CN106012820A CN201610584810.5A CN201610584810A CN106012820A CN 106012820 A CN106012820 A CN 106012820A CN 201610584810 A CN201610584810 A CN 201610584810A CN 106012820 A CN106012820 A CN 106012820A
Authority
CN
China
Prior art keywords
mortar
bridge
installation method
bridge pad
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610584810.5A
Other languages
Chinese (zh)
Inventor
张建
钟晓林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Pengcheng Machinery Co Ltd Of Luqiao
Original Assignee
Chengdu Pengcheng Machinery Co Ltd Of Luqiao
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Pengcheng Machinery Co Ltd Of Luqiao filed Critical Chengdu Pengcheng Machinery Co Ltd Of Luqiao
Priority to CN201610584810.5A priority Critical patent/CN106012820A/en
Publication of CN106012820A publication Critical patent/CN106012820A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention relates to the technical field of bridge engineering and discloses a mounting method of a bridge support. The mounting method comprises the following steps: (a) preparing mortar; (b) carrying out setting-out positioning on a support by virtue of a laser positioning instrument; (c) mounting anchor bolts and the support; (d) mounting a template; (e) pouring the mortar; and (f) mounting anchor bolts of the support and an upper structure. The mounting method has the beneficial effects that the operation is simple, and the setting-out positioning is carried out on the bridge support by virtue of the laser positioning instrument, so that the mounting precision of the bridge support is guaranteed; and meanwhile, the mounting process is normative and reasonable, and the support is firmly mounted, so that the use performance and the service life of the bridge support are guaranteed.

Description

A kind of installation method of bridge pad
Technical field
The present invention relates to technical field of bridge engineering, particularly relate to the installation method of a kind of bridge pad.
Background technology
Along with rapid development of economy, the construction of road there has also been the development advanced by leaps and bounds, and the erection of bridge is Very important ingredient in road construction, and in bridge erection, the installation of bridge pad determines whole The quality of the total quality of individual bridge.And existing bridge pad installation process is lack of standardization, easily causes location The problem such as inaccurate, has had a strong impact on the service life of bridge.
Summary of the invention
It is desirable to provide the installation method of a kind of bridge pad, well solve the problems referred to above, its operation Simply, by laser orientation instru-ment, bridge pad is carried out unwrapping wire location, it is ensured that the installation accuracy of bridge pad, Installation process normative and reasonable simultaneously, bearing firmly installs, it is ensured that the serviceability of bridge pad and use longevity Life.
The technical scheme is that the installation method of a kind of bridge pad, including step:
A. mortar is prepared;
B. use laser orientation instru-ment that bearing is carried out unwrapping wire location;
C., anchor bolt and bearing are installed;
D. installation form;
E. perfusion mortar;
F. erection support and the anchor bolt of superstructure.
Further, before carrying out described step a, pier top dabbing need to be cleared up, carve bearing support with ferrum Face carries out dabbing, and dabbing degree meets the bridge concrete construction regulation about treatment of construction joints, and by end face Clean out.
Further, also need to clear up preformed hole before carrying out described step a, check before cleaning and check pier top anchor The position in fixing bolt hole, size and the degree of depth, qualified rear thoroughly cleaning.
Further, in described step a, mortar is condensation compensation mortar, the water of described condensation compensation mortar Glue ratio is 0.465, and its intensity is not less than 35MPa.
Further, in described step c, in bearing corner, base-plate is looked for by gad with pier face pad Flat, base-plate bottom surface preferably exceeds pier top 20mm~50mm, then checks and installs centrage and elevation.
Further, propping up side form along bearing surrounding in described step d, template is along bridge pier axis of pitch direction two Side size should be greater than each 100mm of bearing width.
Further, described step e is used condensation compensation mortar between bolt hole and base-plate and pier face Gap is filled, and pours into from one end and flows out and aerofluxus from the other end, it is ensured that without hollowing during perfusion.
Further, before carrying out described step f, the mortar such as need reaches design strength recession except corner gad, And use epoxy resin mortar joint filling.
The invention has the beneficial effects as follows:
1, by laser orientation instru-ment, bridge pad is carried out unwrapping wire location, it is ensured that the installation essence of bridge pad Degree, further ensures the installation accuracy of bridge, makes bridge pad uniform force, it is ensured that bridge pad Serviceability;
2, mortar is condensation compensation mortar, and the water-cement ratio of condensation compensation mortar is 0.465, and its intensity is not less than 35MPa, the mortar strength that the present invention uses is high, and in energy rapid draing, and work progress, stress is gentle, no Deformation and the displacement of bridge pad can be caused, thus ensure that the installation accuracy of bridge pad;
3, installation process normative and reasonable, bearing firmly installs, it is ensured that the serviceability of bridge pad and making Use the life-span.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, so that the present invention is entered One step describes in detail.
The invention provides the installation method of a kind of bridge pad, including step:
A. preparing mortar, mortar is condensation compensation mortar, and the water-cement ratio of described condensation compensation mortar is 0.465, Its intensity is not less than 35MPa, before carrying out described step a, need to clear up pier top dabbing, carves propping up with ferrum Seat bearing-surface carries out dabbing, and dabbing degree meets the bridge concrete construction regulation about treatment of construction joints, and End face is cleaned out, also needs to clear up preformed hole before carrying out described step a, check before cleaning and check pier top The position in anchor bolt hole, size and the degree of depth, qualified rear thoroughly cleaning;
B. use laser orientation instru-ment that bearing is carried out unwrapping wire location;
C., anchor bolt and bearing are installed, at bearing corner gad, base-plate are looked for pier face pad Flat, base-plate bottom surface preferably exceeds pier top 20mm~50mm, then checks and installs centrage and elevation;
D. installation form, props up side form along bearing surrounding, and template should along both sides, bridge pier axis of pitch direction size More than each 100mm of bearing width;
E. perfusion mortar, fills bolt hole and base-plate with condensation compensation mortar with gap, pier face, Pour into from one end during perfusion and flow out and aerofluxus from the other end, it is ensured that without hollowing;
F. the anchor bolt of erection support and superstructure, before carrying out described step f, the mortar such as need reaches to set Meter intensity recession is except corner gad, and uses epoxy resin mortar joint filling.
The present invention carries out unwrapping wire location by laser orientation instru-ment to bridge pad, it is ensured that the installation of bridge pad Precision, further ensures the installation accuracy of bridge, makes bridge pad uniform force, it is ensured that bridge pad Serviceability;Mortar is condensation compensation mortar, and the water-cement ratio of condensation compensation mortar is 0.465, its intensity Being not less than 35MPa, the mortar strength that the present invention uses is high, stress temperature in energy rapid draing, and work progress With, do not result in deformation and the displacement of bridge pad, thus ensure that the installation accuracy of bridge pad;Install Process specification is reasonable, and bearing firmly installs, it is ensured that the serviceability of bridge pad and service life.
Certainly, the present invention also can have other various embodiments, without departing substantially from present invention spirit and the feelings of essence thereof Under condition, those of ordinary skill in the art can make various corresponding change and deformation according to the present invention, but this A little corresponding changes and deformation all should belong to the protection domain of appended claims of the invention.

