be solved in the present invention is that existing monitoring method needs extra increase equipment, and can not be according to system Power supply state carry out adaptively changing monitor mode, reliability is poor.
In order to solve above-mentioned technical problem, the invention provides a kind of self adaptation that network topologies are recognized based on STU Over current fault localization method, comprises the steps:
Step 1, master control STU set up the network real-time topology structure of system by inquiry mode step by step, and according to network reality When topological structure judge that system is presently at single supply power supply state or multiple feed state;
Step 2, master control STU according to the adaptively selected corresponding fault location flow process of power supply state, if single supply is powered, Single supply fault location flow process is entered then, if multiple feed, then into many power failure positioning flows, wherein,
Single supply fault location flow process is concretely comprised the following steps:
Started using the Sudden Changing Rate of transient zero-sequence current from control STU, and led to from control STU with adjacent upon actuation Letter, obtains the fault current information of adjacent switch;If adjacent switch detects fault current, failure is not in the adjacent switch On section;If adjacent switch is not detected by fault current or no adjacent switch, failure is on the section of adjacent switch;
Many power failure positioning flows are concretely comprised the following steps:
Started using difference of phase currents from control STU, and the first catastrophe point for detecting is calculated into failure as from control STU The phase place starting point of electric current, failure occur after, respectively from control STU according to mutation current detect fault-signal, and write down receive therefore Barrier signal moment, and on the basis of this moment calculate fault current real-time phase, then by the phase place starting point of fault current with Real-time phase is compared calculating;If there is two adjacent phase contrasts for comparing calculating from control STU to be 180 °, failure this two On section between the individual adjacent STU from control;It is if the phase contrast for comparing calculating from control STU is 0 °, adjacent from control STU with this No failure on section.
It is as the further limits scheme of the present invention, in step 2, when being started from control STU using difference of phase currents, mutually electric Stream Sudden Changing Rate computing formula be:
In formula,For difference of phase currents,For the phase current sampling value of K points,It is to light 1 cycle forward from K Current sampling data, N is the sampled point of every frequency cycle,It is the current sampling data that 2 cycles forward are lighted from K;As Δ Iφ > IsetWhen, IsetSudden Changing Rate for setting starts threshold value, then start from control STU.
The beneficial effects of the present invention is:(1) can real-time query network topology structure, according to different topology structure self adaptation Select suitable location algorithm, strong applicability;(2) from control distributed location method, it is not necessary to which main website is participated in, locating speed is fast, Adaptability is wide;(3) fault-signal Self-synchronous algorithm is adopted during operation with closed ring, and without the need for additionally increasing monitoring device, system letter Single, low cost and easy to implement.
Description of the drawings
Fig. 1 is method of the present invention flow chart;
Fig. 2 is the system structure diagram of the present invention;
Fig. 3 is the fault location flow chart under the single supply state of the present invention;
Fig. 4 is the fault location flow chart under many power supply status of the present invention.
Specific embodiment
As Figure 1-4, a kind of self adaptation over current fault based on STU identification network topologies that the present invention is provided is fixed Position method, comprises the steps:
Step 1, master control STU set up the network reality of system directly in response to by way of inquiring about step by step, being queried from control STU When topological structure, and single supply power supply state or many power supplys be presently at according to network real-time topology structure decision system supply Electricity condition;
Step 2, master control STU according to the adaptively selected corresponding fault location flow process of power supply state, if single supply is powered, Single supply fault location flow process is entered then, if multiple feed, then into many power failure positioning flows, wherein,
Single supply fault location flow process is concretely comprised the following steps:
Started using the Sudden Changing Rate of transient zero-sequence current from control STU, and led to from control STU with adjacent upon actuation Letter, obtains the fault current information of adjacent switch;If adjacent switch detects fault current, passing through property of failure is illustrated, then Failure is not on the section of the adjacent switch;If adjacent switch is not detected by fault current or no adjacent switch, failure is illustrated Electric current is injection, then failure on the section of adjacent switch, and confirm should from control STU it is corresponding switch belong to fault section Upstream boundary is switched;
Many power failure positioning flows are concretely comprised the following steps:
Started using difference of phase currents from control STU, failure initial time, circuit are determined using fault-signal motor synchronizing After breaking down, the failure initial time detected from control STU can be considered as synchronization, i.e., by the inspection of first catastrophe point Survey can determine failure initial time, therefore can be using the first catastrophe point for detecting as the phase place that fault current is calculated from control STU Starting point, the computing formula of difference of phase currents is:
