CN106025923A - Construction method of tension type power line protection net - Google Patents

Construction method of tension type power line protection net Download PDF

Info

Publication number
CN106025923A
CN106025923A CN201610533066.6A CN201610533066A CN106025923A CN 106025923 A CN106025923 A CN 106025923A CN 201610533066 A CN201610533066 A CN 201610533066A CN 106025923 A CN106025923 A CN 106025923A
Authority
CN
China
Prior art keywords
rope
tower
carrying
mesh grid
wave wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610533066.6A
Other languages
Chinese (zh)
Other versions
CN106025923B (en
Inventor
戚柏林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoxing Daxing Electrical Bearing Co Ltd
Original Assignee
Shaoxing Daxing Electrical Bearing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Daxing Electrical Bearing Co Ltd filed Critical Shaoxing Daxing Electrical Bearing Co Ltd
Priority to CN201610533066.6A priority Critical patent/CN106025923B/en
Publication of CN106025923A publication Critical patent/CN106025923A/en
Application granted granted Critical
Publication of CN106025923B publication Critical patent/CN106025923B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/18Devices affording mechanical protection in the event of breakage of a line or cable, e.g. net for catching broken lines

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to the technical field of power line protection, more particularly, to a construction method of tension type power line protection net, which is characterized in that a tension type protection net is arranged above a running power line crossing a new line; the tension type protection net comprises a woven net, carrying ropes, wave wind ropes, a ground anchor system and a support device. The woven net is arranged above the crossed power line, between an N tower and an N + 1 tower; the N tower and the N + 1 tower are towers for new power lines. The woven net is equipped and arranged through the carrying ropes, the wave wind ropes, the ground anchor system and the support device. The hanging points of the carrying ropes, the angles of the carrying ropes, the ground inclination angles of the wave wind ropes, and the size and height of the woven net are set according to the condition of engineering. The theoretical value of each rope in the tethered force system is calculated. For the support of the tethered force system, the woven net effectively protects the safe operation of the crossed power lines, which leads to the air traction of the new lines without affecting the operation of the crossed power lines.

Description

A kind of construction method of tension type power line protection net
Technical field
The present invention relates to power line protection field, refer in particular to the construction method of a kind of tension type power line protection net.
Background technology
The development built along with electric power energy, powerline network cloth and the earth, become economic, society and life breath manner of breathing The neural venation closed.During newly-built electric transmission line erection lead wire and earth wire, the leap that has a power failure intersects power line construction will be to local warp Ji and people's life bring inconvenience, electrical network reliable power supply to concern national economy and social public security.For a long time, do not stop Electricity crosses over intersection power line construction method, worldwide lacks effective solution.
Therefore, this is made further research by the present inventor, develops a kind of tension type transmission line protection system, this case by This produces.
Summary of the invention
It is an object of the invention to provide the construction method one tension type electricity of a kind of tension type line protection The construction method of line of force road catch net, reaches newly-built circuit and leads ground aerotow and do not affect and be spanned power circuit operation.
To achieve these goals, technical scheme is as follows:
The construction method of a kind of tension type line protection, is being provided above tension type transmission line of electricity across power circuit Protection device, tension type line protection includes catch net, carrying rope, wave wind rope, earth anchor system, and wherein catch net sets Putting by above power circuit, between N tower and N+1 tower, N tower and N+1 tower are across the ferrum of power circuit Tower;Catch net by carrying rope, wave wind rope, earth anchor system carry arrange, by project situation set carrying rope cross-arm hanging point position, Carrying rope ground angle, wave wind rope ground elevation, catch net size and height, then calculate the theory of each rope in rope force system Value, fixing-line device one that earth anchor system includes being sequentially connected with, lever hoist, draw-bar donamometer, earth anchor.
Described construction method comprises the steps:
1) first strop is pulled out from draw drum, through the suspension pulley being arranged on N steel tower, then strop is hung over On the line hanging mechanism of multi-rotor aerocraft, after aircraft arrives N+1 steel tower, by radio control, guiding becket bridle is taken off From, then end is through the suspension pulley being arranged on N+1 steel tower to ground, strop and carrying rope at N+1 steel tower Or endless rope connects, then returning traction conductor rope on N Ta Chu ground, carrying rope, endless rope set up by root;Carrying rope is at N ferrum Being connected to earth anchor system through suspension pulley on tower and N+1 steel tower, endless rope does with the ferrum of both sides and ties up tower anchor temporarily;
2) being lived by carrying line anchor with fixing-line device two on N tower, earth anchor system freed by carrying rope, returns back out the suspension pulley on tower, N tower ground fallen by tail rope, the most successively braiding nettle nose-ring is penetrated carrying rope, is then threaded back through carrying rope on tower hanging sliding Taking turns, carrying rope is tightened up on ground, and mesh grid promotes and is suspended on fixing-line device two and suspension pulley room, and then carrying rope connects earth anchor system System, continues to tighten up spooler, after carrying rope ground is painstaking, releases fixing-line device two on tower;
3) after mesh grid hangs up carrying rope, then endless rope tangles catch net medial ends, and at N+1 tower, endless rope is received Line, mesh grid is pulled to protection zone and moves, at mesh grid end continuous extension endless rope and wave wind rope, when catch net arrives specific bit Putting, then circulation rope belt tension on the tower of both sides is tied up tower and is fixed;
4) mesh grid end wave wind rope connects earth anchor system, and opposite side is risen wave wind rope hook on blanking bar by multi-rotor aerocraft and catches Carrying rope, then wave wind rope is connected with earth anchor system, and after 4 unrestrained wind ropes hang up properly, regulation spooler applies tension force, and catch net is opened Open, make about catch net and work as position, apply carrying rope downforce simultaneously;
5) regulation carrying rope, the spooler of wave wind rope earth anchor system, observe draw-bar donamometer reading, meet design setting, with Time check protection net height be spanned power circuit spacing compliant requirement, then various places anchor point specify special messenger guard;
6) after new line stringing completes, remove catch net device in time, first free wave wind rope earth anchor system, fake is inserted in wave wind Rope, is then hooked by multi-rotor aerocraft rope and holds fake rising, and fake impulsive force hooks wave wind rope to depart from and carries rope, front and back repeats 4 times, wave wind rope departs from carrying rope;
7) with endless rope, mesh grid being pulled to N tower, on tower, carrying rope outside mesh grid lived by fixing-line device anchor, unties earth anchor system Carrying end portion, unloads mesh grid from carrying rope;
8) at N tower, carry cheese circle inside fixing-line device and hang on endless rope, unload fixing-line device, receive on N+1 Ta Chu ground Cage carrying rope;
9) finally endless rope is removed by multi-rotor aerocraft.
After using such scheme, the present invention compared with prior art, has the advantage that
(1) raw material of catch net is ultra high molecular polyethylene fibrage rope, has high intensity, low elongation, low quality and electricity Gas insulating properties, arrange wave wind rope at catch net corner, are applied with catch net vertical force, and this power can offset accident wire pendant net Pressure, it is to avoid catch net is encountered protected electric lines of force by accident wire pendant net;(2) carrying rope is arranged at the cross-arm strong point flexibly Conveniently, it is to avoid use additional support crossbeam, catch net, after ground rope nose-ring penetrates carrying rope, then carries rope lift-off, circulation Rope danish seine, unmanned vehicle set up the operating procedures such as wave wind rope in the air, reduce personal height operation intensity and risk;(3) protection Net rope tension force is arranged by accident situation value of calculation, safe and reliable;(4) catch net installing, dismounting can be spanned electric lines of force Carry out under the not power-off condition of road, improve efficiency of construction and social benefit, be environmental protection construction method.
Accompanying drawing explanation
Fig. 1 is the installation achievement schematic diagram of the present invention;
Fig. 2 is one of installation figure of the present invention;
Fig. 3 is the two of the installation figure of the present invention;
Fig. 4 is the three of the dismounting construction drawing of the present invention,
Fig. 5 is the four of the dismounting construction drawing of the present invention;
Fig. 6 is the five of the dismounting construction drawing of the present invention;
Fig. 7 is the six of the dismounting construction drawing of the present invention;
Label declaration
Catch net 1, carrying rope 2, endless rope 3, wave wind rope 4,
Fixing-line device 1, lever hoist 6, draw-bar donamometer 7, earth anchor 8,
Suspension pulley 9, draw ring fixture 10, double hook spoolers 11,
Fixing-line device 2 12, wave wind rope hook 13, multi-rotor aerocraft 14
N tower 15, N+1 tower 16, fake 17, by across power circuit 18,
Newly-built power circuit lead wire and earth wire 19.
Detailed description of the invention
The present invention is further illustrated with specific embodiment below in conjunction with the accompanying drawings.
As it can be seen, the construction method of a kind of tension type power line protection net 1, including mesh grid, carrying rope 2, circulation Rope 3, wave wind rope 4, earth anchor 8 system and supporting device constructing operation, wherein mesh grid be arranged on be spanned above power circuit 18, Between N tower 15 and N+1 tower 16, N tower 15 and N+1 tower 16 are the steel towers of newly-built power circuit;Mesh grid is passed through Carrying rope 2, wave wind rope 4, earth anchor 8 system are carried and are arranged, and set carrying rope 2 cross-arm hanging point positions, carrying rope 2 ground by project situation Face angle, wave wind rope 4 ground elevation, mesh grid height, wire bearing down, calculate the theoretical value of each rope in rope force system.
Wherein catch net 1 rope uses φ 8 chinlon kernmantle, all longitudinal ends of catch net 1 or laterally end to make rope Nose-ring, rope nose-ring is double joint φ 8 chinlon kernmantle, smears outward epoxy resin, nose-ring interior diameter 80mm, and nose-ring can penetrate successively Carrying rope 2.
Carrying rope 2 is Di Nima sheath rope, selects specification Φ 12, diameter of phi 16 after jacket.Carrying rope 2 is at N tower 15 With N+1 tower 16 to earth anchor 8 system strain insulator.
Surrounding at mesh grid coverage area arranges wave wind rope 4 earth anchor 8 system.
Wherein earth anchor 8 system is by the fixing-line device 1 connected, lever hoist 6, draw-bar donamometer 7 and earth anchor 8.
Being provided with supporting device on steel tower, supporting device includes hanging pulley 9, double hook spooler 11, draw ring fixture 10 and Fixing-line device.Above utensil is fixed by described draw ring fixture 10, and draw ring fixture 10 is installed on the main material of cross-arm.
Its installation steps are as follows: early stage completes exploration, design and utensil preparation, first scene and carries out setting-out, determines Catch net 1 installation region, determines earth anchor 8 alliance and carries out excavating hole body or piling, completing earth anchor 8 system device and connect, Complete supporting device on tower to install.1) first strop is pulled out from draw drum, through the suspension pulley being arranged on N steel tower 9, then strop is hung on the line hanging mechanism of multi-rotor aerocraft 14, after aircraft arrives N+1 steel tower, by wireless Electric control will guide becket bridle and depart from, and then end is through suspension pulley 9 to the ground being arranged on N+1 steel tower, at N+1 ferrum At tower, strop is connected with carrying rope 2 or endless rope 3, and then at N tower 15, return traction conductor rope on ground, carries rope 2, endless rope 3 set up by root;Carrying rope 2 is connected to earth anchor 8 system through suspension pulley 9 on N steel tower and N+1 steel tower, and endless rope 3 is two Do with the ferrum of limit and tie up tower anchor temporarily;
2) using fixing-line device 2 12 to be lived by carrying rope 2 anchors on N tower 15, earth anchor 8 system freed by carrying rope 2, returns back out hanging on tower Hanging pulley 9, N tower 15 ground fallen by tail rope, the most successively braiding nettle nose-ring is penetrated carrying rope 2, then carrying is restricted 2 times Wearing suspension pulley 9 on tower, carrying rope 2 is tightened up on ground, and mesh grid promotes and is suspended on fixing-line device 2 12 and hangs between pulley 9, then Carrying rope 2 connection earth anchor 8 system, continues to tighten up spooler, after carrying rope 2 ground are painstaking, releases fixing-line device 2 12 on tower;
3) after mesh grid hangs up carrying rope 2, then endless rope 3 tangles catch net 1 medial ends, circulates at N+1 tower 16 Restricting 3 take-ups, mesh grid is pulled to protection zone and moves, and hangs endless rope 3 and wave wind rope 4, when catch net 1 arrives mesh grid end is continuous Reaching appointment position, then endless rope 3 rope belt tension on the tower of both sides is tied up tower and is fixed;
4) mesh grid end wave wind rope 4 connects earth anchor 8 system, and opposite side is by wave wind rope hook on 14 liters of blanking bars of multi-rotor aerocraft 13 catch carrying rope 2, and then wave wind rope 4 is connected with earth anchor 8 system, and after 4 unrestrained wind ropes 4 hang up properly, regulation spooler applies to open Power, catch net 1 opens, and regulates catch net about 1 and works as position, applies carrying rope 2 downforce simultaneously;
5) regulation carrying rope 2, the spooler of wave wind rope 4 earth anchor 8 system, observe draw-bar donamometer 7 reading, meets design regulation Value, simultaneously check protection net 1 height be spanned power circuit spacing compliant requirement, the most each earth anchor 8 specify special messenger Guard.
6), after new line stringing completes, catch net 1 device is removed in time.First free wave wind rope 4 earth anchor 8 system, fake 17 be inserted in wave wind rope 4, then by multi-rotor aerocraft 14 restrict hook hold fake 17 rise, fake 17 impulsive force wave wind rope 4 hook Depart from carrying rope 2.Front and back being repeated 4 times, wave wind rope 4 departs from carrying rope 2.
7) pulling to N tower 15 with 3 mesh grids of endless rope, on tower, carrying rope 2 outside mesh grid lived by fixing-line device anchor, and solution is turned up the soil The carrying of anchor 8 system is restricted 2 ends, and mesh grid is unloaded from carrying rope 2.
8) at N tower 15, inside fixing-line device, carrying rope 2 coils hang on endless rope 3, unload fixing-line device, at N+1 tower At 16, cage carrying rope 2 is received on ground.
9) finally endless rope 3 is removed by multi-rotor aerocraft 14.All Work tools are removed and are summed up, 100% profit in continuous engineering With.
Above are only the specific embodiment of the present invention, but the design concept of the present invention is not limited thereto, all utilize this structure Think the present invention is carried out the change of unsubstantiality, the behavior invading scope all should be belonged to.

Claims (2)

1. the construction method of a tension type power line protection net, it is characterised in that: the operation crossed at newly-built crossing elimination Power circuit is provided above tension type catch net, tension type catch net include mesh grid, carrying rope, wave wind rope, earth anchor system and Supporting device, wherein mesh grid is arranged on by above power circuit, between N tower and N+1 tower, N tower with No. N+1 Tower is the steel tower of newly-built power circuit;Mesh grid is carried arranged by carrying rope, wave wind rope, earth anchor system and supporting device, presses Project situation sets carrying rope cross-arm hanging point position, carrying rope ground angle, wave wind rope ground elevation, mesh grid size and height Degree, calculates the theoretical value of each rope in rope force system, supports through rope force system, and mesh grid is being spanned above power circuit Open.
A kind of construction method of tension type power line protection net, described construction method include as Lower step:
1) first strop is pulled out from draw drum, through the suspension pulley being arranged on N steel tower, then strop is hung over On the line hanging mechanism of multi-rotor aerocraft, after aircraft arrives N+1 steel tower, by radio control, guiding becket bridle is taken off From, then end is through the suspension pulley being arranged on N+1 steel tower to ground, strop and carrying rope at N+1 steel tower Or endless rope connects, then returning traction conductor rope on N Ta Chu ground, carrying rope, endless rope set up by root;Carrying rope is at N ferrum Being connected to earth anchor system through suspension pulley on tower and N+1 steel tower, endless rope does with the ferrum of both sides and ties up tower anchor temporarily;
2) being lived by carrying line anchor with fixing-line device two on N tower, earth anchor system freed by carrying rope, returns back out the suspension pulley on tower, N tower ground fallen by tail rope, the most successively braiding nettle nose-ring is penetrated carrying rope, is then threaded back through carrying rope on tower hanging sliding Taking turns, carrying rope is tightened up on ground, and mesh grid promotes and is suspended on fixing-line device two and suspension pulley room, and then carrying rope connects earth anchor system System, continues to tighten up spooler, after carrying rope ground is painstaking, releases fixing-line device two on tower;
3) after mesh grid hangs up carrying rope, then endless rope tangles catch net medial ends, and at N+1 tower, endless rope is received Line, mesh grid is pulled to protection zone and moves, at mesh grid end continuous extension endless rope and wave wind rope, when catch net arrives specific bit Putting, then circulation rope belt tension on the tower of both sides is tied up tower and is fixed;
4) mesh grid end wave wind rope connects earth anchor system, and opposite side is risen wave wind rope hook on blanking bar by multi-rotor aerocraft and catches Carrying rope, then wave wind rope is connected with earth anchor system, and after 4 unrestrained wind ropes hang up properly, regulation spooler applies tension force, and catch net is opened Open, regulate about catch net and work as position, apply carrying rope downforce simultaneously;
5) regulation carrying rope, the spooler of wave wind rope earth anchor system, observe draw-bar donamometer reading, meet design setting, with Time check protection net height be spanned power circuit spacing compliant requirement, then various places anchor point specify special messenger guard;
6) after new line stringing completes, remove catch net device in time, first free wave wind rope earth anchor system, fake is inserted in wave wind Rope, is then hooked by multi-rotor aerocraft rope and holds fake rising, and fake impulsive force hooks wave wind rope to depart from and carries rope, front and back repeats 4 times, wave wind rope departs from carrying rope;
7) with endless rope, mesh grid being pulled to N tower, on tower, carrying rope outside mesh grid lived by fixing-line device anchor, unties earth anchor system Carrying rope, unloads mesh grid from carrying rope;
8) at N tower, carry cheese circle inside fixing-line device and hang on endless rope, unload fixing-line device, receive on N+1 Ta Chu ground Cage carrying rope;
9) finally endless rope is removed by multi-rotor aerocraft.
CN201610533066.6A 2016-07-05 2016-07-05 A kind of construction method of tension type power line protection net Expired - Fee Related CN106025923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610533066.6A CN106025923B (en) 2016-07-05 2016-07-05 A kind of construction method of tension type power line protection net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610533066.6A CN106025923B (en) 2016-07-05 2016-07-05 A kind of construction method of tension type power line protection net

Publications (2)

Publication Number Publication Date
CN106025923A true CN106025923A (en) 2016-10-12
CN106025923B CN106025923B (en) 2018-04-03

Family

ID=57108527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610533066.6A Expired - Fee Related CN106025923B (en) 2016-07-05 2016-07-05 A kind of construction method of tension type power line protection net

Country Status (1)

Country Link
CN (1) CN106025923B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109204332A (en) * 2018-09-13 2019-01-15 华中农业大学 A kind of control system and control method of trackless hawser transporter
CN110504641A (en) * 2019-09-17 2019-11-26 国网辽宁省电力有限公司辽阳供电公司 A kind of insulation protection device of charged for replacement independence shelves aerial earth wire and guard method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202373906U (en) * 2011-12-20 2012-08-08 山东电力集团公司滨州供电公司 Construction spanning device for spanning alive circuit
CN202474756U (en) * 2012-03-16 2012-10-03 山东电力集团公司枣庄供电公司 Crossing net
CN102738732A (en) * 2011-04-08 2012-10-17 上海市电力公司 Construction method for 500kV line to span highly intensive high-voltage live lines
CN203645249U (en) * 2014-01-10 2014-06-11 葛洲坝集团电力有限责任公司 Hook-net-plane-type charged crossing device
CN104536459A (en) * 2014-12-24 2015-04-22 国家电网公司 Construction method for small multi-shaft unmanned aerial vehicle to unwind and release haulage cable
CN204316006U (en) * 2014-12-30 2015-05-06 国家电网公司 A kind of electric transmission line hot-line crosses over block device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102738732A (en) * 2011-04-08 2012-10-17 上海市电力公司 Construction method for 500kV line to span highly intensive high-voltage live lines
CN202373906U (en) * 2011-12-20 2012-08-08 山东电力集团公司滨州供电公司 Construction spanning device for spanning alive circuit
CN202474756U (en) * 2012-03-16 2012-10-03 山东电力集团公司枣庄供电公司 Crossing net
CN203645249U (en) * 2014-01-10 2014-06-11 葛洲坝集团电力有限责任公司 Hook-net-plane-type charged crossing device
CN104536459A (en) * 2014-12-24 2015-04-22 国家电网公司 Construction method for small multi-shaft unmanned aerial vehicle to unwind and release haulage cable
CN204316006U (en) * 2014-12-30 2015-05-06 国家电网公司 A kind of electric transmission line hot-line crosses over block device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109204332A (en) * 2018-09-13 2019-01-15 华中农业大学 A kind of control system and control method of trackless hawser transporter
CN109204332B (en) * 2018-09-13 2019-10-25 华中农业大学 A kind of control system and control method of trackless hawser transporter
CN110504641A (en) * 2019-09-17 2019-11-26 国网辽宁省电力有限公司辽阳供电公司 A kind of insulation protection device of charged for replacement independence shelves aerial earth wire and guard method

Also Published As

Publication number Publication date
CN106025923B (en) 2018-04-03

Similar Documents

Publication Publication Date Title
CN108736377B (en) Live crossing system for paying-off construction crossing power line and application method thereof
CN207339088U (en) Transmission line of electricity straight line pole aerial earth wire overhauls stent
WO2014082641A1 (en) Crane comprising a lifting frame for lifting and mounting wind turbine blades
CN106025923A (en) Construction method of tension type power line protection net
CN205985949U (en) Tension formula transmission line protection system
CN105152033A (en) Integral hoisting process of ship unloader
CN203352051U (en) Insulation protective umbrella
CN205985948U (en) Tension formula line protection
CN102611057A (en) Crossing mesh
CN208835584U (en) A kind of installation tool promoting aerial earth wire
CN203750064U (en) Portable safety belt fixing device for power equipment framework
CN214282542U (en) Rope fastening device for directional tree cutting
CN105858403A (en) Device for stabilizing ropes of man-carrying lifting cage in vertical shaft excavating period and application method
CN203445520U (en) Live spanning device
CN114242355A (en) Automatic connecting insulator for emergency dance stopping and using method thereof
CN106058724B (en) A kind of tension type transmission line protection system
CN201424805Y (en) Support system
CN114256774A (en) Construction method for erecting power supply line of contact network based on unmanned aerial vehicle technology
CN202474756U (en) Crossing net
CN203188131U (en) Beam and slab erection construction independent derrick mast device
CN204992433U (en) Cable carrier
CN207884192U (en) A kind of hanging wire pulley for cable
CN203911342U (en) Adjustable temporary stay wire system for line repair
CN114725835B (en) Erection and dismantling method of high-voltage line net sealing device
CN110984668A (en) Safe type electric power tower and root structure of bottom thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180403

Termination date: 20190705

CF01 Termination of patent right due to non-payment of annual fee