CN106013136B - 装配式地脚桩 - Google Patents

装配式地脚桩 Download PDF

Info

Publication number
CN106013136B
CN106013136B CN201610534776.0A CN201610534776A CN106013136B CN 106013136 B CN106013136 B CN 106013136B CN 201610534776 A CN201610534776 A CN 201610534776A CN 106013136 B CN106013136 B CN 106013136B
Authority
CN
China
Prior art keywords
stake bar
pile
bar
pedestal
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610534776.0A
Other languages
English (en)
Other versions
CN106013136A (zh
Inventor
祝庆林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Dif Tech Co Ltd
Original Assignee
Dianfu Science & Technology Co Ltd Wuxi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dianfu Science & Technology Co Ltd Wuxi filed Critical Dianfu Science & Technology Co Ltd Wuxi
Priority to CN201610534776.0A priority Critical patent/CN106013136B/zh
Publication of CN106013136A publication Critical patent/CN106013136A/zh
Application granted granted Critical
Publication of CN106013136B publication Critical patent/CN106013136B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种装配式地脚桩,包括底座、桩柱,桩柱的内腔设有桩杆,桩杆的下端为倒锥状,桩杆下方的圆柱面上设置有螺旋状刀片,底座上方通过螺纹连接有连接套,底座的上端还开设有至少两条纵向分隔槽,连接套的上方依次连接有并紧螺母、调节件、衬套和锁紧螺母,桩杆的上端开设有安装孔。本发明由于桩杆的下端为倒锥状而且桩杆下方的圆柱面上有螺旋状刀片,使得该桩杆可以通过手工将其在草地上或泥土地上方便安装,省力、快捷,降低了成本,也极大地减轻了安装的劳动强度,提高了安装效率,是本领域的一次革命性的创新。