Claims (8)

1. the installation method of a bridge pad, it is characterised in that include step:
A. mortar is prepared;
B. use laser orientation instru-ment that bearing is carried out unwrapping wire location;
C., anchor bolt and bearing are installed;
D. installation form;
E. perfusion mortar;
F. erection support and the anchor bolt of superstructure.
The installation method of bridge pad the most according to claim 1, it is characterised in that: carry out described Before step a, need to clear up pier top dabbing, carve with ferrum and bearing support face carries out dabbing, dabbing degree is full Foot bridge concrete construction is about the regulation for the treatment of of construction joints, and is cleaned out by end face.
The installation method of bridge pad the most according to claim 1, it is characterised in that: carry out described Before step a also need clear up preformed hole, cleaning before check check the position in pier top anchor bolt hole, size and The degree of depth, qualified rear thoroughly cleaning.
The installation method of bridge pad the most according to claim 1, it is characterised in that: described step a In, mortar is condensation compensation mortar, and the water-cement ratio of described condensation compensation mortar is 0.465, and its intensity is the lowest In 35MPa.
The installation method of bridge pad the most according to claim 1, it is characterised in that: described step c In, at bearing corner gad, base-plate is levelling with pier face pad, base-plate bottom surface preferably exceeds pier Platform top 20mm~50mm, then checks and installs centrage and elevation.
The installation method of bridge pad the most according to claim 1, it is characterised in that: described step d Middle propping up side form along bearing surrounding, it is each that template should be greater than bearing width along both sides, bridge pier axis of pitch direction size 100mm。
The installation method of bridge pad the most according to claim 1, it is characterised in that: described step e Middle condensation compensation mortar is filled bolt hole and base-plate with gap, pier face, pours into from one end during perfusion Flow out and aerofluxus from the other end, it is ensured that without hollowing.
The installation method of bridge pad the most according to claim 1, it is characterised in that: carry out described Before step f, the mortar such as need reaches design strength recession except corner gad, and uses epoxy resin mortar joint filling.
CN201610584810.5A 2016-07-22 2016-07-22 Mounting method of bridge support Pending CN106012820A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610584810.5A CN106012820A (en) 2016-07-22 2016-07-22 Mounting method of bridge support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610584810.5A CN106012820A (en) 2016-07-22 2016-07-22 Mounting method of bridge support

Publications (1)

Publication Number Publication Date
CN106012820A true CN106012820A (en) 2016-10-12

Family

ID=57117271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610584810.5A Pending CN106012820A (en) 2016-07-22 2016-07-22 Mounting method of bridge support

Country Status (1)

Country Link
CN (1) CN106012820A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610344A (en) * 2018-12-31 2019-04-12 中铁六局集团太原铁路建设有限公司 Bridge rotation body support construction method of installation
CN111426549A (en) * 2020-04-27 2020-07-17 河南省交院工程检测科技有限公司 Rapid centering method of bridge metal support

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003227109A (en) * 2002-02-05 2003-08-15 Kaimon:Kk Mounting method of horizontal force buffer of structure and mounting structure
CN102817324A (en) * 2012-09-06 2012-12-12 浙江金筑交通建设有限公司 Construction method for quickly installing pot rubber bearing by using epoxy resin mortar
CN105239502A (en) * 2015-11-07 2016-01-13 西安公路研究院 Uniform force transmission device used for bridge support and installation method of uniform force transmission device
CN105297620A (en) * 2015-11-07 2016-02-03 西安公路研究院 Steel plate spherical crown polymer mortar structure support and construction method thereof
CN105509933A (en) * 2016-01-09 2016-04-20 长安大学 Unsymmetrical pressure detector for bearing installation and unsymmetrical pressure-preventing bearing installation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003227109A (en) * 2002-02-05 2003-08-15 Kaimon:Kk Mounting method of horizontal force buffer of structure and mounting structure
CN102817324A (en) * 2012-09-06 2012-12-12 浙江金筑交通建设有限公司 Construction method for quickly installing pot rubber bearing by using epoxy resin mortar
CN105239502A (en) * 2015-11-07 2016-01-13 西安公路研究院 Uniform force transmission device used for bridge support and installation method of uniform force transmission device
CN105297620A (en) * 2015-11-07 2016-02-03 西安公路研究院 Steel plate spherical crown polymer mortar structure support and construction method thereof
CN105509933A (en) * 2016-01-09 2016-04-20 长安大学 Unsymmetrical pressure detector for bearing installation and unsymmetrical pressure-preventing bearing installation method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
胡兵良等: "环氧树酯砂浆盆式支座快速安装施工技术", 《城市建设理论研究(电子版)》 *
郎义勇主编: "《质量员市政工程》", 30 April 2014 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610344A (en) * 2018-12-31 2019-04-12 中铁六局集团太原铁路建设有限公司 Bridge rotation body support construction method of installation
CN111426549A (en) * 2020-04-27 2020-07-17 河南省交院工程检测科技有限公司 Rapid centering method of bridge metal support
CN111426549B (en) * 2020-04-27 2023-05-02 中犇检测认证有限公司 Quick centering method for bridge metal support

Similar Documents

Publication Publication Date Title
CN104234070B (en) A kind of steel construction and the pre-buried attachment structure in basis and construction method
CN105887702A (en) Method for reinforcing concrete beam by prestressed carbon fiber plate and steel-concrete
CN109137762B (en) Method for reinforcing wave-shaped arch plate double-curved arch bridge
CN102061746A (en) Steel structure assembled embedded part and construction method thereof
CN106320715B (en) A kind of construction method of installation of the I-shaped inclined-plane built-in fitting of large size
CN102392420A (en) Vertical crack grouting and reinforcing method of prestressed concrete hollow slab bridge bottom plate
CN109457993A (en) A kind of concrete column restoring and fastening method
CN107143039B (en) Architectural vibration-insulation elastic sliding plate support construction method
CN103758046B (en) The reinforcement means of CFST Arch Bridge main beam structure
CN106087739A (en) A kind of combination U rib shaped steel floorings and preparation method thereof
CN106401207A (en) Superimposed connection structure for additionally arranging column foundation on existing building and construction method of superimposed connection structure
KR20150057581A (en) Level adjusting apparatus for precast slab and precast slab construction method using therewith
CN106012820A (en) Mounting method of bridge support
CN204059391U (en) A kind of steel work and the pre-buried syndeton in basis
CN105649213A (en) Construction method for large steel structural embedded part in dense reinforcement distribution region
CN113863166B (en) Reverse order construction method for swivel-first and mounting support
CN105297620B (en) Steel plate spherical crown polymer mortar structure support and construction method thereof
CN109680737A (en) A kind of foundation of wind-driven generator unit drift correction construction method
CN108385869A (en) A kind of wall element of overlapped shear wall and construction method using its progress
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN106638172A (en) Rail ditch fine adjustment device
CN207047889U (en) A kind of device for installing forging machine main frame embedded part
CN103276645A (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
KR20120100052A (en) Bridge leg correcting method using oil compressure jack and broken parts compensation structure
CN207176527U (en) Bridge Crack bracing means

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012