In formula,For difference of phase currents,For the phase current sampling value of K points,It is to light 1 cycle forward from K Current sampling data, N is the sampled point of every frequency cycle,It is the current sampling data that 2 cycles forward are lighted from K;As Δ Iφ > IsetWhen, IsetSudden Changing Rate for setting starts threshold value, then start from control STU.Failure occur after, respectively from control STU according to Mutation current detects fault-signal, and writes down the moment for receiving fault-signal, and on the basis of this moment calculates fault current Real-time phase, then the phase place starting point of fault current and real-time phase are compared into calculating;If have two it is adjacent from control STU The phase contrast for relatively calculating is 180 °, then failure is adjacent from the section between control STU at this two;If comparing from control STU The phase contrast of calculating is 0 °, then with this from no failure on the control adjacent sections of STU.
The principle of the self adaptation over current fault localization method of the present invention is described as follows:
Master control STU sets up concretely comprising the following steps for applied topology by the way of inquiring about step by step:Inquire about adjacent from control first STU, obtains its local topology information and next stage from the mailing address of control STU;Then next stage is inquired about from control STU, obtain The mailing address of its local topology information and next stage terminal;The like, until inquire control domain border from control STU, so as to set up network topology structure.After topology is set up, the displacement of all switches in real-time monitoring topology is believed by master control STU Breath, carries out the real-time update of topology when topological structure changes.
Single supply is powered, and flows through fault current using fault section, and non-faulting section carries out event without flow through fault current Barrier positioning.Started using the Sudden Changing Rate of transient zero-sequence current from control STU, check adjacent switch whether also faulty electric current stream Cross.If adjacent switch is monitored (such as the switch of same ring main unit) from control STU by same, directly can check from control STU The whether faulty electric current of adjacent switch flows through, and otherwise needs with adjacent from control STU communications, obtains the inspection of adjacent switch fault current Survey result.Fault location criterion:If the adjacent switch in switch side detects fault current, passing through property of failure is illustrated, Failure is not on the section of the side;If the adjacent no fault current of switch in switch side flows through no in other words adjacent Switch, illustrates that fault current is injection, and failure is in the lateral areas section, and confirms that oneself belonging to fault section upstream boundary opens Close (switch adjacent with section is referred to as section boundaries switch, in boundary switch near transformer station switch, referred to as upstream boundary Switch).
Multiple feed, it is using phase bit comparison Fault Locating Method, i.e., contrary using the fault section both sides sense of current Principle realizes fault location.From control STU using mutation current start, each from control STU detect fault-signal when, write down reception To the moment of fault-signal, and using the time as the benchmark of fault current phase calculation.Each receives failure letter from control STU After number, its fault phase is calculated respectively, the fault current phase contrast of foundation only fault section both sides determines failure for 180 ° Section.
As shown in Fig. 2 distributed FA systems are mainly made up of QS1, QS2 (outlet switch) and Q1, Q2, Q3, Q4, Q5, and Each switch corresponds to a STU.
It is normal when running, cross the network topology that inquiry mode step by step obtains system near the STUA of transformer station, STUA according to System is powered in single supply or multiple feed state self-adaption uses suitable fault location algorithm.When detecting STU3 During to disconnect, i.e., when system is in single supply power supply mode, after failure occurs, STU2 detects the startup of failure mutation current, and Communicated with adjacent S TU1, STU3, the whether faulty electric current of inquiry adjacent switch flows through, the section for not having fault current is event Barrier section.When STU3 is detected to close, i.e., when system is in multiple feed mode, after failure occurs, STU2, STU3 inspection Start after measuring fault current, and communicate with adjacent S TU1, STU4, calculate the phase place of respective fault current and compare adjacent switch Fault current phase place, the section of opposite in phase is fault section.
The beneficial effect of self adaptation over current fault localization method that the present invention is provided is:
(1) can real-time query network topology structure, according to the adaptively selected suitable location algorithm of different topology, the suitability By force.
(2) distributed location method, it is not necessary to which main website is participated in, adaptability is wide.
(3) adopt fault-signal Self-synchronous algorithm during operation with closed ring, simple, low cost and easy to implement.
In a word, after line failure, suitable excessively stream can be selected according to the real-time network structure adaptive of system Fault Locating Method, and distributed algorithm is adopted, main website participation is not required to, locating speed is fast, improves the power supply reliability of system.

