CN105971367A CN201610337156.8A CN201610337156A CN105971367A CN 105971367 A CN105971367 A CN 105971367A CN 201610337156 A CN201610337156 A CN 201610337156A CN 105971367 A CN105971367 A CN 105971367A
Authority
CN
China
Prior art keywords
tower
king
steel
fixing
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610337156.8A
Other languages
Chinese (zh)
Other versions
CN105971367B (en
Inventor
张少玉
唐云福
宫世冰
刘炳言
刘成光
李永波
慕学平
王翔宇
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Electric Power Co Qixia Power Supply Co
Original Assignee
State Grid Shandong Electric Power Co Qixia Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electric Power Co Qixia Power Supply Co filed Critical State Grid Shandong Electric Power Co Qixia Power Supply Co
Priority to CN201610337156.8A priority Critical patent/CN105971367B/en
Publication of CN105971367A publication Critical patent/CN105971367A/en
Application granted granted Critical
Publication of CN105971367B publication Critical patent/CN105971367B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses an anti-seismic ultra-high voltage power transmission tower which comprises a concrete base and two locating grooves symmetrically formed in the inner side of the concrete base. A locating column is arranged between the two locating grooves. A tower support is arranged inside each locating groove, and the width of each tower support is smaller than that of the corresponding locating groove. High-strength springs are arranged on the side walls of the two sides of each tower support, and a fixing hole is formed in the middle of each tower support. A first main tower body and a second main tower body are arranged on the tower supports correspondingly, and the lower end of the first main tower body and the lower end of the second main tower body are inserted into the fixing holes of the corresponding tower supports. The tower supports are adopted, the first main tower body and the second main tower body are inserted into the corresponding tower supports, and concrete locating rings are adopted for fixation, so that installation is convenient, and reliability is high.

Description

A kind of antidetonation UHV transmission steel tower
Technical field
The present invention relates to a kind of antidetonation UHV transmission steel tower.
Background technology
UHV transmission technology is capable of the long-distance sand transport of electric energy, has that reliability is high, motility strong and the feature of good economy performance.Existing iron tower structure by using xoncrete structure to be embedded in subsurface, structural instability, and, inconvenience is installed.
Summary of the invention
It is an object of the invention to provide a kind of antidetonation UHV transmission steel tower, the problem that prior art exists can be improved, by using steel tower bearing, first king-tower and the second king-tower are plugged on inside steel tower bearing respectively, can conveniently install, use concrete centring ring to realize fixing simultaneously, simple in construction, comparing existing structure, easy for installation, reliability is high.
The present invention is achieved through the following technical solutions:
nullA kind of antidetonation UHV transmission steel tower,Including concrete bed and be arranged on the locating slot inside described concrete bed,Described locating slot is symmetrically arranged 2,It is provided with locating dowel between 2 described locating slots,Steel tower bearing it is provided with inside described locating slot,The width of described steel tower bearing is less than the width of described locating slot,Described steel tower bearing both sides sidewall is provided with high strong spring,Described high-strength spring one end is fixedly connected on the sidewall of described steel tower bearing,The described high strong spring other end is fixedly connected on the sidewall of described locating slot,It is provided with fixing hole in the middle part of described steel tower bearing,The first king-tower and the second king-tower it is respectively arranged with above described steel tower bearing,The first described king-tower and the second described king-tower lower end are plugged in the fixing hole of corresponding described steel tower bearing respectively,The first described king-tower and the second described king-tower sidewall are respectively arranged with angle steel,Described angle steel be around the first described king-tower and the second described king-tower sidewall be equally circumferentially spaced at least 2,Described angle steel one end is welded on the first described king-tower and the second described king-tower,The described angle steel other end is free end,It is respectively installed with concrete ring for fixing outside the first described king-tower and the second described king-tower,It is respectively arranged with limiting section inside described concrete ring for fixing upper surface,The internal diameter of described limiting section is less than described angle steel maximum outer circumference diameter,Described concrete ring for fixing lower end is plugged on inside described locating slot,Described concrete ring for fixing outer wall is provided with agnail,Described agnail one end is fixedly connected on described concrete ring for fixing outer wall,The described agnail other end tilts upward,Described concrete ring for fixing is provided with through hole,It is provided with stud in described through hole,Described through hole is run through in described stud upper end,Described stud lower end is threaded on described steel tower bearing,It is set with locking nut in described stud upper end.
Further, for the present invention is better achieved, being provided with through hole on described limiting section, be provided with bolt, the described through hole described in bolt-through on described angle steel, described bolt end is provided with locking nut.
Further, for the present invention is better achieved, between the first described king-tower and the second described king-tower end face in opposite directions, it is provided with crossbeam.
Further, for the present invention is better achieved, arch upward upward in the middle part of described crossbeam.
Further, for the present invention is better achieved, the first described king-tower and the second described king-tower are provided with mounting groove, described mounting groove is groove, it is provided with trave lling girder in described mounting groove, described trave lling girder upper and lower end face is respectively arranged with screwed hole, the first described king-tower and the second described king-tower outer wall are respectively arranged with angle steel, one end face of described angle steel is bolted to connection respectively on the first described king-tower and the second described king-tower sidewall, another end face of described angle steel is bolted to connection on described trave lling girder.
Further, for the present invention is better achieved, at the first described king-tower and the second described king-tower outside side wall, described concrete bed upper surface support is provided with traction steel wire.
Further, for the present invention is better achieved, being provided with pre-embedded bolt on described concrete bed, be provided with high strong spring on described pre-embedded bolt, described high strong spring is connected away from described pre-embedded bolt one end and described traction steel wire are fixing.
Further, for the present invention is better achieved, being provided with agnail on described concrete bed outside side wall, described agnail one end is fixedly connected on described concrete bed, and the described agnail other end tilts upward.
The present invention compared with prior art, has the advantages that
The present invention is by being plugged on respectively below the first king-tower and the second king-tower inside corresponding steel tower bearing, can conveniently install, use concrete ring for fixing to realize the first king-tower and the second king-tower are fixed simultaneously, owing to being provided with high strong spring between steel tower bearing and locating slot, steel tower bearing is made to have more preferable shock resistance, make it when by External Force Acting, it is not easy to damage.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, the accompanying drawing used required in embodiment will be briefly described below, it is to be understood that, the following drawings illustrate only certain embodiments of the present invention, therefore the restriction to scope it is not construed as, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other relevant accompanying drawings according to these accompanying drawings.
Fig. 1 is overall structure schematic diagram of the present invention.
Wherein: 1. concrete bed, 2. locating slot, 3. locating dowel, 4. steel tower bearing, the highest strong spring, 6. the first king-tower, 7. the second king-tower, 8. angle steel, 9. concrete ring for fixing, 10. agnail, 11. limiting sections, 12. studs, 13. locking nuts, 14. crossbeams, 15. mounting grooves, 16. trave lling girders, 17. traction steel wires, 18. pre-embedded bolts.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited to this.
Embodiment 1:
nullAs shown in Figure 1,A kind of antidetonation UHV transmission steel tower,Including concrete bed 1 and be arranged on the locating slot 2 inside described concrete bed,Described locating slot is symmetrically arranged 2,Locating dowel 3 it is provided with between 2 described locating slots,Steel tower bearing 4 it is provided with inside described locating slot,The width of described steel tower bearing is less than the width of described locating slot,Described steel tower bearing both sides sidewall is provided with high strong spring 5,Described high-strength spring one end is fixedly connected on the sidewall of described steel tower bearing,The described high strong spring other end is fixedly connected on the sidewall of described locating slot,It is provided with fixing hole in the middle part of described steel tower bearing,The first king-tower 6 and the second king-tower 7 it is respectively arranged with above described steel tower bearing,The first described king-tower and the second described king-tower lower end are plugged in the fixing hole of corresponding described steel tower bearing respectively,The first described king-tower and the second described king-tower sidewall are respectively arranged with angle steel 8,Described angle steel be around the first described king-tower and the second described king-tower sidewall be equally circumferentially spaced at least 2,Described angle steel one end is welded on the first described king-tower and the second described king-tower,The described angle steel other end is free end,It is respectively installed with concrete ring for fixing 9 outside the first described king-tower and the second described king-tower,It is respectively arranged with limiting section 11 inside described concrete ring for fixing upper surface,The internal diameter of described limiting section is less than described angle steel maximum outer circumference diameter,Described concrete ring for fixing lower end is plugged on inside described locating slot,Described concrete ring for fixing outer wall is provided with agnail 10,Described agnail one end is fixedly connected on described concrete ring for fixing outer wall,The described agnail other end tilts upward,Described concrete ring for fixing is provided with through hole,Stud 12 it is provided with in described through hole,Described through hole is run through in described stud upper end,Described stud lower end is threaded on described steel tower bearing,It is set with locking nut 13 in described stud upper end.
In the present embodiment, by arranging high strong spring between steel tower bearing sidewall and locating slot, make steel tower bearing when by active force in horizontal direction, the relative movement in horizontal direction can be produced, under the effect of high strong spring, it is possible to reset, due to the effect of high strong spring, the steel tower bearing made is when by active force in horizontal direction, it is not easy to damage due to impulsive force;The present invention is by arranging concrete ring for fixing, it is possible to realize being fixed on steel tower bearing the first king-tower and the second king-tower, and, due to angle steel and the interaction of limiting section so that the first king-tower and the second king-tower are more stable, it is not easy to unnecessary movement occur;In the present invention, utilize and be arranged on the agnail outside concrete ring for fixing, be capable of being relatively fixed between concrete ring for fixing relative localization groove inwall so that concrete ring for fixing be not easy from locating slot removal so that the first king-tower and the second king-tower are the most stable.
Embodiment 2:
The present embodiment is on the basis of embodiment 1, in order to make limiting section and angle steel to be relatively fixed, in the present embodiment, preferably, described limiting section is provided with through hole, being provided with bolt, the described through hole described in bolt-through on described angle steel, described bolt end is provided with locking nut 13.
In order to improve the relative stability between the first king-tower and the second king-tower, in the present embodiment, it is preferable that be provided with crossbeam 14 between the first described king-tower and the second described king-tower end face in opposite directions.
It is further preferred that in order to improve the first king-tower and the anti-seismic performance of the second king-tower, in the present embodiment, arch upward upward in the middle part of described crossbeam.
Cable is installed for convenience, in the present embodiment, preferably, the first described king-tower and the second described king-tower are provided with mounting groove 15, described mounting groove is groove, trave lling girder 16 it is provided with in described mounting groove, described trave lling girder upper and lower end face is respectively arranged with screwed hole, the first described king-tower and the second described king-tower outer wall are respectively arranged with angle steel 8, one end face of described angle steel is bolted to connection respectively on the first described king-tower and the second described king-tower sidewall, another end face of described angle steel is bolted to connection on described trave lling girder.Cable is separately mounted on the trave lling girder on the first king-tower and the second king-tower, adjusts the position of trave lling girder as required, thus conveniently determine the distance between adjacent cable.
In order to improve the first king-tower and the stability of the second king-tower, in the present embodiment, it is preferable that at the first described king-tower and the second described king-tower outside side wall, described concrete bed upper surface support is provided with traction steel wire 17.Make traction steel wire from outer side-lining the first king-tower and the second king-tower so that it is to keep relative stability.
High in order to improve anti-seismic performance, in the present embodiment, it is preferable that be provided with pre-embedded bolt 18 on described concrete bed, being provided with high strong spring 5 on described pre-embedded bolt, described high strong spring is connected away from described pre-embedded bolt one end and described traction steel wire are fixing.
In order to make concrete bed be embedded under after, it is possible to more stable, in the present embodiment, preferably, being provided with agnail 10 on described concrete bed outside side wall, described agnail one end is fixedly connected on described concrete bed, and the described agnail other end tilts upward.By using barb structure, it is possible to when making concrete bed generation vertically move, it is possible to by bigger resistance, so that it is more stable, anti-seismic performance is more preferable.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (8)

  1. null1. an antidetonation UHV transmission steel tower,It is characterized in that: include concrete bed and be arranged on the locating slot inside described concrete bed,Described locating slot is symmetrically arranged 2,It is provided with locating dowel between 2 described locating slots,Steel tower bearing it is provided with inside described locating slot,The width of described steel tower bearing is less than the width of described locating slot,Described steel tower bearing both sides sidewall is provided with high strong spring,Described high-strength spring one end is fixedly connected on the sidewall of described steel tower bearing,The described high strong spring other end is fixedly connected on the sidewall of described locating slot,It is provided with fixing hole in the middle part of described steel tower bearing,The first king-tower and the second king-tower it is respectively arranged with above described steel tower bearing,The first described king-tower and the second described king-tower lower end are plugged in the fixing hole of corresponding described steel tower bearing respectively,The first described king-tower and the second described king-tower sidewall are respectively arranged with angle steel,Described angle steel be around the first described king-tower and the second described king-tower sidewall be equally circumferentially spaced at least 2,Described angle steel one end is welded on the first described king-tower and the second described king-tower,The described angle steel other end is free end,It is respectively installed with concrete ring for fixing outside the first described king-tower and the second described king-tower,It is respectively arranged with limiting section inside described concrete ring for fixing upper surface,The internal diameter of described limiting section is less than described angle steel maximum outer circumference diameter,Described concrete ring for fixing lower end is plugged on inside described locating slot,Described concrete ring for fixing outer wall is provided with agnail,Described agnail one end is fixedly connected on described concrete ring for fixing outer wall,The described agnail other end tilts upward,Described concrete ring for fixing is provided with through hole,It is provided with stud in described through hole,Described through hole is run through in described stud upper end,Described stud lower end is threaded on described steel tower bearing,It is set with locking nut in described stud upper end.
  2. A kind of antidetonation UHV transmission steel tower the most according to claim 1, it is characterized in that: on described limiting section, be provided with through hole, being provided with bolt, the described through hole described in bolt-through on described angle steel, described bolt end is provided with locking nut.
  3. A kind of antidetonation UHV transmission steel tower the most according to claim 1 and 2, it is characterised in that: between the first described king-tower and the second described king-tower end face in opposite directions, it is provided with crossbeam.
  4. A kind of antidetonation UHV transmission steel tower the most according to claim 3, it is characterised in that: arch upward upward in the middle part of described crossbeam.
  5. A kind of antidetonation UHV transmission ferrum tower the most according to claim 1 and 2, it is characterized in that: on the first described king-tower and the second described king-tower, be provided with mounting groove, described mounting groove is groove, it is provided with trave lling girder in described mounting groove, described trave lling girder upper and lower end face is respectively arranged with screwed hole, the first described king-tower and the second described king-tower outer wall are respectively arranged with angle steel, one end face of described angle steel is bolted to connection respectively on the first described king-tower and the second described king-tower sidewall, another end face of described angle steel is bolted to connection on described trave lling girder.
  6. A kind of antidetonation UHV transmission steel tower the most according to claim 1 and 2, it is characterised in that: at the first described king-tower and the second described king-tower outside side wall, described concrete bed upper surface support is provided with traction steel wire.
  7. A kind of antidetonation UHV transmission steel tower the most according to claim 6, it is characterized in that: on described concrete bed, be provided with pre-embedded bolt, being provided with high strong spring on described pre-embedded bolt, described high strong spring is connected away from described pre-embedded bolt one end and described traction steel wire are fixing.
  8. A kind of antidetonation UHV transmission steel tower the most according to claim 1 and 2, it is characterized in that: on described concrete bed outside side wall, be provided with agnail, described agnail one end is fixedly connected on described concrete bed, and the described agnail other end tilts upward.
CN201610337156.8A 2016-05-21 2016-05-21 A kind of antidetonation UHV transmission steel tower Expired - Fee Related CN105971367B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610337156.8A CN105971367B (en) 2016-05-21 2016-05-21 A kind of antidetonation UHV transmission steel tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610337156.8A CN105971367B (en) 2016-05-21 2016-05-21 A kind of antidetonation UHV transmission steel tower

Publications (2)

Publication Number Publication Date
CN105971367A true CN105971367A (en) 2016-09-28
CN105971367B CN105971367B (en) 2018-08-21

Family

ID=56955391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610337156.8A Expired - Fee Related CN105971367B (en) 2016-05-21 2016-05-21 A kind of antidetonation UHV transmission steel tower

Country Status (1)

Country Link
CN (1) CN105971367B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201447898U (en) * 2009-07-08 2010-05-05 孙新红 Windproof guardrail base
CN202194424U (en) * 2011-07-22 2012-04-18 中铁第一勘察设计院集团有限公司 Aeolation-prevention thin-wall centrifugal concrete steel pipe support for electric railway catenary
CN202500373U (en) * 2011-12-13 2012-10-24 河南省电力勘测设计院 Annular rod column base joint reinforcement mechanism
CN203835013U (en) * 2014-05-09 2014-09-17 祁锦明 Concrete combined rod with metal sleeve
KR20150055365A (en) * 2013-11-13 2015-05-21 김상원 Wire connecting link for a traffic light pillar using cylindrical pressing sleeve

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201447898U (en) * 2009-07-08 2010-05-05 孙新红 Windproof guardrail base
CN202194424U (en) * 2011-07-22 2012-04-18 中铁第一勘察设计院集团有限公司 Aeolation-prevention thin-wall centrifugal concrete steel pipe support for electric railway catenary
CN202500373U (en) * 2011-12-13 2012-10-24 河南省电力勘测设计院 Annular rod column base joint reinforcement mechanism
KR20150055365A (en) * 2013-11-13 2015-05-21 김상원 Wire connecting link for a traffic light pillar using cylindrical pressing sleeve
CN203835013U (en) * 2014-05-09 2014-09-17 祁锦明 Concrete combined rod with metal sleeve

Also Published As

Publication number Publication date
CN105971367B (en) 2018-08-21

Similar Documents

Publication Publication Date Title
CN103541430A (en) Support connection structure for steel structure corridor
CN204512284U (en) Two-way ring type tuned mass damper damping device
CN103292047A (en) Multifunctional pipeline support structure
CN105971367A (en) Anti-seismic ultra-high voltage power transmission tower
CN203604807U (en) Supporting device
CN202299572U (en) Plus or minus 800kV extra-high voltage direct current large-crossing steel tubular tower joint
CN106949307A (en) A kind of assembled tunnel frame
CN212956993U (en) Vertical sliding support of space grid structure
CN202513536U (en) Cable support for power tunnel
CN105822834B (en) Can multidirectional regulation submarine pipeline fixing device and its installation method
CN205531612U (en) Electric power iron tower installation base
CN203159027U (en) A prefabricated iron tower foundation spreader
CN205123201U (en) Sea cable center location protection device
US3219224A (en) Elevated tank support
CN201486202U (en) Extra-high voltage AC power transmission line support
CN201605864U (en) Narrow base tower for power transmission line
CN201531141U (en) Framework for ultra-high voltage AC transmission line
CN105155833A (en) Automatic lifting scaffold
CN104863334A (en) Bracing type floor without installation of keel
CN205938179U (en) Underwater pipeline fixing device that can multidirectionally adjust
CN204590486U (en) Node installed by a kind of flexible connecting device, side fascia and side fascia
CN209854721U (en) Pile pulling equipment for hydraulic engineering
CN204156451U (en) Lv power cable fixed support
CN204151645U (en) A kind of mix main building structure
CN203237896U (en) Multi-directional adjusting device of counterweight wheel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Hao

Inventor after: Wang Mingxia

Inventor after: Lu Enxu

Inventor after: Liu Bingyan

Inventor after: Liu Jinsheng

Inventor after: Yang Jun

Inventor after: Liu Chengguang

Inventor after: Gong Shibing

Inventor after: Li Yongbo

Inventor after: Mu Xueping

Inventor after: Wang Jun

Inventor before: Zhang Shaoyu

Inventor before: Tang Yunfu

Inventor before: Gong Shibing

Inventor before: Liu Bingyan

Inventor before: Liu Chengguang

Inventor before: Li Yongbo

Inventor before: Mu Xueping

Inventor before: Wang Xiangyu

Inventor before: Wang Jun

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180821