CN106012820A - Mounting method of bridge support - Google Patents
Mounting method of bridge support Download PDFInfo
- Publication number
- CN106012820A CN106012820A CN201610584810.5A CN201610584810A CN106012820A CN 106012820 A CN106012820 A CN 106012820A CN 201610584810 A CN201610584810 A CN 201610584810A CN 106012820 A CN106012820 A CN 106012820A
- Authority
- CN
- China
- Prior art keywords
- mortar
- bridge
- installation method
- bridge pad
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
The invention relates to the technical field of bridge engineering and discloses a mounting method of a bridge support. The mounting method comprises the following steps: (a) preparing mortar; (b) carrying out setting-out positioning on a support by virtue of a laser positioning instrument; (c) mounting anchor bolts and the support; (d) mounting a template; (e) pouring the mortar; and (f) mounting anchor bolts of the support and an upper structure. The mounting method has the beneficial effects that the operation is simple, and the setting-out positioning is carried out on the bridge support by virtue of the laser positioning instrument, so that the mounting precision of the bridge support is guaranteed; and meanwhile, the mounting process is normative and reasonable, and the support is firmly mounted, so that the use performance and the service life of the bridge support are guaranteed.
Description
Technical field
The present invention relates to technical field of bridge engineering, particularly relate to the installation method of a kind of bridge pad.
Background technology
Along with rapid development of economy, the construction of road there has also been the development advanced by leaps and bounds, and the erection of bridge is
Very important ingredient in road construction, and in bridge erection, the installation of bridge pad determines whole
The quality of the total quality of individual bridge.And existing bridge pad installation process is lack of standardization, easily causes location
The problem such as inaccurate, has had a strong impact on the service life of bridge.
Summary of the invention
It is desirable to provide the installation method of a kind of bridge pad, well solve the problems referred to above, its operation
Simply, by laser orientation instru-ment, bridge pad is carried out unwrapping wire location, it is ensured that the installation accuracy of bridge pad,
Installation process normative and reasonable simultaneously, bearing firmly installs, it is ensured that the serviceability of bridge pad and use longevity
Life.
The technical scheme is that the installation method of a kind of bridge pad, including step:
A. mortar is prepared;
B. use laser orientation instru-ment that bearing is carried out unwrapping wire location;
C., anchor bolt and bearing are installed;
D. installation form;
E. perfusion mortar;
F. erection support and the anchor bolt of superstructure.
Further, before carrying out described step a, pier top dabbing need to be cleared up, carve bearing support with ferrum
Face carries out dabbing, and dabbing degree meets the bridge concrete construction regulation about treatment of construction joints, and by end face
Clean out.
Further, also need to clear up preformed hole before carrying out described step a, check before cleaning and check pier top anchor
The position in fixing bolt hole, size and the degree of depth, qualified rear thoroughly cleaning.
Further, in described step a, mortar is condensation compensation mortar, the water of described condensation compensation mortar
Glue ratio is 0.465, and its intensity is not less than 35MPa.
Further, in described step c, in bearing corner, base-plate is looked for by gad with pier face pad
Flat, base-plate bottom surface preferably exceeds pier top 20mm~50mm, then checks and installs centrage and elevation.
Further, propping up side form along bearing surrounding in described step d, template is along bridge pier axis of pitch direction two
Side size should be greater than each 100mm of bearing width.
Further, described step e is used condensation compensation mortar between bolt hole and base-plate and pier face
Gap is filled, and pours into from one end and flows out and aerofluxus from the other end, it is ensured that without hollowing during perfusion.
Further, before carrying out described step f, the mortar such as need reaches design strength recession except corner gad,
And use epoxy resin mortar joint filling.
The invention has the beneficial effects as follows:
1, by laser orientation instru-ment, bridge pad is carried out unwrapping wire location, it is ensured that the installation essence of bridge pad
Degree, further ensures the installation accuracy of bridge, makes bridge pad uniform force, it is ensured that bridge pad
Serviceability;
2, mortar is condensation compensation mortar, and the water-cement ratio of condensation compensation mortar is 0.465, and its intensity is not less than
35MPa, the mortar strength that the present invention uses is high, and in energy rapid draing, and work progress, stress is gentle, no
Deformation and the displacement of bridge pad can be caused, thus ensure that the installation accuracy of bridge pad;
3, installation process normative and reasonable, bearing firmly installs, it is ensured that the serviceability of bridge pad and making
Use the life-span.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, so that the present invention is entered
One step describes in detail.
