CN106013242A - Assembled type working wheel standard joint and installation method of assembled type working well standard joint in new project - Google Patents

Assembled type working wheel standard joint and installation method of assembled type working well standard joint in new project Download PDF

Info

Publication number
CN106013242A
CN106013242A CN201610541753.2A CN201610541753A CN106013242A CN 106013242 A CN106013242 A CN 106013242A CN 201610541753 A CN201610541753 A CN 201610541753A CN 106013242 A CN106013242 A CN 106013242A
Authority
CN
China
Prior art keywords
work well
standard knot
mentioned
assembly
perforate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610541753.2A
Other languages
Chinese (zh)
Other versions
CN106013242B (en
Inventor
陈俊光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Santai New Mstar Technology Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610541753.2A priority Critical patent/CN106013242B/en
Publication of CN106013242A publication Critical patent/CN106013242A/en
Application granted granted Critical
Publication of CN106013242B publication Critical patent/CN106013242B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/121Manhole shafts; Other inspection or access chambers; Accessories therefor characterised by the connection between shaft elements, e.g. of rings forming said shaft
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/027The bottom made of prefabricated segments
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F2005/028Sealing joints between manhole segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Sewage (AREA)

Abstract

The invention provides an assembled type working wheel standard joint and an installation method of the assembled type working well standard joint in a new project, belongs to the technical field of pipeline working wells, and solves the problems in the existing new project, the size of a working well is difficult to adjust, the construction efficiency is low, and the construction quality is poor. The installation method of the assembled type working well standard joint comprises the following steps: S1, digging a foundation pit; S2, installing a first working well standard joint; S3, installing a second working well standard joint; S4, continuing installing the working well standard joint to a cable pipe orifice; S5, trepanning the standard joints; S6, continuing installing the working well standard joint to the calculated elevation, and installing a temporary cover plate; and S7, backfilling a gap between the working well and the foundation pit, removing the temporary cover plate, and installing a well cover. The installation method of the assembled type working well standard joint has the advantages of high construction efficiency and quality and small labor force of the construction.

Description

A kind of assembled work well standard knot and the installation method in new construction thereof
Technical field
The invention belongs to pipeliner's well technical field, relate to a kind of assembled work well standard knot and in new construction Installation method.
Background technology
Work well is mainly for the power supply of Urban Underground infrastructure, feedwater, draining, communication, cable television, gas pipe, road Lamp drivers etc. keep in repair, easy for installation and arrange.It is generally located at pipeline intersection, turning, caliber or gradient change and straight Locate at a certain distance in spool section, be easy for the auxiliary construction made regular check on.
Tradition work well typically uses reinforced concrete structure or masonry structure etc..Wherein, masonry work well is to labor technical Require height, and service life is short;Cast-in-situ steel reinforced concrete work well construction operation is loaded down with trivial details, needs the multiple tracks such as shuttering, assembling reinforcement Operation;Prefabricated reinforced concrete work well volume and quality are big, not readily transportable and installation.The tradition work well construction time is long, work Power demand is big, and constructing, affected by environment and construction quality is difficult to ensure that greatly, and later maintenance cost is high, transports inconvenience simultaneously.Assembling Formula work well standard knot is fixed due to size, for needing the engineering of sizes, needs various sizes of standard knot customized, cost The highest, standard knot cost of transportation is high simultaneously.
Summary of the invention
It is an object of the invention to there are the problems referred to above for existing technology, it is proposed that a kind of convenient transportation, installation are simply Assembled work well standard knot.
Another object of the present invention is to propose one can be assembled into different size size work well, construction effect as required The assembled work well standard knot installation method that rate is high and quality is secure.
The purpose of the present invention can be realized by following technical proposal: a kind of assembled work well standard knot, it is characterised in that: Including assembly and connector, described assembly includes inner panel and outside plate, is provided with several longitudinal rib, top between inner panel and outside plate Being provided with cross rib, and inside and outside plate is connected by longitudinal rib and cross rib, cross rib upper center convexes to form projection, is provided with upper bottom it Stating the groove that projection matches, described assembly includes four corner assemblies and several straight line assemblies, described corner group Piece installing and straight line assembly each two ends are equipped with connection socket, and above-mentioned connector is incited somebody to action by being connected with described connection socket Corner assembly and straight line assembly are connected with each other assembling and form a complete work well standard knot.
In above-mentioned a kind of assembled work well standard knot, the bottom surface of described longitudinal rib is slightly above above-mentioned inner panel and outside plate Bottom surface and form above-mentioned groove with the bottom surface of inner panel and outside plate, or longitudinal rib bottom surface is neat with the bottom surface of above-mentioned inner panel and outside plate Flat, the bottom surface of longitudinal rib has above-mentioned groove.
In above-mentioned a kind of assembled work well standard knot, described connection socket include a limited step, one insert Groove and two bar blocks, described limited step is opened on projection and its step surface is less than cross rib upper surface, and described slot is with upper State limited step formed " 7 " font groove, above-mentioned two bar blocks be respectively fixedly connected with on slot two groove sidewall and with assembly port Flushing, the upper surface of two described bar blocks is less than the step surface of above-mentioned limited step.
In above-mentioned a kind of assembled work well standard knot, described connector is T-shaped, including the company of horizontally set Connect cap and the inserting column being vertically connected under attachment cap, inserting column two side has the bar shaped matched with above-mentioned bar blocks Groove, after assembly connection is good, inserting column is inserted in above-mentioned slot, and adjacent two connection sockets are positioned at two bar blocks of the same side Mutually by connecting and being inserted into together in the bar-shaped trough on the sidewall that inserting column is corresponding and realize tight fit with this bar-shaped trough Thus realize connecting two adjacent groups piece installing, described attachment cap lower surface bears against at adjacent its limited step of two connection sockets Step surface on, and its cross rib upper surface of attachment cap upper surface and two adjacent groups piece installing flushes.
In above-mentioned a kind of assembled work well standard knot, the two ends of described assembly are all designed near longitudinal rib, when After assembly connection is good, above-mentioned inserting column contacts tight fit connection with the longitudinal rib on connection socket limit after inserting slot.
In above-mentioned a kind of assembled work well standard knot, the outer surface of described outside plate is smooth panel.
In above-mentioned a kind of assembled work well standard knot, the corner of described corner assembly is right angle or circular arc Angle.
A kind of assembled work well standard knot installation method in new construction, it is characterised in that include following step Rapid:
S1, elder generation dig foundation ditch on road surface, after having dug foundation ditch, according to geological conditions compacting work well basis and by the basis of work well Surface pats whole;
S2, installation head joint work well standard knot, select the corner assembly of corresponding size and straight line to assemble according to work well size Part, knocks in connector with hammer or hammer after then setting on the basis of Gong Jing and makes adjacent two straight line assembly or adjacent corners Connect between assembly and straight line assembly or install on limit outside foundation ditch connect first joint standard knot after again entirety put into On the basis of work well;
S3, installation second section work well standard knot, according to the mounting means installation second section work well standard knot of step S2, but group During dress, each various sizes of corner assembly is adjusted relative to position with straight line assembly so that connector thereon with The most adjacent connector on work well standard knot forms straight joint the most on the same line;
S4, mounting means with reference to step S3 continue up work well and install standard knot until the work well standard knot upper end installed Face is not less than on limit the overhead height presetting the cable mouth of pipe, stops installing;
S5, definition have local to be perforate standard knot with the work well standard knot of the above-mentioned default positive relative position relation of the cable mouth of pipe, Judge whether described perforate standard knot meets perforate requirement, if being unsatisfactory for perforate requirement, then adjust each assembly and relatively connect position Putting until meeting perforate requirement, if meeting perforate requirement, then on perforate standard knot, doing lower aperture labelling and take out on-the-spot perforate Then install and go back or do not take out directly perforate on the most mounted perforate standard knot, or the hole that has been prefabricated in the factory in advance Mouth is mounted directly, by the interface connecting line mouth of pipe and aperture;
S6, mounting means according to step S3 continue up erector's well standard knot until reaching to calculate absolute altitude, definition meter Calculating the difference that absolute altitude is grade elevation and well lid height, all mounted standard knots form work well, dispose interim at Gong Jing top Cover plate (14)
S7, space between work well and foundation ditch are backfilled by backfilling material, when being backfilled to Gong Jing top, and puddled backfill Material, removes interim cover plate, if work well elevation of top just reaches above-mentioned calculating absolute altitude, then and mounting shaft on Gong Jing top Lid, then applying mortar makes above-mentioned well lid be compacted seamless link with work well;If work well elevation of top exceedes above-mentioned calculating absolute altitude, logical Crossing adjustment operation and work well elevation of top meets above-mentioned calculating absolute altitude, then applying mortar makes above-mentioned well lid seamless with the compacting of work well Connect.
In above-mentioned a kind of assembled work well standard knot installation method in new construction, described perforate standard knot It is that a joint work well standard knot, i.e. the cable mouth of pipe are located just on this joint work well standard knot;Or upper and lower two joint work well standard knots it Between, i.e. the cable mouth of pipe is between these upper and lower two joint work well standard knots.
In above-mentioned a kind of assembled work well standard knot installation method in new construction, described perforate requirement is Aperture is not at connector.
In above-mentioned a kind of assembled work well standard knot installation method in new construction, described perforate uses hole Saw or handsaw mode make.
In above-mentioned a kind of assembled work well standard knot installation method in new construction, in described step S5 Behind the interface connecting line mouth of pipe and aperture, then fill the gap between aperture and interface, by cable pipe with mortar or foaming agent It is arranged on the cable mouth of pipe, interface and aperture.
In above-mentioned a kind of assembled work well standard knot installation method in new construction, described interface is finished product Prefabricated interface or inspection shaft interface connector.
In above-mentioned a kind of assembled work well standard knot installation method in new construction, described adjustment operation is According to foundation ditch height and well lid height, mark in standard knot relevant position, Gong Jing top, at the scene with handsaw or cutting machine Cut, in order to adjust work well elevation of top with satisfied calculating absolute altitude.
Compared with prior art, this assembled work well standard knot and installation method thereof have following several advantage:
1, cost of transportation is low, and assembled work well standard knot build is relatively big, and packaging volume is big, and cost of transportation is high, and this standard Joint uses multiple accessories (corner assembly, straight line assembly and connector) to assemble, and packaging volume is little, and is easier to utilize Space, handling goods and transport are the most more convenient, can also save space simultaneously, improve carrying capacity, reduce logistics cost;
2, assembled standard knot size is flexible, and corner assembly is divided into equilateral and inequilateral two kinds, is designed with plurality of specifications; Straight line assembly is designed with different lengths.Work well size can select different assemblies according to practical situation, connects with connector ?;
3, installation method is easy, by assembly after alignment, only need to be aligned for insertion in slot by connector, institute Needing labour force little, skill set requirements is low, and efficiency of construction is high, and assembling quality is guaranteed.
Accompanying drawing explanation
Fig. 1 is the top view of corner assembly.
Fig. 2 is the upward view of corner assembly.
Fig. 3 is the one side structure chart of corner assembly.
Fig. 4 is the left view of Fig. 3.
Fig. 5 is the sectional view in Fig. 3 at 1-1.
Fig. 6 is the sectional view in Fig. 3 at 2-2.
Fig. 7 is the structural representation of connector.
Fig. 8 is the top view of Fig. 7.
Fig. 9 is the top view of straight line assembly.
Figure 10 is the upward view of straight line assembly.
Figure 11 is the one side structure chart of straight line assembly.
Figure 12 is the structural representation figure installing head joint work well standard knot in embodiment one.
Figure 13 be in embodiment one erector's well standard knot to the structural representation of the cable mouth of pipe.
Figure 14 is the side view of Figure 13.
Figure 15 is the structural representation installing interim cover plate in embodiment one.
Figure 16 is the structural representation after all completing in embodiment one.
Figure 17 is the structural representation installing cover plate in embodiment two.
Figure 18 is the side view of Figure 17.
In figure, 1, corner assembly;2, straight line assembly;3, connector;31, attachment cap;32, inserting column;33, bar-shaped trough; 4, inner panel;5, outside plate;6, cross rib;61, projection;7, longitudinal rib;8, groove;9, connection socket;91, limited step;92, slot;93、 Bar blocks;10, work well standard knot;101, perforate standard knot;101a, aperture;11, work well basis;12, foundation ditch;13, the cable mouth of pipe; 14, interim cover plate;15, well lid.
Detailed description of the invention
The following is the specific embodiment of the present invention and combine accompanying drawing, technical scheme is further described, But the present invention is not limited to these embodiments.
Embodiment one
As shown in Fig. 1,2,3,4,5 and 6, this assembled work well standard knot includes assembly and connector 3, and assembly includes Inner panel 4 and outside plate 5, be provided with several longitudinal rib 7 between inner panel 4 and outside plate 5, top is provided with cross rib 6, and inside and outside plate 4,5 is by vertical Rib 7 and cross rib 6 connect, and the top of inner panel 4 and outside plate 5 is fixed with cross rib 6, and cross rib 6 upper center convexes to form projection 61, its end Portion is provided with the groove 8 matched with projection 61, and during assembling, projection 61 is inserted into the groove of adjacent work its assembly of well standard knot 10 Realize on 8 connecting.The bottom surface of longitudinal rib 7 is slightly above inner panel 4 and the bottom surface of outside plate 5 and the bottom surface with inner panel 4 and outside plate 5 and forms groove 8, groove 8 structure can also include but are not limited to flush with the bottom surface of inner panel 4 and outside plate 5, in longitudinal rib 7 for longitudinal rib 7 bottom surface Above-mentioned groove 8 is had on bottom surface.The outer surface of outside plate 5 is smooth panel, and smooth outer surface backfills soil due to little being beneficial to of rubbing Compacting;Except of course that outside plate 5 outer surface is made outside smooth panel, the inner and outer surfaces of its outside plate 5 inner surface and inner panel 4 is all Smooth panel can be made.
Assembly includes four corner assemblies 1 and multiple straight line assembly 2, and corner assembly 1 can be equilateral and not Equilateral two kinds, it is designed with plurality of specifications, is equilateral as shown in Figure 1,2 and 3;Straight line assembly 2 can be different length size, Straight line assembly 2 structure is such as Fig. 9, shown in 10 and 11, and work well size can select various sizes of assembly according to practical situation.Turn Angle assembly 1 is the same with straight line assembly 2 general structure, and simply straight line assembly 2 is straight line, and corner assembly 1 has Having a corner, can be that right-angled corner can also be for arc chord angle, the present embodiment be right-angled corner, is therefore illustrating internal structure Time only as a example by corner assembly 1, the internal structure of straight line assembly 2 no longer elaborates.
Corner assembly 1 and the respective two ends of straight line assembly 2 be equipped with connection socket 9 and each on connection socket 9 tie Structure is all identical, is only described as a example by connection socket 9 structure on corner assembly 1.
Further, connection socket 9 includes 91, slot 92 of a limited step and two bar blocks 93, limiting stand Rank 91 are opened on projection 61 and its step surface forms " 7 " font groove less than cross rib 6 upper surface, slot 92 and limited step 91, Two bar blocks 93 are respectively fixedly connected with on 92 liang of groove sidewalls of slot and flush with assembly port, and the upper surface of two bar blocks 93 is low Step surface in limited step 91.
Accordingly, as shown in FIG. 7 and 8, connector 3 is T-shaped, and the attachment cap 31 including horizontally set is connected with vertical Inserting column 32 under attachment cap 31, inserting column 32 two side has the bar-shaped trough 33 matched with bar blocks 93, works as assembling After connecting, inserting column 32 is inserted in slot 92, and two bar blocks 93 that adjacent two connection sockets 9 are positioned at the same side are mutually close to Connect and be inserted into together in the bar-shaped trough 33 on the sidewall that inserting column 32 is corresponding and with this bar-shaped trough 33 realize tight fit from And realize connecting two adjacent groups piece installing, attachment cap 31 lower surface bears against at adjacent its limited step 91 of two connection sockets 9 Step surface on, and its cross rib 6 upper surface of attachment cap 31 upper surface and two adjacent groups piece installing flushes.And inserting column 32 inserts slot 92 Tight fit connection is contacted afterwards with the longitudinal rib 7 on connection socket 9 limit.
This connection socket 9 and connector 3 are not limited only to said structure, it is also possible to for other structures, as long as being capable of steady Surely connect.Such as, its connection socket 9 structure can also be by limited step 91 structure of above-mentioned connection socket 9 structure Removing, corresponding connector 3 is designed to " n " font, is inserted directly into, owing to this structure is more typically technical pattern, no longer Drawings in detail describes.After can also is that limited step 91 structure is removed, two bar blocks 93 are merged and is linked to be a limiting plate, with The corresponding connector of sample 3 is designed to " n " font structure.Described in specific embodiment be only the most for example to spirit of the present invention Explanation.
The concrete steps of the installation method of this assembled work well standard knot are as follows:
S1, elder generation dig foundation ditch 12 on road surface, after having dug foundation ditch 12, according to geological conditions compacting work well basis 11 and by work well Basis 11 upper surface processes smooth.
S2, installation head joint work well standard knot, select the corner assembly 1 of corresponding size and straight line to assemble according to work well size Part 2, knocks in connector 3 with hammer or hammer after then setting on work well basis 11 and makes adjacent two straight line assembly 2 or phases After connecting between adjacent corner assembly 1 and straight line assembly 2 or installing on limit outside foundation ditch 12 and connect first joint standard knot Entirety is put on work well basis 11 again, as shown in figure 12.
As required, dig correspondingly sized foundation ditch 12, select corner assembly 1 and the straight line assembly 2 of corresponding size Mutually assemble the work well cooperatively forming design.Various sizes of corner assembly 1 and straight line assembly 2 complement each other to form The work well standard knot of different size size, thus meet different size of work well demand, the scope of application is big.
S3, installation second section work well standard knot, according to the mounting means installation second section work well standard knot of step S2, but group During dress, each various sizes of corner assembly 1 position relative with straight line assembly 2 is adjusted, so that connector thereon 3 form straight joint the most on the same line with the connector 3 on the most adjacent work well standard knot.
The corner assembly 1 of the present embodiment is equilateral, but four corner assemblies 1 have two kinds of size dimensions, installs Under corner assembly 1 positions different for two kinds of size dimensions being exchanged during second section work well standard knot, the most various sizes of directly The connector 3 of upper and lower work well standard knot is realized the most on the same line under the also the most corresponding exchange of line assembly 2 position.This The corner assembly 1 of embodiment is in addition to equilateral, it is also possible to be inequilateral, and various size dimensions can be arranged according to actual needs.
S4, mounting means with reference to step S3 continue up work well and install standard knot until the work well standard knot upper end installed Face is not less than on limit the overhead height presetting the cable mouth of pipe 13, stops installing, as shown in Figs. 13 and 14.The up installation of the present embodiment Work well standard knot, can be that Section of three work well standard knot is identical, so with second section work well mark with first joint work well standard knot structure The connector 3 of quasi-joint is the most on the same line;Then Section four identical with second section work well standard knot structure, class successively Push away.
S5, definition have local to be perforate standard knot with the work well standard knot of the above-mentioned default positive relative position relation of the cable mouth of pipe, Judge whether described perforate standard knot meets perforate requirement, if being unsatisfactory for perforate requirement, then adjust each assembly and relatively connect position Putting until meeting perforate requirement, if meeting perforate requirement, then on perforate standard knot, doing lower aperture labelling and take out on-the-spot perforate Then install and go back or do not take out directly perforate on the most mounted perforate standard knot, or the hole that has been prefabricated in the factory in advance Mouth is mounted directly, by the interface connecting line mouth of pipe and aperture.
Then fill the gap between aperture and interface with mortar or foaming agent, cable pipe is arranged on the cable mouth of pipe, interface and On aperture.In the present embodiment, the cable mouth of pipe 13 is located just on a joint work well standard knot, and this joint work well standard knot is perforate standard knot 101, and this perforate standard knot 101 meets perforate requirement, namely needs the aperture 101a offered not on connector 3, then exists Scene carries out perforate by hole saw and then installs back.Except on-the-spot hole saw can be to use on-the-spot handsaw mode perforate or thing The aperture 101a that has first been prefabricated in the factory is mounted directly;Certainly, in practice of construction, perforate standard knot 101 is likely to exist discontented The situation that foot perforate requires, namely needs the aperture 101a offered to be located just at, wherein on a connection piece 3, now needing structure Become the corner assembly 1 of this perforate standard knot 101 and straight line assembly 2 to carry out various sizes of replacing or be changed without but exchange The lower different order of connection is so that needing the aperture 101a offered to avoid connector 3.
The interface of the aperture 101a on the connecting line mouth of pipe 13 and perforate standard component 101 can use the prefabricated interface of finished product or The structures such as inspection shaft interface connector are attached installing.
S6, mounting means according to step S3 continue up erector's well standard knot until reaching to calculate absolute altitude, definition meter Calculating the difference that absolute altitude is grade elevation and well lid height, all mounted standard knots form work well, dispose interim at Gong Jing top Cover plate 14, as shown in figure 15.Calculate the setting of absolute altitude so that when finally covering well lid 15, its well lid 15 is just neat with road surface Flat, so form a smooth road surface.
Space between S7, work well and foundation ditch (12) is backfilled by backfilling material, continues backfill by backfilling material During to Gong Jing top, puddled backfill material successively, remove interim cover plate 14, if work well elevation of top just reaches above-mentioned calculating mark Gao Shi, then install well lid 15 on Gong Jing top, and then applying mortar makes above-mentioned well lid 15 be compacted seamless link with work well;If work Well elevation of top exceedes above-mentioned calculating absolute altitude, by adjusting operation, work well elevation of top is met above-mentioned calculating absolute altitude, is then coated with Smearing mortar makes above-mentioned well lid 15 and work well be compacted seamless link, as shown in figure 16.Adjusting operation is according to foundation ditch 12 height and well Lid height, marks in standard knot relevant position, Gong Jing top, cuts with handsaw or cutting machine at the scene, in order to adjust Work well elevation of top is with satisfied calculating absolute altitude.
Completing above-mentioned steps and can complete whole installations of work well, corner assembly 1 and straight line assembly 2 use lightweight high Strong material is made, light weight, easy construction, and required labour force is few, and 1,2 people can complete operation, can all-weather construction;And Technical ability be there is no yet what requirement, it is not necessary to experience, simple operations, reliable construction quality;Standard knot good mechanical property, can arbitrarily open Slot in hole, have effect the most fire-retardant, corrosion-resistant simultaneously, and bearing capacity is big, and service life is long.
Uppermost standard knot can not level or time there is hollow sectors, can be filled with plain concrete mixing, Reach level or fill its hollow sectors, then well lid 15 being installed, is compacted.
Embodiment two
The present embodiment is with the difference of embodiment one: as shown in FIG. 17 and 18, and the cable mouth of pipe 13 is positioned at two joint work wells Between standard knot, then this two joints work well standard knot is perforate standard knot, this two joints work well standard knot is lower aperture 101a Labelling, then on-the-spot perforate or do not take off directly perforate on perforate standard knot, or this two joints work well standard knot is prior At factory the most prefabricated aperture 101a, certainly when perforate or prefabricated aperture 101a, this two joints work well standard will be ensured All connectors 3 on joint are not the most positioned on the 101a of aperture.Other structures, principle and installation method are all identical with embodiment one, Repeat no more.
Described specific embodiment can be made various amendment by those skilled in the art Or supplement or use similar mode to substitute, but without departing from the spirit of the present invention or surmount appended claims and determined The scope of justice.

Claims (10)

1. an assembled work well standard knot, it is characterised in that: include assembly and connector (3), in described assembly includes Plate (4) and outside plate (5), be provided with several longitudinal rib (7) between inner panel (4) and outside plate (5), top is provided with cross rib (6), and inside and outside Plate (4,5) is connected by longitudinal rib (7) and cross rib (6), and cross rib (6) upper center convexes to form projection (61), be provided with bottom it and The groove (8) that above-mentioned projection (61) matches, described assembly includes four corner assemblies (1) and several straight line assemblies (2), described corner assembly (1) and straight line assembly (2) are each equipped with connection socket (9) in two ends, and above-mentioned connector (3) leads to Cross to be connected with described connection socket (9) thus be connected with each other corner assembly (1) and straight line assembly (2) to assemble and form one Complete work well standard knot (10).
A kind of assembled work well standard knot the most according to claim 1, it is characterised in that the bottom surface of described longitudinal rib (7) It is slightly above above-mentioned inner panel (4) and the bottom surface of outside plate (5) and forms above-mentioned groove (8) with the bottom surface of inner panel (4) and outside plate (5), Or longitudinal rib (7) bottom surface flushes with the bottom surface of above-mentioned inner panel (4) and outside plate (5), the bottom surface of longitudinal rib (7) have above-mentioned Groove (8).
A kind of assembled work well standard knot the most according to claim 1 and 2, it is characterised in that described connection socket (9) Including a limited step (91), a slot (92) and two bar blocks (93), described limited step (91) is opened in projection (61) upper and its step surface forms " 7 " font less than cross rib (6) upper surface, described slot (92) with above-mentioned limited step (91) Groove, above-mentioned two bar blocks (93) is respectively fixedly connected with on slot (92) two groove sidewall and flushes with assembly port, described two The upper surface of bar blocks (93) is less than the step surface of above-mentioned limited step (91).
A kind of assembled work well standard knot the most according to claim 3, it is characterised in that described connector (3) is in " T " Font, including the attachment cap (31) of horizontally set and the inserting column (32) that is vertically connected under attachment cap (31), inserting column (32) both sides Having the bar-shaped trough (33) matched with above-mentioned bar blocks (93) on wall, after assembly connection is good, inserting column (32) is inserted into In above-mentioned slot (92), adjacent two connection sockets (9) are positioned at two bar blocks (93) of the same side mutually by connection and Rise in the bar-shaped trough (33) that is inserted on the sidewall that inserting column (32) is corresponding and realize tight fit with this bar-shaped trough (33) thus Realizing connecting two adjacent groups piece installing, described attachment cap (31) lower surface bears against adjacent two connection sockets (9) that it is spacing On the step surface of step (91), and attachment cap (31) upper surface flushes with two adjacent groups piece installing its cross rib (6) upper surface.
A kind of assembled work well standard knot the most according to claim 4, it is characterised in that the two ends of described assembly are equal Design is longitudinal rib (7) near, after assembly connection is good, above-mentioned inserting column (32) insertion slot (92) afterwards with connection socket (9) limit On longitudinal rib (7) contact tight fit connection.
6. weigh arbitrary above-mentioned assembled work well standard knot installation method in new construction in 1-5 for one kind, it is characterised in that bag Include following step:
S1, elder generation dig foundation ditch (12) on road surface, after having dug foundation ditch (12), according to geological conditions compacting work well basis (11) and by work Well basis (11) upper surface processes smooth;
S2, installation head joint work well standard knot, select corner assembly (1) and the straight line assembly of corresponding size according to work well size (2) with hammer or hammer connector (3) knocked in after, then setting on work well basis (11) and make adjacent two straight line assemblies (2) or connect between adjacent corners assembly (1) and straight line assembly (2) or install on limit, foundation ditch (12) outside and connect After first joint standard knot, entirety is put on work well basis (11) again;
S3, installation second section work well standard knot, install second section work well standard knot according to the mounting means of step S2, but when assembling Each various sizes of corner assembly (1) is adjusted with straight line assembly (2) relative position, so that connector thereon (3) straight joint is formed the most on the same line with the connector (3) on the most adjacent work well standard knot;
S4, mounting means with reference to step S3 continue up work well standard knot is installed until the work well standard knot upper surface installed not The overhead height of the default cable mouth of pipe (13) less than on limit, stops installing;
S5, definition have the work well standard knot of local and the positive relative position relation of the above-mentioned default cable mouth of pipe (13) to be perforate standard knot (101), it is judged that whether described perforate standard knot (101) meets perforate requirement, if being unsatisfactory for perforate requirement, then adjusts each assembly Link position relatively, until meeting perforate requirement, if meeting perforate requirement, then does lower aperture on perforate standard knot (101) (101a) then labelling and the on-the-spot perforate of taking-up are installed back or are not taken out directly the most mounted perforate standard knot (101) Upper perforate, or the aperture (101a) that has been prefabricated in the factory in advance is mounted directly, by the interface connecting line mouth of pipe (13) and aperture (101a);
S6, mounting means according to step S3 continue up that erector's well standard knot is until reaching to calculate absolute altitude, and definition calculates mark A height of grade elevation and well lid (15) difference highly, all mounted standard knots form work well, dispose interim at Gong Jing top Cover plate (14)
Space between S7, work well and foundation ditch (12) is backfilled by backfilling material, when being backfilled to Gong Jing top, and puddled backfill Material, removes interim cover plate (14), if work well elevation of top just reaches above-mentioned calculating absolute altitude, then installs on Gong Jing top Well lid (15), then applying mortar makes above-mentioned well lid (15) be compacted seamless link with work well;If work well elevation of top exceedes above-mentioned Calculating absolute altitude, by adjusting operation, work well elevation of top is met above-mentioned calculating absolute altitude, then applying mortar makes above-mentioned well lid (15) it is compacted seamless link with work well.
A kind of assembled work well standard knot the most according to claim 6 installation method in new construction, its feature exists In, described perforate standard knot (101) is that a joint work well standard knot, i.e. the cable mouth of pipe (13) are located just at this joint work well standard knot On;Or upper and lower two joint work well standard knots between, i.e. the cable mouth of pipe (13) this upper and lower two joint work well standard knots between.
A kind of assembled work well standard knot the most according to claim 6 installation method in new construction, its feature exists In, described perforate requires as aperture (101a) not at connector (3) place.
9. according to the installation method in new construction of a kind of assembled work well standard knot described in claim 7 or 8, its feature It is, in described step S5 after by the interface connecting line mouth of pipe (13) and aperture (101a), then with mortar or foaming agent Fill the gap between aperture (101a) and interface, cable pipe is arranged on the cable mouth of pipe (13), interface and aperture (101a).
A kind of assembled work well standard knot the most according to claim 9 installation method in new construction, its feature exists In, described adjustment operation is according to foundation ditch (12) height with well lid (15) highly, does in standard knot relevant position, Gong Jing top Upper labelling, cuts with handsaw or cutting machine at the scene, in order to adjust work well elevation of top with satisfied calculating absolute altitude.
CN201610541753.2A 2016-07-05 2016-07-05 A kind of assembly type work well standard knot and its installation method in new construction Active CN106013242B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610541753.2A CN106013242B (en) 2016-07-05 2016-07-05 A kind of assembly type work well standard knot and its installation method in new construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610541753.2A CN106013242B (en) 2016-07-05 2016-07-05 A kind of assembly type work well standard knot and its installation method in new construction

Publications (2)

Publication Number Publication Date
CN106013242A true CN106013242A (en) 2016-10-12
CN106013242B CN106013242B (en) 2018-06-26

Family

ID=57109432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610541753.2A Active CN106013242B (en) 2016-07-05 2016-07-05 A kind of assembly type work well standard knot and its installation method in new construction

Country Status (1)

Country Link
CN (1) CN106013242B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2515248Y (en) * 2001-12-27 2002-10-09 祁连海 Assembling concrete manhole
CN2861286Y (en) * 2005-06-02 2007-01-24 周佰兴 Combined type inspection well
JP2009138434A (en) * 2007-12-06 2009-06-25 Tokyo Metropolitan Sewerage Service Corp Construction method for making manhole connecting section of existing pipe aseismic
CN205077516U (en) * 2015-08-12 2016-03-09 陈俊光 Assembled cable shaft
CN205907714U (en) * 2016-07-05 2017-01-25 陈俊光 Assembled worker's well standard festival

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2515248Y (en) * 2001-12-27 2002-10-09 祁连海 Assembling concrete manhole
CN2861286Y (en) * 2005-06-02 2007-01-24 周佰兴 Combined type inspection well
JP2009138434A (en) * 2007-12-06 2009-06-25 Tokyo Metropolitan Sewerage Service Corp Construction method for making manhole connecting section of existing pipe aseismic
CN205077516U (en) * 2015-08-12 2016-03-09 陈俊光 Assembled cable shaft
CN205907714U (en) * 2016-07-05 2017-01-25 陈俊光 Assembled worker's well standard festival

Also Published As

Publication number Publication date
CN106013242B (en) 2018-06-26

Similar Documents

Publication Publication Date Title
EP3633141A1 (en) Construction method for inner structure of single-bore double-track composite lining shield tunnel
US10030792B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN103982199B (en) Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking
CN106013218B (en) A kind of method of construction of underground garage open caisson
KR101314081B1 (en) Retaining wall and upeer structure connection method for rahmen structure
CN109505609B (en) Bracket-free construction method for underground comprehensive pipe rack of shallow-buried underground excavation city and comprehensive pipe rack
KR100549691B1 (en) A steel- concrete composite lining system for road tunnel and construction method
CN107503382B (en) End template fixed rubber water stop belt structure and construction method thereof
CN107012887B (en) Prefabricated pin-connected panel node of arc top utility tunnel piecemeal
JP2007009430A (en) Tunnel composition structure and its construction method
CN105401593A (en) Assembly type square underground pipe gallery
CN112855180B (en) Comprehensive pipe gallery assembled structure constructed by shield method and construction method thereof
CN206873491U (en) A kind of assembled piping lane
KR20150059640A (en) Perpendicular hall module and construction method for perpendicular hall using the same
CN106013242A (en) Assembled type working wheel standard joint and installation method of assembled type working well standard joint in new project
CN106760486A (en) Exterior wall mould and its erection method in foundation ditch
CN106120860B (en) A kind of installation method of assembly type work well in reconstruction and extension project
CN105951885B (en) A kind of assembled work well standard knot and its installation method in new construction
CN110863512A (en) Prefabricated cable utility tunnel
JP7225356B2 (en) Press bars and struts for open shield construction
CN107217687B (en) A kind of pipe gallery and the road structure with the pipe gallery
CN109488341B (en) Supporting method and supporting structure of curtain frame type underground excavation system
CN209686449U (en) A kind of prefabricated assembled pipe gallery of sheet hydrant and its piping lane unit
CN204098066U (en) The square underground pipe gallery of assembling
CN204098067U (en) Side's culvert formula underground pipe gallery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190203

Address after: 318020 1 1, wing Gu Road, Jiangkou street, Huangyan District, Taizhou, Zhejiang.

Patentee after: Zhejiang Santai new Mstar Technology Ltd

Address before: 318020 No. 2 Nanhui Road, Nancheng street, Huangyan District, Taizhou, Zhejiang.

Patentee before: Chen Junguang