Claims (2)

1. it is a kind of based on STU recognize network topologies self adaptation over current fault localization method, it is characterised in that including as follows Step:
Step 1, master control STU set up the network real-time topology structure of system by inquiry mode step by step, and are opened up according to network in real time Flutter structure decision system and be presently at single supply power supply state or multiple feed state;
Step 2, master control STU, if single supply is powered then are entered according to the adaptively selected corresponding fault location flow process of power supply state Enter single supply fault location flow process, if multiple feed, then into many power failure positioning flows, wherein,
Single supply fault location flow process is concretely comprised the following steps:
Started using the Sudden Changing Rate of transient zero-sequence current from control STU, and communicated from control STU with adjacent upon actuation, obtained Take the fault current information of adjacent switch;If adjacent switch detects fault current, failure is not in the section of the adjacent switch On;If adjacent switch is not detected by fault current or no adjacent switch, failure is on the section of adjacent switch;
Many power failure positioning flows are concretely comprised the following steps:
Started using difference of phase currents from control STU, and the first catastrophe point for detecting is calculated into fault current as from control STU Phase place starting point, failure occur after, respectively from control STU according to mutation current detect fault-signal, and write down receive failure letter Number moment, and on the basis of this moment calculate fault current real-time phase, then by the phase place starting point of fault current with it is real-time Phase place is compared calculating;If there is two adjacent phase contrasts for comparing calculating from control STU to be 180 °, failure is in two phases It is adjacent from the section between control STU;If the phase contrast for comparing calculating from control STU is 0 °, with this from the control adjacent sections of STU Upper no failure.
2. the self adaptation over current fault localization method that network topologies are recognized based on STU according to claim 1, which is special Levy and be, in step 2, when being started using difference of phase currents from control STU, the computing formula of difference of phase currents is:
In formula,For difference of phase currents,For the phase current sampling value of K points,It is the electricity that 1 cycle forward is lighted from K Stream sampled value, N is the sampled point of every frequency cycle,It is the current sampling data that 2 cycles forward are lighted from K;WhenWhen, IsetSudden Changing Rate for setting starts threshold value, then start from control STU.
CN201611158743.7A 2016-12-15 2016-12-15 Adaptive overcurrent fault positioning method based on technology of STU recognition network topology Pending CN106610448A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611158743.7A CN106610448A (en) 2016-12-15 2016-12-15 Adaptive overcurrent fault positioning method based on technology of STU recognition network topology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611158743.7A CN106610448A (en) 2016-12-15 2016-12-15 Adaptive overcurrent fault positioning method based on technology of STU recognition network topology

Publications (1)

Publication Number Publication Date
CN106610448A true CN106610448A (en) 2017-05-03

Family

ID=58636041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611158743.7A Pending CN106610448A (en) 2016-12-15 2016-12-15 Adaptive overcurrent fault positioning method based on technology of STU recognition network topology

Country Status (1)

Country Link
CN (1) CN106610448A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107134787A (en) * 2017-06-23 2017-09-05 国网江苏省电力公司电力科学研究院 Urgent accurate cutting load control system and cutting load method based on distributed feeder automation
CN108226710A (en) * 2017-12-29 2018-06-29 中国电力科学研究院有限公司 A kind of transmission line parameter discrimination method and system
CN108548987A (en) * 2017-10-31 2018-09-18 国网江苏省电力公司扬州供电公司 Active power distribution network Fault Locating Method based on current phase variation
CN110350516A (en) * 2019-06-21 2019-10-18 广东电网有限责任公司 A kind of high voltage distribution network Single-ring network topology automatic identification method
CN112782528A (en) * 2020-12-31 2021-05-11 西安理工大学 Power distribution network fault section positioning method using PMU

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11227503A (en) * 1998-02-13 1999-08-24 West Japan Railway Co Short-circuiting failure discriminating device
CN101881803A (en) * 2010-05-24 2010-11-10 北京交通大学 Fault localization method of overhead transmission line
CN102981103A (en) * 2012-11-19 2013-03-20 山东理工大学 Method for positioning closed-loop network faults through fault signal self-synchronization
CN103698660A (en) * 2013-12-30 2014-04-02 航天科工深圳(集团)有限公司 Transmission line malfunction monitoring auxiliary device
CN104049178A (en) * 2014-06-28 2014-09-17 国家电网公司 Fault locating method and system of active power distribution network

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11227503A (en) * 1998-02-13 1999-08-24 West Japan Railway Co Short-circuiting failure discriminating device
CN101881803A (en) * 2010-05-24 2010-11-10 北京交通大学 Fault localization method of overhead transmission line
CN102981103A (en) * 2012-11-19 2013-03-20 山东理工大学 Method for positioning closed-loop network faults through fault signal self-synchronization
CN103698660A (en) * 2013-12-30 2014-04-02 航天科工深圳(集团)有限公司 Transmission line malfunction monitoring auxiliary device
CN104049178A (en) * 2014-06-28 2014-09-17 国家电网公司 Fault locating method and system of active power distribution network

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
范开俊 等: ""基于智能终端逐级查询的馈线拓扑识别方法"", 《电力系统自动化》 *
邹贵彬 等: ""馈线自动化自适应快速保护控制方案"", 《电网技术》 *
高孟友 等: ""基于实时拓扑识别的分布式馈线自动化控制方法"", 《电力系统自动化》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107134787A (en) * 2017-06-23 2017-09-05 国网江苏省电力公司电力科学研究院 Urgent accurate cutting load control system and cutting load method based on distributed feeder automation
CN107134787B (en) * 2017-06-23 2019-10-18 国网江苏省电力公司电力科学研究院 Cutting load control system and cutting load method based on distributed feeder automation
CN108548987A (en) * 2017-10-31 2018-09-18 国网江苏省电力公司扬州供电公司 Active power distribution network Fault Locating Method based on current phase variation
CN108226710A (en) * 2017-12-29 2018-06-29 中国电力科学研究院有限公司 A kind of transmission line parameter discrimination method and system
CN110350516A (en) * 2019-06-21 2019-10-18 广东电网有限责任公司 A kind of high voltage distribution network Single-ring network topology automatic identification method
CN110350516B (en) * 2019-06-21 2022-03-29 广东电网有限责任公司 Automatic identification method for single-ring network topology of high-voltage distribution network
CN112782528A (en) * 2020-12-31 2021-05-11 西安理工大学 Power distribution network fault section positioning method using PMU

Similar Documents

Publication Publication Date Title
CN106610448A (en) Adaptive overcurrent fault positioning method based on technology of STU recognition network topology
JP5993249B2 (en) System, method and apparatus for locating faults on a distribution network
CN101409442B (en) Rapid line backup protection method with reliable selection based on wide area measuring system
CN103606910B (en) The fault self-recovery method in a kind of outlet of the distribution feeder based on Wide-area Measurement Information dead band
CN101789596B (en) Automatic detection method of power grid failure
CN102411117B (en) Method for positioning short-circuit fault of distribution network based on distributed intelligent multi-calibration
CN104820163A (en) FTU-based power distribution network fault positioning method
CN107561405B (en) Fault line selection positioning method and system based on non-contact sensing device
US20080211511A1 (en) Method of Generating Fault Indication in Feeder Remote Terminal Unit for Power Distribution Automation System
CN103872660B (en) Network type protection method based on closed-loop mode operation of power network
CN103872662B (en) Network type protection method for hybrid networking based on closed-loop model operation
CN108957243A (en) A kind of method for locating single-phase ground fault and system applied to power distribution network
CN104917160B (en) A kind of distributed feed line automatization system permissive type fault handling method based on FTU
CN103887780B (en) Based on the network type guard method of the mixed networking that open loop mode runs
CN106646130A (en) Active power distribution network fault positioning method and system based on current polarity comparison
CN104993582B (en) The control method and device of power system
CN103956715B (en) A kind of region-type back-up protection method simplified for II section of protection seting of distance
CN105954651B (en) A kind of FTU configuration method based on distribution network fault location
CN1664598A (en) Method for automatically orientating line fault of electrical power system by using time mark grouping
CN106093683A (en) Heater broken wire detection system and wire break detection method
CN104201766B (en) The method determining prepared auto restart sequential and combination is followed the trail of based on power supply point
CN103872661B (en) Network type protection method based on open-loop mode operation of power network
US20130304270A1 (en) Networked differential protection method for a distribution network based on overhauling of terminal equipment
CN104898022B (en) A kind of online fault location system and method for high-speed railway high pressure full cable perforation circuit
CN107728002B (en) Distribution network fault online positioning method considering distributed power access

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170503

RJ01 Rejection of invention patent application after publication