CN205938179U - Underwater pipeline fixing device that can multidirectionally adjust - Google Patents

Underwater pipeline fixing device that can multidirectionally adjust Download PDF

Info

Publication number
CN205938179U
CN205938179U CN201620494612.5U CN201620494612U CN205938179U CN 205938179 U CN205938179 U CN 205938179U CN 201620494612 U CN201620494612 U CN 201620494612U CN 205938179 U CN205938179 U CN 205938179U
Authority
CN
China
Prior art keywords
bolt
crossbeam
sleeve
fixing device
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620494612.5U
Other languages
Chinese (zh)
Inventor
韩士标
占红波
朱佳莉
张学喜
苑敬舜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI SURVEY AND DESIGN INSTITUTE OF WATER CONSERVANCY AND HYDROPOWER
Original Assignee
ANHUI SURVEY AND DESIGN INSTITUTE OF WATER CONSERVANCY AND HYDROPOWER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI SURVEY AND DESIGN INSTITUTE OF WATER CONSERVANCY AND HYDROPOWER filed Critical ANHUI SURVEY AND DESIGN INSTITUTE OF WATER CONSERVANCY AND HYDROPOWER
Priority to CN201620494612.5U priority Critical patent/CN205938179U/en
Application granted granted Critical
Publication of CN205938179U publication Critical patent/CN205938179U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses an underwater pipeline fixing device that can multidirectionally adjust, its characteristics lie in: pile bolck cover barrel casing in the pile sinking upper end, use the horizontal bolt fastening connection, the crossbeam sets up on two pile bolck sleeves, connects with the bolt -up, and the beam -ends sleeve at crossbeam both ends entangles the pile bolck sleeve, uses the fixing bolt fastening connection, last round hole gasket and the adjustment pad of being equipped with of fixing bolt, and the adjustment is filled up to prescribe a limit to and is installed the clearance department between beam -ends sleeve inner wall and pile bolck sleeve outer wall, the support by support bolt fixed mounting at the up end of crossbeam middle part, the pipeline erects on the support, with clamp, bolt and support bolt and crossbeam fixed connection, is equipped with the rubber lower bolster between pipeline and support, is equipped with the rubber upper padding plate between pipeline and clamp. The utility model discloses reduce the underwater installation degree of difficulty, it is higher to the fixed efficiency of construction of multirow stake under water very much, can reduce the time limit for a project by a wide margin to reduce construction cost, its structural integrity is strong, has improved fixing device security and life.

Description

Can multidirectional regulation submarine pipeline fixing device
Technical field
This utility model belongs to the Design of The Hydraulic Structure technical field of Hydraulic and Hydro-Power Engineering and in particular to one kind can be multidirectional The submarine pipeline fixing device adjusting.
Background technology
Submarine pipeline fixing device is the important component part of profundal zone pipeline building, and pipeline is typically disposed in two pile sinking On the crossbeam on top.The fixation of profundal zone pipeline is difficult to construction at dry land, and piling construction is often aboard ship carried out, by current, The impact of the factors such as stormy waves, the construction error of pile sinking is difficult to avoid that, further, since pipeline length, rigidity are big, all adopts multiple rows of (group) Stake is fixing, and multiple rows of (group) stake stake position is more difficult to accurately control.Submarine pipeline fixing device at present, using solid between pile sinking and crossbeam Determine bolt connection, bolt position is unadjustable.
Prior art presence is disadvantageous in that:
Due to being connected using fixing bolt between pile sinking and crossbeam, bolt position can not adjust, because piling construction error The deflected file causing, makes fixing bolt on pile sinking be difficult to penetrate in corresponding hole on crossbeam, further, since underwater visibility Low, particularly under the influence of having current, uncontrollable fixed installation difficulty of construction is big under water, long in time limit, or even occurs not Situation about install.
Content of the invention
The purpose of this utility model is:Using cross chute and the design of strip groove, fixing bolt is enable to slide in cross Mobile installation in groove and strip groove, crossbeam two ends are provided with beam-ends sleeve, and beam-ends sleeve entangles pile sinking and fastened with leveling screw, Thus provide a kind of can multidirectional regulation submarine pipeline fixing device, its structural integrity is strong, and security performance is high, be easily installed, Save man-hour, reduce construction cost.
To achieve these goals, this utility model adopts the following technical scheme that:
Of the present utility model can multidirectional regulation submarine pipeline fixing device, stake top sleeve is enclosed within pile sinking upper end, uses level Bolt is fastenedly connected;Beam erection, on two stake top sleeves, is bolted connection, and the beam-ends sleeve at crossbeam two ends entangles stake Top cover cylinder, is fastenedly connected with fixing bolt, and equipped with circular hole pad and adjusting pad on fixing bolt, adjusting pad limits and is arranged on beam-ends Gap location between sleeve lining and stake top sleeve outer wall;Bearing is fixedly mounted in the middle part of the upper surface of crossbeam by carrier setting bolt, Pipeline construction, on bearing, is fixedly connected with crossbeam with carrier setting bolt with clip, bolt, is provided with rubber between pipeline and bearing Lower bolster, is provided with rubber upper padding plate between pipeline and clip.
Feature of the present utility model also resides in:
Two beam-ends sleeves at described crossbeam two ends are square, be provided with reinforcing plate and be connected between two beam-ends sleeves, beam End sleeve lining is provided with equidistant spacing with stake top sleeve outer wall, and distance values are more than two piling construction relative positions and allow by mistake Difference.
At the beam-ends sleeve at described crossbeam two ends and stake top sleeve top center, the groove of installation bolt is set to cross cunning Groove, bolt can be arbitrarily mobile in cross chute;In the middle part of the upper surface of crossbeam the groove of erection support bolt be set to strip lead to Groove, carrier setting bolt can be arbitrarily mobile in strip groove.
By adjusting base and adjusting pad lid forms, using threaded, adjustment the cylindrical of base is provided with described adjusting pad External screw thread, the endoporus of adjusting pad lid is provided with female thread, and the height of adjusting pad is adjusted by rotating screw thread.
Described rubber lower bolster and rubber upper padding plate are concave groove type strip, supporting steel plate and clip press-in rubber on bearing In the groove of lower bolster and rubber upper padding plate.
Described can multidirectional regulation submarine pipeline fixing device installation method, comprise the following steps:
Step 1:Pile sinking under water, the relative position error of two pile sinking of detection is in allowed band;
Step 2:Stake top sleeve is installed, the bolt that will be equipped with circular hole pad is placed in the cross chute at stake top sleeve top, Afterwards stake top sleeve is enclosed within pile sinking upper end, is fixed with two leveling screws being mutually perpendicular to intersect;
Step 3:Crossbeam is installed, beam-ends sleeve on crossbeam is enclosed within the pile sinking upper end installing stake top sleeve, with two The fixing bolt being mutually perpendicular to intersect connects, equipped with circular hole pad and adjustment base and adjusting pad lid, adjusting pad on fixing bolt Seat and adjusting pad lid limit the gap location being arranged between two ends sleeve lining and stake top sleeve outer wall, and nut wouldn't be locked;
Step 4:Pipe laying, pipeline is placed on the bearing having laid rubber lower bolster, then install rubber upper padding plate and Clip, two clip connecting bolts are integrated, and are fixed on crossbeam with carrier setting bolt;
Step 5:Adjust and fixing, because the position of two pile sinking is fixing, the position of crossbeam can only be adjusted, Step 2 is enable to be placed on the bolt at stake top sleeve top to penetrate in two cross chutes on crossbeam;Adjust adjusting pad, with one Spanner fixed adjustment base is motionless, rotates adjusting pad lid with another spanner, rotates threaded adjusting adjustment base and adjusting pad lid Distance between both ends of the surface, realizes intimate contact between adjusting pad both ends of the surface and beam-ends sleeve lining and stake top sleeve outer wall;Treat Each position bolt is adjusted after being installed in place, and tightens fixing bolt, finally tightens bolt;All bolts are all fixed using double nut.
The beneficial effects of the utility model embody in the following areas:
1) adopt cross chute and the design of strip groove, enable bolt mobile installation in cross chute and strip groove, Can move to adjust pile sinking pile position deviation by the multidirectional regulation of crossbeam, reduce installation difficulty under water, especially to multiline pile under water Fixing efficiency of construction higher, significantly can reduce the duration, thus reducing construction cost.
2) beam structure is improved with design, crossbeam two ends are provided with two beam-ends sleeves, and is provided with reinforcing plate 20 and be connected, Beam-ends sleeve entangles pile sinking and is fixed, because employ both horizontally and vertically simultaneously with the leveling screw 11 being mutually perpendicular to intersect Two kinds of modes that are connected, its structural integrity is strong, reduces the fatigue rupture producing under the course under cyclic loading such as wave, carries High fixing device safety and service life.
Brief description
Fig. 1 is this utility model structural representation;
Fig. 2 is A-A sectional view in Fig. 1;
Fig. 3 is C-C sectional view in Fig. 1;
Fig. 4 is B-B sectional view in Fig. 1;
Fig. 5 is clip schematic diagram;
Fig. 6 is adjusting pad structural representation;
Fig. 7 is Fig. 6 left side view.
In figure sequence number:Pile sinking 1, stake top sleeve 2, beam-ends sleeve 3, crossbeam 4, bearing 5, rubber lower bolster 6, rubber upper padding plate 7th, pipeline 8, fixing bolt 9, bolt 10, leveling screw 11, clip 12, carrier setting bolt 13, circular hole pad 14, adjustment base 15, Connecting bolt 16, cross chute 17, strip groove 18, adjusting pad lid 19, reinforcing plate 20.
Specific embodiment
Below in conjunction with the accompanying drawings, by specific embodiment, the utility model is further described.
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, Fig. 1 is this utility model structural representation;Fig. 2 is A-A sectional view in Fig. 1;Figure 3 is C-C sectional view in Fig. 1;Fig. 4 is B-B sectional view in Fig. 1.
Of the present utility model can multidirectional regulation submarine pipeline fixing device, described stake top sleeve 2 is enclosed within pile sinking 1 End, is fastenedly connected with leveling screw 11;Crossbeam 4 is erected on two stake top sleeves 2, is fastenedly connected with bolt 10, crossbeam 4 two ends Beam-ends sleeve 3 entangle stake top sleeve 2, be fastenedly connected with fixing bolt 9, on fixing bolt 9 equipped with circular hole pad 14 and adjustment Pad, adjusting pad limits the gap location being arranged between beam-ends sleeve 3 inwall and stake top sleeve 2 outer wall;Bearing 5 is by carrier setting bolt 13 Be fixedly mounted in the middle part of the upper surface of crossbeam 4, pipeline 8 is erected on bearing 5, with clip 12, bolt 16 and carrier setting bolt 13 with Crossbeam 4 is fixedly connected, and is provided with rubber lower bolster 6 between pipeline 8 and bearing 5, is provided with rubber between pipeline 8 and clip 12 Backing plate 7.
Feature of the present utility model also resides in:
Two beam-ends sleeves 3 at described crossbeam 4 two ends are square, are provided with reinforcing plate 20 phase between two beam-ends sleeves 3 Company, beam-ends sleeve 3 inwall and stake top sleeve 2 outer wall are provided with equidistant spacing, and distance values are more than two pile sinking 1 and construct with respect to position Put allowable error value.
At the beam-ends sleeve 3 at described crossbeam 4 two ends and stake top sleeve 2 top center, the groove of installation bolt 10 is set to ten Word chute 17, bolt 10 can be arbitrarily mobile in cross chute 17;Erection support bolt 13 in the middle part of the upper surface of crossbeam 4 Groove is set to strip groove 18, and carrier setting bolt 13 can be arbitrarily mobile in strip groove 18.
Described adjusting pad by adjusting base 15 and adjusting pad lid 19 forms, using threaded, adjustment base 15 outer Circle is provided with external screw thread, and the endoporus of adjusting pad lid 19 is provided with female thread, and the height of adjusting pad is adjusted by rotating screw thread.Referring to figure 6 and Fig. 7, Fig. 6 are adjusting pad structural representation, and Fig. 7 is Fig. 6 left side view.
Described rubber lower bolster 6 and rubber upper padding plate 7 are concave groove type strip, and on bearing 5, supporting steel plate and clip 12 are pressed Enter in rubber lower bolster 6 and the groove of rubber upper padding plate 7.Referring to Fig. 5, Fig. 5 is clip schematic diagram to clip 12;
Described can multidirectional regulation submarine pipeline fixing device installation method, comprise the following steps:
Step 1:Pile sinking 1 under water, the relative position error of two pile sinking 1 of detection is in allowed band;
Step 2:Stake top sleeve 2 is installed, the bolt 10 that will be equipped with circular hole pad 14 is placed on the cross at stake top sleeve 2 top to slide In groove 17, after stake top sleeve 2 is enclosed within pile sinking 1 upper end, fixing with two leveling screws 11 being mutually perpendicular to intersect;
Step 3:Crossbeam 4 is installed, beam-ends sleeve 3 on crossbeam 4 is enclosed within pile sinking 1 upper end installing stake top sleeve 2, use Two fixing bolts 9 being mutually perpendicular to intersect connect, equipped with circular hole pad 14 and adjustment base 15 and adjusting pad on fixing bolt 9 Lid 19, adjustment base 15 and adjusting pad lid 19 limit the gap being arranged between two ends sleeve 3 inwall and stake top sleeve 2 outer wall Place, nut wouldn't be locked;
Step 4:Pipe laying 8, pipeline 8 is placed on the bearing 5 having laid rubber lower bolster 6, then installs pad on rubber Plate 7 and clip 12, two clips 12 are integrated with connecting bolt 16, and are fixed on crossbeam 4 with carrier setting bolt 13;
Step 5:Adjust and fixing, because the position of two pile sinking 1 is fixing, the position of crossbeam 4 can only be adjusted Whole, enable step 2 to be placed on the bolt 10 at stake top sleeve 2 top to penetrate in two cross chutes 17 on crossbeam 4;Adjust adjustment Pad, motionless with a spanner fixed adjustment base 15, rotate adjusting pad lid 19 with another spanner, rotate threaded adjusting adjusting pad Distance between seat 15 and adjusting pad lid 19 both ends of the surface, between adjusting pad both ends of the surface and beam-ends sleeve 3 inwall and stake top sleeve 2 outer wall Realize intimate contact;After each position bolt adjusts and is installed in place, tighten fixing bolt 9, finally tighten bolt 10;All spiral shells Bolt is all fixed using double nut.
In order to improve underwater visibility, convenient installation under water, improve speed of application, the fine day that stormy waves should be selected little enters Row construction;Have welding mark in drawing is full weld;All parts, particularly welding, polishing part, to carry out in a pre-installation Rust cleaning and preservative treatment.

Claims (5)

1. can multidirectional regulation submarine pipeline fixing device it is characterised in that:Stake top sleeve (2) is enclosed within pile sinking (1) upper end, uses water Flat bolt (11) is fastenedly connected;Crossbeam (4) is erected on two stake top sleeves (2), is fastenedly connected with bolt (10), crossbeam (4) The beam-ends sleeve (3) at two ends entangles stake top sleeve (2), is fastenedly connected with fixing bolt (9), equipped with circular hole on fixing bolt (9) Pad (14) and adjusting pad, adjusting pad limits the gap being arranged between beam-ends sleeve (3) inwall and stake top sleeve (2) outer wall Place;Bearing (5) is fixedly mounted in the middle part of the upper surface of crossbeam (4) by carrier setting bolt (13), and pipeline (8) is erected on bearing (5), It is fixedly connected with crossbeam (4) with carrier setting bolt (13) with clip (12), bolt (16), be provided between pipeline (8) and bearing (5) Rubber lower bolster (6), is provided with rubber upper padding plate (7) between pipeline (8) and clip (12).
2. according to claim 1 can multidirectional regulation submarine pipeline fixing device it is characterised in that:Described crossbeam (4) Two beam-ends sleeves (3) at two ends are square, be provided with reinforcing plate (20) and be connected between two beam-ends sleeves (3), beam-ends sleeve (3) Inwall and stake top sleeve (2) outer wall are provided with equidistant spacing, and distance values are more than two pile sinking (1) construction relative positions and allow by mistake Difference.
3. according to claim 1 can multidirectional regulation submarine pipeline fixing device it is characterised in that:Described crossbeam (4) At the beam-ends sleeve (3) at two ends and stake top sleeve (2) top center, the groove of installation bolt (10) is set to cross chute (17), spiral shell Bolt (10) can be arbitrarily mobile in cross chute (17);The groove of erection support bolt (13) in the middle part of the upper surface of crossbeam (4) It is set to strip groove (18), carrier setting bolt (13) can be arbitrarily mobile in strip groove (18).
4. according to claim 1 can multidirectional regulation submarine pipeline fixing device it is characterised in that:Described adjusting pad It is made up of adjustment base (15) and adjusting pad lid (19), using threaded, adjust the cylindrical of base (15) and be provided with external screw thread, adjust The endoporus of whole pad lid (19) is provided with female thread, and the height of adjusting pad is adjusted by rotating screw thread.
5. according to claim 1 can multidirectional regulation submarine pipeline fixing device it is characterised in that:Under described rubber Backing plate (6) and rubber upper padding plate (7) are concave groove type strip, and the upper supporting steel plate of bearing (5) and clip (12) are pressed into rubber lower bolster (6) and in the groove of rubber upper padding plate (7).
CN201620494612.5U 2016-05-27 2016-05-27 Underwater pipeline fixing device that can multidirectionally adjust Withdrawn - After Issue CN205938179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620494612.5U CN205938179U (en) 2016-05-27 2016-05-27 Underwater pipeline fixing device that can multidirectionally adjust

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620494612.5U CN205938179U (en) 2016-05-27 2016-05-27 Underwater pipeline fixing device that can multidirectionally adjust

Publications (1)

Publication Number Publication Date
CN205938179U true CN205938179U (en) 2017-02-08

Family

ID=57934377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620494612.5U Withdrawn - After Issue CN205938179U (en) 2016-05-27 2016-05-27 Underwater pipeline fixing device that can multidirectionally adjust

Country Status (1)

Country Link
CN (1) CN205938179U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822834A (en) * 2016-05-27 2016-08-03 安徽省水利水电勘测设计院 Underwater pipeline fixing device with multidirectional adjustment function and installation method of underwater pipeline fixing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822834A (en) * 2016-05-27 2016-08-03 安徽省水利水电勘测设计院 Underwater pipeline fixing device with multidirectional adjustment function and installation method of underwater pipeline fixing device
CN105822834B (en) * 2016-05-27 2017-10-24 安徽省水利水电勘测设计院 Can multidirectional regulation submarine pipeline fixing device and its installation method

Similar Documents

Publication Publication Date Title
JP5069171B2 (en) Offshore wind power generation foundation and superstructure joint structure and superstructure installation method
CA2618543C (en) A mooring
CN105822834B (en) Can multidirectional regulation submarine pipeline fixing device and its installation method
CN205938179U (en) Underwater pipeline fixing device that can multidirectionally adjust
JP2013159945A (en) Connection structure of superstructure and pile
US10538935B2 (en) Guy wire anchor securement system
KR20180063107A (en) Offshore wind farm
CN105908772A (en) Offshore wind turbine gravity type base, base system and gravity type base construction method
JP5356482B2 (en) Fundamental structure of solar cell module or solar cell array mount
CN104120802A (en) Simple method for mounting and locating seismic isolation support
CN104234950A (en) Base of wind driven generator used for deep-water area
CN112761177A (en) Multifunctional comprehensive fan single-pile foundation and damping dynamic adjustment method thereof
KR102304302B1 (en) Method of Constructing Underwater Base Structure
KR102304303B1 (en) Method of Constructing Underwater Base Structure
KR20150020512A (en) Transition piece for Adjusting Horizontality
CN103523175B (en) A kind of wind turbine generator jacket bottom fixing device
CN210507512U (en) Offshore generator foundation structure
CN213974368U (en) Tool for shipping and fixing four-pipe jacket
CN212223615U (en) Simple trestle supporting system with adjustable span
CN202073682U (en) Rigid support structure for water turbine seat ring
CN211771570U (en) Novel sacrificial anode structure for ocean engineering steel pipe pile
CN110714653A (en) Tower structure and method for distribution line water area emergency training
CN104846850A (en) Steel sheet pile protection system for tidal range area and water level fluctuation area and construction method thereof
CN204024932U (en) The base of the wind-driven generator tower that deep is used
AU2006281969B2 (en) A mooring

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170208

Effective date of abandoning: 20171024