Description

装配式地脚桩
技术领域
本发明涉及一种组装式栅栏用桩柱,属于栅栏技术领域。
背景技术
栅栏的两端都需要有桩柱与地面固定,传统的栅栏桩柱一般只能通过底座安装在平整的地面上,如水泥地、柏油地面等,需要将底座用螺栓与地面连接固定,一般是通过在柱子的下部焊接一平板,再把焊好的柱子固定在水泥地或柏油地面上,或者把柱子套入地脚板上,再固定在硬地或者预埋件上。
当遇到需要在草地或者泥土地上安装栅栏的时候,需要先打洞,将桩柱直接用专用设备打入地面,或者在地上挖出较深的坑,灌注水泥来埋设桩柱的下半部分。这样成本较高,而且还要多花时间,大大增加了桩柱在草地或者泥土地上的安装难度。
发明内容
本发明所要解决的技术问题是提供一种能在草地或泥土地上方便安装省力、快捷,也能在平整地面上安装的装配式地脚桩。
本发明的技术方案是:
一种装配式地脚桩,包括底座、桩柱,桩柱的内腔设有圆柱状桩杆,桩杆的下端为倒锥状,桩杆的圆柱面上靠近倒锥状的一端设置有螺旋状刀片,底座上方通过螺纹连接有连接套,底座的上端还开设有至少两条纵向分隔槽,连接套的上方依次连接有并紧螺母、调节件、衬套和锁紧螺母,桩杆的上端开设有安装孔。
桩杆包括桩杆本体、桩杆锥体,桩杆本体和桩杆锥体之间螺纹连接。
桩柱的上端设置有桩帽。
桩杆下端倒锥状的锥角为10度—90度。
有益效果:本发明由于桩杆的下端为倒锥状而且桩杆下方的圆柱面上有螺旋状刀片,使得该桩杆可以通过手工将其在草地或泥土地上方便安装,使得装配式地脚桩在不平整土地上安装的时候,不再需要在地上挖出较深的坑,灌注水泥来埋设桩柱的下半部分,省力、快捷,降低了成本,也极大地减轻了安装的劳动强度,提高了安装效率,是本领域的一次革命性的创新,也可以在其他需要埋设立柱的行业适用。
附图说明
图1为本发明的爆炸图;
图1-1是图1中桩杆1的结构示意图;
图2是本发明的桩柱和桩帽结构示意图;
图3是本发明中欲将桩杆插入草地或者泥土地的安装示意图;
图4是本发明中杠杆将桩杆拧入草地或者泥土地下的安装示意图;
图5是本发明中桩杆上套入底座和连接套的安装示意图;
图6是图5中X处的局部放大立体示意图;
图7是本发明中底座套入桩杆后拧紧连接套的安装示意图;
图8是图7中的I处的局部放大立体示意图;
图9是本发明中依次套入并紧螺母、调节件、衬套和锁紧螺母的安装示意图;
图10是图9中的Ⅱ处的局部放大立体示意图;
图11是本发明中适量拧紧锁紧螺母的安装示意图;
图12是本发明调整调节件、拧紧所有螺母的安装示意图;
图13是图12中Ⅲ处的局部放大立体示意图;
图14是本发明套入桩柱的安装示意图;
图15是本发明桩柱和底座安装到位的示意图。
图中:1—桩杆、1-1—桩杆本体、1-2—桩杆锥体、2—底座、3—连接套、4—并紧螺母、5—调节件、6—衬套、7—锁紧螺母、8—安装孔、9—杠杆、10—刀片、11—桩帽、12—桩柱、13—分隔槽。
具体实施方式
下面结合附图对本发明作进一步说明。
一种装配式地脚桩,包括底座2、桩柱12,桩柱12的内腔设有圆柱状桩杆1,桩杆1的下端为倒锥状,桩杆1的圆柱面上靠近倒锥状的一端设置有螺旋状刀片10,底座2上方通过螺纹连接有连接套3,底座2的上端还开设有至少两条纵向分隔槽13,连接套3的上方依次连接有并紧螺母4、调节件5、衬套6和锁紧螺母7,桩杆1的上端开设有安装孔8。
桩杆1包括桩杆本体1-1、桩杆锥体1-2,桩杆本体1-1和桩杆锥体1-2之间螺纹连接。桩柱12的上端设置有桩帽11。
桩杆1下端倒锥状的锥角为10度—90度。
本发明装配式地脚桩在草地或者泥土地上的安装步骤是:
1.将杠杆9伸入桩杆1的上端开设的安装孔8内,将桩杆1的下端插在泥土地面上,用杠杆9将桩杆1拧入地下一部分;
2.将底座2套入桩杆1,一直到地面,并保证所有底座2在同一水平面,然后拧紧连接套3,为了增加桩杆在泥土里的稳定性,可把桩杆周边敲实,再用小铁棍通过底座上的孔敲入地下;
3.依次套入并紧螺母4、调节件5、衬套6和锁紧螺母7;
4.适量拧紧锁紧螺母7;
5.调整调节件5,保证连接套3和调节件5连线竖直,拧紧所有螺母,包括并紧螺母4、锁紧螺母7,当桩杆1倾斜的时候,用水平仪来检测,可以通过调整调节件5,让套入的桩柱12 垂直于地面;
6.套入桩柱12,将桩柱12和底座2安装到位,套上桩帽11。
底座2和连接套3的外径上有上小下大的锥度1-2度,所以套入桩柱12后,很难再轻易往上拉出。
桩杆1起到稳定在地下的功能,底座2用于固定在桩杆1上,桩柱12是固定在底座2上,并紧螺母4、调节件5、衬套6和锁紧螺母7用于平衡桩柱12。
本发明的桩柱也适合在平整的地面上如水泥地、柏油路面上使用,只要将桩杆1的桩杆本体1-1保留,桩杆锥体1-2部分拆卸下来,再按照前述步骤安装桩柱等零部件即可,只是安装底座后,需要打入膨胀螺栓,拧紧底座,然后再重复上述步骤。

Claims (4)

1.一种装配式地脚桩,包括底座、桩柱,其特征在于:所述桩柱的内腔设有圆柱状桩杆,桩杆的下端为倒锥状,桩杆的圆柱面上靠近倒锥状的一端设置有螺旋状刀片,底座上方通过螺纹连接有连接套,底座的上端还开设有至少两条纵向分隔槽,连接套的上方依次连接有并紧螺母、调节件、衬套和锁紧螺母,桩杆的上端开设有安装孔。
2.根据权利要求1所述的装配式地脚桩,其特征在于:所述桩杆包括桩杆本体、桩杆锥体,桩杆本体和桩杆锥体之间螺纹连接。
3.根据权利要求1所述的装配式地脚桩,其特征在于:所述桩柱的上端设置有桩帽。
4.根据权利要求1所述的装配式地脚桩,其特征在于:所述桩杆下端倒锥状的锥角为10度—90度。
CN201610534776.0A 2016-07-07 2016-07-07 装配式地脚桩 Active CN106013136B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610534776.0A CN106013136B (zh) 2016-07-07 2016-07-07 装配式地脚桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610534776.0A CN106013136B (zh) 2016-07-07 2016-07-07 装配式地脚桩

Publications (2)

Publication Number Publication Date
CN106013136A CN106013136A (zh) 2016-10-12
CN106013136B true CN106013136B (zh) 2019-01-08

Family

ID=57108357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610534776.0A Active CN106013136B (zh) 2016-07-07 2016-07-07 装配式地脚桩

Country Status (1)

