CN105984038A - 组合模具双板施工方法 - Google Patents

组合模具双板施工方法 Download PDF

Info

Publication number
CN105984038A
CN105984038A CN201510092446.6A CN201510092446A CN105984038A CN 105984038 A CN105984038 A CN 105984038A CN 201510092446 A CN201510092446 A CN 201510092446A CN 105984038 A CN105984038 A CN 105984038A
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
mould
die
matched moulds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510092446.6A
Other languages
English (en)
Inventor
朱连吉
刘艳颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renqiu Yongji Construction and Installation Engineering Co Ltd
Original Assignee
Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Renqiu Yongji Construction and Installation Engineering Co Ltd filed Critical Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority to CN201510092446.6A priority Critical patent/CN105984038A/zh
Publication of CN105984038A publication Critical patent/CN105984038A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

本发明涉及建筑施工领域,尤其涉及组合模具双板施工方法。组合模具双板施工方法包含以下步骤:放置模具底板支架、放置钢筋笼、第一次合模、放置第二个模具底板支架、放置钢筋笼、第二次合模、浇筑、养护、脱模。通过本发明,可以提高预制钢筋混凝土墙板生产效率,降低成本。

Description

组合模具双板施工方法
技术领域
本发明涉及建筑施工领域,尤其涉及组合模具双板施工方法。
背景技术
现在国内市场建筑墙体材料主要分为砖、块、板三类产品,预制钢筋混凝土墙板以其优越的性能,应用越来越广泛。目前较常见的预制钢筋混凝土墙板采用平模浇筑混凝土,浇筑前要清理模具,涂刷脱模剂,然后经浇筑、振捣、修平等多道工序、最后再送至蒸养窑进行养护,生产周期长,一组模具每次只浇筑一块墙板,生产效率低,浪费模具资源。
发明内容
本发明的目的是提供一种组合模具双板施工方法,解决现有钢筋混凝土墙板施工工艺复杂,生产周期长,生产效率低等问题。
本发明组合模具双板施工方法包含以下步骤:第一步,放置模具底板支架,将模具底板放置在浇筑工位两片组合模具之间,方向严格垂直于模具运行轨道;第二步,放置钢筋笼,钢筋笼上部焊接有吊运环,利用吊运装置将钢筋笼吊运至底板支架上,将钢筋笼定位;第三步,第一次合模,两片模具分别位于钢筋笼两侧,沿轨道向钢筋笼靠近,调整模具与钢筋笼的相对位置,调整好后模具滚轮锁紧,模具位置固定,除去钢筋笼上方的吊运装置;第四步,放置第二个模具底板支架,将另一模具底板放置在已合模的模具与第三片组合模具之间,紧靠在已合模模具外侧的底板托架上;第五步,放置钢筋笼,利用吊运装置将钢筋笼吊运至第二个底板支架上,将钢筋笼定位;第六步,第二次合模,将第三片模具沿轨道向钢筋笼靠近,调整模具与钢筋笼的相对位置,调整好后模具滚轮锁紧,模具位置固定,除去钢筋笼上方的吊运装置;第七步,浇筑,使用浇筑泵车,通过模具底板的浇筑孔由下向上浇筑自密实混凝土;第八步,养护,组合模具通过内部管道通热水实现自养护;第九步,脱模,利用液压缸依次将模具与墙板分离,墙板吊运至堆放场地,模具自动行走至下一工位。
本发明的有益效果是:生产工艺简单,生产过程自动化,一次浇筑生产两片墙板,提高生产效率,节约成本。
附图说明
1是放置钢筋笼的示意
2是合模示意
3是组合模具底部结构示意
标记:1、钢筋笼;2、吊运环;3、底板支架;4、组合模具;5、液压缸;6、自密实混凝土;7、底板托架;8、滚轮。
具体实施方式
下面结合附对本发明作进一步说明:如1所示,组合模具双板施工方法主要包括九个步骤,首先放置底板支架3和钢筋笼1,如2所示,钢筋笼1的上方焊接两个吊运环2,首先将底板支架3放置于浇筑工位,放置于两片组合模具4之间,方向垂直于组合模具行走轨道,将钢筋笼1吊运放至底板支架3上,如3所示,组合模具4下方有多个滚轮8,可沿轨道行走,钢筋笼1放置好后,组合模具4行进至浇筑工位,调整组合模具4与钢筋笼1的位置,使模具底板3与底板托架7配合完好,如3所示,此时合模完成,将组合模具4底部的滚轮8锁紧,组合模具4位置被固定,此时可以除去钢筋笼1顶部的吊运装置。
第一次合模完成后,放置第二个底板支架3,将另一模具底板放置在已合模的模具与第三片组合模具之间,紧靠在已合模模具外侧的底板托架上,然后再吊运一个钢筋笼1放置与第二个底板支架3上,另一片模具自动行进至钢筋笼1附近,调整好组合模具4与钢筋笼1的位置后锁紧滚轮8,此时完成第二次合模。
合模完成后可以浇筑自密实混凝土6,采用混凝土泵车,使用软管,通过底板上的浇筑孔浇筑自密实混凝土6,自密实混凝土由下向上浇筑,减少气泡的产生,保障墙板质量,可以采取两辆混凝土泵车同时浇筑两片墙板,也可以用一辆混凝土泵车依次浇筑,浇筑完成后,将模具底板的浇筑孔密封,浇筑过程完成。
组合模具4内壁分布有弯曲排布的水管,向水管内注入循环热水可以实现混凝土墙板的养护,养护完成后停止循环水,将墙板上部吊运环连接吊运装置,先将最外侧组合模具滚轮解锁,液压缸自动进入最外侧两模具之间,液压缸启动,最外侧模具与墙板分离,墙板吊运至堆放场地,最外侧模具自动行走至下一工位,将剩余两模具滚轮解锁,液压缸自动进入两模具之间,液压缸启动,模具与墙板分离,墙板吊运至堆放场地,模具自动行走至下一工位。
通过本发明,可以提高预制钢筋混凝土墙板生产效率,降低成本。

Claims (1)

1.组合模具双板施工方法,其特征在于,包括以下步骤:第一步,放置模具底板支架,将模具底板放置在浇筑工位两片组合模具之间,方向严格垂直于模具运行轨道;第二步,放置钢筋笼,钢筋笼上部焊接有吊运环,利用吊运装置将钢筋笼吊运至底板支架上,将钢筋笼定位;第三步,第一次合模,两片模具分别位于钢筋笼两侧,沿轨道向钢筋笼靠近,调整模具与钢筋笼的相对位置,调整好后模具滚轮锁紧,模具位置固定,除去钢筋笼上方的吊运装置;第四步,放置第二个模具底板支架,将另一模具底板放置在已合模的模具与第三片组合模具之间,紧靠在已合模模具外侧的底板托架上;第五步,放置钢筋笼,利用吊运装置将钢筋笼吊运至第二个底板支架上,将钢筋笼定位;第六步,第二次合模,将第三片模具沿轨道向钢筋笼靠近,调整模具与钢筋笼的相对位置,调整好后模具滚轮锁紧,模具位置固定,除去钢筋笼上方的吊运装置;第七步,浇筑,使用浇筑泵车,通过模具底板的浇筑孔由下向上浇筑自密实混凝土;第八步,养护,组合模具通过内部管道通热水实现自养护;第九步,脱模,利用液压缸依次将模具与墙板分离,墙板吊运至堆放场地,模具自动行走至下一工位。
CN201510092446.6A 2015-03-02 2015-03-02 组合模具双板施工方法 Pending CN105984038A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510092446.6A CN105984038A (zh) 2015-03-02 2015-03-02 组合模具双板施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510092446.6A CN105984038A (zh) 2015-03-02 2015-03-02 组合模具双板施工方法

Publications (1)

Publication Number Publication Date
CN105984038A true CN105984038A (zh) 2016-10-05

Family

ID=57038522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510092446.6A Pending CN105984038A (zh) 2015-03-02 2015-03-02 组合模具双板施工方法

Country Status (1)

Country Link
CN (1) CN105984038A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110549469A (zh) * 2019-09-12 2019-12-10 浙江阿斯克建材科技股份有限公司 一种浇注成型的耐高温硅酸钙及其制作方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3360231A (en) * 1963-12-04 1967-12-26 Adrianus E Q Van Hezik Mould for making a number of bodies of concrete
US3645490A (en) * 1970-10-01 1972-02-29 Ted Nelson Co Adjustable form for casting concrete beams
US3785608A (en) * 1971-05-28 1974-01-15 R Theobald Jig for precasting a plurality of panels
US3881856A (en) * 1971-12-06 1975-05-06 Coignet Construct Edmond Plant for the fabrication of parallel molded construction elements
CN2895000Y (zh) * 2006-03-06 2007-05-02 王保民 新型轻质墙板制造机
CN202388602U (zh) * 2011-11-10 2012-08-22 川荣重工机械常州有限公司 立式墙板模具
CN103182731A (zh) * 2013-03-21 2013-07-03 长沙远大住宅工业有限公司 立模
CN103643740A (zh) * 2013-11-12 2014-03-19 浙江江南春建设集团有限公司 一种钢管柱混凝土顶升施工方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3360231A (en) * 1963-12-04 1967-12-26 Adrianus E Q Van Hezik Mould for making a number of bodies of concrete
US3645490A (en) * 1970-10-01 1972-02-29 Ted Nelson Co Adjustable form for casting concrete beams
US3785608A (en) * 1971-05-28 1974-01-15 R Theobald Jig for precasting a plurality of panels
US3881856A (en) * 1971-12-06 1975-05-06 Coignet Construct Edmond Plant for the fabrication of parallel molded construction elements
CN2895000Y (zh) * 2006-03-06 2007-05-02 王保民 新型轻质墙板制造机
CN202388602U (zh) * 2011-11-10 2012-08-22 川荣重工机械常州有限公司 立式墙板模具
CN103182731A (zh) * 2013-03-21 2013-07-03 长沙远大住宅工业有限公司 立模
CN103643740A (zh) * 2013-11-12 2014-03-19 浙江江南春建设集团有限公司 一种钢管柱混凝土顶升施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110549469A (zh) * 2019-09-12 2019-12-10 浙江阿斯克建材科技股份有限公司 一种浇注成型的耐高温硅酸钙及其制作方法

Similar Documents

Publication Publication Date Title
CN102720284A (zh) 双面板叠合式混凝土剪力墙及其生产工艺
CN208068545U (zh) 一种装配式预制构件的立体生产系统
CN105839667A (zh) 全预制叠合装配式地下综合管廊的施工制作工艺
CN105952148B (zh) 狭窄变形缝内易拆式铝模板支撑体系及施工方法
CN104652815A (zh) 一种厨卫间止水反梁浇筑的施工方法
CN110682434A (zh) 叠合楼板和双皮墙单循环预制综合生产线及其生产方法
CN102071953B (zh) 一种盾构隧道内衬钢管外包混凝土的浇筑方法
CN108049318A (zh) 组合整体装配叠合箱涵及施工方法
CN108071124B (zh) 预制装配式地铁车站预制构件施工方法
CN102535841A (zh) 一种预制墙板施工工艺
CN211306802U (zh) 叠合楼板和双皮墙单循环预制综合生产线
CN105984038A (zh) 组合模具双板施工方法
CN202117320U (zh) 循环水管沟内圆模抗浮装置
CN207959614U (zh) 一种保温装饰一体化内嵌式墙板结构
CN106032031A (zh) 组合模具多板施工技术
CN105984023A (zh) 组合模具单板施工方法
CN102995661B (zh) 水表井及其水表装置
CN206205429U (zh) 狭窄变形缝内易拆式铝模板支撑体系
CN104712087A (zh) 一种叠合楼板连接方法
CN106914984A (zh) 一种预制复合结构板的施工方法
CN210210841U (zh) 带中央调度系统的建筑预制构件成型生产线
CN210121895U (zh) 多用途装配式建筑预制构件成型生产线
CN208293833U (zh) 一种轻钢骨架夹芯保温混凝土复合墙体模壳
CN109853615A (zh) 管廊节段一次性浇筑成型方法
CN207244659U (zh) 一种城市地下综合管廊现场快速成型机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161005