CN105986577A - Plugging device for secondary underwater concrete pipe insertion - Google Patents
Plugging device for secondary underwater concrete pipe insertion Download PDFInfo
- Publication number
- CN105986577A CN105986577A CN201510052572.9A CN201510052572A CN105986577A CN 105986577 A CN105986577 A CN 105986577A CN 201510052572 A CN201510052572 A CN 201510052572A CN 105986577 A CN105986577 A CN 105986577A
- Authority
- CN
- China
- Prior art keywords
- plugging device
- conduit
- stopper
- limiting plate
- pull wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention provides a plugging device for secondary underwater concrete pipe insertion. The technical scheme includes that a first guide pipe (1) is arranged on the upper portion of the plugging device, a plugging device shell (2) is arranged outside the plugging device, a lock (4) is arranged in the inner middle of the plugging device and connected with an unlocking pull wire (3), an ejection rod (5) is arranged below the lock (4), a limiting plate (6) is mounted below the ejection rod (5), and a pull wire (7) is connected with a pull wire connection ring (8). A discharging hopper (13) is connected with the first guide pipe (1) which is connected with a guide pipe (11), a reinforcement cage (9) is arranged below a pile casing (10) which is arranged below a limiting plate (12), and a pull wire support (14) is arranged on the right side of the limiting plate (12) and provided with a pull wire limiting point B (15) and a pull wire limiting point A (16). The plugging device is reasonable and practical in design, the problem of pile breakage is avoided, quality of finished underwater concrete piles is guaranteed effectively, and type-A pile proportion of the finished piles is increased.
Description
Technical field
The present invention relates to technical field of buildings, especially underwater concrete secondary intubates stopper.
Background technology
At present, along with expanding economy, capital construction is advanced by leaps and bounds, and underwater cast-in-place pile is widely used in bridge, building basis, macrostructure thing basis etc..But, during filling pile construction, easily there are abnormal conditions in conduit under water, causes having plenty of conduit and cannot normally lower be filled by card, concrete;Having plenty of conduit and occur that under the impact of concrete explosion or conduit connection sealing ring damage, mud enters conduit and is mixed in concrete;Have plenty of owing to manual operation is improper, or control wrong conduit to be proposed concrete surface, cause conduit to enter mud;Have plenty of conduit and imbedded deeply, when pulling out conduit, conduit is put off, cause concrete can not normal construction, need to propose conduit changing, cause conduit secondary to intubate.But, it is to combine with experience to measure that general secondary intubates, and is inserted directly in the concrete poured into by conduit.But because of technological reason, underwater concrete filling pile pile crown contains mud in 02 meters to some extent.When secondary intubates shallower, the concrete with mud having 1-1.5 rice can not be come up by top and stay become stake in stake one;When secondary intubates deeper, being pressed by concrete above, the mud in conduit can not be discharged and stay in stake, becomes a part for stake, and this section of stake, because of poor by its Forming Quality of mud influence, causes this stake B class stake or C class stake occur.The most traditional successful intubation is relatively low and unsecured, broken pile often occurs.And after there is broken pile, the solution generally used: dangerous bigger diving operation, have backfills stake holes, and after parking seven days, circulation drilling machine being replaced with percussive drill is punched out, but the duration is longer;Have increases by two stakes in former pile foundation both sides, solves the stress problem of former stake, but cost is high.Above method not only causes pile foundation construction construction delay, and cost increases therewith.
Summary of the invention
The purpose of the present invention is aiming at the defect that prior art exists, it is provided that a kind of generation avoiding broken pile problem, is effectively guaranteed the finished peg quality of underwater concrete filling pile, and the underwater concrete secondary that improve finished peg A class stake ratio intubates stopper.Its technical scheme is: be provided with first segment conduit on the top of stopper, is provided with stopper shell in the outside of stopper, and the inside medium position at stopper is provided with lock, lock connection is unblanked bracing wire, push rod is located at the lower section of lock, and limiting plate is arranged on the lower section of push rod, and bracing wire connecting stay wire connects ring.Hopper connects first segment conduit, and first segment conduit connects conduit, and limiting plate is divided into casing, is provided with steel reinforcement cage in the lower section of casing, is provided with guy wire support on the right side of limiting plate, is provided with bracing wire spacing B point and bracing wire spacing A point on guy wire support.
Beneficial effects of the present invention: practicality reasonable in design, avoid the generation of broken pile problem, be effectively guaranteed the finished peg quality of underwater concrete filling pile, improve finished peg A class stake ratio, improve product quality and Business Economic Benefit, be suitable for popularity and use.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation that the present invention uses state.
Detailed description of the invention
As shown in Figure 1 and Figure 2, underwater concrete secondary intubates stopper, is mainly connected ring 8, steel reinforcement cage 9, casing 10, conduit 11, limiting plate 12, hopper 13, guy wire support 14, bracing wire spacing B point 15 and bracing wire spacing A point 16 constituted by first segment conduit 1, stopper shell 2, bracing wire 3 of unblanking, lock 4, push rod 5, limiting plate 6, bracing wire 7, bracing wire;It is provided with first segment conduit 1 on the top of stopper, it is provided with stopper shell 2 in the outside of stopper, inside medium position at stopper is provided with lock 4, lock 4 connects bracing wire 3 of unblanking, push rod 5 is located at the lower section of lock 4, limiting plate 6 is arranged on the lower section of push rod 5, and bracing wire 7 connecting stay wire connects ring 8(and sees Fig. 1).Hopper 13 connects first segment conduit 1, first segment conduit 1 connects conduit 11, and limiting plate 12 divides into casing 10, is provided with steel reinforcement cage 9 in the lower section of casing 10, it is provided with guy wire support 14 on the right side of limiting plate 12, guy wire support 14 is provided with bracing wire spacing B point 15 and bracing wire spacing A point 16(is shown in Fig. 2).
Present invention process flow process: measure the end face of underwater concrete with lining rope, the distance between limiting plate on casing.The conduit that will appear from problem proposes in time and is replaced, and is pulled out by the push rod on capping tools and is opened by lock, and first segment conduit end opening inserts in capping tools lock, pushes to push rod to shut lock and conduit is blocked so that it is be in running order.Then, the first segment conduit with capping tools is carried out conventional links with other conduits.Conduit is transferred to top of concrete at about 2.5 meters by the length according to measuring, and adjusts capping tools bracing wire, and bracing wire control cage is fixed on the stopper, checks whether capping tools bracing wire is in free state.Check errorless after, will carry in bracing wire, by A to B, now the push rod on capping tools moves down pull-out drive bracing wire of unblanking and is opened by lock, and capping tools separates with conduit.Vertically measure carrying 20cm-50cm(dip stick on conduit on casing limiting plate), conduit thoroughly departs from capping tools.Promoting bracing wire subsequently to be elevated from concrete by capping tools, secondary underwater concrete intubates successfully, may thereafter continue to carry out the perfusion of concrete.This method thoroughly solves secondary and intubates unsuccessful problem, efficiently solves the broken pile situation caused because conduit goes wrong.
Claims (2)
1. underwater concrete secondary intubates stopper, it is characterized in that: be provided with first segment conduit (1) on the top of stopper, stopper shell (2) it is provided with in the outside of stopper, inside medium position at stopper is provided with lock (4), lock (4) connects bracing wire (3) of unblanking, push rod (5) is located at the lower section of lock (4), and limiting plate (6) is arranged on the lower section of push rod (5), and bracing wire (7) connecting stay wire connects ring (8).
Underwater concrete secondary the most according to claim 1 intubates stopper, it is characterized in that: hopper (13) connects first segment conduit (1), first segment conduit (1) connects conduit (11), limiting plate (12) divides into casing (10), it is provided with steel reinforcement cage (9) in the lower section of casing (10), it is provided with guy wire support (14) on the right side of limiting plate (12), guy wire support (14) is provided with bracing wire spacing B point (15) and bracing wire spacing A point (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510052572.9A CN105986577B (en) | 2015-02-02 | 2015-02-02 | The secondary intubation plugging device of underwater concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510052572.9A CN105986577B (en) | 2015-02-02 | 2015-02-02 | The secondary intubation plugging device of underwater concrete |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105986577A true CN105986577A (en) | 2016-10-05 |
CN105986577B CN105986577B (en) | 2017-12-29 |
Family
ID=57036549
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510052572.9A Expired - Fee Related CN105986577B (en) | 2015-02-02 | 2015-02-02 | The secondary intubation plugging device of underwater concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105986577B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112709224A (en) * | 2021-01-18 | 2021-04-27 | 广东省建筑工程机械施工有限公司 | Construction device and method for secondary pouring concrete pile splicing of underwater cast-in-place pile |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2626762A1 (en) * | 1976-06-15 | 1977-12-22 | Heinrich Stade | Concrete pile with larger dia. base hole - with pile drawn up as base concrete is poured and then driven into place |
JPS5761111A (en) * | 1980-09-30 | 1982-04-13 | Takenaka Komuten Co Ltd | Reduction of extra-banking concrete for head of pile driven in situ |
CN1858364A (en) * | 2005-05-08 | 2006-11-08 | 宋亚非 | Secondary pouring method for preventing broken pile accident in pile pouring construction |
CN101818500A (en) * | 2010-05-01 | 2010-09-01 | 张锦松 | Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover |
CN204456129U (en) * | 2015-02-02 | 2015-07-08 | 山东宇通路桥集团有限公司 | Underwater concrete secondary intubate plugging device |
-
2015
- 2015-02-02 CN CN201510052572.9A patent/CN105986577B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2626762A1 (en) * | 1976-06-15 | 1977-12-22 | Heinrich Stade | Concrete pile with larger dia. base hole - with pile drawn up as base concrete is poured and then driven into place |
JPS5761111A (en) * | 1980-09-30 | 1982-04-13 | Takenaka Komuten Co Ltd | Reduction of extra-banking concrete for head of pile driven in situ |
CN1858364A (en) * | 2005-05-08 | 2006-11-08 | 宋亚非 | Secondary pouring method for preventing broken pile accident in pile pouring construction |
CN101818500A (en) * | 2010-05-01 | 2010-09-01 | 张锦松 | Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover |
CN204456129U (en) * | 2015-02-02 | 2015-07-08 | 山东宇通路桥集团有限公司 | Underwater concrete secondary intubate plugging device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112709224A (en) * | 2021-01-18 | 2021-04-27 | 广东省建筑工程机械施工有限公司 | Construction device and method for secondary pouring concrete pile splicing of underwater cast-in-place pile |
Also Published As
Publication number | Publication date |
---|---|
CN105986577B (en) | 2017-12-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104895072B (en) | A kind of prestress anchorage cable and prestress anchorage cable one-pass molding construction method | |
CN102140800B (en) | Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile | |
CN102011596B (en) | Shield originating or receiving end tunnel portal maintenance process | |
CN106245931A (en) | The underpinning device of load bearing wall and construction method in brick mix structure | |
CN206646502U (en) | A kind of steel pipe type soil nailing | |
CN104948133B (en) | The slip casting plugging device and its technique of a kind of suitable high-pressure high-flow drilling water burst | |
CN102071645A (en) | Bridge bored pile hole wall opening protection method | |
CN106089252B (en) | Grouting reinforcement method for inhomogeneous loose bodies | |
EP3318677B1 (en) | Method for forming a reinforced pile and use of an accessory therein | |
CN104234716B (en) | The packed cofferdam method of mining by the way of filling | |
CN204456129U (en) | Underwater concrete secondary intubate plugging device | |
CN203270578U (en) | Underground pile removing apparatus provided with steel wire rope clamps | |
CN111676954A (en) | Locking type high polymer anti-seepage wall forming groove plate and construction method | |
CN111005740A (en) | Method for controlling surrounding rock of upper and lower walls of stope by medium-length hole pre-grouting | |
CN105155669B (en) | Concealed beam floor framing rod structure construction method | |
CN105986577A (en) | Plugging device for secondary underwater concrete pipe insertion | |
CN110566226A (en) | shallow-consolidation deep-injection supporting method for rapid excavation of broken roof large-section roadway | |
CN206071096U (en) | The underpinning device of load bearing wall in brick mix structure | |
CN205206779U (en) | Fracture drilling rod fishing device | |
CN105178966A (en) | Grouting process for water blocking by wall breaking for mine vertical shafts | |
CN202730756U (en) | Sleeve connection device for drilling cast-in-situ bored pipe construction | |
CN212200409U (en) | Elevation mortar anchor rod | |
CN103850694B (en) | The grouting cable anchor that slip casting both sides, a kind of one side are fastening and grouting method | |
CN204401474U (en) | A kind of hoisting appliance of reinforcing steel bar concrete box erection | |
CN209523770U (en) | A kind of slip casting combination of steel rope device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Zuoyi Inventor after: Liu Gang Inventor after: Zhao Yongbin Inventor after: Dong Xuemei Inventor before: Liu Zuoyi Inventor before: Liu Gang |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171229 Termination date: 20210202 |
|
CF01 | Termination of patent right due to non-payment of annual fee |