Country Link
CN (1) CN106013136B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109009797A (zh) * 2018-09-14 2018-12-18 周靖皓 一种助老助残的泳池移位装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200978555Y (zh) * 2006-11-30 2007-11-21 诺曼·威廉·理克 围栏的组合构造
CN105735607A (zh) * 2014-12-12 2016-07-06 上海骏雄木业有限公司 一种新型地板支架

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202208920U (zh) * 2011-08-25 2012-05-02 广东保威新能源有限公司 立柱安装偏心可调螺旋地桩
KR20150006257A (ko) * 2013-07-08 2015-01-16 배효성 지주 구조물 설치를 위한 나선형 기초파일
CN103835291A (zh) * 2014-03-11 2014-06-04 苏州尼克司建材有限公司 螺旋地桩
CN203730492U (zh) * 2014-03-13 2014-07-23 温州市强杰不锈钢标准件有限公司 自锁防松膨胀螺栓
CN205776186U (zh) * 2016-07-07 2016-12-07 无锡帝安福科技有限公司 装配式地脚桩

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200978555Y (zh) * 2006-11-30 2007-11-21 诺曼·威廉·理克 围栏的组合构造
CN105735607A (zh) * 2014-12-12 2016-07-06 上海骏雄木业有限公司 一种新型地板支架

Also Published As

Publication number Publication date
CN106013136A (zh) 2016-10-12

Similar Documents

Publication Publication Date Title
US8464482B2 (en) Sectioned precast deck footings/ piers
CN101970777B (zh) 自攻地基桩
EP1691073A2 (de) Flächengründung, bevorzugt aufgelöst, für Offshore-Windenergieanlage
KR101489198B1 (ko) 절취사면에 대한 패널 옹벽 설치구조
CN106013136B (zh) 装配式地脚桩
CN205776186U (zh) 装配式地脚桩
US9422741B1 (en) Ball field suspended fence post base support and post support with lateral support
US6799401B1 (en) Hollow pole anchoring system
KR101364586B1 (ko) 그리드 네일링 사면보강공법용 네일 조립체, 보강시설 및 이를 이용한 그리드 네일링 사면보강공법
KR101341176B1 (ko) 해상 지지구조물 및 이의 시공 방법
CN205577187U (zh) 预制钢管混凝土构造柱夯土墙
KR20150107035A (ko) 플레이트 파일 기초를 이용한 데크 및 그 시공방법
HUE029248T2 (en) Priming equipment for columns, in particular for lamp posts
JP5747053B2 (ja) 基礎杭及び支持基礎体
CN209724376U (zh) 一种矿用工字钢棚
CN104405734A (zh) 风力机塔架与基座的卡扣式法兰连接结构及连接方法
CN204385762U (zh) 一种岩石锚杆基础结构
CN219365601U (zh) 一种10kV配网复合材料电杆
CN203383217U (zh) 一种用于基坑支护的预应力地锚装置
CN207130727U (zh) 一种球墨铸铁螺旋桩
CN203213102U (zh) 预应力混凝土管桩对接构件
KR101291705B1 (ko) 파일의 선단지지력 보강장치
CN208010018U (zh) 一种特高压钢电塔连接法兰
CN203284780U (zh) 安装户外设施时可使用的地基装置及施工安装架
CN208123626U (zh) 叠装式可拆卸支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190923

Address after: Room 202, Unit One, 7 Lanxin Apartments, Danyang Development Zone, Zhenjiang City, Jiangsu Province

Patentee after: Ju Jianrong

Address before: 214028, room four, zone 408, science and Technology Pioneer Park, 7 Changjiang Road, Xin Wu, Wuxi, Jiangsu

Patentee before: WUXI DIF TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201208

Address after: Room 2-506, Yilin building, No. 19, gaolang East Road, Xinwu District, Wuxi City, Jiangsu Province

Patentee after: Asier (Wuxi) Security Technology Co.,Ltd.

Address before: Room 202, Unit One, 7 Lanxin Apartments, Danyang Development Zone, Zhenjiang City, Jiangsu Province

Patentee before: Ju Jianrong

TR01 Transfer of patent right
PP01 Preservation of patent right

Effective date of registration: 20210625

Granted publication date: 20190108

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20230625

Granted publication date: 20190108

PD01 Discharge of preservation of patent
TR01 Transfer of patent right

Effective date of registration: 20230726

Address after: F16, No. 85, Wuai Jiayuan, Liangxi District, Wuxi City, Jiangsu Province, 214000

Patentee after: WUXI DIF TECHNOLOGY Co.,Ltd.

Address before: Room 2-506, Yilin building, No. 19, gaolang East Road, Xinwu District, Wuxi City, Jiangsu Province

Patentee before: Asier (Wuxi) Security Technology Co.,Ltd.

TR01 Transfer of patent right