CN105970815B - A kind of technique carrying out bridge spraying using back-covered box beam spraying platform - Google Patents

A kind of technique carrying out bridge spraying using back-covered box beam spraying platform Download PDF

Info

Publication number
CN105970815B
CN105970815B CN201610345228.3A CN201610345228A CN105970815B CN 105970815 B CN105970815 B CN 105970815B CN 201610345228 A CN201610345228 A CN 201610345228A CN 105970815 B CN105970815 B CN 105970815B
Authority
CN
China
Prior art keywords
platform
spraying
wearing
box beam
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610345228.3A
Other languages
Chinese (zh)
Other versions
CN105970815A (en
Inventor
唐立明
安秀山
尹景燕
杨建勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201610345228.3A priority Critical patent/CN105970815B/en
Publication of CN105970815A publication Critical patent/CN105970815A/en
Application granted granted Critical
Publication of CN105970815B publication Critical patent/CN105970815B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention is a kind of technique carrying out bridge spraying using back-covered box beam spraying platform, the specific steps are:(1) use girder steel as platform skeleton, wooden frame and girder steel are attached by longitudinal paving with wooden frame, with buckle, then spread bamboo slab rubber on wooden frame, and scaffold tubes form safe enclosing on surrounding cloth, form single platform;(2) platform both ends are run through to wearing bolt;(3) surface that electronic form removal machine is moved on to pre-buried form removal hole is connected using to wearing cap to wearing, at the uniform velocity hoisting platform and fixation;(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is in half vacant state along box beam outer profile, hangs safety belt;(5) it is connected using bamboo slab rubber between multiple single platforms, platform ladder is set up in both sides;(6) staff enters job platform to bridge progress spraying operation.The present invention from personnel, machinery, material service life on complete upgrading, greatly reduce construction cost, improve construction efficiency.

