CN102213735B - Typical test network with power distribution automation - Google Patents

Typical test network with power distribution automation Download PDF

Info

Publication number
CN102213735B
CN102213735B CN201110051803.6A CN201110051803A CN102213735B CN 102213735 B CN102213735 B CN 102213735B CN 201110051803 A CN201110051803 A CN 201110051803A CN 102213735 B CN102213735 B CN 102213735B
Authority
CN
China
Prior art keywords
switch
block
outlet
network
block switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110051803.6A
Other languages
Chinese (zh)
Other versions
CN102213735A (en
Inventor
梁英
盛万兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201110051803.6A priority Critical patent/CN102213735B/en
Publication of CN102213735A publication Critical patent/CN102213735A/en
Application granted granted Critical
Publication of CN102213735B publication Critical patent/CN102213735B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention provides a typical test network with power distribution automation, which comprises three transformer substation 10kV buses, three 10kV outgoing lines, three transformer substation 10kV outgoing line switches, 14 power distribution section switches and three power distribution interconnection switches, wherein the components are combined into four network states such as a multi-power-supply latticed power supply network which comprises a looped network and a radiation circuit, a network which is provided with a faulted power supply and transfers the power through other power supplies, a network which is provided with a faulted circuit and transfers the power through the other power supplies, a network which is provided with a faulted radiation circuit and only needs failure isolation and the like by utilizing the on and off of the switches. The network provided by the invention can simulate four conditions which usually occur in the engineering such as partial communication interruption, power distribution terminal misinformation or failure information omission, switch operation failure, switch operation refuse and the like and can be used for verifying the failure positioning practice functions of a power distribution automation system. The network provided by the invention has the advantages that the number of the needed power supplies and switches is appropriate; and the structure is concise and practical, and is suitable for the establishment of a test network based on real equipment.

Description

A kind of typical test network with power distribution automation
Technical field
The invention belongs to power distribution automation field, relate more specifically to a kind of typical test network with power distribution automation.
Background technology
1, fault location and network reconfiguration principle
Distribution network failure location and network reconfiguration general principle are when feeder line looped network generation permanent fault, electric substation's outlet switch (primary equipment employing on-load switch) or line sectionalizing switch (primary equipment employing breaker) protection act trip and unsuccessful reclosing, cause feeder line dead electricity; On looped network, the information whether having fault current to flow through uploaded by each panel switches place intelligent terminal, on the basis of Network topology and data acquisition, fault section location is carried out by main station/sub station system, criterion is the track section all on the net by topological structure traversal ring from mains side to outlet direction, and the section be only connected with a switch flowing through fault current is fault section.Carry out Fault Isolation according to fault section, the non-faulting section (isolated island) of dead electricity is carried out network reconfiguration thus restored electricity.
2, power distribution automation experimental network
The effect of the direct influential system of practical level of electrical power distribution automatization system engineering, this system is the complication system comprising primary equipment, distribution terminal, communication and main website, and the overall applicability effect of the reliability of each key link and cooperation each other and system is closely related.Current domestic electrical power distribution automatization system detects special projects such as being divided into panel switches, distribution power automation terminal, power distribution automation main website to be carried out, and lack tests and analysis technology that is unified, system, network reconfiguration functional verification can only be simulated and be carried out.Therefore available for ensureing the entirety of electrical power distribution automatization system, need to build the experimental network based on true type equipment, and systematically design experiment method is verified and the various functions such as Sampling network reconstruct, wherein experimental network is the basis of bulk testing and system, not only should form all kinds of common network structure, validation fault location and network reconfiguration function, also should possess the features such as economic, practical, workable.
At present, research fault location and Network Reconfiguration Algorithm are still focused in domestic correlative study, and the network of employing is all comparatively complicated, is difficult to through engineering approaches; In engineer applied, the electrical power distribution automatization system of all kinds of producer adopts duplicate supply looped network containing multiple node as research object usually, and the application of emphasis incorporation engineering carries out functional development for particular network.Domestic also less to general type testing network research, the type testing network based on true type equipment have not been reported.
The present invention proposes mainly for distribution automatic system tests and analysis method and minimizes type testing network, true type equipment can be adopted to realize, both the needs that power distribution automation conventional fault location is verified with Network Reconfiguration Algorithm can have been met, also can measure the actual conditions such as deficiency, bad data information, switch failure or malfunction in model engineering, there is good versatility and practicality.
Summary of the invention
The invention provides a kind of typical power distribution automation experimental network.This network packet containing 3 transformer station 10kV buses, 3 10kV outlets, 3 transformer station 10 kV outgoing line switches, 14 distribution block switches, 3 distribution interconnection switches compositions, can utilize switch deciliter be combined into containing looped network and many power nets trellis supply network of radial line, 1 power loss and by other power supply turn the network of confession, line failure and turn the network of confession by other power supply, radial line fault only needs the four class network states such as the network of Fault Isolation.This network also can be simulated local communication interruption, distribution terminal wrong report or be failed to report the normal four kinds of situations occurred in the engineerings such as fault message, switch malfunction and switch failure, for verifying the practical function of electrical power distribution automatization system fault location.
According to a kind of typical test network with power distribution automation of the present invention, comprise 3 transformer station 10kV buses, 3 10kV outlets, 3 outlet switchs and 3 interconnection switches, it is characterized in that: outlet switch one side connects the first transformer station 10kV bus, opposite side connects a 10kV outlet; Outlet switch two side connects the second transformer station 10kV bus: opposite side connects the 2nd 10kV outlet; Outlet switch three side connects the 3rd transformer station 10kV bus: opposite side connects the 3rd 10kV outlet; Interconnection switch one side connects outlet switch one, and opposite side connects outlet switch two; Interconnection switch two side connects outlet switch one, and opposite side connects outlet switch three; Interconnection switch three side connects outlet switch two, and opposite side connects outlet switch three.
Wherein, above-mentioned network also comprises: block switch one, and side connects outlet switch one, and opposite side connects interconnection switch one; Block switch two, side connects the common port of outlet switch 1 and block switch one, opposite side connection segment switch three; Block switch three, side connection segment switch two, opposite side connects interconnection switch two.
Wherein, above-mentioned network also comprises: block switch four, and side connects outlet switch two, and opposite side connects interconnection switch three; Block switch five, side connects the common port of outlet switch two and block switch four, opposite side connection segment switch six; Block switch six, side connection segment switch five, opposite side connects interconnection switch one; Block switch seven, the common port of side connection segment switch six and block switch five, side connection segment switch eight; Block switch Aug. 1st side connection segment switch seven, opposite side is unsettled.
Wherein, above-mentioned network also comprises: block switch nine, and side connects outlet switch three, and side connects interconnection switch three; Block switch ten, side connects the common port of outlet switch three and block switch nine, side connection segment switch 11; Block switch 11, side connection segment switch ten, side connects interconnection switch two.
Wherein, above-mentioned network normal operating condition is outlet switch one, the on off state of outlet switch two, outlet switch three, block switch one, block switch two, block switch three, block switch four, block switch five, block switch six, block switch seven, block switch eight, block switch nine, block switch ten and block switch 11 is conjunction state; The on off state of interconnection switch one, interconnection switch two and interconnection switch three is a point state.
Wherein, when above-mentioned network support verifies that a Switch Communication interrupts, the power direction that can detect according to adjacent switch place judges the function of its on off state; If communication disruption switch upstream and detection power direction, downstream switches place are consistent, then the state of this switch is conjunction state; Otherwise, be a point state.
Wherein, when above-mentioned network support is verified a non-most end switch wrong report or fails to report fault message, the function of its fault message can be judged according to the fault message of adjacent switch; If upstream and downstream switches place all detect fault current, then this switch place also should detect fault current.
Wherein, during above-mentioned network support checking killer switch overstep tripping, the function of fault section is correctly judged according to all on off states and fault message; Criterion is by track sections all topological structure traverses network from mains side to outlet direction, the section be only connected with a breaker flowing through fault current is fault section, if the breaker of what fault section was connected flow through fault current does not trip, and the upstream circuit breaker tripping operation of affiliated same outlet, then prove that this trip breaker is overstep tripping, this overstep tripping breaker control should be closed when restoring electricity.
Wherein, during above-mentioned network support validation switch tripping, standby isolation or standby recombination function; In fault isolation stage, if the switch failure of fault upstream, then travel through the adjacent all upstream switches of this switch and control point; If the switch failure of fault down stream, then travel through all downstreams control point that this switch is adjacent; Whether in the network reconfiguration stage, if desired control the switch failure of conjunction, then travel through the connected all switches of corresponding dead electricity section and be connected with other power outlet, if can be powered by other power outlet, then relevant interconnection switch is closed in control.
The advantage of technical solution of the present invention is:
(1) power distribution network typical network architecture of the present invention, four class classical network states can be built into, both can be used for the power distribution automation function checked conventional fault isolation and restore electricity, may be used for again checking for local communication interruption, distribution terminal wrong report or the power distribution automation function failing to report the common project situation of four classes such as fault message, switch malfunction and switch failure, to the practicality of checking power distribution automation network reconfiguration function, there is good construction value.
(2) power supply needed for representative network of the present invention and moderate, the simple for structure practicality of number of switches, be applicable to very much building the experimental network based on true type equipment, both the network reconfiguration function for true type equipment can have been realized, also can realize the running optimizatin function based on Digital Simulation and physical analogy, to build comprise primary equipment, secondary terminals, communication, main website and Digital Simulation System power distribution automation comprehensive test system there is great reference.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further described.
Fig. 1 illustrates electrical power distribution automatization system type testing network.
Fig. 2 illustrates the network state of power supply 1 dead electricity by power supply 3 turns of confessions.
Fig. 3 shows power supply 2 dead electricity is turned confession jointly network state by power supply 1 and power supply 3.
Fig. 4 illustrates that 1 turns the network state that power supply source is island with power.
Fig. 5 illustrates that 2 turn the network state that power supply source is island with power.
Fig. 6 illustrates that radial line end breaks down.
Fig. 7 illustrates and breaks down in the middle of radial line.
Fig. 8 judges on off state according to adjacent switch power direction when switch 11 communication disruption is shown.
Fig. 9 judges on off state according to adjacent switch power direction when switch 8 communication disruption is shown.
Figure 10 illustrates the network state of breaker overstep tripping.
Figure 11 illustrates the network state after overstep tripping troubleshooting.
Figure 12 illustrates the network state that standby is isolated.
Figure 13 illustrates the network state that standby reconstructs.
Detailed description of the invention
The electrical power distribution automatization system type testing network packet that the present invention proposes containing 3 transformer station 10kV buses, 3 10kV outlets, 3 transformer station 10 kV outgoing line switches, 14 distribution block switches, 3 distribution interconnection switches compositions, can utilize switch deciliter be combined into containing looped network and many power nets trellis supply network of radial line, 1 power loss and by other power supply turn the network of confession, line failure and turn the network of confession by other power supply, radial line fault only needs the four class network states such as the network of Fault Isolation.This network also can be simulated local communication interruption, distribution terminal wrong report or be failed to report the normal four kinds of situations occurred in the engineerings such as fault message, switch malfunction and switch failure, for verifying the practical function of electrical power distribution automatization system fault location.
1, normal operating mode.Outlet switch 1 side connects the first transformer station 10kV bus, and opposite side connects a 10kV outlet; Outlet switch 22 side connects the second transformer station 10kV bus: opposite side connects the 2nd 10kV outlet; Outlet switch 33 side connects the 3rd transformer station 10kV bus: opposite side connects the 3rd 10kV outlet; Interconnection switch 1 side connects outlet switch one, and opposite side connects outlet switch two; Interconnection switch 26 side connects outlet switch one, and opposite side connects outlet switch three; Interconnection switch 3 14 side connects outlet switch two, and opposite side connects outlet switch three; Block switch 1, side connects outlet switch 1, and opposite side connects interconnection switch 1; Block switch 24, side connects the common port of outlet switch 1 and block switch 1, opposite side connection segment switch 35; Block switch 35, side connection segment switch 24, opposite side connects interconnection switch 26; Block switch 4 13, side connects outlet switch 22, and opposite side connects interconnection switch 3 14; Block switch 5 10, side connects the common port of outlet switch 22 and block switch 4 13, opposite side connection segment switch 69; Block switch 69, side connection segment switch 5 10, opposite side connects interconnection switch 1; Block switch 7 11, the common port of side connection segment switch 69 and block switch 5 10, side connection segment switch 8 12; Block switch 8 12 side connection segment switch 7 11, opposite side is unsettled.Block switch 9 15, side connects outlet switch 33, and side connects interconnection switch 3 14; Block switch 10, side connects the common port of outlet switch 33 and block switch 9 15, side connection segment switch 11; Block switch 11, side connection segment switch 10, side connects interconnection switch 26; Network normal operating condition is outlet switch 1, the on off state of outlet switch 22, outlet switch 33, block switch 1, block switch 24, block switch 35, block switch 4 13, block switch 5 10, block switch 69, block switch 7 11, block switch 8 12, block switch 9 15, block switch 10, block switch 11 is conjunction state; The on off state of interconnection switch 1, interconnection switch 26, interconnection switch 3 14 is a point state.
2, the network state that power loss, other power supply turn confession is built.During 3 power supply difference dead electricity, in other two power supply turning solutions, select the network reconfiguration scheme of economy optimum, one can be selected to turn power supply source and power, 2 also can be selected simultaneously to turn power supply source and power.Wherein power supply one dead electricity, by the network state of power supply three turns of confessions is: the on off state of outlet switch 1, interconnection switch 1, interconnection switch 3 14 is point state; The on off state of outlet switch 22, outlet switch 33, block switch 1, block switch 24, block switch 35, block switch 4 13, block switch 5 10, block switch 69, block switch 7 11, block switch 8 12, block switch 9 15, block switch 10, block switch 11, interconnection switch 26 is conjunction state.Power supply two dead electricity, the network state being turned confession by power supply one and power supply San Tong method is: the on off state of outlet switch 22, block switch 5 10, interconnection switch 26 is point state; The on off state of outlet switch 1, outlet switch 33, block switch 1, block switch 24, block switch 35, block switch 4 13, block switch 69, block switch 7 11, block switch 8 12, block switch 9 15, block switch 10, block switch 11, interconnection switch 1, interconnection switch 3 14 is conjunction state.
3, each section of line failure after constructing wiretap, one or more power supply is needed to turn the network state of confession.
(1) feeder line sectional area break down, need 1 to turn network state that power supply source is island with power.During as line failure between block switch 24 and block switch 35, control is needed to close interconnection switch 26, by power supply three for being isolated island with power.Concrete network state is: the on off state of block switch 24, block switch 35, interconnection switch 1, interconnection switch 3 14 is point state; The on off state of outlet switch 1, outlet switch 22, outlet switch 33, block switch 1, block switch 4 13, block switch 5 10, block switch 69, block switch 7 11, block switch 8 12, block switch 9 15, block switch 10, block switch 11, interconnection switch 26 is conjunction state.
(2) feeder line sectional area break down, need 2 to turn network state that power supply source is island with power.As the line failure between outlet switch 1, block switch 24, block switch 1, point outlet switch 1, block switch 24, block switch 1 should be controlled, interconnection switch 1, interconnection switch 26 are closed in control, respectively by power supply two and power supply three for being isolated island with power.Concrete network state is: the on off state of outlet switch 1, block switch 24, block switch 1, interconnection switch 3 14 is point state; The on off state of outlet switch 22, outlet switch 33, block switch 35, block switch 4 13, block switch 5 10, block switch 69, block switch 7 11, block switch 8 12, block switch 9 15, block switch 10, block switch 11, interconnection switch 1, interconnection switch 26 is conjunction state.
4, when structure radial line (branch line) breaks down, the network state of Fault Isolation need only be carried out.Downstream line as block switch 8 12 breaks down, need control point block switch 8 12, concrete network state is: the on off state of outlet switch 1, outlet switch 22, outlet switch 33, block switch 1, block switch 24, block switch 35, block switch 4 13, block switch 5 10, block switch 69, block switch 7 11, block switch 9 15, block switch 10, block switch 11 is conjunction state; The on off state of interconnection switch 1, interconnection switch 26, interconnection switch 3 14, block switch 8 12 is a point state.As the line failure between block switch 7 11 and block switch 8 12, point block switch 7 11 and block switch 8 12 need be controlled, without the need to carrying out network reconfiguration.
When 5, building the interruption of certain Switch Communication, need the network state judging this on off state according to adjacent switch information.If communication disruption switch upstream and detection power direction, downstream switches place are consistent, then the state of this switch is conjunction state; Otherwise, be a point state.During as block switch 7 11 communication disruption, need the power direction detected by block switch 5 10 and block switch 8 12 place to judge its on off state, if two detection power directions, switch place are consistent, then block switch 7 11 should be conjunction state; For another example during interconnection switch one 8 communication disruption, the power direction that should be detected by block switch 1 and block switch 69 place judges its on off state, if two detection power directions, switch place are contrary, then interconnection switch 1 is a point state.
When 6, building the wrong report of non-most end switch place and fail to report fault message, need to judge according to the fault message at adjacent switch place the network state whether this switch place has fault current to flow through.If upstream and downstream switches place all detect fault current, then this switch place also should detect fault current.During as block switch 8 12 downstream fault, if block switch 5 10 and block switch 8 12 place have all reported fault current to flow through, and fault message is failed to report at block switch 7 11 place, so judgement block switch 7 11 also should have fault current to flow through by fault location and network reconfiguration system, thus correct isolated fault.
When 7, building generation breaker overstep tripping, need the network state correctly judging fault section according to all on off states and fault message.Criterion is by track sections all topological structure traverses network from mains side to outlet direction, the section be only connected with a breaker flowing through fault current is fault section, if the breaker of what fault section was connected flow through fault current does not trip, and the upstream circuit breaker tripping operation of affiliated same outlet, then prove that this trip breaker is overstep tripping, this overstep tripping breaker control should be closed when restoring electricity.During as line failure between block switch 7 11 and block switch 8 12, if there is overstep tripping in block switch 5 10, now outlet switch 22, block switch 5 10, block switch 7 11 all have fault current to flow through, so fault section should be judged as between block switch 7 11 and block switch 8 12, these two switch controls should divide by Fault Isolation, restore electricity block switch 5 10 to be controlled to close.
When 8, building validation switch tripping, the network state of standby isolation or standby recombination function.In fault isolation stage, if the switch failure of fault upstream, then travel through the adjacent all upstream switches of this switch and control point; If the switch failure of fault down stream, then travel through all downstreams control point that this switch is adjacent.In the network reconfiguration stage, if desired control the switch failure of conjunction, then travel through the connected all switches of corresponding dead electricity section, if can be powered by other power outlet, then relevant interconnection switch is closed in control.As the line failure between block switch 7 11 and block switch 8 12, in fault isolation stage, if block switch 7 11 is refused point, then need to start standby isolation features, control point block switch 69 and block switch 5 10, and incompatible restoring electricity is controlled to interconnection switch 1; If Fault Isolation success, namely block switch 7 11 and block switch 8 12 are controlled and are divided successfully, but close unsuccessfully in network reconfiguration stage block switch five (10) control, then should start standby recombination function, be restored electricity by interconnection switch 1.
9, also following various configurations can be carried out to this electrical power distribution automatization system type testing network:
Wherein, above-mentioned network can be transformed into power supply one dead electricity, network state by power supply two turns of confessions: the on off state of outlet switch one, interconnection switch two, interconnection switch three is point state; The on off state of outlet switch two, outlet switch three, block switch one, block switch two, block switch three, block switch four, block switch five, block switch six, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch one is conjunction state.
Wherein, above-mentioned network can be transformed into power supply one dead electricity, network state by power supply three turns of confessions: the on off state of outlet switch one, interconnection switch one, interconnection switch three is point state; The on off state of outlet switch two, outlet switch three, block switch one, block switch two, block switch three, block switch four, block switch five, block switch six, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch two is conjunction state.
Wherein, above-mentioned network can be transformed into power supply one dead electricity, network state by power supply two and power supply three turns of confessions: the on off state of outlet switch one, interconnection switch three is point state; The on off state of outlet switch two, outlet switch three, block switch four, block switch five, block switch six, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch one, interconnection switch two is conjunction state; In block switch one, block switch two, block switch three, arbitrary switch is a point state, and other two switches are conjunction state.
Wherein, above-mentioned network can also be transformed into power supply two dead electricity, network state by power supply one turn of confession: the on off state of outlet switch two, interconnection switch two, interconnection switch three is point state; The on off state of outlet switch one, outlet switch three, block switch one, block switch two, block switch three, block switch four, block switch six, block switch five, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch one is conjunction state.
Wherein, above-mentioned network can also be transformed into power supply two dead electricity, network state by power supply three turns of confessions: the on off state of outlet switch two, interconnection switch two, interconnection switch one is point state; The on off state of outlet switch one, outlet switch three, block switch one, block switch two, block switch three, block switch four, block switch six, block switch five, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch three is conjunction state.
Wherein, above-mentioned network can also be transformed into power supply two dead electricity, network state by power supply one and power supply three turns of confessions: the on off state of outlet switch two, interconnection switch two is point state; The on off state of outlet switch one, outlet switch three, block switch one, block switch two, block switch three, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch one, interconnection switch three is conjunction state; In block switch five, block switch six, block switch four, arbitrary switch is a point state, and other two switches are conjunction state.
Wherein, above-mentioned network can also be transformed into power supply three dead electricity, network state by power supply one turn of confession: the on off state of outlet switch three, interconnection switch one, interconnection switch three is point state; The on off state of outlet switch one, outlet switch two, block switch one, block switch two, block switch three, block switch four, block switch six, block switch five, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch two is conjunction state.
Wherein, above-mentioned network can also be transformed into power supply three dead electricity, network state by power supply two turns of confessions: the on off state of outlet switch three, interconnection switch one, interconnection switch two is point state; The on off state of outlet switch one, outlet switch two, block switch one, block switch two, block switch three, block switch four, block switch six, block switch five, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch three is conjunction state.
Wherein, above-mentioned network can also be transformed into power supply three dead electricity, network state by power supply one and power supply two turns of confessions: the on off state of outlet switch three, interconnection switch one is point state; The on off state of outlet switch one, outlet switch two, block switch one, block switch two, block switch three, block switch four, block switch six, block switch five, block switch seven, block switch eight, interconnection switch two, interconnection switch three is conjunction state; In block switch nine, block switch ten, block switch 11, arbitrary switch is a point state, and other two switches are conjunction state.
Wherein, above-mentioned network can also be transformed into the line failure between block switch two and block switch three, the network state by power supply three turns of confessions: the on off state of block switch two, block switch three, interconnection switch one, interconnection switch three is a point state; The on off state of outlet switch one, outlet switch two, outlet switch three, block switch one, block switch four, block switch five, block switch six, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch two is conjunction state.
Wherein, above-mentioned network can also be transformed into the line failure between outlet switch one, block switch two, block switch one, the network state by power supply two and power supply three turns of confessions: the on off state of outlet switch one, block switch two, block switch one, interconnection switch three is a point state; The on off state of outlet switch two, outlet switch three, block switch three, block switch four, block switch five, block switch six, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch one, interconnection switch two is conjunction state.
Wherein, above-mentioned network can also be transformed into the line failure between outlet switch two, block switch four, block switch five, the network state by power supply one and power supply three turns of confessions: the on off state of outlet switch two, block switch four, block switch five, interconnection switch two is a point state; The on off state of outlet switch one, block switch two, block switch one, outlet switch three, block switch three, block switch six, block switch seven, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch one, interconnection switch three is conjunction state.
Wherein, above-mentioned network can also be transformed into the line failure between block switch five, block switch six, block switch seven, the network state by power supply one turn of confession: the on off state of block switch five, block switch six, block switch seven, interconnection switch two, interconnection switch three is a point state; The on off state of outlet switch two, block switch four, outlet switch one, block switch two, block switch one, outlet switch three, block switch three, block switch eight, block switch nine, block switch ten, block switch 11, interconnection switch one is conjunction state.
Wherein, above-mentioned network can also be transformed into block switch eight, block switch one, block switch three, block switch six, block switch four, block switch nine, block switch 11 downstream radial line break down, only need control the network state that point above-mentioned switch carries out Fault Isolation respectively, the state of other switch is: the on off state of outlet switch one, outlet switch two, outlet switch three, block switch two, block switch five, block switch seven, block switch ten is conjunction state; The on off state of interconnection switch one, interconnection switch two, interconnection switch three is a point state.
Wherein, above-mentioned network can also be transformed into the line failure between outlet switch three, block switch nine, block switch ten, the network state by power supply one and power supply two turns of confessions: the on off state of outlet switch three, block switch nine, block switch ten, interconnection switch one is a point state; The on off state of outlet switch one, outlet switch two, block switch one, block switch two, block switch three, block switch four, block switch five, block switch six, block switch seven, block switch eight, block switch 11, interconnection switch two, interconnection switch three is conjunction state.
Wherein, above-mentioned network can also be transformed into the line failure between block switch ten, block switch 11, the network state by power supply one turn of confession: the on off state of block switch ten, block switch 11, interconnection switch one, interconnection switch three is a point state; The on off state of outlet switch one, outlet switch two, outlet switch three, block switch one, block switch two, block switch three, block switch four, block switch five, block switch six, block switch seven, block switch eight, block switch nine, interconnection switch two is conjunction state.
Wherein, above-mentioned network can also be transformed into the line failure between block switch seven and block switch eight, only need control the network state that point above-mentioned switch carries out Fault Isolation: the on off state of outlet switch one, outlet switch two, outlet switch three, block switch one, block switch two, block switch three, block switch four, block switch five, block switch six, block switch nine, block switch ten, block switch 11 is conjunction state; The on off state of interconnection switch one, interconnection switch two, interconnection switch three is a point state.
According to specific exemplary embodiment, invention has been described herein.It will be apparent under not departing from the scope of the present invention, carrying out suitable replacement to one skilled in the art or revise.Exemplary embodiment is only illustrative, instead of the restriction to scope of the present invention, and scope of the present invention is defined by appended claim.

Claims (1)

1. a typical test network with power distribution automation, comprise 3 transformer station 10kV buses, 3 10kV outlets, 3 outlet switchs and 3 interconnection switches, it is characterized in that: outlet switch one (1) side connects the first transformer station 10kV bus, opposite side connects a 10kV outlet, outlet switch two (2) side connects the second transformer station 10kV bus, and opposite side connects the 2nd 10kV outlet, outlet switch three (3) side connects the 3rd transformer station 10kV bus, and opposite side connects the 3rd 10kV outlet, interconnection switch one (8) side connects outlet switch one, and opposite side connects outlet switch two, interconnection switch two (6) side connects outlet switch one, and opposite side connects outlet switch three, interconnection switch three (14) side connects outlet switch two, and opposite side connects outlet switch three, block switch one (7), side connects outlet switch one (1), and opposite side connects interconnection switch one (8), block switch two (4), side connects the common port of outlet switch one (1) and block switch one (7), opposite side connection segment switch three (5), block switch three (5), side connection segment switch two (4), opposite side connects interconnection switch two (6), block switch four (13), side connects outlet switch two (2), and opposite side connects interconnection switch three (14), block switch five (10), side connects the common port of outlet switch two (2) and block switch four (13), opposite side connection segment switch six (9), block switch six (9), side connection segment switch five (10), opposite side connects interconnection switch one (8), block switch seven (11), the common port of side connection segment switch six (9) and block switch five (10), side connection segment switch eight (12), block switch eight (12) side connection segment switch seven (11), opposite side is unsettled, block switch nine (15), side connects outlet switch three (3), and side connects interconnection switch three (14), block switch ten (16), side connects the common port of outlet switch three (3) and block switch nine (15), side connection segment switch ten one (17), block switch ten one (17), side connection segment switch ten (16), side connects interconnection switch two (6), this network normal operating condition is outlet switch one (1), outlet switch two (2), outlet switch three (3), block switch one (7), block switch two (4), block switch three (5), block switch four (13), block switch five (10), block switch six (9), block switch seven (11), block switch eight (12), block switch nine (15), the on off state of block switch ten (16) and block switch ten one (17) is conjunction state, the on off state of interconnection switch one (8), interconnection switch two (6) and interconnection switch three (14) is a point state,
Above-mentioned network can be transformed into 1 power loss, by other 1 power supply turn for or other 2 power supplys turn the network state of confession simultaneously; 3 power supplys respectively dead electricity time, in other two power supply turning solutions, select the network reconfiguration scheme of economy optimum, selects one to turn power supply source and power, or selection 2 turns power supply source and powers simultaneously;
Above-mentioned network also can be transformed into line failure, is turned the network state of confession by other power supply; Each section of line failure after outlet switch, need control point fault upstream and downstream switch, and dead electricity region needs 1 or 2 other Power supplies; When radial line breaks down, only the control of fault upstream switch need be divided and carry out Fault Isolation;
When above-mentioned network support verifies that a Switch Communication interrupts, the power direction that can detect according to adjacent switch place judges the function of its on off state; If communication disruption switch upstream and detection power direction, downstream switches place are consistent, then the state of this switch is conjunction state; Otherwise, be a point state;
When above-mentioned network support is verified a non-most end switch wrong report or fails to report fault message, the function of its fault message can be judged according to the fault message of adjacent switch; If upstream and downstream switches place all detect fault current, then this switch place also should detect fault current;
During above-mentioned network support checking killer switch overstep tripping, correctly judge the function of fault section according to all on off states and fault message; Criterion is by track sections all topological structure traverses network from mains side to outlet direction, the section be only connected with a breaker flowing through fault current is fault section, if the breaker of what fault section was connected flow through fault current does not trip, and the upstream circuit breaker tripping operation of affiliated same outlet, then prove that this trip breaker is overstep tripping, this overstep tripping breaker control should be closed when restoring electricity;
During above-mentioned network support validation switch tripping, standby isolation or standby recombination function; In fault isolation stage, if the switch failure of fault upstream, then travel through the adjacent all upstream switches of this switch and control point; If the switch failure of fault down stream, then travel through the adjacent all downstream switches of this switch and control point; Whether in the network reconfiguration stage, if desired control the switch failure of conjunction, then travel through the connected all switches of corresponding dead electricity section and be connected with other power outlet, if can be powered by other power outlet, then this switch is closed in control.
CN201110051803.6A 2011-03-04 2011-03-04 Typical test network with power distribution automation Active CN102213735B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110051803.6A CN102213735B (en) 2011-03-04 2011-03-04 Typical test network with power distribution automation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110051803.6A CN102213735B (en) 2011-03-04 2011-03-04 Typical test network with power distribution automation

Publications (2)

Publication Number Publication Date
CN102213735A CN102213735A (en) 2011-10-12
CN102213735B true CN102213735B (en) 2015-04-29

Family

ID=44745127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110051803.6A Active CN102213735B (en) 2011-03-04 2011-03-04 Typical test network with power distribution automation

Country Status (1)

Country Link
CN (1) CN102213735B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102508081B (en) * 2011-11-18 2013-10-09 航天科工深圳(集团)有限公司 Distribution network fault simulating method and device and distribution network system
CN103337856B (en) * 2013-05-29 2015-07-08 国家电网公司 Switch grouping method of network reconstruction of power distribution network
CN104734125B (en) * 2013-12-23 2018-08-07 国家电网公司 Power grid mixed line fault treating method and apparatus
CN104113048B (en) * 2014-06-24 2017-11-10 中国石油化工股份有限公司 A kind of power distribution network intelligent protection system
CN105067959B (en) * 2015-09-15 2017-11-28 长沙威胜信息技术有限公司 Fault Locating Method under the conditions of ring network power supply
WO2017097380A1 (en) * 2015-12-11 2017-06-15 Abb Schweiz Ag Microgrid segmentation
CN106410806B (en) * 2016-06-24 2019-10-18 国家电网公司 Three circuit types two are segmented two pressure rack sky trunk power distribution networks and its construction method in the contact
CN106253252A (en) * 2016-08-27 2016-12-21 国网山东省电力公司蓬莱市供电公司 A kind of feeder automation fault self-recovery method of high fault tolerance
CN110095665B (en) * 2018-01-31 2021-10-01 上海二十冶建设有限公司 Method for testing an electrical system circuit formed by busbars connected by tie switches
CN109633297B (en) * 2018-11-09 2021-03-09 珠海许继芝电网自动化有限公司 Fault determination method and system under condition of key signal loss

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1443624A1 (en) * 2003-01-31 2004-08-04 Viserge Limited Fault control and restoration in a multi-feed power network
CN100376069C (en) * 2005-03-14 2008-03-19 上海申瑞电力自动化科技有限公司 Non-master station transinission and distribution network control method
CN101867223A (en) * 2010-04-08 2010-10-20 浙江省电力试验研究院 Automatic system fault handling method of distribution network containing a plurality of distributed power supplies

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2308149B1 (en) * 2008-07-21 2017-08-30 ABB Research Ltd. Feeder automation system and method for operating the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1443624A1 (en) * 2003-01-31 2004-08-04 Viserge Limited Fault control and restoration in a multi-feed power network
CN100376069C (en) * 2005-03-14 2008-03-19 上海申瑞电力自动化科技有限公司 Non-master station transinission and distribution network control method
CN101867223A (en) * 2010-04-08 2010-10-20 浙江省电力试验研究院 Automatic system fault handling method of distribution network containing a plurality of distributed power supplies

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
一种快速自愈的分布智能馈线自动化系统;刘健 等;《电力系统自动化》;20100525;第34卷(第10期);第62-66页:第3.2.1节、第3.3.1节,图2 *
基于网形的配电网故障判断、隔离与恢复;齐宝平 等;《安康师专学报》;20050630;第17卷(第3期);第59-63页:第1节,图1、2 *

Also Published As

Publication number Publication date
CN102213735A (en) 2011-10-12

Similar Documents

Publication Publication Date Title
CN102213735B (en) Typical test network with power distribution automation
JP6077789B2 (en) Distribution network fault management
CN109347093B (en) Power distribution network self-healing control method combining master station with local control
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN103872660B (en) Network type protection method based on closed-loop mode operation of power network
WO2014201989A1 (en) Distributed intelligence feeder line automated control method
CN104716745A (en) Topology generation method and topology generation system oriented to power distribution automation terminals
CN105896490B (en) A kind of fault handling method and device of power distribution network
CN104283215A (en) Detection and test method and device of intelligent distributed power distribution terminal
Zhang et al. An integrative approach to reliability analysis of an IEC 61850 digital substation
Greiner et al. Availability evaluation of multi-terminal DC networks with DC circuit breakers
CN103872662A (en) Network type protection method for hybrid networking based on closed-loop model operation
Xie et al. Fast algorithm for the reliability evaluation of large-scale electrical distribution networks using the section technique
CN107846015A (en) Intelligent distribution network load transfer optimal route selection method based on peer-to-peer communication
Wiboonrat An empirical study on data center system failure diagnosis
CN102565630B (en) State labeling method for estimating reliability of distribution network
Rault et al. Real-time simulation with an industrial DCCB controller in a HVDC grid
CN110048384A (en) A kind of distribution high reliability self-healing method and system
CN203774871U (en) Open-loop mode operation based hybrid networking power network system
CN105244872A (en) Medium voltage cable network networking method
CN102904221A (en) Spare power automatic switching latching method and device for 10kv distribution room of intelligent substation
CN202550668U (en) Distributed power distribution network management terminal
Larruskain et al. Requirements for fault protection in HVDC grids
CN112865320B (en) Power grid self-healing control method and device based on power loss path information flow transition and flexible level difference
CN102928688A (en) Method for synchronously testing automatic isolation of feeder fault from multiple points

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130424

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130424

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute

C14 Grant of patent or utility model
GR01 Patent grant