The invention provides the installation method of a kind of bridge pad, including step:
A. preparing mortar, mortar is condensation compensation mortar, and the water-cement ratio of described condensation compensation mortar is 0.465,
Its intensity is not less than 35MPa, before carrying out described step a, need to clear up pier top dabbing, carves propping up with ferrum
Seat bearing-surface carries out dabbing, and dabbing degree meets the bridge concrete construction regulation about treatment of construction joints, and
End face is cleaned out, also needs to clear up preformed hole before carrying out described step a, check before cleaning and check pier top
The position in anchor bolt hole, size and the degree of depth, qualified rear thoroughly cleaning;
B. use laser orientation instru-ment that bearing is carried out unwrapping wire location;
C., anchor bolt and bearing are installed, at bearing corner gad, base-plate are looked for pier face pad
Flat, base-plate bottom surface preferably exceeds pier top 20mm~50mm, then checks and installs centrage and elevation;
D. installation form, props up side form along bearing surrounding, and template should along both sides, bridge pier axis of pitch direction size
More than each 100mm of bearing width;
E. perfusion mortar, fills bolt hole and base-plate with condensation compensation mortar with gap, pier face,
Pour into from one end during perfusion and flow out and aerofluxus from the other end, it is ensured that without hollowing;
F. the anchor bolt of erection support and superstructure, before carrying out described step f, the mortar such as need reaches to set
Meter intensity recession is except corner gad, and uses epoxy resin mortar joint filling.
The present invention carries out unwrapping wire location by laser orientation instru-ment to bridge pad, it is ensured that the installation of bridge pad
Precision, further ensures the installation accuracy of bridge, makes bridge pad uniform force, it is ensured that bridge pad
Serviceability;Mortar is condensation compensation mortar, and the water-cement ratio of condensation compensation mortar is 0.465, its intensity
Being not less than 35MPa, the mortar strength that the present invention uses is high, stress temperature in energy rapid draing, and work progress
With, do not result in deformation and the displacement of bridge pad, thus ensure that the installation accuracy of bridge pad;Install
Process specification is reasonable, and bearing firmly installs, it is ensured that the serviceability of bridge pad and service life.
Certainly, the present invention also can have other various embodiments, without departing substantially from present invention spirit and the feelings of essence thereof
Under condition, those of ordinary skill in the art can make various corresponding change and deformation according to the present invention, but this
A little corresponding changes and deformation all should belong to the protection domain of appended claims of the invention.
Claims (8)
1. the installation method of a bridge pad, it is characterised in that include step:
A. mortar is prepared;
B. use laser orientation instru-ment that bearing is carried out unwrapping wire location;
C., anchor bolt and bearing are installed;
D. installation form;
E. perfusion mortar;
F. erection support and the anchor bolt of superstructure.
The installation method of bridge pad the most according to claim 1, it is characterised in that: carry out described
Before step a, need to clear up pier top dabbing, carve with ferrum and bearing support face carries out dabbing, dabbing degree is full
Foot bridge concrete construction is about the regulation for the treatment of of construction joints, and is cleaned out by end face.
The installation method of bridge pad the most according to claim 1, it is characterised in that: carry out described
Before step a also need clear up preformed hole, cleaning before check check the position in pier top anchor bolt hole, size and
The degree of depth, qualified rear thoroughly cleaning.
The installation method of bridge pad the most according to claim 1, it is characterised in that: described step a
In, mortar is condensation compensation mortar, and the water-cement ratio of described condensation compensation mortar is 0.465, and its intensity is the lowest
In 35MPa.
The installation method of bridge pad the most according to claim 1, it is characterised in that: described step c
In, at bearing corner gad, base-plate is levelling with pier face pad, base-plate bottom surface preferably exceeds pier
Platform top 20mm~50mm, then checks and installs centrage and elevation.
The installation method of bridge pad the most according to claim 1, it is characterised in that: described step d
Middle propping up side form along bearing surrounding, it is each that template should be greater than bearing width along both sides, bridge pier axis of pitch direction size
100mm。
The installation method of bridge pad the most according to claim 1, it is characterised in that: described step e
Middle condensation compensation mortar is filled bolt hole and base-plate with gap, pier face, pours into from one end during perfusion
Flow out and aerofluxus from the other end, it is ensured that without hollowing.
The installation method of bridge pad the most according to claim 1, it is characterised in that: carry out described
Before step f, the mortar such as need reaches design strength recession except corner gad, and uses epoxy resin mortar joint filling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610584810.5A CN106012820A (en) | 2016-07-22 | 2016-07-22 | Mounting method of bridge support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610584810.5A CN106012820A (en) | 2016-07-22 | 2016-07-22 | Mounting method of bridge support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106012820A true CN106012820A (en) | 2016-10-12 |
Family
ID=57117271
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610584810.5A Pending CN106012820A (en) | 2016-07-22 | 2016-07-22 | Mounting method of bridge support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106012820A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610344A (en) * | 2018-12-31 | 2019-04-12 | 中铁六局集团太原铁路建设有限公司 | Bridge rotation body support construction method of installation |
CN111426549A (en) * | 2020-04-27 | 2020-07-17 | 河南省交院工程检测科技有限公司 | Rapid centering method of bridge metal support |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003227109A (en) * | 2002-02-05 | 2003-08-15 | Kaimon:Kk | Mounting method of horizontal force buffer of structure and mounting structure |
CN102817324A (en) * | 2012-09-06 | 2012-12-12 | 浙江金筑交通建设有限公司 | Construction method for quickly installing pot rubber bearing by using epoxy resin mortar |
CN105239502A (en) * | 2015-11-07 | 2016-01-13 | 西安公路研究院 | Uniform force transmission device used for bridge support and installation method of uniform force transmission device |
CN105297620A (en) * | 2015-11-07 | 2016-02-03 | 西安公路研究院 | Steel plate spherical crown polymer mortar structure support and construction method thereof |
CN105509933A (en) * | 2016-01-09 | 2016-04-20 | 长安大学 | Unsymmetrical pressure detector for bearing installation and unsymmetrical pressure-preventing bearing installation method |
-
2016
- 2016-07-22 CN CN201610584810.5A patent/CN106012820A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003227109A (en) * | 2002-02-05 | 2003-08-15 | Kaimon:Kk | Mounting method of horizontal force buffer of structure and mounting structure |
CN102817324A (en) * | 2012-09-06 | 2012-12-12 | 浙江金筑交通建设有限公司 | Construction method for quickly installing pot rubber bearing by using epoxy resin mortar |
CN105239502A (en) * | 2015-11-07 | 2016-01-13 | 西安公路研究院 | Uniform force transmission device used for bridge support and installation method of uniform force transmission device |
CN105297620A (en) * | 2015-11-07 | 2016-02-03 | 西安公路研究院 | Steel plate spherical crown polymer mortar structure support and construction method thereof |
CN105509933A (en) * | 2016-01-09 | 2016-04-20 | 长安大学 | Unsymmetrical pressure detector for bearing installation and unsymmetrical pressure-preventing bearing installation method |
Non-Patent Citations (2)
Title |
---|
胡兵良等: "环氧树酯砂浆盆式支座快速安装施工技术", 《城市建设理论研究(电子版)》 * |
郎义勇主编: "《质量员市政工程》", 30 April 2014 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610344A (en) * | 2018-12-31 | 2019-04-12 | 中铁六局集团太原铁路建设有限公司 | Bridge rotation body support construction method of installation |
CN111426549A (en) * | 2020-04-27 | 2020-07-17 | 河南省交院工程检测科技有限公司 | Rapid centering method of bridge metal support |
CN111426549B (en) * | 2020-04-27 | 2023-05-02 | 中犇检测认证有限公司 | Quick centering method for bridge metal support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104234070B (en) | A kind of steel construction and the pre-buried attachment structure in basis and construction method | |
CN105887702A (en) | Method for reinforcing concrete beam by prestressed carbon fiber plate and steel-concrete | |
CN109137762B (en) | Method for reinforcing wave-shaped arch plate double-curved arch bridge | |
CN102061746A (en) | Steel structure assembled embedded part and construction method thereof | |
CN106320715B (en) | A kind of construction method of installation of the I-shaped inclined-plane built-in fitting of large size | |
CN102392420A (en) | Vertical crack grouting and reinforcing method of prestressed concrete hollow slab bridge bottom plate | |
CN109457993A (en) | A kind of concrete column restoring and fastening method | |
CN107143039B (en) | Architectural vibration-insulation elastic sliding plate support construction method | |
CN103758046B (en) | The reinforcement means of CFST Arch Bridge main beam structure | |
CN106087739A (en) | A kind of combination U rib shaped steel floorings and preparation method thereof | |
CN106401207A (en) | Superimposed connection structure for additionally arranging column foundation on existing building and construction method of superimposed connection structure | |
KR20150057581A (en) | Level adjusting apparatus for precast slab and precast slab construction method using therewith | |
CN106012820A (en) | Mounting method of bridge support | |
CN204059391U (en) | A kind of steel work and the pre-buried syndeton in basis | |
CN105649213A (en) | Construction method for large steel structural embedded part in dense reinforcement distribution region | |
CN113863166B (en) | Reverse order construction method for swivel-first and mounting support | |
CN105297620B (en) | Steel plate spherical crown polymer mortar structure support and construction method thereof | |
CN109680737A (en) | A kind of foundation of wind-driven generator unit drift correction construction method | |
CN108385869A (en) | A kind of wall element of overlapped shear wall and construction method using its progress | |
CN104746434B (en) | Closure segment formwork system without dismantling outer formwork | |
CN106638172A (en) | Rail ditch fine adjustment device | |
CN207047889U (en) | A kind of device for installing forging machine main frame embedded part | |
CN103276645A (en) | Precast pile, beam and slab renovation technology for diseases of existing line tunnel base | |
KR20120100052A (en) | Bridge leg correcting method using oil compressure jack and broken parts compensation structure | |
CN207176527U (en) | Bridge Crack bracing means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161012 |