CN106018035B - The rock bridge angle of cut and more crack rocks sample moulds of rock bridge length can be accurately positioned - Google Patents

The rock bridge angle of cut and more crack rocks sample moulds of rock bridge length can be accurately positioned Download PDF

Info

Publication number
CN106018035B
CN106018035B CN201610529222.1A CN201610529222A CN106018035B CN 106018035 B CN106018035 B CN 106018035B CN 201610529222 A CN201610529222 A CN 201610529222A CN 106018035 B CN106018035 B CN 106018035B
Authority
CN
China
Prior art keywords
plate
side plate
fixed
crack
scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610529222.1A
Other languages
Chinese (zh)
Other versions
CN106018035A (en
Inventor
戴�峰
冯鹏
徐奴文
刘燚
赵涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN201610529222.1A priority Critical patent/CN106018035B/en
Publication of CN106018035A publication Critical patent/CN106018035A/en
Application granted granted Critical
Publication of CN106018035B publication Critical patent/CN106018035B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/28Preparing specimens for investigation including physical details of (bio-)chemical methods covered elsewhere, e.g. G01N33/50, C12Q

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention provides a kind of more crack rocks sample moulds that can be accurately positioned the rock bridge angle of cut and rock bridge length, including crack prefabricated film, fixed plate, fixing bolt, bottom plate, the first side plate, the second side plate and scale plate;The bottom plate, the first side plate, the second side plate, scale plate, fixed plate are made by organic clear sheet.Pass through the adjustment of the horizontal position of the scale plate to the mold, coordinate the change of the angle of inclination of fixed seam, size and position set in fixed plate again, the adjustment at position, the inclination angle of crack prefabricated film in a mold etc. can be achieved, in addition the fixed seam on the horizontal position and fixed plate of each scale plate can be adjusted independently, therefore pass through the cooperation of above structure and crack prefabricated film, it can be achieved freely adjusting for rock bridge length and the rock bridge angle of cut, which has the characteristics that the method for adjustment of the rock bridge angle of cut and rock bridge length is simple, adjustment mode is diversified.

