CN104993582B - The control method and device of power system - Google Patents

The control method and device of power system Download PDF

Info

Publication number
CN104993582B
CN104993582B CN201510041335.2A CN201510041335A CN104993582B CN 104993582 B CN104993582 B CN 104993582B CN 201510041335 A CN201510041335 A CN 201510041335A CN 104993582 B CN104993582 B CN 104993582B
Authority
CN
China
Prior art keywords
switch
operational mode
state
mode
default sample
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510041335.2A
Other languages
Chinese (zh)
Other versions
CN104993582A (en
Inventor
卢洁
贾京花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510041335.2A priority Critical patent/CN104993582B/en
Publication of CN104993582A publication Critical patent/CN104993582A/en
Application granted granted Critical
Publication of CN104993582B publication Critical patent/CN104993582B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention provides a kind of control method and device of power system.This method includes:The on off state respectively switched in the power system is obtained, obtains the present mode of operation of the power system;Wherein, the on off state includes switch combined floodgate and switch separating brake;Default sample operational mode is sequentially obtained from default operational mode sequence;Compare the same different of present mode of operation and the default sample operational mode;Power system electric current, voltage, the fault-signal gathered again, and according to preset rules, the present mode of operation is switched to default sample operational mode feasible in the operational mode sequence;So that power system carries out system call interception, makes Operation of Electric Systems in a best mode automatically in the case of there are various failures.

Description

The control method and device of power system
Technical field
The present invention relates to the control method and device of a kind of automatic control technology, more particularly to a kind of power system.
Background technology
As China's economy develops rapidly, mega project is continuously increased, the power system of mega project have power consumption it is big, The characteristics of system architecture complexity;And for mega projects such as chemical industry, nuclear powers, usually require that the continuity of power system is high, require Failure system being capable of quick response, fast recovery of power supply.
In traditional method of operation, if power system is broken down, system operation situation is typically judged by operation maintenance personnel And fault message, according to operational procedure, and the technical experience of itself is combined, draw anti-fault countermeasure, manually control, manually Or electrically operated mode, complete the anti-failure measures such as grid switching operation.
And demand is difficult in adapt to for complicated and high reliability requirement power system, above-mentioned traditional method of operation, it is main Show the following aspects:First, traditional method of operation requires high for the technical merit of operation maintenance personnel, and exists The artificial risk for judging operational error, safety and reliability are difficult to ensure;Second, when there is the system failure in complication system, people Work judges system operation situation and fault message takes more, causes system switching time to exceed uninterrupted power source power-on time, Cause power breakdown;3rd, for the situation of complex fault, such as there is two or more failures, O&M people simultaneously or successively Member is difficult to judge;4th, because the failure for influenceing Operation of Electric Systems is varied simultaneously, it is possible to occur, even if system in advance Fixed anti-fault countermeasure, it is also difficult to improve and comprehensive.Therefore, need badly and propose a kind of method for automatically controlling power system.
The content of the invention
The present invention provides a kind of control method and device of power system, to realize automatically controlling for power system, makes electricity Force system is operated under the optimum operation pattern that conditions present is allowed.
The present invention provides a kind of control method of power system, including:
Step S1, the title respectively switched in the power system and corresponding on off state are obtained, obtains the power train The present mode of operation of system;Wherein, the on off state includes switch combined floodgate and switch separating brake;
Step S2, default sample operational mode is obtained from default operational mode sequence;
Step S3, judge whether the present mode of operation and the default sample operational mode are consistent;
If step S4, inconsistent, the default sample is switched to transport the present mode of operation according to preset rules Row mode.
Method as described above, wherein, the operational mode sequence includes multiple default sample operational modes, Duo Gesuo Default sample operational mode is stated to sort according to priority level;
The step S2 is specifically included:
Step S21, the order according to priority level from high to low, the default sample operational mode is obtained successively.
Method as described above, wherein, the step S3 is specifically included:
Step S31, the on off state that will respectively be switched in the present mode of operation, transported respectively with the default sample The on off state of respective switch is compared in row mode;
If the on off state respectively switched in step S32, described present mode of operation, with the default sample operation mould The on off state of respective switch is consistent in formula, then judges the present mode of operation and the default sample operational mode Unanimously;
If the on off state respectively switched in step S33, described present mode of operation, with the default sample operation mould The on off state of respective switch is not quite identical in formula, then judges that the present mode of operation is run with the default sample Pattern is inconsistent.
Method as described above, wherein, the step S4 is specifically included:
Step S41, the on off state respectively switched in the present mode of operation and the default sample are run into mould The on off state respectively switched in formula is compared, by off state difference, the switch motion sequence needed for acquisition model conversion;
Step S42, the current system status of the power system is obtained;The system status includes the power system Information of voltage, current information and fault message;
Step S43, according to the system status of acquisition, and default switch divide-shut brake condition, the switch is judged Whether each switch motion in action sequence is feasible;
Step S44, if the determination result is YES, according to default switch motion ordering rule, each switch motion is determined Order;
Step S45, according to determination each switch motion order, successively to corresponding switch sending action signal, To control corresponding switch motion.
Method as described above, wherein, after the step S43, in addition to:If the judged result is no, return is held The row step S2.
Method as described above, wherein, the switch motion ordering rule is:Sub-switching operation is first carried out, then is closed a floodgate Operation;
The order of the closing operation is:First service entrance switch is closed a floodgate, then interconnection switch is closed a floodgate, finally to feeder switch Close a floodgate.
Method as described above, wherein, after the step S4, in addition to:
Step S5, the present mode of operation of the power system is detected, to determine the current operation mould of the power system Formula switches to the default sample operational mode.
Method as described above, wherein, the step S5 is specifically included:
Step S51, the on off state that will respectively be switched in the present mode of operation, transported respectively with the default sample The on off state switched accordingly in row mode is compared;
If step S52, comparative result is not quite identical, by the on off state difference, obtains new switch and move Make sequence, and return and perform step S43;
If step S53, described comparative result is completely the same, it is determined that the present mode of operation switching of the power system The default sample operational mode is switched to.
Method as described above, wherein, if after return execution step S43 reaches preset times, the comparative result is still It is not quite identical, then step S2 is gone to, obtains the low other default sample operational mode of one-level, repeats step S2 to step Rapid S5.
The present invention also provides a kind of control device of power system, including:
Acquisition module, for obtaining the title respectively switched in the power system and corresponding on off state, obtain described The present mode of operation of power system;Wherein, the on off state includes switch combined floodgate and switch separating brake;From default operation mould Default sample operational mode is obtained in formula sequence;
Judge module, for judging whether the present mode of operation and the default sample operational mode are consistent;
Handover module, if judge for the judge module it is inconsistent, according to preset rules by the current operation Pattern switching is the default sample operational mode.
Device as described above, wherein, the operational mode sequence includes multiple default sample operational modes, Duo Gesuo Default sample operational mode is stated to sort according to priority level;
The acquisition module is specifically used for:According to the order of priority level from high to low, the default sample is obtained successively Operational mode.
Device as described above, wherein, the judge module is specifically used for:
The on off state that will respectively be switched in the present mode of operation, respectively with the default sample operational mode The on off state of respective switch is compared;
It is corresponding to the default sample operational mode if the on off state respectively switched in the present mode of operation The on off state of switch is consistent, then judges that the present mode of operation is consistent with the default sample operational mode;
It is corresponding to the default sample operational mode if the on off state respectively switched in the present mode of operation The on off state of switch is not quite identical, then judges that the present mode of operation differs with the default sample operational mode Cause.
Device as described above, wherein, the acquisition module is specifically used for:
By the on off state respectively switched in the present mode of operation with respectively being opened in the default sample operational mode The on off state of pass is compared, by off state difference, the switch motion sequence needed for acquisition model conversion;Described in acquisition The current system status of power system;The system status includes the information of voltage, current information and event of the power system Hinder information;
The judge module is specifically used for:According to the system status of acquisition, and default switch divide-shut brake condition, Judge whether each switch motion in the switch motion sequence is feasible;
The handover module is specifically used for:If each switch motion is feasible, according to default switch motion ordering rule, Determine the order of each switch motion;According to the order of each switch motion of determination, sent successively to corresponding switch Action signal, to control corresponding switch motion.
Device as described above, wherein, the acquisition module is additionally operable to:
If the switch motion is infeasible, repeats described obtained from default operational mode sequence and preset sample fortune The operation of row mode.
Device as described above, wherein, the switch motion ordering rule is:Sub-switching operation is first carried out, then is closed a floodgate Operation;
The order of the closing operation is:First service entrance switch is closed a floodgate, then interconnection switch is closed a floodgate, finally to feeder switch Close a floodgate.
Device as described above, wherein, described device also includes:
Detection module, for detecting the present mode of operation of the power system, to determine the current of the power system Operational mode switches to the default sample operational mode.
Device as described above, wherein, the detection module is specifically used for:
The on off state that will respectively be switched in the present mode of operation, respectively with the default sample operational mode The on off state switched accordingly is compared;If comparative result is not quite identical, by the on off state difference, obtain To new switch motion sequence, and repeat it is described according to it is default it is described switch divide-shut brake condition, judge it is described switch move Make the whether feasible operation of each switch motion in sequence;If comparative result is completely the same, it is determined that the power system Present mode of operation has switched to the default sample operational mode.
Device as described above, wherein, if the detection module repeat it is described according to the default switch division Lock condition, it is described relatively to tie after judging the whether feasible operation preset times of each switch motion in the switch motion sequence Fruit is still to be not quite identical, then the acquisition module obtains the low other default sample operational mode of one-level, the detection mould Block repeats the on off state that will respectively be switched in the present mode of operation, respectively with the default sample operational mode In the operation that is compared of the on off state that switchs accordingly, until the operational mode for finding and being converted to conditions present permission is Only.
The control method and device of power system provided by the invention.By obtaining the name respectively switched in the power system Title and corresponding on off state, obtain the present mode of operation of the power system;Wherein, the on off state includes switch conjunction Lock and switch separating brake;Default sample operational mode is sequentially obtained from default operational mode sequence;Compare present mode of operation It is same different with the default sample operational mode;Power system electric current, voltage, the fault-signal gathered again, and according to default rule Then, the present mode of operation is switched to default sample operational mode feasible in the operational mode sequence;It is so that electric Force system carries out system call interception, makes Operation of Electric Systems in a best mode automatically in the case of there are various failures.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are this hairs Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the schematic diagram of the application scenarios one of the control method of power system of the present invention;
Fig. 2 is the schematic diagram of the application scenarios two of the control method of power system of the present invention;
Fig. 3 is the flow chart of the control method embodiment one of power system of the present invention;
Fig. 4 is the flow chart of the control method embodiment two of power system of the present invention;
Fig. 5 is the flow chart of the control method embodiment three of power system of the present invention;
Fig. 6 is the flow chart of the control method example IV of power system of the present invention;
Fig. 7 is the flow chart of the control method embodiment five of power system of the present invention;
Fig. 8 is the structural representation of the control device embodiment of power system of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
First, the application scenarios of the embodiment of the present invention are illustrated.Reference picture 1, in the application scenarios one shown in Fig. 1, Power system includes two-way civil power, and two-way bavin generates electricity, two sections of buses, and is provided with two interconnection switches.Reference picture 2, shown in Fig. 2 Application scenarios two in, power system includes three road civil powers, and three road bavins generate electricity, three sections of buses, and are provided with three interconnection switches. It is understood that the power system of the application scenarios one shown in Fig. 1, the electricity of the application scenarios two shown in Fig. 2 can be regarded as The simplification of Force system, i.e. remove the civil power all the way in Fig. 2, bavin hair, one section of bus and two interconnection switches can obtain figure all the way Application scenarios shown in 1, the control method of power system provided by the invention is carried out only by taking application scenarios one as an example below Describe in detail.
Table one gives switch, the coding rule of bus in Fig. 1 and Fig. 2, as shown in Table 1:
Table one
Wherein, high pressure 10kV buses sectionalized single busbar connection, usually interconnection switch separating brake, two sections of buses be separately operable, two sections of mothers Line is powered respectively by two-way civil power, when mains supply has a power failure, by 10kV diesel generating sets as stand-by power supply.
It should be noted that set two interconnection switches 2AB and 2AB ' purpose be make system can realize it is planned Line maintenance function.I.e.:When interconnection switch 2AB breaks down, the power switch of the direct-connected bus mains sides of 2AB can be disconnected, and it is another Individual interconnection switch 2AB ';Without influence another section of bus 2B# power supply, realize it is planned can on-line maintenance function.For simplification System control logic, in enumerating, only 2AB is automatically controlled, 2AB ' is usually closure, using manual control, is not involved in Automatically control;Bavin hair starts using automatically controlling, and bavin hair, which is shut down, is shut down using automatic control delay or can also use control manually Mode;Electric power incoming line switchs, and feeder switch sets no-voltage trip relay protection.
Reference picture 3 is to Fig. 7, and the method that the present embodiment provides specifically can be by the control device of power system, such as control meter Calculation machine performs, and the method that the present embodiment provides can include:
Step S1, the title respectively switched in the power system and corresponding on off state are obtained, obtains the power train The present mode of operation of system;Wherein, the on off state includes switch combined floodgate and switch separating brake.
In this step, the title respectively switched in power system and corresponding on off state can be formed symbol rank, carry out table The various operational modes of power system are levied, wherein, the title of switch can be named according to the coding rule in above table;Can With understanding, other naming rules can also be used to be named each switch, the present embodiment is not limited to this.
Step S2, default sample operational mode is obtained from default operational mode sequence.
It should be noted that the default operational mode sequence, is according to power system architectures, by each of power system Kind operational mode is listed one by one, and the overall condition of the superior and the subordinate's system according to power system, and the demand of power system, will Operational mode carries out priority ranking, by order of the operational mode according to priority from high to low, lines up the operational mode sequence Row, and be stored in advance in the control device of power system.
Specifically, the operational mode sequence includes multiple default sample operational modes, multiple default sample fortune Row mode sorts according to priority level;It is described that default sample operational mode is obtained from default operational mode sequence, specifically may be used With including:According to the order of priority level from high to low, the default sample operational mode is obtained successively.
That is, after the on off state respectively switched in obtaining power system, the control device of power system is from fortune Priority level highest is first taken out in row mode sequence and presets sample operational mode, if in subsequent step, judges current operation Pattern can not switch to priority level highest to preset sample operational mode, then the control device of power system is from operational mode sequence The low other default sample operational mode of one-level is obtained in row, repeats said process.
, can be as shown in Table 2 for the operational mode sequence of application scenarios shown in Fig. 1 in the present embodiment.
Table two
Illustrated herein for operational mode M1 in table two, other operational modes are referred to saying for operational mode M1 It is bright;Wherein, f represents switch separating brake, and h represents that switch closes a floodgate.Operational mode M1 is normal operation mode, in operational mode M1, Electric high voltage bus sectionalized single busbar connection, interconnection switch separating brake, two sections of buses are separately operable.Usually two-way 10kV civil powers supply, S-201, S-202 closes a floodgate;10kV bavin energy sources are not powered, F-201, F-202 separating brake;Interconnection switch 2AB switchs separating brake, and 2AB-2 switches close Lock;Feeder switch 2A01~2A05,2B01~2B05, which close a floodgate, to power.Specifically, above-mentioned operational mode M1, can be expressed as S201h-F201f-2AKh-2ABf-S202h-F202f-2BKh。
Step S3, judge whether the present mode of operation and the default sample operational mode are consistent.
This step can specifically include:
Step S31, the on off state that will respectively be switched in the present mode of operation, transported respectively with the default sample The on off state of respective switch is compared in row mode;
If the on off state respectively switched in step S32, described present mode of operation, with the default sample operation mould The on off state of respective switch is consistent in formula, then judges the present mode of operation and the default sample operational mode Unanimously;
If the on off state respectively switched in step S33, described present mode of operation, with the default sample operation mould The on off state of respective switch is not quite identical in formula, then judges that the present mode of operation is run with the default sample Pattern is inconsistent.
If step S4, inconsistent, the default sample is switched to transport the present mode of operation according to preset rules Row mode.
Specifically, in this step, the control device of power system can be switched present mode of operation by following steps To preset sample operational mode:
Step S41, the on off state respectively switched in the present mode of operation and the default sample are run into mould The on off state respectively switched in formula is compared, by off state difference, the switch motion sequence needed for acquisition model conversion.
Step S42, the current system status of the power system is obtained;The system status includes the power system Information of voltage, current information and fault message.
Step S43, according to the system status of acquisition, and default switch divide-shut brake condition, the switch is judged Whether each switch motion in action sequence is feasible.
Specifically, in the present embodiment, the default switch divide-shut brake condition can be as shown in Table 3:
Table three switchs divide-shut brake condition
Step S44, if the determination result is YES, according to default switch motion ordering rule, each switch motion is determined Order.
Step S45, according to determination each switch motion order, successively to corresponding switch sending action signal, To control corresponding switch motion.
Further, after above-mentioned steps S43, in addition to:If judged result is no, returns and perform above-mentioned steps S2.
Wherein, the switch motion ordering rule is:Sub-switching operation is first carried out, then carries out closing operation;The behaviour that closes a floodgate The order of work is:First service entrance switch is closed a floodgate, then interconnection switch is closed a floodgate, finally feeder switch is closed a floodgate.
If that is, judging that the switch motion is infeasible, come back to from operational mode retrieval and preset sample The step of this operational mode, i.e. the low other default sample operational mode of one-level is obtained from operational mode sequence, then performs step S3 and step S4.So circulation, so that Operation of Electric Systems is under the optimum operation pattern that tale quale allows.
It should be noted that in the present embodiment, the switch need to be electric operating, and be configured with control electrically operated two Secondary control circuit;After corresponding switch motion is controlled, i.e. the present mode of operation is switched into the default sample After operational mode, after above-mentioned steps S4, the control device of power system can also carry out following operation:
Step S5, the present mode of operation of the power system is detected, to determine the current operation mould of the power system Formula switches to the default sample operational mode.
Specifically, this step includes:
Step S51, the on off state that will respectively be switched in present mode of operation, it is corresponding to default sample operational mode respectively The on off state of switch be compared.
If step S52, comparative result is not quite identical, by the on off state difference, obtains new switch and move Make sequence, and return and perform step S43.
That is, if judging, the switch motion in new switch motion sequence is infeasible, is obtained from operational mode sequence low The other default sample operational mode of one-level, if judging, the switch motion in new switch motion sequence is feasible, performs corresponding Switch motion, lay equal stress on and recheck the operation for the present mode of operation for surveying the power system.
If step S53, described comparative result is completely the same, it is determined that the present mode of operation switching of the power system The default sample operational mode is switched to.
In actual applications, performed if returning after step S43 reaches preset times, the comparative result is still incomplete one Cause, then go to step S2, obtain the low other default sample operational mode of one-level, repeat step S2 to step S5, directly It is completely the same to the comparative result.
The technical scheme of the present embodiment, by obtaining the title respectively switched in the power system and switching shape accordingly State, obtain the present mode of operation of the power system;Wherein, the on off state includes switch combined floodgate and switch separating brake;From Default sample operational mode is obtained in default operational mode sequence;Compare present mode of operation and the default sample operation mould Formula it is same different;Power system electric current, voltage, the fault-signal gathered again, and according to preset rules, by the present mode of operation Switch to default sample operational mode feasible in the operational mode sequence;So that is there are various failures in power system Under situation, system call interception is carried out automatically, makes Operation of Electric Systems in a best mode.
There is the situation of power failure with reference to mains supply 1, to the control method of power system provided by the invention It is further described.
Usually, Operation of Electric Systems above-mentioned operational mode M1 state, i.e.,:S201h-F201f-2AKh-2ABf- S202h-F202f-2BKh.If now there is the situation of the power failure of mains supply 1, civil power incoming power switch S201 decompressions Relay protection acts, and causes S201 tripping operations to disconnect.2A# buses power off, feeder switch 2A01~2A05 decompressions relay protection action, Feeder switch tripping operation is caused to disconnect, i.e. now, in the presence of relay protection, present mode of operation is changed into for power system: S201f-F201f-2AKf-2ABf-S202h-F202f-2BKh。
The control device of power system obtains the on off state of each switch, obtains present mode of operation Mc (S201f- F201f-2AKf-2ABf-S202h-F202f-2BKh);Default sample operational mode is obtained from default operational mode sequence Mn, n=1, that is, the default sample operational mode obtained are Mn=M1, M1 (S201h-F201f-2AKh-2ABf-S202h- F202f-2BKh)。
Judge whether present mode of operation and default sample operational mode are consistent;That is, by Mc compared with M1, drawing to change To M1, S201 is needed to carry out closing operation, 2AK will carry out closing operation;Action sequence is obtained according to switch motion ordering rule Table D:1st, S201 closing operations are carried out.2nd, 2AK closing operations are carried out.
The current system status G of power system is obtained, according to system status G and switch divide-shut brake condition, due to civil power electricity Source 1 powers off, and mains side voltage, electric current are continuously 0, therefore S201 is unsatisfactory for switching divide-shut brake condition, then action sequence table D can not OK.Export the infeasible projects of operation of recording sequence table D and reason.
Default sample operational mode is obtained, makes n=n+1, i.e. Mn=M2, it is M2 (S201h- to preset sample operational mode F201f-2AKh-2ABh-S202f-F202f-2BKh), above-mentioned judgement present mode of operation is repeated to run with default sample The whether consistent operation of pattern, it is known that, action sequence table D ' is still infeasible, exports the infeasible projects of operation of recording sequence table D ' And reason.
Default sample operational mode is obtained, makes n=n+2, i.e. Mn=M3, it is M3 (S201f- to preset sample operational mode F201f-2AKh-2ABh-S202h-F202f-2BKh), above-mentioned judgement present mode of operation is repeated to run with default sample The whether consistent operation of pattern, it is known that, action sequence table D ":1st, carry out 2AB combined floodgates, 2, carry out 2AK close a floodgate it is feasible, then successively to 2AB and switch 2AK sending action signals are switched, with controlling switch 2AB and switch 2AK actions;Detect the current fortune of power system Row mode, to determine that the present mode of operation of power system has switched to default sample operational mode;Output switching pass signal.
When mains supply 1 recovers again, the current operation mould for the power system that the control device of power system is got Formula is Mc (S201f-F201f-2AKh-2ABh-S202h-F202f-2BKh);Obtained from default operational mode sequence default Sample operational mode Mn, n=1, that is, the default sample operational mode obtained are Mn=M1, M1 (S201h-F201f-2AKh- 2ABf-S202h-F202f-2BKh)。
Judge whether present mode of operation and default sample operational mode are consistent;That is, by Mc compared with M1, drawing to change To M1, it is necessary to which S201 will carry out closing operation, 2AK will carry out closing operation.Switch motion ordering rule obtains action sequence table D:1st, 2AB separating brakes are carried out.2nd, S201 combined floodgates are carried out.
The current system status G of power system is obtained, according to system status G and switch divide-shut brake condition, judges to act sequence List D can perform, then is moved successively to switch 2AB and switch S201 sending action signals with controlling switch 2AB and switch S201 Make;The present mode of operation of power system is detected, obtains present situation mode of operation state Mc (S201h-F201f-2AKf-2ABf- S202h-F202f-2BKh), will Mc compared with M1, draw M1 to be transformed into, it is necessary to closing operation will be carried out by switching S2AK, open Closing action sequence table D is:Carry out S2AK combined floodgates.
The current system status G of power system is obtained again, according to system status G and switch divide-shut brake condition, is judged dynamic Make sequence table D can perform, then to switch S2AK sending action signals, closing operation is carried out with controlling switch S2AK, detects electric power The present mode of operation of system, to determine that the present mode of operation of power system has switched to default sample operational mode;Output Switch successfully signal.
The technical scheme of the present embodiment, in the case where condition is certain, power system can be automatically adjusted to condition and permitted Perhaps optimum operation pattern.During Operation of Electric Systems, or in operational mode transfer process, there is switch failure, switch Jump, feeder assembly short circuit but feeder switch tripping cause power supply master to enter the complex fault situation such as switch trip, and the present embodiment carries The control method of the power system of confession all can be that an optimal feasible operational mode is found in power system, can give full play to electric power The function that system architecture can reach, ensure the continuity of power system power supply.
Fig. 8 is the structural representation of the control device embodiment of power system of the present invention.As shown in figure 8, the present embodiment carries The control device 10 of the power system of confession can specifically include:
Acquisition module 11, for obtaining the title respectively switched in the power system and corresponding on off state, obtain institute State the present mode of operation of power system;Wherein, the on off state includes switch combined floodgate and switch separating brake;From default operation Default sample operational mode is obtained in mode sequences;
Judge module 12, for judging whether the present mode of operation and the default sample operational mode are consistent;
Handover module 13, if judge for the judge module it is inconsistent, according to preset rules by the current fortune Row mode switches to the default sample operational mode.
Wherein, the operational mode sequence includes multiple default sample operational modes, multiple default sample operations Pattern sorts according to priority level;The acquisition module 11 specifically can be used for:According to the order of priority level from high to low, according to It is secondary to obtain the default sample operational mode.
The judge module 12 specifically can be used for:The on off state that will respectively be switched in the present mode of operation, Respectively compared with the on off state of respective switch in the default sample operational mode;It is if each in the present mode of operation The on off state of switch, it is consistent with the on off state of respective switch in the default sample operational mode, then sentence The fixed present mode of operation is consistent with the default sample operational mode;If what is respectively switched in the present mode of operation is described The on off state of respective switch is not quite identical on off state, with the default sample operational mode, then described in judgement Present mode of operation and the default sample operational mode are inconsistent.
It should be noted that the acquisition module 11 is specifically used for:Described in respectively being switched in the present mode of operation On off state, by off state difference, obtains compared with the on off state respectively switched in the default sample operational mode Obtain the switch motion sequence needed for patten transformation;Obtain the current system status of the power system;The system status includes Information of voltage, current information and the fault message of the power system;The judge module specific 12 is used for:According to acquisition The system status, and default switch divide-shut brake condition, judge whether is each switch motion in the switch motion sequence It is feasible;The handover module 13 is specifically used for:If each switch motion is feasible, according to default switch motion ordering rule, Determine the order of each switch motion;According to the order of each switch motion of determination, sent successively to corresponding switch Action signal, to control corresponding switch motion.
Specifically, the switch motion ordering rule is:Sub-switching operation is first carried out, then carries out closing operation;The combined floodgate The order of operation is:First service entrance switch is closed a floodgate, then interconnection switch is closed a floodgate, finally feeder switch is closed a floodgate.
If it is infeasible that the acquisition module 11 can be also used for the switch motion, repeat described from default operation The operation of default sample operational mode is obtained in mode sequences.
The control device 10 of the power system can also include detection module, for detecting the current of the power system Operational mode, to determine that the present mode of operation of the power system switches to the default sample operational mode.Specifically, institute The on off state that detection module will can be switched respectively in the present mode of operation is stated, is run respectively with the default sample The on off state switched accordingly in pattern is compared;If comparative result is not quite identical, pass through the on off state Difference, obtain new switch motion sequence, and repeat it is described according to the default switch divide-shut brake condition, described in judgement The whether feasible operation of each switch motion in switch motion sequence;If comparative result is completely the same, it is determined that the electric power The present mode of operation of system has switched to the default sample operational mode.
If the detection module repeat it is described according to it is default it is described switch divide-shut brake condition, judge it is described switch move After making the whether feasible operation preset times of each switch motion in sequence, the comparative result is still to be not quite identical, then institute State acquisition module and obtain the low other default sample operational mode of one-level, the detection module is repeated the current fortune The on off state respectively switched in row mode, respectively with the corresponding on off state switched in the default sample operational mode The operation being compared, untill finding and being converted to the operational mode that conditions present allows.
The control device of the power system of the present embodiment, available for perform above method embodiment technical scheme, in fact Existing principle and technique effect are similar, and here is omitted.
In several embodiments provided by the present invention, it should be understood that disclosed apparatus and method, it can be passed through Its mode is realized.For example, device embodiment described above is only schematical, for example, the division of the unit, only Only a kind of division of logic function, there can be other dividing mode when actually realizing, such as multiple units or component can be tied Another system is closed or is desirably integrated into, or some features can be ignored, or do not perform.It is another, it is shown or discussed Mutual coupling or direct-coupling or communication connection can be the INDIRECT COUPLINGs or logical by some interfaces, device or unit Letter connection, can be electrical, mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, can also be realized in the form of hardware adds SFU software functional unit.
The above-mentioned integrated unit realized in the form of SFU software functional unit, can be stored in one and computer-readable deposit In storage media.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are causing a computer It is each that equipment (can be personal computer, server, or network equipment etc.) or processor (processor) perform the present invention The part steps of embodiment methods described.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (Read- Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic disc or CD etc. it is various Can be with the medium of store program codes.
Those skilled in the art can be understood that, for convenience and simplicity of description, only with above-mentioned each functional module Division progress for example, in practical application, can be complete by different functional modules by above-mentioned function distribution as needed Into the internal structure of device being divided into different functional modules, to complete all or part of function described above.On The specific work process of the device of description is stated, the corresponding process in preceding method embodiment is may be referred to, will not be repeated here.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, either which part or all technical characteristic are entered Row equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (16)

  1. A kind of 1. control method of power system, it is characterised in that including:
    Step S1, the title respectively switched in the power system and corresponding on off state are obtained, obtains the power system Present mode of operation;Wherein, the on off state includes switch combined floodgate and switch separating brake;
    Step S2, default sample operational mode is obtained from default operational mode sequence;
    Step S3, judge whether the present mode of operation and the default sample operational mode are consistent;
    If step S4, inconsistent, the default sample is switched to run mould the present mode of operation according to preset rules Formula;
    The operational mode sequence includes multiple default sample operational modes, and multiple default sample operational modes are according to excellent First rank sequence;
    The step S2 is specifically included:
    According to the order of priority level from high to low, the default sample operational mode is obtained successively.
  2. 2. according to the method for claim 1, it is characterised in that the step S3 is specifically included:
    Step S31, the on off state that will respectively be switched in the present mode of operation, mould is run with the default sample respectively The on off state of respective switch is compared in formula;
    If the on off state respectively switched in step S32, described present mode of operation, and in the default sample operational mode The on off state of respective switch is consistent, then judges the present mode of operation and the default sample operational mode one Cause;
    If the on off state respectively switched in step S33, described present mode of operation, and in the default sample operational mode The on off state of respective switch is not quite identical, then judges the present mode of operation and the default sample operational mode It is inconsistent.
  3. 3. according to the method for claim 2, it is characterised in that the step S4 is specifically included:
    Step S41, by the on off state respectively switched in the present mode of operation and the default sample operational mode The on off state respectively switched is compared, by off state difference, the switch motion sequence needed for acquisition model conversion;
    Step S42, the current system status of the power system is obtained;The system status includes the voltage of the power system Information, current information and fault message;
    Step S43, according to the system status of acquisition, and default switch divide-shut brake condition, the switch motion is judged Whether each switch motion in sequence is feasible;
    Step S44, if the determination result is YES, according to default switch motion ordering rule, the suitable of each switch motion is determined Sequence;
    Step S45, according to determination each switch motion order, successively to corresponding switch sending action signal, with control Make corresponding switch motion.
  4. 4. according to the method for claim 3, it is characterised in that after the step S43, in addition to:If described judge knot Fruit is no, returns and performs the step S2.
  5. 5. according to the method for claim 4, it is characterised in that the switch motion ordering rule is:First carry out separating brake behaviour Make, then carry out closing operation;
    The order of the closing operation is:First service entrance switch is closed a floodgate, then interconnection switch is closed a floodgate, finally feeder switch is closed Lock.
  6. 6. according to any described methods of claim 1-5, it is characterised in that after the step S4, in addition to:
    Step S5, the present mode of operation of the power system is detected, to determine that the present mode of operation of the power system is cut It is changed to the default sample operational mode.
  7. 7. according to the method for claim 6, it is characterised in that the step S5 is specifically included:
    Step S51, the on off state that will respectively be switched in the present mode of operation, mould is run with the default sample respectively The on off state switched accordingly in formula is compared;
    If step S52, comparative result is not quite identical, by the on off state difference, new switch motion sequence is obtained Row, and return and perform step S43;
    If step S53, described comparative result is completely the same, it is determined that the present mode of operation of the power system has been cut It is changed to the default sample operational mode.
  8. 8. according to the method for claim 7, it is characterised in that if after return execution step S43 reaches preset times, it is described Comparative result is still not quite identical, then goes to step S2, obtains the low other default sample operational mode of one-level, and repetition is held Row step S2 to step S5.
  9. A kind of 9. control device of power system, it is characterised in that including:
    Acquisition module, for obtaining the title respectively switched in the power system and corresponding on off state, obtain the electric power The present mode of operation of system;Wherein, the on off state includes switch combined floodgate and switch separating brake;From default operational mode sequence Default sample operational mode is obtained in row;
    Judge module, for judging whether the present mode of operation and the default sample operational mode are consistent;
    Handover module, if judge for the judge module it is inconsistent, according to preset rules by the present mode of operation Switch to the default sample operational mode;
    The operational mode sequence includes multiple default sample operational modes, and multiple default sample operational modes are according to excellent First rank sequence;
    The acquisition module is specifically used for:According to the order of priority level from high to low, the default sample operation is obtained successively Pattern.
  10. 10. device according to claim 9, it is characterised in that the judge module is specifically used for:
    The on off state that will respectively be switched in the present mode of operation, it is corresponding to the default sample operational mode respectively The on off state of switch is compared;
    If the on off state respectively switched in the present mode of operation, with respective switch in the default sample operational mode The on off state it is consistent, then judge that the present mode of operation is consistent with the default sample operational mode;
    If the on off state respectively switched in the present mode of operation, with respective switch in the default sample operational mode The on off state it is not quite identical, then judge that the present mode of operation and the default sample operational mode are inconsistent.
  11. 11. device according to claim 10, it is characterised in that the acquisition module is specifically used for:
    By what is respectively switched in the on off state respectively switched in the present mode of operation and the default sample operational mode On off state is compared, by off state difference, the switch motion sequence needed for acquisition model conversion;Obtain the electric power The current system status of system;The system status includes information of voltage, current information and the failure letter of the power system Breath;
    The judge module is specifically used for:The system status obtained according to the acquisition module, and default switch point Combined floodgate condition, judge whether each switch motion in the switch motion sequence is feasible;
    The handover module is specifically used for:If the determination result is YES, according to default switch motion ordering rule, determine each described The order of switch motion;According to the order of each switch motion of determination, sending action signal is switched to corresponding successively, with Control corresponding switch motion.
  12. 12. device according to claim 11, it is characterised in that the acquisition module is additionally operable to:
    If the judged result is no, repeats described obtained from default operational mode sequence and preset sample operation The operation of pattern.
  13. 13. device according to claim 12, it is characterised in that the switch motion ordering rule is:First carry out separating brake Operation, then carry out closing operation;
    The order of the closing operation is:First service entrance switch is closed a floodgate, then interconnection switch is closed a floodgate, finally feeder switch is closed Lock.
  14. 14. according to any described devices of claim 9-13, it is characterised in that described device also includes:
    Detection module, for detecting the present mode of operation of the power system, to determine the current operation of the power system Pattern switching is the default sample operational mode.
  15. 15. device according to claim 14, it is characterised in that the detection module is specifically used for:
    The on off state that will respectively be switched in the present mode of operation, it is corresponding to the default sample operational mode respectively The on off state of switch be compared;If comparative result is not quite identical, by the on off state difference, obtain new Switch motion sequence, and repeat it is described according to it is default it is described switch divide-shut brake condition, judge the switch motion sequence The whether feasible operation of each switch motion in row;If comparative result is completely the same, it is determined that the power system it is current Operational mode has switched to the default sample operational mode.
  16. 16. device according to claim 15, it is characterised in that if the detection module repeats the basis and preset The switch divide-shut brake condition, judge that the whether feasible operation of each switch motion in the switch motion sequence reaches default After number, the comparative result is still to be not quite identical, then the acquisition module obtains the low other default sample fortune of one-level Row mode, the detection module repeat the on off state that will respectively be switched in the present mode of operation, respectively with institute The operation that the on off state switched accordingly in default sample operational mode is compared is stated, works as preceding article until finding and being converted to Untill the operational mode that part allows.
CN201510041335.2A 2015-01-27 2015-01-27 The control method and device of power system Active CN104993582B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510041335.2A CN104993582B (en) 2015-01-27 2015-01-27 The control method and device of power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510041335.2A CN104993582B (en) 2015-01-27 2015-01-27 The control method and device of power system

Publications (2)

Publication Number Publication Date
CN104993582A CN104993582A (en) 2015-10-21
CN104993582B true CN104993582B (en) 2017-11-14

Family

ID=54305356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510041335.2A Active CN104993582B (en) 2015-01-27 2015-01-27 The control method and device of power system

Country Status (1)

Country Link
CN (1) CN104993582B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107122505B (en) * 2016-02-25 2020-08-04 中国石油化工股份有限公司 Load modeling method and device
CN106953400B (en) * 2017-02-23 2023-08-11 山东电工电气集团新能科技有限公司 Novel three-phase four-wire distribution network tie switch
CN108536042A (en) * 2018-03-27 2018-09-14 许继电气股份有限公司 A kind of HVDC transmission system alternating-current field sequence control method and device
CN113534604B (en) 2020-03-31 2023-11-24 长鑫存储技术有限公司 Mark detection method, mark detection device and computer readable storage medium
CN114035453A (en) * 2021-11-10 2022-02-11 国网江苏省电力有限公司电力科学研究院 One-key sequence control system and method for short circuit test of power equipment
CN114362343A (en) * 2021-12-28 2022-04-15 中国电信股份有限公司 Power distribution control device, system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1466023A (en) * 2002-06-24 2004-01-07 重庆钢铁(集团)有限责任公司 In site bus control system based on controlling local total circuit
CN102209231A (en) * 2010-03-29 2011-10-05 北京市电力公司 Equipment information output method and system
CN103745120A (en) * 2014-01-22 2014-04-23 上海海事大学 Ship electric-power system reconstruction method based on BDI (belief-desire-intention theory) multi-agent
JP2014225941A (en) * 2013-05-15 2014-12-04 中国電力株式会社 Distribution line rolling load system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1466023A (en) * 2002-06-24 2004-01-07 重庆钢铁(集团)有限责任公司 In site bus control system based on controlling local total circuit
CN102209231A (en) * 2010-03-29 2011-10-05 北京市电力公司 Equipment information output method and system
JP2014225941A (en) * 2013-05-15 2014-12-04 中国電力株式会社 Distribution line rolling load system
CN103745120A (en) * 2014-01-22 2014-04-23 上海海事大学 Ship electric-power system reconstruction method based on BDI (belief-desire-intention theory) multi-agent

Also Published As

Publication number Publication date
CN104993582A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN104993582B (en) The control method and device of power system
CN111952972B (en) Main-auxiliary integrated load transfer method for high-quality power supply service
CN101923346B (en) Method and system for automatically generating anti-sabotage, anti-blocking, water irrigation, breathing, fire burning logic rules of substation
CN101789596B (en) Automatic detection method of power grid failure
Petino et al. Application of multilevel full bridge converters in HVDC multiterminal systems
CN104539043B (en) A kind of automatic switching device of standby power supply system haul oneself willingly into method
CN105548801B (en) Fault Locating Method suitable for power distribution network operation with closed ring
CN103840439B (en) Main website coordinates the power distribution automation guard method realized with distributed terminal
CN102213735B (en) Typical test network with power distribution automation
CN101958536A (en) Distribution network failure isolation and quick power service restoration decision support system
CN108957243A (en) A kind of method for locating single-phase ground fault and system applied to power distribution network
CN103872660A (en) Network type protection method based on closed-loop mode operation of power network
CN107843800A (en) Supply network monitoring method, apparatus and system
CN105680567A (en) Fault processing method, device and system of converter system
CN103346497B (en) Intelligent substation electrical virtual circuit isolation method and system
CN104297676B (en) Method, device and system for monitoring circuit breaker of wind generating set
CN103616610B (en) The emulation mode of pilot signal in a kind of power grid fault line
CN104485732A (en) In-put control method for standby powers of transformer substations
US11309699B2 (en) Control system for and method of fault location, isolation and supply restoration
CN106410805B (en) A kind of one drags the shipping shore power system more run and control method
CN104991525B (en) Power auto-control system
CN207588452U (en) Power distribution network three returns one group of topological structure
CN102738892A (en) Realization method of intelligent anti-error system of transformer substation based on IEC61850
CN101710712B (en) Automatic recovery method for power loss of shipping grid
CN105550407B (en) Guangdong power system repairs scheduling simulation method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant