CN105986577A - Plugging device for secondary underwater concrete pipe insertion - Google Patents

Plugging device for secondary underwater concrete pipe insertion Download PDF

Info

Publication number
CN105986577A
CN105986577A CN201510052572.9A CN201510052572A CN105986577A CN 105986577 A CN105986577 A CN 105986577A CN 201510052572 A CN201510052572 A CN 201510052572A CN 105986577 A CN105986577 A CN 105986577A
Authority
CN
China
Prior art keywords
plugging device
conduit
stopper
limiting plate
pull wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510052572.9A
Other languages
Chinese (zh)
Other versions
CN105986577B (en
Inventor
刘佐义
刘刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Space Path Bridge Group Co Ltd
Original Assignee
Shandong Space Path Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Space Path Bridge Group Co Ltd filed Critical Shandong Space Path Bridge Group Co Ltd
Priority to CN201510052572.9A priority Critical patent/CN105986577B/en
Publication of CN105986577A publication Critical patent/CN105986577A/en
Application granted granted Critical
Publication of CN105986577B publication Critical patent/CN105986577B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides a plugging device for secondary underwater concrete pipe insertion. The technical scheme includes that a first guide pipe (1) is arranged on the upper portion of the plugging device, a plugging device shell (2) is arranged outside the plugging device, a lock (4) is arranged in the inner middle of the plugging device and connected with an unlocking pull wire (3), an ejection rod (5) is arranged below the lock (4), a limiting plate (6) is mounted below the ejection rod (5), and a pull wire (7) is connected with a pull wire connection ring (8). A discharging hopper (13) is connected with the first guide pipe (1) which is connected with a guide pipe (11), a reinforcement cage (9) is arranged below a pile casing (10) which is arranged below a limiting plate (12), and a pull wire support (14) is arranged on the right side of the limiting plate (12) and provided with a pull wire limiting point B (15) and a pull wire limiting point A (16). The plugging device is reasonable and practical in design, the problem of pile breakage is avoided, quality of finished underwater concrete piles is guaranteed effectively, and type-A pile proportion of the finished piles is increased.

Description

Underwater concrete secondary intubates stopper
Technical field
The present invention relates to technical field of buildings, especially underwater concrete secondary intubates stopper.
Background technology
At present, along with expanding economy, capital construction is advanced by leaps and bounds, and underwater cast-in-place pile is widely used in bridge, building basis, macrostructure thing basis etc..But, during filling pile construction, easily there are abnormal conditions in conduit under water, causes having plenty of conduit and cannot normally lower be filled by card, concrete;Having plenty of conduit and occur that under the impact of concrete explosion or conduit connection sealing ring damage, mud enters conduit and is mixed in concrete;Have plenty of owing to manual operation is improper, or control wrong conduit to be proposed concrete surface, cause conduit to enter mud;Have plenty of conduit and imbedded deeply, when pulling out conduit, conduit is put off, cause concrete can not normal construction, need to propose conduit changing, cause conduit secondary to intubate.But, it is to combine with experience to measure that general secondary intubates, and is inserted directly in the concrete poured into by conduit.But because of technological reason, underwater concrete filling pile pile crown contains mud in 02 meters to some extent.When secondary intubates shallower, the concrete with mud having 1-1.5 rice can not be come up by top and stay become stake in stake one;When secondary intubates deeper, being pressed by concrete above, the mud in conduit can not be discharged and stay in stake, becomes a part for stake, and this section of stake, because of poor by its Forming Quality of mud influence, causes this stake B class stake or C class stake occur.The most traditional successful intubation is relatively low and unsecured, broken pile often occurs.And after there is broken pile, the solution generally used: dangerous bigger diving operation, have backfills stake holes, and after parking seven days, circulation drilling machine being replaced with percussive drill is punched out, but the duration is longer;Have increases by two stakes in former pile foundation both sides, solves the stress problem of former stake, but cost is high.Above method not only causes pile foundation construction construction delay, and cost increases therewith.
Summary of the invention
The purpose of the present invention is aiming at the defect that prior art exists, it is provided that a kind of generation avoiding broken pile problem, is effectively guaranteed the finished peg quality of underwater concrete filling pile, and the underwater concrete secondary that improve finished peg A class stake ratio intubates stopper.Its technical scheme is: be provided with first segment conduit on the top of stopper, is provided with stopper shell in the outside of stopper, and the inside medium position at stopper is provided with lock, lock connection is unblanked bracing wire, push rod is located at the lower section of lock, and limiting plate is arranged on the lower section of push rod, and bracing wire connecting stay wire connects ring.Hopper connects first segment conduit, and first segment conduit connects conduit, and limiting plate is divided into casing, is provided with steel reinforcement cage in the lower section of casing, is provided with guy wire support on the right side of limiting plate, is provided with bracing wire spacing B point and bracing wire spacing A point on guy wire support.
Beneficial effects of the present invention: practicality reasonable in design, avoid the generation of broken pile problem, be effectively guaranteed the finished peg quality of underwater concrete filling pile, improve finished peg A class stake ratio, improve product quality and Business Economic Benefit, be suitable for popularity and use.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation that the present invention uses state.
Detailed description of the invention
As shown in Figure 1 and Figure 2, underwater concrete secondary intubates stopper, is mainly connected ring 8, steel reinforcement cage 9, casing 10, conduit 11, limiting plate 12, hopper 13, guy wire support 14, bracing wire spacing B point 15 and bracing wire spacing A point 16 constituted by first segment conduit 1, stopper shell 2, bracing wire 3 of unblanking, lock 4, push rod 5, limiting plate 6, bracing wire 7, bracing wire;It is provided with first segment conduit 1 on the top of stopper, it is provided with stopper shell 2 in the outside of stopper, inside medium position at stopper is provided with lock 4, lock 4 connects bracing wire 3 of unblanking, push rod 5 is located at the lower section of lock 4, limiting plate 6 is arranged on the lower section of push rod 5, and bracing wire 7 connecting stay wire connects ring 8(and sees Fig. 1).Hopper 13 connects first segment conduit 1, first segment conduit 1 connects conduit 11, and limiting plate 12 divides into casing 10, is provided with steel reinforcement cage 9 in the lower section of casing 10, it is provided with guy wire support 14 on the right side of limiting plate 12, guy wire support 14 is provided with bracing wire spacing B point 15 and bracing wire spacing A point 16(is shown in Fig. 2).
Present invention process flow process: measure the end face of underwater concrete with lining rope, the distance between limiting plate on casing.The conduit that will appear from problem proposes in time and is replaced, and is pulled out by the push rod on capping tools and is opened by lock, and first segment conduit end opening inserts in capping tools lock, pushes to push rod to shut lock and conduit is blocked so that it is be in running order.Then, the first segment conduit with capping tools is carried out conventional links with other conduits.Conduit is transferred to top of concrete at about 2.5 meters by the length according to measuring, and adjusts capping tools bracing wire, and bracing wire control cage is fixed on the stopper, checks whether capping tools bracing wire is in free state.Check errorless after, will carry in bracing wire, by A to B, now the push rod on capping tools moves down pull-out drive bracing wire of unblanking and is opened by lock, and capping tools separates with conduit.Vertically measure carrying 20cm-50cm(dip stick on conduit on casing limiting plate), conduit thoroughly departs from capping tools.Promoting bracing wire subsequently to be elevated from concrete by capping tools, secondary underwater concrete intubates successfully, may thereafter continue to carry out the perfusion of concrete.This method thoroughly solves secondary and intubates unsuccessful problem, efficiently solves the broken pile situation caused because conduit goes wrong.

Claims (2)

1. underwater concrete secondary intubates stopper, it is characterized in that: be provided with first segment conduit (1) on the top of stopper, stopper shell (2) it is provided with in the outside of stopper, inside medium position at stopper is provided with lock (4), lock (4) connects bracing wire (3) of unblanking, push rod (5) is located at the lower section of lock (4), and limiting plate (6) is arranged on the lower section of push rod (5), and bracing wire (7) connecting stay wire connects ring (8).
Underwater concrete secondary the most according to claim 1 intubates stopper, it is characterized in that: hopper (13) connects first segment conduit (1), first segment conduit (1) connects conduit (11), limiting plate (12) divides into casing (10), it is provided with steel reinforcement cage (9) in the lower section of casing (10), it is provided with guy wire support (14) on the right side of limiting plate (12), guy wire support (14) is provided with bracing wire spacing B point (15) and bracing wire spacing A point (16).
CN201510052572.9A 2015-02-02 2015-02-02 The secondary intubation plugging device of underwater concrete Expired - Fee Related CN105986577B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510052572.9A CN105986577B (en) 2015-02-02 2015-02-02 The secondary intubation plugging device of underwater concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510052572.9A CN105986577B (en) 2015-02-02 2015-02-02 The secondary intubation plugging device of underwater concrete

Publications (2)

Publication Number Publication Date
CN105986577A true CN105986577A (en) 2016-10-05
CN105986577B CN105986577B (en) 2017-12-29

Family

ID=57036549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510052572.9A Expired - Fee Related CN105986577B (en) 2015-02-02 2015-02-02 The secondary intubation plugging device of underwater concrete

Country Status (1)

Country Link
CN (1) CN105986577B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709224A (en) * 2021-01-18 2021-04-27 广东省建筑工程机械施工有限公司 Construction device and method for secondary pouring concrete pile splicing of underwater cast-in-place pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2626762A1 (en) * 1976-06-15 1977-12-22 Heinrich Stade Concrete pile with larger dia. base hole - with pile drawn up as base concrete is poured and then driven into place
JPS5761111A (en) * 1980-09-30 1982-04-13 Takenaka Komuten Co Ltd Reduction of extra-banking concrete for head of pile driven in situ
CN1858364A (en) * 2005-05-08 2006-11-08 宋亚非 Secondary pouring method for preventing broken pile accident in pile pouring construction
CN101818500A (en) * 2010-05-01 2010-09-01 张锦松 Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover
CN204456129U (en) * 2015-02-02 2015-07-08 山东宇通路桥集团有限公司 Underwater concrete secondary intubate plugging device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2626762A1 (en) * 1976-06-15 1977-12-22 Heinrich Stade Concrete pile with larger dia. base hole - with pile drawn up as base concrete is poured and then driven into place
JPS5761111A (en) * 1980-09-30 1982-04-13 Takenaka Komuten Co Ltd Reduction of extra-banking concrete for head of pile driven in situ
CN1858364A (en) * 2005-05-08 2006-11-08 宋亚非 Secondary pouring method for preventing broken pile accident in pile pouring construction
CN101818500A (en) * 2010-05-01 2010-09-01 张锦松 Underwater plugging and water sealing method for bottom plate of concrete pouring jacket without back cover
CN204456129U (en) * 2015-02-02 2015-07-08 山东宇通路桥集团有限公司 Underwater concrete secondary intubate plugging device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709224A (en) * 2021-01-18 2021-04-27 广东省建筑工程机械施工有限公司 Construction device and method for secondary pouring concrete pile splicing of underwater cast-in-place pile

Also Published As

Publication number Publication date
CN105986577B (en) 2017-12-29

Similar Documents

Publication Publication Date Title
CN104895072B (en) A kind of prestress anchorage cable and prestress anchorage cable one-pass molding construction method
CN102140800B (en) Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile
CN102011596B (en) Shield originating or receiving end tunnel portal maintenance process
CN106245931A (en) The underpinning device of load bearing wall and construction method in brick mix structure
CN206646502U (en) A kind of steel pipe type soil nailing
CN104948133B (en) The slip casting plugging device and its technique of a kind of suitable high-pressure high-flow drilling water burst
CN102071645A (en) Bridge bored pile hole wall opening protection method
CN106089252B (en) Grouting reinforcement method for inhomogeneous loose bodies
EP3318677B1 (en) Method for forming a reinforced pile and use of an accessory therein
CN104234716B (en) The packed cofferdam method of mining by the way of filling
CN204456129U (en) Underwater concrete secondary intubate plugging device
CN203270578U (en) Underground pile removing apparatus provided with steel wire rope clamps
CN111676954A (en) Locking type high polymer anti-seepage wall forming groove plate and construction method
CN111005740A (en) Method for controlling surrounding rock of upper and lower walls of stope by medium-length hole pre-grouting
CN105155669B (en) Concealed beam floor framing rod structure construction method
CN105986577A (en) Plugging device for secondary underwater concrete pipe insertion
CN110566226A (en) shallow-consolidation deep-injection supporting method for rapid excavation of broken roof large-section roadway
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN205206779U (en) Fracture drilling rod fishing device
CN105178966A (en) Grouting process for water blocking by wall breaking for mine vertical shafts
CN202730756U (en) Sleeve connection device for drilling cast-in-situ bored pipe construction
CN212200409U (en) Elevation mortar anchor rod
CN103850694B (en) The grouting cable anchor that slip casting both sides, a kind of one side are fastening and grouting method
CN204401474U (en) A kind of hoisting appliance of reinforcing steel bar concrete box erection
CN209523770U (en) A kind of slip casting combination of steel rope device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Liu Zuoyi

Inventor after: Liu Gang

Inventor after: Zhao Yongbin

Inventor after: Dong Xuemei

Inventor before: Liu Zuoyi

Inventor before: Liu Gang

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20210202

CF01 Termination of patent right due to non-payment of annual fee