CN106410806B - Three circuit types two are segmented two pressure rack sky trunk power distribution networks and its construction method in the contact - Google Patents

Three circuit types two are segmented two pressure rack sky trunk power distribution networks and its construction method in the contact Download PDF

Info

Publication number
CN106410806B
CN106410806B CN201610473375.9A CN201610473375A CN106410806B CN 106410806 B CN106410806 B CN 106410806B CN 201610473375 A CN201610473375 A CN 201610473375A CN 106410806 B CN106410806 B CN 106410806B
Authority
CN
China
Prior art keywords
power
level
feed section
power supply
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610473375.9A
Other languages
Chinese (zh)
Other versions
CN106410806A (en
Inventor
李磊
周猷传
张健
卞真旭
郝韩兵
韩坤
杨学梅
张家海
宋驰
杜露露
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610473375.9A priority Critical patent/CN106410806B/en
Publication of CN106410806A publication Critical patent/CN106410806A/en
Application granted granted Critical
Publication of CN106410806B publication Critical patent/CN106410806B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/005

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of three circuit types two to be segmented two pressure rack sky trunk power distribution networks and its construction method in the contact, which includes: the first level-one power-feed section constructed by first end power supply, the second level-one power-feed section constructed by second end power supply and the third level-one power-feed section constructed by third end power supply;And triangle power supply structure, including connecting the first second level power-feed section triangular in shape, the second second level power-feed section and third power-feed section from beginning to end, wherein, the wiring construction being made of the block switch of normally off and the interconnection switch of a normally open is respectively equipped on the first second level power-feed section, the second second level power-feed section and third second level power-feed section.For power distribution network of the invention using two contact structure of the segmentation of double-circuit formula two, the structure is relatively independent, load transfer ability is stronger, simple and reasonable, meets the actual requirement of fortune inspection, scheduling, marketing management, especially suitable for rural area and novel downtown areas.

Description

Three circuit types two are segmented two pressure rack sky trunk power distribution networks and its construction method in the contact
Technical field
The present invention relates to a kind of middle pressure rack sky trunk power distribution network and its construction methods.
Background technique
According to " distribution network planning designing technique directive/guide " (Q/GDW 738-2012), " urban distribution network planning design rule Model " (GB 50613-2010) and " rural cadastration Guidance Rule " (DL/T 5118), middle pressure rack sky trunk power distribution network allusion quotation Type structure has: single radiation wiring, the wiring of simply connected network and more segmentation appropriateness contact wiring.
The three of the above standard mode of connection, in the construction of traditional medium voltage distribution network, because the geographical distribution of load point, road are walked To with the factors such as rising characteristic, easily cause practical rack to deviate with grid plan modification target.Though being rolled modification year by year and being entangled Partially, it but ultimately causes that network structure is unintelligible, the reality more than unreasonable, the invalid contact of segmentation, directly affects power distribution network and turn to supply Mutually band inferior capabilities, customer power supply reliability are difficult to ensure.
Due to being constrained by customer charge density, planned road network and the otherness of regional development, all kinds of " regulations " can not Timing is built to rack and rack transient mode defines.In order to reach the power supply capacity index of different zones, distribution is realized The growth requirement of net construction appropriate advance customer charge.For many years, power supply enterprise is always close around " customer charge develops special Property ", " grid structure how being improved, to realize reasonable transition and evolution to final rack ", " how to realize power distribution network investment with In-depth analysis and primary study are carried out in a series of this proposition such as coordination between income ".
More especially it is located at the power supply user in rural area, novel cities and towns, due to being layouted by source substation, medium-voltage line The constraints such as radius of electricity supply, power supply capacity, power supply quality, a large amount of trunk power distribution network performance driving economy levels are not high.Heavy duty with Situations such as underloading, substation's interval resource is not occupied high with line load level, simultaneously deposits, and directly causes the power supply water to user Gentle power supply capacity is low, and customer power supply reliability is difficult to ensure.
Summary of the invention
The purpose of the present invention is to provide a kind of three circuit types two segmentation, two contacts simple and reasonable, extended capability is strong Middle pressure rack sky trunk power distribution network.
The object of the invention is also to provide a kind of construction methods of middle pressure rack sky trunk power distribution network.
For this purpose, one aspect of the present invention provides a kind of middle pressure rack sky trunk power distribution network, comprising: constructed by first end power supply First level-one power-feed section, the second level-one power-feed section constructed by second end power supply and the constructed by third end power supply the 3rd 1 Grade power-feed section;And triangle power supply structure, it is connected to the first level-one power-feed section, the second level-one power-feed section and the power supply of third level-one Between section, including connecting the first second level power-feed section triangular in shape, the second second level power-feed section and third power-feed section from beginning to end, wherein It is respectively equipped on first second level power-feed section, the second second level power-feed section and third second level power-feed section and is joined by a block switch and one The wiring construction of network switch composition a, wherein block switch keeps normally off and an interconnection switch maintains a normally open state.
Further, above-mentioned first end power supply is the first transformer, and the first level-one power-feed section includes in the first transformer The first outlet breaker of outlet end setting;Second end power supply is the second transformer, and the second level-one power-feed section is included in the second change The second outlet breaker of the outlet end setting of depressor;And third end power supply is third transformer, third level-one power-feed section packet Include the third outlet breaker in the setting of the outlet end of third transformer.
Further, pressure rack sky trunk power distribution network for Rural Power Distribution Network or is used for novel town power distribution network among the above.
According to another aspect of the present invention, a kind of construction method of middle pressure rack sky trunk power distribution network is provided, including following Step: the first line constructed by first end power supply, the second route constructed by second end power supply are constructed and by third end electricity The step of tertiary circuit of source building one;The step of wiring construction is respectively set on first line, the second route and tertiary circuit Rapid two, wherein wiring construction is made of a block switch and an interconnection switch, wherein a block switch keeps normally closed A state and interconnection switch maintains a normally open state;And by the wiring construction in first line, the wiring knot on the second route Connection structure on structure and tertiary circuit is connected with each other, to form the step of power supply structure is got in touch in the segmentation of triangle two two three.
Further, above-mentioned steps two include that the first block switch and first are sequentially connected in series on the bus of first line Network switch is sequentially connected in series the second block switch and the second interconnection switch and in tertiary circuit on the bus of the second route Third block switch and third interconnection switch are sequentially connected in series on bus, wherein separate first line using the first block switch Level-one power-feed section and second level power-feed section separate, separated using the second block switch by the level-one power-feed section and second level of the second route Power-feed section separates, and is separated the level-one power-feed section of tertiary circuit and second level power-feed section using third block switch, step 3 includes The second level power-feed section of first line is connected to the level-one power-feed section of the second route, is connected to the second level power-feed section of the second route The level-one power-feed section of tertiary circuit and the level-one power-feed section that the second level power-feed section of tertiary circuit is connected to first line.
Further, above-mentioned steps two include: in the end of the level-one power-feed section of first line the first block switch in parallel With the first interconnection switch;The second block switch in parallel and the second interconnection switch in the end of the level-one power-feed section of the second route;With And the end parallel connection third block switch and third interconnection switch of the level-one power-feed section in tertiary circuit, step 3 include: by First block switch of one route is connect with the second interconnection switch of the second route by the first second level power-feed section;By the second route The third interconnection switch of second block switch and tertiary circuit is connected by the second second level power-feed section;And by the third of tertiary circuit Block switch and the first interconnection switch of first line connect.
Middle pressure rack sky trunk power distribution network of the invention, using three circuit types two segmentation, two contact structure, the structure is relatively only It is vertical, load transfer ability is stronger, simple and reasonable, meet the actual requirement of fortune inspection, scheduling, marketing management.Especially suitable for Rural area and novel downtown areas.
Compared with the prior art, middle pressure rack sky trunk power distribution network of the invention has the following characteristics that
1), power distribution network of the invention includes 3 two segmentations, two contact wiring construction.The structure is relatively independent, supply load It is relatively stable.When the customer charge demand that the structure is accessed increases or reduces, changed by flexibly cutting, it can be to other types mesh Mark structure, which is cut, to be changed, to guarantee the control of route performance driving economy in zone of reasonableness.
2), power distribution network of the invention, the three-line for participating in contact are connected to the bus of different substation to join between building station The contact point of network, three-line shares at 3.In addition to providing power supply by source substation bus, power-feed sections at different levels can also be passed through The route that two interconnection switches of upper setting and another two buses provide power supply, which is formed, to be got in touch with.Guarantee line failure or electricity When source access bus breaks down, the power supply capacity to non-faulting section is remained to.
3), the factors such as the geographical distribution and rising characteristic of traditional medium voltage distribution network because of load point, easily cause practical rack with Grid plan modification target deviates.Though through rolling modification and correction year by year, ultimately cause network structure it is unintelligible, segmentation do not conform to Reason, the in vain more reality of contact directly affect turning for mutual band inferior capabilities for power distribution network, and customer power supply reliability is difficult to ensure. Power distribution network of the invention provides 1 two contact whole group power supply unit of route building standard two segmentation by 3 substations respectively, has Structure is simple, turns strong for ability, and rack, which is cut, changes the features such as flexible, is preferably used as in Urban New District, center small towns, development park etc. and presses Make somebody a mere figurehead public trunk power distribution network final period target net application.
4), power distribution network of the invention, based on modular design specification, structure is simple, convenient to construct.The structure is compared with standard network Frame structure specifically and quantization.Distribution and highway and the route of power supply area power supply point and load point can effectively be combined Application is carried out in gallery arrangement.The orderly construction of middle pressure mains network, reasonable evolution have not only been guided, while greatly having improved power transformation Stand, in switchyard extrusion line interval resource distribution, and have to the inspection of power distribution network fortune, scheduling and the access-in management of newly-increased load Directive significance.
Other than objects, features and advantages described above, there are also other objects, features and advantages by the present invention. Below with reference to figure, the present invention is described in further detail.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present invention, and of the invention shows Examples and descriptions thereof are used to explain the present invention for meaning property, does not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the framework that three circuit type two according to an embodiment of the invention is segmented two pressure rack sky trunk power distribution networks in the contact Schematic diagram;
Fig. 2 is that double-circuit formula two according to the present invention is segmented the first of two pressure rack sky trunk power distribution network construction methods in the contact The schematic diagram of embodiment;And
Fig. 3 is that double-circuit formula two according to the present invention is segmented the second of two pressure rack sky trunk power distribution network construction methods in the contact The schematic diagram of embodiment.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
Fig. 1 to Fig. 3 shows some embodiments of middle pressure rack sky trunk power distribution network.
In an embodiment of the present invention, as shown in Figure 1, middle pressure rack sky trunk power distribution network includes being constructed by first end power supply First level-one power-feed section A-1, the second level-one power-feed section B-1 constructed by second end power supply and by the building of third end power supply Third level-one power-feed section C-1;And triangle power supply structure, it is connected to the first level-one power-feed section A-1, the second level-one power-feed section B- Between 1 and third level-one power-feed section C-1, including connecting the first second level power-feed section A-2 triangular in shape, the power supply of the second second level from beginning to end Section B-2 and third second level power-feed section C-2, wherein the first second level power-feed section A-2 is equipped with to be got in touch with by a block switch 11 and one The wiring construction that switch 12 forms, the second second level power-feed section B-2 are equipped with by a block switch 21 and one 22 groups of interconnection switch At wiring construction, third second level power-feed section C-2 be equipped with connect by what a block switch 31 and an interconnection switch 32 formed Cable architecture, wherein block switch 11,21,31 keeps normally off and interconnection switch 12,22,32 maintains a normally open state.
In the present embodiment, the first second level power-feed section A-2, the second second level power-feed section B-2 and third second level power-feed section C-2 shape At the power supply structure of triangle, have the advantage that
1), power distribution network of the invention includes 3 two segmentations, two contact wiring construction.The structure is relatively independent, supply load It is relatively stable.When the customer charge demand that the structure is accessed increases or reduces, changed by flexibly cutting, it can be to other types mesh Mark structure, which is cut, to be changed, to guarantee the control of route performance driving economy in zone of reasonableness.
2), power distribution network of the invention, the three-line for participating in contact are connected to the bus of different substation to join between building station The contact point of network, three-line shares at 3.In addition to providing power supply by source substation bus, power-feed sections at different levels can also be passed through The route that two interconnection switches of upper setting and another two buses provide power supply, which is formed, to be got in touch with.Guarantee line failure or electricity When source access bus breaks down, the power supply capacity to non-faulting section is remained to.
3), the factors such as the geographical distribution and rising characteristic of traditional medium voltage distribution network because of load point, easily cause practical rack with Grid plan modification target deviates.Though through rolling modification and correction year by year, ultimately cause network structure it is unintelligible, segmentation do not conform to Reason, the in vain more reality of contact directly affect turning for mutual band inferior capabilities for power distribution network, and customer power supply reliability is difficult to ensure. Power distribution network of the invention provides 1 two contact whole group power supply unit of route building standard two segmentation by 3 substations respectively, has Structure is simple, turns strong for ability, and rack, which is cut, changes the features such as flexible, is preferably used as in Urban New District, center small towns, development park etc. and presses Make somebody a mere figurehead public trunk power distribution network final period target net application.
4), power distribution network of the invention, based on modular design specification, structure is simple, convenient to construct.The structure is compared with standard network Frame structure specifically and quantization.Distribution and highway and the route of power supply area power supply point and load point can effectively be combined Application is carried out in gallery arrangement.The orderly construction of middle pressure mains network, reasonable evolution have not only been guided, while greatly having improved power transformation Stand, in switchyard extrusion line interval resource distribution, and have to the inspection of power distribution network fortune, scheduling and the access-in management of newly-increased load Directive significance.
In an embodiment of the present invention, as shown in Figure 1, by pressure rack sky trunk distribution in three circuit types of three end power supplys building Net includes 3 source substations.The outlet of first source substation passes through bus A series connection first outlet breaker 13, the second electricity By bus B series connection second outlet breaker 23, the outlet of third source substation is connected by bus C for the outlet of source substation Third outlet breaker 33.The first second level power-feed section is equipped between first outlet breaker 13 and the third outlet breaker 33; The second second level power-feed section is equipped between the second outlet breaker and the first outlet breaker;The third breaker and institute It states and is equipped with third second level power-feed section between the second breaker.A triangle second level power supply segment structure is collectively formed in the above structure.
One end of each second level power-feed section is equipped with a block switch, and the other end is equipped with an interconnection switch, wherein segmentation is opened It closes and keeps normally off, interconnection switch maintains a normally open state, and each outlet breaker keeps normally off.First outlet breaker Leading-out terminal is connected with the first second level power-feed section and the second second level power-feed section respectively by level-one power-feed section A-1;Second outlet open circuit The leading-out terminal of device is connected with the second second level power-feed section and third second level power-feed section respectively by level-one power-feed section B-1;Third outlet The leading-out terminal of breaker is connected with third second level power-feed section and the first second level power-feed section respectively by level-one power-feed section C-1.
When the customer charge demand that the structure is accessed increases or reduces, changed by flexibly cutting, it can be to other types mesh Mark structure, which is cut, to be changed, to guarantee the control of route performance driving economy in zone of reasonableness.
Boundary condition: often allow long-term work load condition table with cable referring to middle pressure trunk power distribution network:
Single power supply segment fault: when normal operating mode, the operation load level of single line is usually no more than maximum negative Carry 70% horizontal (substantially close to 2/3).Single power-feed section load level carries out about according to the 1/3 of corresponding cable load level Beam, that is, when can guarantee single power supply segment fault, non-faulting power-feed section still safe power supply.
The system failure: when generating system failure, source substation single transformer power loss or source substation single bus Power loss, when being related to load transfer, single power-feed section load level is constrained according to the 1/3 of corresponding cable load level.
In one embodiment of this invention, as shown in Figure 2 or Figure 3, middle pressure rack sky trunk power distribution network construction method, including with Lower step:
Construct the first line constructed by first end power supply, the second route constructed by second end power supply and by third The step of holding the tertiary circuit of power supply building one;
In the step of wiring construction is respectively set on first line, the second route and tertiary circuit two, wherein wiring construction It is made of a block switch and an interconnection switch, wherein a block switch keeps normally off and an interconnection switch Maintain a normally open state;And
Wiring construction in first line, the wiring construction on the wiring construction and tertiary circuit on the second route are connected It connects, to form the step of power supply structure is got in touch in the segmentation of triangle two two three.
Power distribution network construction method according to the present invention, every route is by a level-one power-feed section and two second level power-feed section groups At power supply structure is clear, especially suitable for rural area and novel downtown areas.
In an embodiment of the present invention, as shown in Fig. 2, on the level-one power-feed section A-1 of first line an in parallel segmentation open 11 and an interconnection switch 12 are closed, a block switch 21 in parallel and a contact are opened on the level-one power-feed section B-1 of the second route 22 are closed, a block switch 31 in parallel and an interconnection switch 32 on the level-one power-feed section C-1 of tertiary circuit, wherein First Line It is connected between the interconnection switch 12 on road and the block switch 21 of the second route by a second level power-feed section B-2, the second route Interconnection switch 22 is connected with the block switch 31 of tertiary circuit by a second level power-feed section C-2, thus three second level power-feed sections A-2, B-2, C-2 join end to end to form the segmentation contact power supply structure of triangle two.
In the present embodiment, the type of the wiring construction of three-line is identical, is a block switch and a contact Switch in parallel.
In an embodiment of the present invention, as shown in figure 3, three circuit type two segmentation, two contact power supply structure is by two circuit types The wiring construction of two segmentations, two contact power supply structure and tertiary circuit is built-up.Specifically, two circuit types two segmentation, two contact Power supply structure includes the level-one power-feed section and second level power-feed section of first line, level-one power-feed section and the second level power supply of the second route Section, wherein the second level power-feed section parallel connection of the second level power-feed section and the second route of first line forms mutual two contact of the segmentation of font two Power supply structure, the wiring construction on the level-one power-feed section of tertiary circuit are an interconnection switch and a block switch parallel connection.It will The second level power-feed section A-2 of first line and the interconnection switch of tertiary circuit connect, and the interconnection switch of the second route passes through one two Grade power-feed section C-2 is connected with the block switch of tertiary circuit, to form two segmentations, the two contact power supply structure of triangle.
In the present invention, the use normality of block switch and interconnection switch is as follows: block switch keeps normally off and connection Network switch maintains a normally open state.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (5)

1. a kind of middle pressure rack sky trunk power distribution network characterized by comprising
The the first level-one power-feed section constructed by first end power supply, the second level-one power-feed section, the Yi Jiyou that are constructed by second end power supply The third level-one power-feed section of third end power supply building;And
Triangle power supply structure, be connected to the first level-one power-feed section, the second level-one power-feed section and third level-one power-feed section it Between, including connecting the first second level power-feed section triangular in shape, the second second level power-feed section and third second level power-feed section from beginning to end,
Wherein, it is respectively equipped on the first second level power-feed section, the second second level power-feed section and third second level power-feed section by one point The wiring construction of Duan Kaiguan and interconnection switch composition, wherein one block switch keeps normally off and described one A interconnection switch maintains a normally open state,
It includes 3 two segmentations, two contact wiring construction that medium pressure, which makes somebody a mere figurehead trunk power distribution network,
Medium pressure makes somebody a mere figurehead trunk power distribution network for Rural Power Distribution Network or is used for novel town power distribution network.
2. middle pressure rack sky trunk power distribution network according to claim 1, which is characterized in that
The first end power supply is the first transformer, and the first level-one power-feed section includes in the outlet end of first transformer The first outlet breaker of setting;
The second end power supply is the second transformer, and the second level-one power-feed section includes in the outlet end of second transformer The second outlet breaker of setting;And
Third end power supply is third transformer, and the third level-one power-feed section includes in the outlet end of the third transformer The third outlet breaker of setting.
3. a kind of construction method of middle pressure rack sky trunk power distribution network, which comprises the following steps:
Construct the first line constructed by first end power supply, the second route constructed by second end power supply and by third end electricity The step of tertiary circuit of source building one;
In the step of wiring construction is respectively set on the first line, second route and the tertiary circuit two, wherein The wiring construction is made of a block switch and an interconnection switch, wherein one block switch keeps normally closed shape State and one interconnection switch maintains a normally open state;And
By the wiring construction in the first line, the connection knot on the wiring construction and tertiary circuit on second route Structure is connected with each other, to form the step of power supply structure is got in touch in the segmentation of triangle two two three,
Wherein, it includes 3 two segmentations, two contact wiring construction that medium pressure, which makes somebody a mere figurehead trunk power distribution network,.
4. the construction method of middle pressure rack sky trunk power distribution network according to claim 3, which is characterized in that
The step 2 include be sequentially connected in series on the bus of the first line the first block switch and the first interconnection switch, The second block switch and the second interconnection switch and the mother in the tertiary circuit are sequentially connected in series on the bus of second route Third block switch and third interconnection switch are sequentially connected in series on line, wherein separate described using first block switch The level-one power-feed section and second level power-feed section of one route separate, and are separated using second block switch by the one of second route Grade power-feed section and second level power-feed section separate, using the third block switch by the level-one power-feed section and second level of the tertiary circuit Power-feed section separates,
The step 3 includes the level-one power-feed section that the second level power-feed section of the first line is connected to second route, incites somebody to action The second level power-feed section of second route is connected to the level-one power-feed section of the tertiary circuit and supplies the second level of tertiary circuit Electric section is connected to the level-one power-feed section of the first line.
5. the construction method of middle pressure rack sky trunk power distribution network according to claim 3, which is characterized in that
The step 2 includes: in the end of the level-one power-feed section of the first line the first block switch in parallel and the first contact Switch;The second block switch in parallel and the second interconnection switch in the end of the level-one power-feed section of second route;And institute The end parallel connection third block switch and third interconnection switch of the level-one power-feed section of tertiary circuit are stated,
The step 3 include: by the second interconnection switch of the first block switch of the first line and second route by The connection of first second level power-feed section;By the third interconnection switch of the second block switch of second route and the tertiary circuit by The connection of second second level power-feed section;And the third block switch of the tertiary circuit and the first contact of the first line are opened Connection connects.
CN201610473375.9A 2016-06-24 2016-06-24 Three circuit types two are segmented two pressure rack sky trunk power distribution networks and its construction method in the contact Active CN106410806B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610473375.9A CN106410806B (en) 2016-06-24 2016-06-24 Three circuit types two are segmented two pressure rack sky trunk power distribution networks and its construction method in the contact

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610473375.9A CN106410806B (en) 2016-06-24 2016-06-24 Three circuit types two are segmented two pressure rack sky trunk power distribution networks and its construction method in the contact

Publications (2)

Publication Number Publication Date
CN106410806A CN106410806A (en) 2017-02-15
CN106410806B true CN106410806B (en) 2019-10-18

Family

ID=58005946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610473375.9A Active CN106410806B (en) 2016-06-24 2016-06-24 Three circuit types two are segmented two pressure rack sky trunk power distribution networks and its construction method in the contact

Country Status (1)

Country Link
CN (1) CN106410806B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101447681A (en) * 2008-06-03 2009-06-03 中国电力科学研究院 3*4 wiring method for medium-pressure distribution network
CN102213735A (en) * 2011-03-04 2011-10-12 中国电力科学研究院 Typical test network with power distribution automation
CN103840439A (en) * 2014-03-31 2014-06-04 国网上海市电力公司 Power distribution automation protecting method achieved by matching of master station and distributed terminals
CN103986160A (en) * 2014-05-29 2014-08-13 国网上海市电力公司 Method for delaminating and districting of 10 KV medium voltage distribution network
CN104882883A (en) * 2015-06-29 2015-09-02 国家电网公司 10 KV power distribution network system
CN105024329A (en) * 2015-08-04 2015-11-04 国家电网公司 Medium-voltage overhead trunk power distribution network construction structure and building method thereof
CN105244872A (en) * 2015-10-23 2016-01-13 国家电网公司 Medium voltage cable network networking method
CN205681126U (en) * 2016-06-24 2016-11-09 国家电网公司 Three circuit type two segmentations two pressure rack in the contact sky trunk power distribution network

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4742238B2 (en) * 2006-02-09 2011-08-10 東京電力株式会社 Support system and program for determining conditions for connecting distributed power supply to distribution network

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101447681A (en) * 2008-06-03 2009-06-03 中国电力科学研究院 3*4 wiring method for medium-pressure distribution network
CN102213735A (en) * 2011-03-04 2011-10-12 中国电力科学研究院 Typical test network with power distribution automation
CN103840439A (en) * 2014-03-31 2014-06-04 国网上海市电力公司 Power distribution automation protecting method achieved by matching of master station and distributed terminals
CN103986160A (en) * 2014-05-29 2014-08-13 国网上海市电力公司 Method for delaminating and districting of 10 KV medium voltage distribution network
CN104882883A (en) * 2015-06-29 2015-09-02 国家电网公司 10 KV power distribution network system
CN105024329A (en) * 2015-08-04 2015-11-04 国家电网公司 Medium-voltage overhead trunk power distribution network construction structure and building method thereof
CN105244872A (en) * 2015-10-23 2016-01-13 国家电网公司 Medium voltage cable network networking method
CN205681126U (en) * 2016-06-24 2016-11-09 国家电网公司 Three circuit type two segmentations two pressure rack in the contact sky trunk power distribution network

Also Published As

Publication number Publication date
CN106410806A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
Pierri et al. Challenges and opportunities for a European HVDC grid
CN103116807B (en) A kind of functional areas power distribution network becomes more meticulous planing method
CN105117518A (en) Automatic drawing method and system for power distribution feeder single-line diagram of radiation connection mode
WO2023024369A1 (en) Power distribution network power supply reliability assessment method based on digital twin, and device and medium
CN106154113A (en) Active power distribution network distributed feeder automation fault locating method
CN107086570A (en) A kind of expansible how annular Urban Medium Voltage Distribution Network system
CN104331847A (en) Power supply zone partitioning method by use of Delaunay triangulation
Liu et al. Practical automatic planning for MV distribution network considering complementation of load characteristic and power supply unit partitioning
CN105024329B (en) A kind of empty trunk distribution network construction structure of middle pressure rack and its construction method
CN106410806B (en) Three circuit types two are segmented two pressure rack sky trunk power distribution networks and its construction method in the contact
CN105259751B (en) A kind of electric power thematic map update method based on Real-Time Switch action
CN203104104U (en) Optimized backbone transmission network system for electric power information communication
CN103944166A (en) Single transformer substation power supply mode set based regional power grid reconstruction method
CN104134162B (en) A kind of battalion auxiliary tone full electric network modeling method of integrated distributed power supply
CN205681126U (en) Three circuit type two segmentations two pressure rack in the contact sky trunk power distribution network
CN114336638B (en) Medium-voltage active power distribution network dynamic reconstruction method based on bubbling model
CN205681123U (en) Double-circuit formula two segmentation two pressure rack in the contact sky trunk power distribution network
CN206932003U (en) A kind of expansible how annular Urban Medium Voltage Distribution Network system
CN106329517B (en) Electromagnetic looped network based on longitude and latitude thread path unlinks analysis method automatically
CN208316299U (en) A kind of middle pressure rack sky trunk distribution network construction structure of single ended power supply building
CN205753445U (en) On same soil, wind-solar complementary type generates electricity by way of merging two or more grid systems application apparatus
CN209169957U (en) A kind of urban distribution network wiring construction
CN204858562U (en) Built on stilts trunk distribution network construction system of separable type middling pressure
CN203813438U (en) Power distribution net rack wiring structure
CN204793952U (en) Built on stilts trunk distribution network construction system of couple very much in love type middling pressure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID ANHUI POWER CO., LTD. CHUZHOU POWER SUPPLY Co.

Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District

Patentee before: State Grid Corporation of China

Patentee before: CHUZHOU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER Corp.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 239000 No. 510 Fenghuang Road, Anhui, Chuzhou

Patentee after: STATE GRID ANHUI POWER CO., LTD. CHUZHOU POWER SUPPLY Co.

Patentee after: State Grid Corporation of China

Address before: 100031 No. 86 West Chang'an Avenue, Beijing, Xicheng District

Patentee before: State Grid Corporation of China

Patentee before: STATE GRID ANHUI POWER CO., LTD. CHUZHOU POWER SUPPLY Co.