CN105970815B - A kind of technique carrying out bridge spraying using back-covered box beam spraying platform - Google Patents
A kind of technique carrying out bridge spraying using back-covered box beam spraying platform Download PDFInfo
- Publication number
- CN105970815B CN105970815B CN201610345228.3A CN201610345228A CN105970815B CN 105970815 B CN105970815 B CN 105970815B CN 201610345228 A CN201610345228 A CN 201610345228A CN 105970815 B CN105970815 B CN 105970815B
- Authority
- CN
- China
- Prior art keywords
- platform
- spraying
- wearing
- box beam
- girder steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention is a kind of technique carrying out bridge spraying using back-covered box beam spraying platform, the specific steps are:(1) use girder steel as platform skeleton, wooden frame and girder steel are attached by longitudinal paving with wooden frame, with buckle, then spread bamboo slab rubber on wooden frame, and scaffold tubes form safe enclosing on surrounding cloth, form single platform;(2) platform both ends are run through to wearing bolt;(3) surface that electronic form removal machine is moved on to pre-buried form removal hole is connected using to wearing cap to wearing, at the uniform velocity hoisting platform and fixation;(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is in half vacant state along box beam outer profile, hangs safety belt;(5) it is connected using bamboo slab rubber between multiple single platforms, platform ladder is set up in both sides;(6) staff enters job platform to bridge progress spraying operation.The present invention from personnel, machinery, material service life on complete upgrading, greatly reduce construction cost, improve construction efficiency.
Description
Technical field
The present invention relates to bridge spraying field more particularly to it is a kind of using back-covered box beam spraying platform progress bridge spraying
Technique.
Background technology
Qatar's east high-speed overpass concrete structure needs to carry out spraying operation after the completion of pouring, and ensures structure
Aesthetics and durability.Existing actual conditions are that there are about the bridge structures of half to be above 15m, and highest point reaches 32m.Site operation
It mostly uses bridge inspection vehicle and elevator carries out operation, or even need to set up landing stage of scaffold progress spraying operation, but due to spray
Painting workload is big, and bridge zone structural area is about 167000 square metres, and the step lasts time is long, using the high elevator of lease and sets up
The modes such as scaffold are both needed to pay huge cost, and it is more slow to construct.
Invention content
Present invention seek to address that the deficiencies in the prior art, and provides and a kind of back-covered box beam spraying platform is utilized to carry out bridge
The technique of spraying.
The present invention to achieve the above object, using following technical scheme:It is a kind of to be carried out using back-covered box beam spraying platform
The technique of bridge spraying, the specific steps are:
(1) it uses the girder steel of 3.6m to be used as platform skeleton, is bolted with 6 M16 between girder steel, longitudinally spread with the wood of 3m
Wooden frame and girder steel are attached with buckle, then spread bamboo slab rubber on wooden frame by beam, spacing 0.6m, scaffold tubes on surrounding cloth
Safe enclosing is formed, single platform is formed;
(2) run through to wearing bolt apart from the position of platform both ends 1.88m, the length to wearing bolt is 6m, to wearing bolt
Number be 4, and lock gasket and nut in base opening, the protruded length to wearing bolt is at least 50mm;
(3) surface that electronic form removal machine is moved on to pre-buried form removal hole, using to wearing cap connection to wearing, at the uniform velocity lifting is flat
Platform after reaching spraying position, using gasket and nut fixing bolt top opening, ensures that platform is firm;
(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is outside box beam
Profile is in half vacant state, hangs safety belt;
(5) it will be connected using bamboo slab rubber between the multiple single platforms fixed, frame hand cradle operation post ladder is set up in both sides;
(6) staff enters job platform to bridge progress spraying operation by platform ladder.
The size of the list platform is 14.4mx3m.
The gasket is filling pad.
The beneficial effects of the invention are as follows:The present invention is not take up large lifting equipment, and motor operation is simple and fast, reinforcing side
Formula is firm, and personnel do not have the security risk of working at height, lifting process not to need the auxiliary of personnel, can disposably provide a large amount of
Job platform relative to traditional elevator and sets up the processes such as the landing stage of scaffold, and safe, speed is fast, from personnel,
Complete upgrading in mechanical, material service life, greatly reduces construction cost, improves construction efficiency.
Specific implementation mode
With reference to embodiment, the invention will be further described:
Embodiment 1:
A kind of technique carrying out bridge spraying using back-covered box beam spraying platform, the specific steps are:
(1) it uses the girder steel of 3.6m to be used as platform skeleton, is bolted with 6 M16 between girder steel, longitudinally spread with the wood of 3m
Wooden frame and girder steel are attached with buckle, then spread bamboo slab rubber on wooden frame by beam, spacing 0.6m, scaffold tubes on surrounding cloth
Safe enclosing is formed, single platform is formed;
(2) run through to wearing bolt apart from the position of platform both ends 1.88m, the length to wearing bolt is 6m, to wearing bolt
Number be 4, and lock gasket and nut in base opening, the protruded length to wearing bolt is 50mm;
(3) surface that electronic form removal machine is moved on to pre-buried form removal hole, using to wearing cap connection to wearing, at the uniform velocity lifting is flat
Platform after reaching spraying position, using gasket and nut fixing bolt top opening, ensures that platform is firm;
(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is outside box beam
Profile is in half vacant state, hangs safety belt;
(5) it will be connected using bamboo slab rubber between the multiple single platforms fixed, frame hand cradle operation post ladder is set up in both sides;
(6) staff enters job platform to bridge progress spraying operation by platform ladder.
The size of the list platform is 14.4mx3m.
The gasket is filling pad.
Embodiment 2:
A kind of technique carrying out bridge spraying using back-covered box beam spraying platform, the specific steps are:
(1) it uses the girder steel of 3.6m to be used as platform skeleton, is bolted with 6 M16 between girder steel, longitudinally spread with the wood of 3m
Wooden frame and girder steel are attached with buckle, then spread bamboo slab rubber on wooden frame by beam, spacing 0.6m, scaffold tubes on surrounding cloth
Safe enclosing is formed, single platform is formed;
(2) run through to wearing bolt apart from the position of platform both ends 1.88m, the length to wearing bolt is 6m, to wearing bolt
Number be 4, and lock gasket and nut in base opening, the protruded length to wearing bolt is 60mm;
(3) surface that electronic form removal machine is moved on to pre-buried form removal hole, using to wearing cap connection to wearing, at the uniform velocity lifting is flat
Platform after reaching spraying position, using gasket and nut fixing bolt top opening, ensures that platform is firm;
(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is outside box beam
Profile is in half vacant state, hangs safety belt;
(5) it will be connected using bamboo slab rubber between the multiple single platforms fixed, frame hand cradle operation post ladder is set up in both sides;
(6) staff enters job platform to bridge progress spraying operation by platform ladder.
The size of the list platform is 14.4mx3m.
The gasket is filling pad.
The present invention is exemplarily described above, it is clear that present invention specific implementation is not subject to the restrictions described above,
As long as using the various improvement of inventive concept and technical scheme of the present invention progress, or not improved directly apply to other fields
It closes, within protection scope of the present invention.
Claims (3)
1. a kind of technique carrying out bridge spraying using back-covered box beam spraying platform, which is characterized in that the specific steps are:
(1) it uses the girder steel of 3.6m to be used as platform skeleton, is bolted with 6 M16 between girder steel, longitudinally spread with the wooden frame of 3m,
Spacing is 0.6m, is attached wooden frame and girder steel with buckle, then bamboo slab rubber is spread on wooden frame, scaffold tubes are formed on surrounding cloth
Safe enclosing forms single platform;
(2) run through to wearing bolt apart from the position of platform both ends 1.88m, the length to wearing bolt is 6m, to wearing of bolt
Number is 4, and locks gasket and nut in base opening, and the protruded length to wearing bolt is at least 50mm;
(3) surface that electronic form removal machine is moved on to pre-buried form removal hole connects to wearing, at the uniform velocity hoisting platform using to wearing cap, arrives
Up to after spraying position, using gasket and nut fixing bolt top opening, ensure that platform is firm;
(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is along box beam outer profile
In half vacant state, safety belt is hung;
(5) it will be connected using bamboo slab rubber between the multiple single platforms fixed, frame hand cradle operation post ladder is set up in both sides;
(6) staff enters job platform to bridge progress spraying operation by platform ladder.
2. a kind of technique carrying out bridge spraying using back-covered box beam spraying platform according to claim 1, feature
It is, the size of the list platform is 14.4mx3m.
3. a kind of technique carrying out bridge spraying using back-covered box beam spraying platform according to claim 2, feature
It is, the gasket is filling pad.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610345228.3A CN105970815B (en) | 2016-05-23 | 2016-05-23 | A kind of technique carrying out bridge spraying using back-covered box beam spraying platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610345228.3A CN105970815B (en) | 2016-05-23 | 2016-05-23 | A kind of technique carrying out bridge spraying using back-covered box beam spraying platform |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105970815A CN105970815A (en) | 2016-09-28 |
CN105970815B true CN105970815B (en) | 2018-10-09 |
Family
ID=56956832
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610345228.3A Active CN105970815B (en) | 2016-05-23 | 2016-05-23 | A kind of technique carrying out bridge spraying using back-covered box beam spraying platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105970815B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107083746B (en) * | 2017-04-28 | 2018-11-27 | 曹志锋 | Bridge wall surface paint spraying equipment and its construction method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003013411A (en) * | 2001-06-28 | 2003-01-15 | Sumitomo Constr Co Ltd | Method for repairing concrete bridge girder |
JP4696246B2 (en) * | 2006-04-19 | 2011-06-08 | 国立大学法人信州大学 | Freezing prevention device for bridge road surface |
CN201292512Y (en) * | 2008-08-29 | 2009-08-19 | 北京公联洁达公路养护工程有限公司 | Suspended cable sliding table for spraying main steel box beam of overpass |
CN201823649U (en) * | 2010-02-26 | 2011-05-11 | 北京航材百慕新材料技术工程股份有限公司 | Automatic paint spraying apparatus of suspension bridge cable |
CN104259079B (en) * | 2014-10-27 | 2015-12-30 | 鞍山东方钢构桥梁有限公司 | The pre-spraying coating process of steel bridge case beam cold spray zinc |
-
2016
- 2016-05-23 CN CN201610345228.3A patent/CN105970815B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105970815A (en) | 2016-09-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN101514586B (en) | Hanger rail type electric hanging boat and construction method thereof | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN105152032A (en) | Installing method for bridge crane in enclosed environment workshop | |
CN105421248A (en) | Swivel and closure construction method for large-span continuous beam crossing existing station | |
CN105648926A (en) | Swivel construction method for large span continuous beam which spans existing station | |
CN206859068U (en) | A kind of Cable-stayed Bridge Pylon sill segmental timbering structure | |
CN206418415U (en) | A kind of bridge and facade wall maintenance device | |
CN104975719A (en) | Novel material distribution device and floor concrete casting construction method of novel material distribution device | |
CN106592962A (en) | Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus | |
CN103912128A (en) | Construction method of high-altitude one-piece steel truss | |
CN105018115B (en) | Dry quenching primary deduster fragment hoisting method | |
CN105970815B (en) | A kind of technique carrying out bridge spraying using back-covered box beam spraying platform | |
CN108190808B (en) | Color steel plate anti-suspended ceiling high-altitude sliding device and anti-suspended ceiling construction method | |
CN202688879U (en) | Arch steel tower coating platform running with arch | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN106351245A (en) | Tower crane foundation base and construction method thereof | |
CN207526083U (en) | A kind of detachable overhanging support construction | |
CN108625270A (en) | Nose girder gantry crane installs bridge prefabrication box girder construction method | |
CN206538685U (en) | Twin shaft pier and middle binder truss move integrally system | |
CN201714056U (en) | Truss-type operating platform | |
CN205654127U (en) | Portable operation protective platform of assembly type structure stairwell | |
CN107587711A (en) | A kind of regularization assembled overhanging protection canopy and its assembly method | |
CN104404883A (en) | Inner working platform for rapid construction of bridge pier and construction method using inner working platform | |
CN110984384A (en) | Installation method of lower frame column system of steel-making tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |