CN207588452U - Power distribution network three returns one group of topological structure - Google Patents

Power distribution network three returns one group of topological structure Download PDF

Info

Publication number
CN207588452U
CN207588452U CN201721722132.0U CN201721722132U CN207588452U CN 207588452 U CN207588452 U CN 207588452U CN 201721722132 U CN201721722132 U CN 201721722132U CN 207588452 U CN207588452 U CN 207588452U
Authority
CN
China
Prior art keywords
switch
distribution line
interconnection switch
returns
main unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721722132.0U
Other languages
Chinese (zh)
Inventor
陈健
罗少威
方兵华
潘威
雷才嘉
贾巍
高慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201721722132.0U priority Critical patent/CN207588452U/en
Application granted granted Critical
Publication of CN207588452U publication Critical patent/CN207588452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of power distribution networks three to return one group of topological structure,Third, which is back to, including first returns distribution line,Every time distribution line includes several ring-main units and part of path,Several ring-main units are connected by part of path,First,Two times distribution line ends are connected through first end ring-main unit,Inlet wire or the outgoing line interval switch of first end ring-main unit are as the first interconnection switch,First,At least one outgoing interval switch is respectively included in non-end ring-main unit on two times distribution lines as the second interconnection switch and third interconnection switch,Third returns the inlet wire of the second end ring-main unit on distribution line or outgoing line interval switch is used as the 4th interconnection switch,The non-end ring-main unit that third is returned on distribution line includes at least one outgoing interval switch as the 5th interconnection switch,4th interconnection switch connects third interconnection switch,5th interconnection switch connects the second interconnection switch,Remaining all switch in ring-main unit are block switch,Flexibility is high.

Description

Power distribution network three returns one group of topological structure
Technical field
The utility model is related to power domains, and one group of topological structure is returned more particularly to a kind of power distribution network three.
Background technology
For domestic and international Urban Medium Voltage Distribution Network generally using ring network structure, the method for operation is divided into open loop operation and operation with closed ring Two kinds.Wherein, the interconnection switch between each distribution line that open loop operation mode, i.e. normal operation phase are mutually got in touch with is normally opened, single After feedback line failure, Fault Isolation is realized by the block switch for opening trouble point both sides, is hereafter closed interconnection switch to non-event Hinder the power supply of section.Compared with open loop operation mode, operation with closed ring mode interconnection switch is normally closed, will not cause non-faulting section in short-term Have a power failure, theoretically there is higher reliability, be the common Connection Mode of current domestic distribution.
However, using operation with closed ring mode, since the distribution line intercommunicated is unable to flexible adaptation load development And the problem of changing topological structure, being not easy to management and running, be easy to cause circuit heavy-overload or circuit underloading.Moreover, closed loop is transported Line mode circuit highest average load factor is only 50%, and power grid construction is of high cost, causes the waste of power equipment, therefore, is passed The power distribution network wiring flexibility of system is low.
Utility model content
Based on this, it is necessary to for traditional power distribution network wiring flexibility it is low the problem of, a kind of power distribution network three is provided and returns one Group topological structure.
A kind of power distribution network three returns one group of topological structure, is returned including first time distribution line, second time distribution line and third Distribution line, first time distribution line, second time distribution line and the third return distribution line including several Ring-main unit and part of path, several ring-main units are connected by the part of path, first time distribution line and described The end of second time distribution line is connected through first end ring-main unit, the inlet wire interval of the first end ring-main unit or is gone out Line interval, which switchs, is used as the first interconnection switch, the non-end ring on first time distribution line and second time distribution line At least one outgoing interval switch is respectively included in net unit as the second interconnection switch and third interconnection switch, the third Return the second end ring-main unit on distribution line inlet wire interval or outgoing line interval switch as the 4th interconnection switch, described the Non-end ring-main unit on three times distribution lines includes at least one outgoing interval switch as the 5th interconnection switch, institute It states the 4th interconnection switch and connects the third interconnection switch, the 5th interconnection switch connects second interconnection switch, described Remaining all switch in ring-main unit are block switch.
Above-mentioned power distribution network three returns one group of topological structure, is got in touch with using three times distribution line open loops, every time distribution line has The wiring patterns of 1 circuit group that two contact points are formed, every time distribution line are made of several ring-main units and part of path, Every time distribution line is connect by 2 interconnection switches with All other routes, wherein, first time distribution line and second time distribution wire Road shares an interconnection switch, can realize that electric load can be in three loop lines by the conversion of interconnection switch and block switch The redistribution on road so as to adapt to the development of load more flexiblely, overcomes the problems, such as that operation with closed ring mode flexibility is insufficient.
Description of the drawings
Fig. 1 is that power distribution network three returns one group of topological structure structure chart in an embodiment;
Fig. 2 is that power distribution network three returns one group of topological structure structure diagram in an embodiment.
Specific embodiment
In one embodiment, as shown in Figure 1, a kind of power distribution network three returns one group of topological structure, including first time distribution wire The distribution line 10 of road 9, second times and third return distribution line 11, first time distribution line 9, second times distribution lines 10 and thirds It returns distribution line 11 and includes several ring-main units and part of path, several ring-main units are connected by part of path, first time distribution The end of circuit 9 and second time distribution line 10 is connected through first end ring-main unit 2, the inlet wire of first end ring-main unit 2 Interval or outgoing line interval, which switch, is used as the first interconnection switch 4, the non-end on first time distribution line 9 and second time distribution line 10 At least one outgoing interval switch is respectively included in end ring net unit 1 and is used as the second interconnection switch 5 and third interconnection switch 6, Third goes back to the inlet wire interval of the second end ring-main unit on distribution line 11 or outgoing line interval switch is used as the 4th interconnection switch 7, the non-end ring-main unit 1 that third is returned on distribution line 11 includes at least one outgoing interval switch as the 5th contact Switch 8, the 4th interconnection switch 7 connection third interconnection switch 6, the 5th interconnection switch 8 connects the second interconnection switch 5, ring-main unit All switches of remaining interior are block switch.
Specifically, several ring-main units include non-end ring-main unit and end ring-main unit, first time 9 He of distribution line Second time distribution line 10 is respectively powered to ring-main unit, the end warp of first time distribution line 9 and second time distribution line 10 One end ring-main unit connects, formation closed loop ring network structure, and the inlet wire interval or outgoing line interval in line end ring-main unit are opened It closes as the first interconnection switch 4, inlet wire interval or outgoing line interval switch the switch flowed into or from for electric current;Respectively at first time 1 non-end ring-main unit 1 is selected on distribution line 9 and second time distribution line 10, is at least set in non-end ring-main unit 1 1 face outgoing interval switch returns distribution line 11 as interconnection switch, i.e. the second interconnection switch 5 and third interconnection switch 6, third After ring-main unit power supply, third returns the inlet wire interval of the second end ring-main unit on distribution line 11 or outgoing line interval switch As the 4th interconnection switch 7, the non-end ring-main unit 1 on third time distribution line 11 includes at least one interconnection switch and is 5th interconnection switch 8, the 4th interconnection switch 7 through second end ring-main unit are connected to the non-end of second time distribution line 10 The third interconnection switch 6 of ring-main unit 1, the 5th interconnection switch 8 through non-end ring-main unit 1 are connected to first time distribution line Interconnection switch two on 9.
When first time distribution line, 9, second times distribution lines 10 or third return some node on distribution line 11 because of event When barrier is stopped transport, trouble point is isolated by the ring-main unit of upstream and downstream, and non-faulting section restores electricity after interconnection switch closure.
In one embodiment, as shown in Fig. 2, power distribution network three, which returns one group of topological structure, further includes the first busbar 12, second Busbar 13 and third busbar 14, first time distribution line 9 connect the first busbar 12, and second time distribution line 10 connects the second busbar 13, third returns distribution line 11 and connects third busbar 14.
Specifically, 1 time medium-voltage distribution circuit is respectively drawn from independent two sections of busbares (the first busbar 12 and the second busbar 13), That is first time distribution line 9 and second time distribution line 10 draw 1 time medium-voltage distribution from third busbar 14, i.e. third returns distribution Circuit 11, per loop line, the load of road power supply is no more than the 67% of thermostabilization limit supply load.
In one embodiment, power distribution network three returns one group of topological structure and further includes the first substation 15 and the second substation 16, the first busbar 12 and the second busbar 13 are set in the first substation 15, and third busbar 14 is set in the second substation 16.
Specifically, the first busbar 12, the second busbar 13,14 line power of third busbar are all from substation, ring-main unit It is connected by distribution line.
In one embodiment, 4 to the 5th interconnection switch 8 of the first interconnection switch is normal open switch, and block switch is normally closed Switch.
Specifically, during normal operation, block switch is in closed state, and interconnection switch, which is in, cut-offs state.
In one embodiment, power distribution automation is configured in 4 to the 5th interconnection switch 8 of the first interconnection switch and block switch Equipment.In the present embodiment, power distribution automation equipment is distribution power automation terminal DTU.
Specifically, distribution power automation terminal DTU (Data Transfer unit, data transmission unit) can implement rapidly event Barrier positioning, distribution line is divided into one section one section by block switch, in this way when there is node failure, can faulty section circuit every It leaves, the continuation of other non-faulting sections can power, and block switch and interconnection switch are all transformed by power distribution automation, them is allowed to have It standby certain control logic and realizes controllable, passes through cut-offfing for power distribution automation equipment remote-control block switch and interconnection switch.
In one embodiment, 4 to the 5th interconnection switch 8 of the first interconnection switch and block switch are breaker.Another In outer one embodiment, 4 to the 5th interconnection switch 8 of the first interconnection switch and block switch are on-load switch.
Specifically, breaker is the electric current for referring to close, carry and cut-off under normal loop condition and can close, advise The switching device of the electric current under abnormal loop condition is carried and cut-off in the fixed time, and block switch works as line if breaker During the failure of road, it can act tripping, when the switch in block switch is on-load switch, then cannot horse back tripping, to wait and match It, could tripping after electric line has a power failure completely.
As shown in Fig. 2, (power distribution automation is passed through when distribution line 1 (corresponding first time distribution line 9) have failed Equipment implements rapidly fault location, and failure occurs in first ring-main unit), first ring-main unit tripping, then with First interconnection switch 4 of 1 end ring-main unit of electric line is closed, and such 1 remaining load of distribution line can be by distribution wire Road 2 powers or the second interconnection switch 5 of 1 non-end ring-main unit 1 of distribution line is closed, and such distribution line 1 is remaining Load can be powered by distribution line 3.
Power distribution network is applied to using " open loop operation+centralization power distribution automation " mode, after a feedback line failure, is passed through Power distribution automation equipment implements rapidly fault location and isolation, and fast recovery of power supply is suitable for the higher, distribution to reliability requirement The urban electricity supply area of circuit gallery resource anxiety.
In a more detailed application scenarios, a kind of power distribution network three returns one group of topological structure, includes 2 power transformations It stands, 3 sections of busbares and 3 times distribution lines, the wiring patterns of 1 circuit group that every time distribution line is formed there are two contact point, Every time distribution line is made of several ring-main units and part of path, and every time distribution line passes through 2 interconnection switches and other Connection, wherein, first time distribution line 9 and second time distribution line 10 share an interconnection switch, are put down in 1 circuit group It is 67% per loop line road highest load factor, the ring-main unit with interconnection switch includes block switch simultaneously and contact is opened It closes, block switch be in closed state during normal operation, and interconnection switch is in cut-offfing state.Every time line power is all from power transformation It stands, power distribution automation equipment is configured by connection in ring-main unit on the block switch and interconnection switch in ring-main unit, When some node on distribution line because when failure is stopped transport, trouble point is isolated by the ring-main unit of upstream and downstream, non-faulting section It restores electricity after interconnection switch closure.
In one embodiment, wiring process is to draw first time distribution line 9 from the first busbar 12, from the second busbar 13 Second time distribution line 10 is drawn, third is drawn from third busbar 14 and returns distribution line 11;First time distribution line 9 and second time The end of distribution line 10 is connected through first end ring-main unit 2, between the inlet wire interval or outlet in first end ring-main unit 2 Pass is separated as the first interconnection switch 4;Select a non-end respectively on first time distribution line 9 and second time distribution line 10 Ring-main unit 1 is respectively provided in the non-end ring-main unit 1 on first time distribution line 9 and second time distribution line 10 Few outgoing interval switch is as the second interconnection switch 5 and third interconnection switch 6;Third is returned to the on distribution line 11 As the 4th interconnection switch 7, third is returned on distribution line 11 for the inlet wire interval of two end ring-main units or outgoing line interval switch Non-end ring-main unit 1 includes at least one outgoing interval switch as the 5th interconnection switch 8, second end ring-main unit In the 4th interconnection switch 7 connect second time distribution line 10 third interconnection switch 6, the 5th interconnection switch 8 connection second Network switch 5.
Above-mentioned power distribution network three returns one group of topological structure, is got in touch with using three times distribution line open loops, every time distribution line has The wiring patterns of 1 circuit group that two contact points are formed, every time distribution line are made of several ring-main units and part of path, Every time distribution line is connect by 2 interconnection switches with All other routes, wherein, first time distribution line 9 and second time distribution Circuit 10 shares an interconnection switch, can realize that electric load can be three by the conversion of interconnection switch and block switch The redistribution of distribution line is returned, so as to adapt to the development of load more flexiblely, i.e., when three times distribution lines wherein have one Circuit breaks down, and the load transfer of the faulty line can not had to other twice on the circuit of failure, in addition, using 3 Distribution line open loop contact is returned, theoretical highest circuit Rate of average load is 66.7%, far above operation with closed ring mode 50% most Elevated track Rate of average load solves existing power distribution network wiring and is not easy to management and running, flexibility deficiency, construction cost height, electric power The problems such as utilization rate of equipment and installations is insufficient.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Embodiment described above only expresses the several embodiments of the utility model, and description is more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent range.It should be pointed out that the common skill for this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (8)

1. a kind of power distribution network three returns one group of topological structure, which is characterized in that including first time distribution line, second time distribution line Distribution line is returned with third, it is equal that first time distribution line, second time distribution line and the third return distribution line Including several ring-main units and part of path, several ring-main units are connected by the part of path, first time distribution wire Road is connected with the end of second time distribution line through first end ring-main unit, the inlet wire of the first end ring-main unit Interval or outgoing line interval, which switch, is used as the first interconnection switch, on first time distribution line and second time distribution line At least one outgoing interval switch is respectively included in non-end ring-main unit and is used as the second interconnection switch and third interconnection switch, The inlet wire interval for the second end ring-main unit that the third is returned on distribution line or outgoing line interval switch are opened as the 4th contact It closes, the non-end ring-main unit that the third is returned on distribution line includes at least one outgoing interval switch as 5-linked Network switchs, and the 4th interconnection switch connects the third interconnection switch, the 5th interconnection switch connection second contact It switchs, all switches of remaining in the ring-main unit are block switch.
2. power distribution network three according to claim 1 returns one group of topological structure, which is characterized in that further includes the first busbar, Two busbares and third busbar, first time distribution line connect first busbar, and second time distribution line connects institute The second busbar is stated, the third returns distribution line and connects the third busbar.
3. power distribution network three according to claim 2 returns one group of topological structure, which is characterized in that further include the first substation and Second substation, first busbar and second busbar are set in first substation, the third busbar setting In in second substation.
4. power distribution network three according to claim 1 returns one group of topological structure, which is characterized in that first interconnection switch is extremely 5th interconnection switch is normal open switch, and the block switch is normally closed switch.
5. power distribution network three according to claim 1 returns one group of topological structure, which is characterized in that first interconnection switch is extremely Power distribution automation equipment is configured in 5th interconnection switch and the block switch.
6. power distribution network three according to claim 5 returns one group of topological structure, which is characterized in that the power distribution automation equipment For distribution power automation terminal DTU.
7. power distribution network three according to claim 1 returns one group of topological structure, which is characterized in that first interconnection switch is extremely 5th interconnection switch and the block switch are breaker.
8. power distribution network three according to claim 1 returns one group of topological structure, which is characterized in that first interconnection switch is extremely 5th interconnection switch and the block switch are on-load switch.
CN201721722132.0U 2017-12-08 2017-12-08 Power distribution network three returns one group of topological structure Active CN207588452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721722132.0U CN207588452U (en) 2017-12-08 2017-12-08 Power distribution network three returns one group of topological structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721722132.0U CN207588452U (en) 2017-12-08 2017-12-08 Power distribution network three returns one group of topological structure

Publications (1)

Publication Number Publication Date
CN207588452U true CN207588452U (en) 2018-07-06

Family

ID=62737386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721722132.0U Active CN207588452U (en) 2017-12-08 2017-12-08 Power distribution network three returns one group of topological structure

Country Status (1)

Country Link
CN (1) CN207588452U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107979090A (en) * 2017-12-08 2018-05-01 广州供电局有限公司 Power distribution network three returns one group of topological structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107979090A (en) * 2017-12-08 2018-05-01 广州供电局有限公司 Power distribution network three returns one group of topological structure

Similar Documents

Publication Publication Date Title
CN103840439B (en) Main website coordinates the power distribution automation guard method realized with distributed terminal
CN103855713A (en) Power distribution net rack wiring structure
CN102213735B (en) Typical test network with power distribution automation
CN103872682A (en) Switching station feeder line automatic protection method
CN109347093A (en) A kind of main website and the self-healing control method of distribution network for controlling combination on the spot
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN204928156U (en) Distribution network bridge joint line structure
CN204668942U (en) There is the distribution network structure pattern of high reliability
CN111611662A (en) Reliability constraint power distribution network planning method based on feeder line corridor
CN103855712A (en) Power distribution net rack wiring structure
CN103872687A (en) Power distribution network rack wiring structure
CN108365600A (en) The faulty line detection method of hybrid dc circuit breaker system and breaker closing
CN105391030B (en) The plan isolated island division methods of polymerization are gradually loaded based on network topology structure load
CN207588452U (en) Power distribution network three returns one group of topological structure
CN111082422A (en) Composite grid structure capable of reliably supplying power
CN207588451U (en) Power distribution network four returns one group of topological structure
CN206041492U (en) Two closed loops or how loop -locked interconnected distribution network connect line knot to construct and power supply system
Silva et al. Interaction between DSO and TSO to increase DG penetration-the Portuguese example
CN103872688A (en) Automatic protecting method for double-annular-ring four-power-supply structure feeder
CN106058907A (en) Method of inputting line into DC network in multi-end flexible DC power transmission system
CN203967837U (en) The longitudinal interconnected feeder automation control device of a kind of intelligence
CN114221326B (en) Segmented transfer method under condition of insufficient transfer capability of centralized self-healing function
CN107979090A (en) Power distribution network three returns one group of topological structure
CN113098009B (en) Uninterrupted loop closing and reverse electricity method for 30-degree angle difference system of power distribution network
CN203813438U (en) Power distribution net rack wiring structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200924

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.

TR01 Transfer of patent right