Description

The rock bridge angle of cut and more crack rocks sample moulds of rock bridge length can be accurately positioned
Technical field
The invention belongs to rock mechanics field, more particularly to the more crack classes for being accurately positioned the rock bridge angle of cut and rock bridge length Rock sample mold.
Background technology
The lithosphere of human lives' layer on earth, many engineerings such as oil, mining industry, water conservancy, people's air defense, traffic etc. are directed to To the mechanical characteristic of rock mass.Rock mass in lithosphere is anisotropy and discrete labyrinth body, is generally split containing various The no-continuous discontinuities such as gap, joint, tomography, these structural planes determine to a certain extent engineering rock mass structure stability and Safety.
In recent years, many researchers have carried out a large amount of research to the rock mass containing crack in lithosphere, and research object is gradual Jointed rock masses are extended to from Single Fracture rock mass.Since the rock cranny distribution in nature has very big discreteness, very Difficulty carries out true fissure rock the Research on Regularity of mechanical characteristic, and therefore, current research is essentially all to utilize mold Pour what is carried out on the basis of the rocks sample containing crack to be formed with class rock mass materials.In the research of Jointed rock masses, Rock bridge length and rock bridge angle of cut degree are two important influence factors, and rock bridge refers to the line at tip in two cracks in rock mass, Rock bridge length refers to the length of the line at tip in two cracks in rock mass, and the rock bridge angle of cut refers to rock bridge and the folder of horizontal direction Angle.Researcher has found that rock bridge length and rock bridge are handed over by studying different rock bridge length and the rock sample of the rock bridge angle of cut There is significant impact at angle to rock mass strength and elasticity modulus.In addition, rock bridge length and the rock bridge angle of cut are to nature ROCK MASS JOINT There is great value with the perforation mechanism study of tomography, by the crack sample of the indoor different rock bridge angles of cut and rock bridge length gradually It is studied into destructive process, different crack propagation modes in engineering can be predicted, improve the safety of engineering construction.Want system research more Rock bridge length and rock bridge angle of cut degree are to perforation mechanism, rock mass strength and the elasticity modulus of ROCK MASS JOINT and tomography in crack rock Etc. influence, it is necessary to dependent on suitable more crack rocks sample moulds.Current more crack rocks sample moulds Mostly based on crack dip, crack connected ratio and fracture set number, more cracks specifically for rock bridge length and the angle of cut are there is no The report of rocks sample mould.
102519767 A of CN disclose the mold for making fissure surface of rock like test block, including 4 sliding slots, are no less than 1 Steel disc locating rod, protractor, steel disc, bolt and steel disc fixinig plate, steel disc fixinig plate are the hard sheet equipped with notch, are pasted onto The bottom surface of test block mold, kerf width match with steel plate thickness.Sliding slot is fixed at the top of test block mould side wall, steel disc positioning Bar is bolted on above sliding slot, and slide bar passes through the Kong Bingyu steel discs locating rod at steel disc locating rod both ends to keep vertical, steel Piece one end be fixed on steel disc locating rod in the slot, the other end is inserted into the notch of steel disc fixinig plate.The mold can adjust examination The parameters such as the spacing of fissure-plane, inclination angle in block, moreover it is possible to realize the making of multigroup fissure-plane, but the mold still have it is following not Foot:
(1) structure of the mold is complex, since the both ends of steel disc are separately fixed in locating rod and steel disc fixinig plate, What locating rod was inserted into steel disc one end is that the bolt hole in locating rod is coordinated to realize by bolt to fix after slot, and the other end is inserted into In the notch of steel disc fixinig plate, therefore when adjusting the rock bridge length of rocks sample and the rock bridge angle of cut, it is necessary first to will paste Steel disc fixinig plate on mold bottom surface is changed to the steel disc fixinig plate of notch Pass Test demand, in the hole that then loosers a bolt Bolt adjusts steel disc behind the position run through in slot of locating rod and passes through bolt and fixes steel disc, then unscrew and determine steel disc Position bar is fixed on bolt in sliding slot, coordinates slide bar and protractor adjusts behind the position of steel disc locating rod blending bolt by steel disc Locating rod is fixed in sliding slot, and the other end that will finally adjust the steel disc of good position is inserted into the corresponding notch of steel disc fixinig plate admittedly It is fixed, by foregoing teachings it is found that operating process using the mold when adjusting the rock bridge length of rocks sample and the rock bridge angle of cut It is very cumbersome, it is unfavorable for the raising of rocks sample producing efficiency.(2) due to the steel disc fixinig plate being pasted onto on mold bottom surface On grooving location and shape the fixation that could realize steel disc must be exactly matched with position, angle and the size of steel disc, therefore, As long as the inclination angle in any one crack, size or position change, it is required for remaking and replacement is pasted onto mold bottom surface On steel disc fixinig plate, this can not only make the complex manufacturing process of rocks sample, and can increase the making of rocks sample Cost.(3) since the slide bar in the mold passes through the Kong Bingyu steel discs locating rod at steel disc locating rod both ends to keep vertical, quilt The steel disc locating rod that the same group of litter being mutually parallel passes through be always in the state that is mutually parallel, also, by slide bar and When protractor adjusts the position of steel disc locating rod, each steel disc being fixed in same steel disc locating rod is to be mutually related, because Mobility during this adjustment is low, and the variable-angle using the crack dip of more crack rocks samples of the Mold Making is also It is relatively limited, lead to that rock bridge length and the adjustment mode of the rock bridge angle of cut are relatively limited, can not arbitrarily adjust, thus are difficult to meet The demand of systematic Study is carried out to the variation of rock bridge length and the rock bridge angle of cut.
Invention content
The rock bridge angle of cut can be accurately positioned it is an object of the invention to overcome the deficiencies of the prior art and provide a kind of and rock bridge is long More crack rocks sample moulds of degree, to simplify the method for adjustment of the rock bridge angle of cut and rock bridge length, abundant rock bridge length and rock The adjustment mode of the bridge angle of cut, while reduce the cost of manufacture of rocks sample.
More rocks sample moulds in crack provided by the invention that the rock bridge angle of cut and rock bridge length can be accurately positioned, including splitting Gap prefabricated film, fixed plate, fixing bolt, bottom plate, the first side plate, the second side plate and scale plate;
First side plate is two pieces, and the left and right ends periphery of the first side plate is equipped with bolt hole, bolt hole it is interior Side set there are two with matched second groove of the second side plate thickness, be equipped with and scale plate thickness and width in two the second grooves Matched strip through-hole, set strip through-hole is at least 2 in two the second grooves and quantity is identical, and the strip through-hole exists Respectively a row are scattered in the second residing groove and be located at sustained height with corresponding strip through-hole in another second groove;
Second side plate be two pieces, the second side plate be equipped with strip through-hole quantity is equal in the second groove and length is big In the rectangle hollow-out parts of fixed plate length, the installation position of each rectangle hollow-out parts and the setting position of each strip through-hole in the second groove Put identical, the second side plate of each rectangle hollow-out parts both ends end is equipped with length equal with rectangle hollow-out parts width, depth and quarter Spend the equal third groove of plate thickness;
The upper surface periphery of the bottom plate be equipped with two the 4th grooves matched with the first side plate thickness and with the second side plate Two the 5th grooves of thickness matching;
The scale plate is rectangular slab, and the quantity of scale plate is led to the bar shaped set in two the second grooves on the first side plate Hole sum is identical, is equipped on each scale plate and is equipped with and fixed plate thickness with the matched notch of fixed plate, the edge of the notch Matched first groove is provided with scale at the scale plate edge of the notch both sides along the length direction of scale plate;
The fixed plate is the rectangular slab equipped with fixed seam, and quantity is identical with the quantity of scale plate, the ruler of the fixed seam Very little width and thickness matching with crack prefabricated film;
The combination of above-mentioned component:The lower end of two piece of first side plate is located at two the 4th grooves of floor peripheral respectively In, the lower end of two piece of second side plate is located in two the 5th grooves of floor peripheral respectively, the left and right ends of two piece of second side plate It is located in two the second grooves of two piece of first side plate respectively, in the bolt hole set by being inserted into two piece of first side plate Two piece of first side plate and hardened be integrated of two pieces of the second sides to be formed the abutment wall of mold by the combination of fixing bolt and nut;It is each solid Fixed board is respectively embedded in the notch of corresponding scale plate, and each scale plate embedded with fixed plate is inserted into corresponding on the first side plate respectively In the respective rectangular hollow-out parts of strip through-hole and the second side plate, the fixed seam in the two fixed plates of sustained height is mutual It is parallel;The crack prefabricated film is inserted into respectively in the fixed seam of the two fixed plates at sustained height;
The bottom plate, the first side plate, the second side plate, scale plate, fixed plate are made by organic clear sheet.
In above-mentioned mold, the length of the scale plate is more than the width of the second side plate.
In above-mentioned mold, organic clear sheet is polymethylmethacrylasheet sheet material or polycarbonate plate, is Meet the intensity requirement of mold, clear sheet thickness is at least 10mm.
In above-mentioned mold, the first side plate left and right ends periphery is respectively provided at least two bolt hole, with die size Increase, the quantity of bolt hole can be increased;The quantity of strip through-hole set in two the second grooves of the first side plate according to Practical application demand is determined.
In above-mentioned mold, width, thickness and the material of the crack prefabricated film are wanted according to the specific of rocks sample is made It asks and is determined, such as rocks sample of the crack prefabricated film making with non-filling type crack of rigid material making can be used, The crack prefabricated film that fragile material making can be used makes the rocks sample with filled-type crack.
Method using the more crack rocks sample moulds of above-mentioned Mold Making is as follows:
1. the lower end of two piece of first side plate is inserted into respectively in two the 4th grooves of floor peripheral, by two piece The lower end of two side plates is inserted into respectively in two the 5th grooves of floor peripheral, the left and right ends of two piece of second side plate are distinguished In two the second grooves for inserting two piece of first side plate, by being inserted into consolidating in the bolt hole of two piece of first side plate setting Two piece of first side plate and hardened be integrated of two pieces of the second sides to be formed the abutment wall of mold by the combination for determining screw bolt and nut, then will Each fixed plate is respectively embedded in the notch of corresponding scale plate, and each scale plate that would be embedded with fixed plate is inserted into respectively on the first side plate Corresponding strip through-hole and the second side plate respective rectangular hollow-out parts in, crack prefabricated film is inserted into respectively positioned at same height In the fixed seam of two fixed plates at degree, then rocks slurry poured into mold, vibrate, smooth out;
2. the mold 1. handled by step is stood to rocks slurry coagulation forming, fixing bolt of dismantling successively, the Side plate, the second side plate and bottom plate for being fitted with scale plate, it is that non-filling type are split more to take out crack prefabricated film and obtain crack Gap rocks sample or cut coagulation forming specimen surface prefabricated crack piece obtain crack be filled-type more crack classes Rock sample.
Step 1. in when crack prefabricated film is inserted into fixed seam, inserted successively according to from the bottom plate upwardly direction of mold Dress, after often inserting one piece of crack prefabricated film, just pouring into rocks slurry in mold makes rocks slurry cover firm inserting Crack prefabricated film and vibrate, smooth out, then repeat aforementioned inserting and crack prefabrication and pour into rocks slurry and vibrate, smooth out Operation, until rocks slurry covers all crack prefabricated films.
Compared with prior art, the invention has the advantages that:
1. the rock bridge angle of cut and more crack rocks sample moulds of rock bridge length provided by the invention of being accurately positioned is special The novel more crack rocks sample moulds of one kind that door is studied for rock bridge length and the rock bridge angle of cut, due to the second side of the mold There is provided strip through-hole is provided on rectangle hollow-out parts, the first side plate on plate, it is provided with to be embedded in fixed plate on scale plate Notch, the scale plate of embedded fixed plate can be after being inserted into the strip through-hole of the first side plate and the rectangle hollow-out parts of the second side plate It is moved freely in horizontal direction, by the adjustment of the horizontal position to scale plate, then coordinates the fixed seam set in fixed plate The change at angle of inclination, size and position is, it can be achieved that the adjustment at position, the inclination angle of crack prefabricated film in a mold etc., in addition respectively Fixed seam on the horizontal position and fixed plate of scale plate can be adjusted independently, therefore pass through above structure and crack prefabricated film Cooperation compared with existing more crack rocks sample moulds, has, it can be achieved that freely adjusting for rock bridge length and the rock bridge angle of cut The method of adjustment of the rock bridge angle of cut and rock bridge length is simple, the diversified feature of adjustment mode, can be had using mold of the present invention Effect improves the producing efficiency of rocks sample.
2. since each component for being used to adjust parameters of fissure in mold of the present invention is independent from each other, this is used Invent the mold can make crack dip, Fracture Width, rock bridge length, the single variation of the rock bridge angle of cut more crack rocks Sample can also make more crack rocks samples of two or more in above-mentioned each factor while variation, crack adjustment mode Freely and diversification, the variation that mold of the present invention is easier to meet to rock bridge length and the rock bridge angle of cut carry out systematic Study Demand.
3. during crack rocks sample more using Mold Making of the present invention, the only fixation in adjustment fixed plate in need When the angle and size of seam and position, corresponding fixed plate is just needed replacing, if being only adjusted to the horizontal position in crack, Without needing to change new fixed plate, compared with mold disclosed in 102519767 A of CN, have reduce the process that makes fixed plate and Reduce the advantage of the cost of manufacture of rocks sample.
4. since the bottom plate of mold of the present invention, the first side plate, the second side plate, scale plate, fixed plate are by organic Bright board making during rocks sample is poured, can observe directly bubble situation and timely processing in mold, this It is poor to advantageously reduce the porosity of rocks sample that rocks sample different parts or different batches make caused by bubble It is different, so as to reduce rocks sample mechanical property difference, improve the quality of rocks sample.Meanwhile organic clear sheet into This relatively low and cutting is convenient, advantageously reduces the manufacture difficulty and cost of mold.
Description of the drawings
Fig. 1 is the structure diagram of mold of the present invention;
Fig. 2 is the structure diagram of the first side plate of mold of the present invention;
Fig. 3 is the structure diagram of the second side plate of mold of the present invention;
Fig. 4 is the structure diagram of the bottom plate of mold of the present invention;
Fig. 5 is the structure diagram of the scale plate of mold of the present invention;
Fig. 6 is the structure diagram of the fixed plate of mold of the present invention;
Fig. 7 is the schematic diagram after the scale plate of mold of the present invention is combined with fixed plate;
Fig. 8 is the schematic diagram after the second side plate of mold of the present invention is combined with the scale plate embedded with fixed plate;
In figure, the-the 4th groove of 1-bottom plate, 1-1, the grooves of 1-2-the 5th, the 2-the first side plate, 2-1-bolt hole, 2- 2-the second groove, 2-3-bar hole, the 3-the second side plate, 3-1-rectangle hollow-out parts, 3-2-third groove, 4-scale plate, The-first groove of 4-1-notch, 4-2,4-3-scale, 5-crack prefabricated film, 6-fixed plate, 6-1-fixation seam, 7-are fixed Bolt.
Specific embodiment
Below by embodiment combination attached drawing the rock bridge angle of cut can be accurately positioned to of the present invention and rock bridge length are split more Gap rocks sample mould and its application method further illustrate.
Embodiment 1
In the present embodiment, the structure that can be accurately positioned the rock bridge angle of cut and more crack rocks sample moulds of rock bridge length is shown It is intended to as shown in Figure 1, including crack prefabricated film 5, fixed plate 6, fixing bolt 7, bottom plate 1, the first side plate 2, the second side plate 3 and quarter Spend plate 4.
The structure diagram of first side plate is as shown in Fig. 2, the first side plate 2 is two pieces, the left and right ends of the first side plate Periphery is all provided with there are two bolt hole 2-1, sets that there are two second with 3 thickness matching of the second side plate on the inside of bolt hole 2-1 Be equipped in groove 2-2, two the second groove 2-2 with the matched strip through-hole 2-3 of scale plate thickness and width, two are second recessed Set strip through-hole is two in slot 2-2, the strip through-hole be scattered in the second respectively residing groove a row and It is located at sustained height with corresponding strip through-hole in another second groove.
The structure diagram of second side plate as shown in figure 3, the second side plate 3 is two pieces, set on the second side plate there are two The length of rectangle hollow-out parts 3-1, rectangle hollow-out parts 3-1 are more than the length of fixed plate 6, the installation position of each rectangle hollow-out parts 3-1 It is identical with the installation position of strip through-hole 2-3 each in the second groove 2-2, the second side plate of each rectangle hollow-out parts 3-1 both ends end It is equipped with the third groove 3-2 that length is equal with rectangle hollow-out parts width, depth is equal with scale plate thickness.
The structure diagram of the bottom plate is as shown in figure 4, the upper surface right peripheries of bottom plate 1 are equipped with and 2 thickness of the first side plate Spend matched two the 4th groove 1-1, periphery is equipped with and two of 3 thickness matching of the second side plate the before and after the upper surface of bottom plate 1 Five groove 1-2.
The structure diagram of the scale plate is as shown in figure 5, scale plate 4 is rectangular slab, and the quantity of scale plate is four pieces, respectively It is equipped on scale plate and is equipped with the with fixed plate thickness matching with 6 matched notch 4-1 of fixed plate, the top edge of the notch One groove 4-2 is provided with scale 4-3 in the length direction of scale plate edge along the scale plate of the notch both sides.
The structure of the fixed plate is as shown in fig. 6, fixed plate 6 is equipped with the fixed rectangular slab for stitching 6-1, the quantity of fixed plate It is four pieces, the size and the width and thickness matching of crack prefabricated film 5 of the fixed seam 6-1.
The combination of above-mentioned component:The lower end of two piece of first side plate 2 is located at two the 4th grooves of floor peripheral respectively In 1-1, the lower end of two piece of second side plate 3 respectively in two the 5th groove 1-2 of floor peripheral, two piece of second side plate 3 Left and right ends are located in two the second groove 2-2 of two piece of first side plate respectively, are set by being inserted into two piece of first side plate Two piece of first side plate and two pieces of hardened are integrated of the second side to be formed mould by the combination of fixing bolt 7 and nut in bolt hole The abutment wall of tool;Each fixed plate 6 is respectively embedded in the notch 4-1 of corresponding scale plate, as shown in fig. 7, each quarter embedded with fixed plate Degree plate is inserted into respectively in the respective rectangular hollow-out parts 3-1 of the corresponding strip through-hole 2-3 on the first side plate and the second side plate, is such as schemed Shown in 8, the fixed seam 6-1 in the two fixed plates 6 of sustained height is mutually parallel;The crack prefabricated film 5 is two pieces, point It is not inserted into the fixed seam 6-1 of the two fixed plates at sustained height.
The bottom plate 1, the first side plate 2, the second side plate 3, scale plate 4, fixed plate 6 are by polymethylmethacrylasheet sheet material It makes, the crack prefabricated film 5 is made by steel plate.
Method using the more crack rocks sample moulds of Mold Making described in the present embodiment is as follows:
1. the lower end of two piece of first side plate is inserted into respectively in two the 4th grooves of floor peripheral, by two piece The lower end of two side plates is inserted into respectively in two the 5th grooves of floor peripheral, the left and right ends of two piece of second side plate are distinguished In two the second grooves for inserting two piece of first side plate, by being inserted into consolidating in the bolt hole of two piece of first side plate setting Two piece of first side plate and hardened be integrated of two pieces of the second sides to be formed the abutment wall of mold by the combination for determining screw bolt and nut, then will Each fixed plate is respectively embedded in the notch of corresponding scale plate, and the four pieces of scale plates that would be embedded with fixed plate are inserted into the first side plate respectively On corresponding strip through-hole and the second side plate respective rectangular hollow-out parts in, two pieces of crack prefabricated films are inserted into respectively and are located at In the fixed seam of two fixed plates at sustained height, then rocks slurry poured into mold, vibrate, smooth out;
Step 1. in when crack prefabricated film is inserted into fixed seam, inserted successively according to from the bottom plate upwardly direction of mold Dress, after often inserting one piece of crack prefabricated film, just pouring into rocks slurry in mold makes rocks slurry cover firm inserting Crack prefabricated film and vibrate, smooth out, then repeat aforementioned inserting and crack prefabrication and pour into rocks slurry and vibrate, smooth out Operation, until rocks slurry covers all crack prefabricated films;
2. the mold 1. handled by step is stood to rocks slurry coagulation forming, fixing bolt of dismantling successively, the Side plate, the second side plate and bottom plate for being fitted with scale plate, it is that non-filling type are split more to take out crack prefabricated film and obtain crack Gap rocks sample.
Embodiment 2
In the present embodiment, the structure that can be accurately positioned the rock bridge angle of cut and more crack rocks sample moulds of rock bridge length is shown It is intended to be similar to Fig. 1, including crack prefabricated film 5, fixed plate 6, fixing bolt 7, bottom plate 1, the first side plate 2, the second side plate 3 and carves Spend plate 4.
The structure diagram of first side plate is similar to Fig. 2, and the first side plate 2 is two pieces, the left and right ends of the first side plate Periphery is all provided with there are two bolt hole 2-1, sets that there are two second with 3 thickness matching of the second side plate on the inside of bolt hole 2-1 Be equipped in groove 2-2, two the second groove 2-2 with the matched strip through-hole 2-3 of scale plate thickness and width, two are second recessed Set strip through-hole is three in slot 2-2, the strip through-hole be scattered in the second respectively residing groove a row and It is located at sustained height with corresponding strip through-hole in another second groove.
The structure diagram of second side plate is similar to Fig. 3, and the second side plate 3 is two pieces, set on the second side plate there are three The length of rectangle hollow-out parts 3-1, rectangle hollow-out parts 3-1 are more than the length of fixed plate 6, the installation position of each rectangle hollow-out parts 3-1 It is identical with the installation position of strip through-hole 2-3 each in the second groove 2-2, the second side plate of each rectangle hollow-out parts 3-1 both ends end It is equipped with the third groove 3-2 that length is equal with rectangle hollow-out parts width, depth is equal with scale plate thickness.
The structure diagram of the bottom plate is as shown in figure 4, the upper surface right peripheries of bottom plate 1 are equipped with and 2 thickness of the first side plate Spend matched two the 4th groove 1-1, periphery is equipped with and two of 3 thickness matching of the second side plate the before and after the upper surface of bottom plate 1 Five groove 1-2.
The structure diagram of the scale plate is as shown in figure 5, scale plate 4 is rectangular slab, and the quantity of scale plate is six pieces, respectively It is equipped on scale plate and is equipped with the with fixed plate thickness matching with 6 matched notch 4-1 of fixed plate, the top edge of the notch One groove 4-2 is provided with scale 4-3 in the length direction of scale plate edge along the scale plate of the notch both sides.
The structure of the fixed plate is as shown in fig. 6, fixed plate 6 is equipped with the fixed rectangular slab for stitching 6-1, the quantity of fixed plate It is six pieces, the size and the width and thickness matching of crack prefabricated film 5 of the fixed seam 6-1.
The combination of above-mentioned component:The lower end of two piece of first side plate 2 is located at two the 4th grooves of floor peripheral respectively In 1-1, the lower end of two piece of second side plate 3 respectively in two the 5th groove 1-2 of floor peripheral, two piece of second side plate 3 Left and right ends are located in two the second groove 2-2 of two piece of first side plate respectively, are set by being inserted into two piece of first side plate Two piece of first side plate and two pieces of hardened are integrated of the second side to be formed mould by the combination of fixing bolt 7 and nut in bolt hole The abutment wall of tool;Each fixed plate 6 is respectively embedded in the notch 4-1 of corresponding scale plate, as shown in fig. 7, each quarter embedded with fixed plate Degree plate is inserted into respectively in the respective rectangular hollow-out parts 3-1 of the corresponding strip through-hole 2-3 on the first side plate and the second side plate, similar It is mutually parallel in Fig. 8, the fixed seam 6-1 in the two fixed plates 6 of sustained height;The crack prefabricated film 5 is three pieces, point It is not inserted into the fixed seam 6-1 of the two fixed plates at sustained height.
The bottom plate 1, the first side plate 2, the second side plate 3, scale plate 4, fixed plate 6 are made by polycarbonate plate, institute Crack prefabricated film 5 is stated to be made by steel plate.

Claims (3)

1. the rock bridge angle of cut and more crack rocks sample moulds of rock bridge length can be accurately positioned, including crack prefabricated film (5), admittedly Fixed board (6), fixing bolt (7), it is characterised in that further include bottom plate (1), the first side plate (2), the second side plate (3) and scale plate (4);
First side plate (2) is two pieces, and the left and right ends periphery of the first side plate is equipped with bolt hole (2-1), bolt hole Set the second groove (2-2) there are two with the second side plate (3) thickness matching on the inside of (2-1), in two the second grooves (2-2) Equipped with the matched strip through-hole of scale plate thickness and width (2-3), set strip through-hole is extremely in two the second grooves (2-2) Less for 2 and quantity it is identical, the strip through-hole be scattered in the second respectively residing groove a row and with it is another second recessed Corresponding strip through-hole is located at sustained height in slot;
Second side plate (3) is two pieces, and the second side plate is equipped with equal with strip through-hole (2-3) quantity in the second groove and long Degree is more than the rectangle hollow-out parts (3-1) of fixed plate (6) length, installation position and the second groove (2- of each rectangle hollow-out parts (3-1) 2) installation position of each strip through-hole (2-3) is identical in, and the second side plate of each rectangle hollow-out parts (3-1) both ends end is equipped with length The third groove (3-2) that degree is equal with rectangle hollow-out parts width, depth is equal with scale plate thickness;
The upper surface periphery of the bottom plate (1) is equipped with two the 4th grooves (1-1) of the first side plate (2) thickness matching and with the Two the 5th grooves (1-2) of two side plates (3) thickness matching;
The scale plate (4) is rectangular slab, the bar shaped set in the quantity of scale plate and upper two the second grooves of the first side plate (2) Through-hole sum is identical, be equipped on each scale plate with fixed plate (6) matched notch (4-1), the edge of the notch be equipped with The first groove (4-2) of fixed plate thickness matching, sets at the scale plate edge of the notch both sides along the length direction of scale plate It is equipped with scale (4-3);
The fixed plate (6) is the rectangular slab equipped with fixed seam (6-1), and quantity is identical with the quantity of scale plate (4), the fixation Stitch the size of (6-1) and the width and thickness matching of crack prefabricated film (5);
The combination of above-mentioned component:The lower end of two piece of first side plate (2) is located at two the 4th groove (1- of floor peripheral respectively 1) in, the lower end of two piece of second side plate (3) is located in two the 5th grooves (1-2) of floor peripheral respectively, two piece of second side plate (3) left and right ends are located in two the second grooves (2-2) of two piece of first side plate respectively, by being inserted into two piece of first side plate The combination of fixing bolt (7) and nut in the bolt hole of setting is by two piece of first side plate and two pieces of the second sides are hardened is combined into one Body forms the abutment wall of mold;Each fixed plate (6) is respectively embedded in the notch (4-1) of corresponding scale plate, embedded with each of fixed plate Scale plate is inserted into the respective rectangular hollow-out parts (3-1) of the corresponding strip through-hole (2-3) and the second side plate on the first side plate respectively In, the fixed seam (6-1) in the two fixed plates (6) of sustained height is mutually parallel;The crack prefabricated film (5) is inserted respectively In the fixed seam (6-1) of the two fixed plates at sustained height;
The bottom plate (1), the first side plate (2), the second side plate (3), scale plate (4), fixed plate (6) are by organic clear sheet system Make.
2. it can be accurately positioned the rock bridge angle of cut and more crack rocks sample moulds of rock bridge length according to claim 1, It is characterized in that the length of scale plate (4) is more than the width of the second side plate (3).
3. more rocks sample moulds in crack according to claim 1 or claim 2 that the rock bridge angle of cut and rock bridge length can be accurately positioned, It is characterized in that organic clear sheet is polymethylmethacrylasheet sheet material or polycarbonate plate.
CN201610529222.1A 2016-07-06 2016-07-06 The rock bridge angle of cut and more crack rocks sample moulds of rock bridge length can be accurately positioned Expired - Fee Related CN106018035B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610529222.1A CN106018035B (en) 2016-07-06 2016-07-06 The rock bridge angle of cut and more crack rocks sample moulds of rock bridge length can be accurately positioned

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610529222.1A CN106018035B (en) 2016-07-06 2016-07-06 The rock bridge angle of cut and more crack rocks sample moulds of rock bridge length can be accurately positioned

Publications (2)

Publication Number Publication Date
CN106018035A CN106018035A (en) 2016-10-12
CN106018035B true CN106018035B (en) 2018-06-15

Family

ID=57106751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610529222.1A Expired - Fee Related CN106018035B (en) 2016-07-06 2016-07-06 The rock bridge angle of cut and more crack rocks sample moulds of rock bridge length can be accurately positioned

Country Status (1)

Country Link
CN (1) CN106018035B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105806686B (en) * 2016-03-04 2018-11-16 中国石油大学(华东) A kind of mold made plus anchor intersects at random through crack sillar
CN105738180A (en) * 2016-05-03 2016-07-06 中国石油大学(华东) Mold for manufacturing fracture-containing rock sample with anchor rod
CN108693007A (en) * 2018-06-13 2018-10-23 河南大学 Compound rock stratum rocks test block pours mold and preparation method, compound formation sample machining tool and method
CN109540642B (en) * 2019-01-09 2023-09-08 四川大学 Mould for batch manufacturing rock mass fracture samples with different dip angles

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102519767A (en) * 2011-12-16 2012-06-27 武汉大学 Mould for manufacturing fissure surface of rock like test block
CN103196717A (en) * 2013-03-07 2013-07-10 同济大学 Rock-similar sample mold capable of accurately positioning filling-type prefabricated cracks
CN204202954U (en) * 2014-09-28 2015-03-11 中国地质大学(武汉) A kind of multiple dimensioned mould making simulation protolith structural plane
CN204202960U (en) * 2014-10-30 2015-03-11 山东科技大学 The through crack of standard rock sample makes mould
CN104406833A (en) * 2014-11-26 2015-03-11 中国海洋石油总公司 Prefabricated mould for test specimen of irregular rock mass joint-plane shear test
CN105277406A (en) * 2015-11-03 2016-01-27 中国建筑股份有限公司 Mold for producing cracked rock test piece of different dip angles and production method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0948017A (en) * 1995-08-07 1997-02-18 Zokei:Kk Manufacture of mold for concrete molding

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102519767A (en) * 2011-12-16 2012-06-27 武汉大学 Mould for manufacturing fissure surface of rock like test block
CN103196717A (en) * 2013-03-07 2013-07-10 同济大学 Rock-similar sample mold capable of accurately positioning filling-type prefabricated cracks
CN204202954U (en) * 2014-09-28 2015-03-11 中国地质大学(武汉) A kind of multiple dimensioned mould making simulation protolith structural plane
CN204202960U (en) * 2014-10-30 2015-03-11 山东科技大学 The through crack of standard rock sample makes mould
CN104406833A (en) * 2014-11-26 2015-03-11 中国海洋石油总公司 Prefabricated mould for test specimen of irregular rock mass joint-plane shear test
CN105277406A (en) * 2015-11-03 2016-01-27 中国建筑股份有限公司 Mold for producing cracked rock test piece of different dip angles and production method thereof

Also Published As

Publication number Publication date
CN106018035A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN106018035B (en) The rock bridge angle of cut and more crack rocks sample moulds of rock bridge length can be accurately positioned
CN103983494B (en) A kind of containing interlayer class rock mass analogue formation test unit and test method thereof
CN202599724U (en) Tooling used for manufacturing complete-penetration fracture class rock material standard samples with different angles
CN103900882B (en) Rocks test piece mould for the most double fissure rock triaxial compression tests
CN102519767B (en) Mould for manufacturing fissure surface of rock like test block
CN102289980B (en) Method for preparing preset cracks in hydrofracture simulation specimen
CN106248449B (en) A kind of mold making the rocks sample containing non-through type crack
CN202886159U (en) Concrete sample pre-set template with cracks
CN101592533A (en) Synchronous detection test device for multi-item parameters of linear TBM hobs
CN103308663A (en) Geotechnical engineering landslide model test box
CN106840805A (en) The single pile CYCLIC LOADING model assay systems of anisotropy sand sample can be prepared
CN109855518B (en) Assembly concrete roughness detecting method
CN112362442A (en) Rock-like sample manufacturing mold and using method thereof
CN104833555A (en) Producing method of intermittent-filling fracture rock sample model
CN101892747A (en) Mortar spreader for building wall and using method thereof
CN203635916U (en) Powder laying device for selected area laser cladding powder contour machining
CN107063790A (en) A kind of preparation method and applications of different three-dimensional joint plane characteristic rock mass
CN205580877U (en) Multi -functional transverse strength test device
CN109540642B (en) Mould for batch manufacturing rock mass fracture samples with different dip angles
CN108518209A (en) Consider that the azimuthal design method of well track is adopted in the coal measures payzone combination of intermediate zone
Wang et al. Strength test of 3D printed artificial rock mass with pre-existing fracture
CN105424441A (en) Three-dimensional crack rock material test piece preparation system and application method thereof
CN107229769B (en) Mixture numerical value forming method based on boundary discrimination algorithm
CN104568550B (en) Device used for producing schist similar materials
CN206002360U (en) A kind of analog material rock mass sample Among Intermittent Joints are accurately positioned producing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180615

Termination date: 20200706

CF01 Termination of patent right due to non-payment of annual fee