Description

A kind of technique carrying out bridge spraying using back-covered box beam spraying platform
Technical field
The present invention relates to bridge spraying field more particularly to it is a kind of using back-covered box beam spraying platform progress bridge spraying Technique.
Background technology
Qatar's east high-speed overpass concrete structure needs to carry out spraying operation after the completion of pouring, and ensures structure Aesthetics and durability.Existing actual conditions are that there are about the bridge structures of half to be above 15m, and highest point reaches 32m.Site operation It mostly uses bridge inspection vehicle and elevator carries out operation, or even need to set up landing stage of scaffold progress spraying operation, but due to spray Painting workload is big, and bridge zone structural area is about 167000 square metres, and the step lasts time is long, using the high elevator of lease and sets up The modes such as scaffold are both needed to pay huge cost, and it is more slow to construct.
Invention content
Present invention seek to address that the deficiencies in the prior art, and provides and a kind of back-covered box beam spraying platform is utilized to carry out bridge The technique of spraying.
The present invention to achieve the above object, using following technical scheme:It is a kind of to be carried out using back-covered box beam spraying platform The technique of bridge spraying, the specific steps are:
(1) it uses the girder steel of 3.6m to be used as platform skeleton, is bolted with 6 M16 between girder steel, longitudinally spread with the wood of 3m Wooden frame and girder steel are attached with buckle, then spread bamboo slab rubber on wooden frame by beam, spacing 0.6m, scaffold tubes on surrounding cloth Safe enclosing is formed, single platform is formed;
(2) run through to wearing bolt apart from the position of platform both ends 1.88m, the length to wearing bolt is 6m, to wearing bolt Number be 4, and lock gasket and nut in base opening, the protruded length to wearing bolt is at least 50mm;
(3) surface that electronic form removal machine is moved on to pre-buried form removal hole, using to wearing cap connection to wearing, at the uniform velocity lifting is flat Platform after reaching spraying position, using gasket and nut fixing bolt top opening, ensures that platform is firm;
(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is outside box beam Profile is in half vacant state, hangs safety belt;
(5) it will be connected using bamboo slab rubber between the multiple single platforms fixed, frame hand cradle operation post ladder is set up in both sides;
(6) staff enters job platform to bridge progress spraying operation by platform ladder.
The size of the list platform is 14.4mx3m.
The gasket is filling pad.
The beneficial effects of the invention are as follows:The present invention is not take up large lifting equipment, and motor operation is simple and fast, reinforcing side Formula is firm, and personnel do not have the security risk of working at height, lifting process not to need the auxiliary of personnel, can disposably provide a large amount of Job platform relative to traditional elevator and sets up the processes such as the landing stage of scaffold, and safe, speed is fast, from personnel, Complete upgrading in mechanical, material service life, greatly reduces construction cost, improves construction efficiency.
Specific implementation mode
With reference to embodiment, the invention will be further described:
Embodiment 1:
A kind of technique carrying out bridge spraying using back-covered box beam spraying platform, the specific steps are:
(1) it uses the girder steel of 3.6m to be used as platform skeleton, is bolted with 6 M16 between girder steel, longitudinally spread with the wood of 3m Wooden frame and girder steel are attached with buckle, then spread bamboo slab rubber on wooden frame by beam, spacing 0.6m, scaffold tubes on surrounding cloth Safe enclosing is formed, single platform is formed;
(2) run through to wearing bolt apart from the position of platform both ends 1.88m, the length to wearing bolt is 6m, to wearing bolt Number be 4, and lock gasket and nut in base opening, the protruded length to wearing bolt is 50mm;
(3) surface that electronic form removal machine is moved on to pre-buried form removal hole, using to wearing cap connection to wearing, at the uniform velocity lifting is flat Platform after reaching spraying position, using gasket and nut fixing bolt top opening, ensures that platform is firm;
(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is outside box beam Profile is in half vacant state, hangs safety belt;
(5) it will be connected using bamboo slab rubber between the multiple single platforms fixed, frame hand cradle operation post ladder is set up in both sides;
(6) staff enters job platform to bridge progress spraying operation by platform ladder.
The size of the list platform is 14.4mx3m.
The gasket is filling pad.
Embodiment 2:
A kind of technique carrying out bridge spraying using back-covered box beam spraying platform, the specific steps are:
(1) it uses the girder steel of 3.6m to be used as platform skeleton, is bolted with 6 M16 between girder steel, longitudinally spread with the wood of 3m Wooden frame and girder steel are attached with buckle, then spread bamboo slab rubber on wooden frame by beam, spacing 0.6m, scaffold tubes on surrounding cloth Safe enclosing is formed, single platform is formed;
(2) run through to wearing bolt apart from the position of platform both ends 1.88m, the length to wearing bolt is 6m, to wearing bolt Number be 4, and lock gasket and nut in base opening, the protruded length to wearing bolt is 60mm;
(3) surface that electronic form removal machine is moved on to pre-buried form removal hole, using to wearing cap connection to wearing, at the uniform velocity lifting is flat Platform after reaching spraying position, using gasket and nut fixing bolt top opening, ensures that platform is firm;
(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is outside box beam Profile is in half vacant state, hangs safety belt;
(5) it will be connected using bamboo slab rubber between the multiple single platforms fixed, frame hand cradle operation post ladder is set up in both sides;
(6) staff enters job platform to bridge progress spraying operation by platform ladder.
The size of the list platform is 14.4mx3m.
The gasket is filling pad.
The present invention is exemplarily described above, it is clear that present invention specific implementation is not subject to the restrictions described above, As long as using the various improvement of inventive concept and technical scheme of the present invention progress, or not improved directly apply to other fields It closes, within protection scope of the present invention.

Claims (3)

1. a kind of technique carrying out bridge spraying using back-covered box beam spraying platform, which is characterized in that the specific steps are:
(1) it uses the girder steel of 3.6m to be used as platform skeleton, is bolted with 6 M16 between girder steel, longitudinally spread with the wooden frame of 3m, Spacing is 0.6m, is attached wooden frame and girder steel with buckle, then bamboo slab rubber is spread on wooden frame, scaffold tubes are formed on surrounding cloth Safe enclosing forms single platform;
(2) run through to wearing bolt apart from the position of platform both ends 1.88m, the length to wearing bolt is 6m, to wearing of bolt Number is 4, and locks gasket and nut in base opening, and the protruded length to wearing bolt is at least 50mm;
(3) surface that electronic form removal machine is moved on to pre-buried form removal hole connects to wearing, at the uniform velocity hoisting platform using to wearing cap, arrives Up to after spraying position, using gasket and nut fixing bolt top opening, ensure that platform is firm;
(4) by the pre-buried form removal hole of twice steel wire penetrating, counter together to catch on girder steel, stabilized platform, another road is along box beam outer profile In half vacant state, safety belt is hung;
(5) it will be connected using bamboo slab rubber between the multiple single platforms fixed, frame hand cradle operation post ladder is set up in both sides;
(6) staff enters job platform to bridge progress spraying operation by platform ladder.
2. a kind of technique carrying out bridge spraying using back-covered box beam spraying platform according to claim 1, feature It is, the size of the list platform is 14.4mx3m.
3. a kind of technique carrying out bridge spraying using back-covered box beam spraying platform according to claim 2, feature It is, the gasket is filling pad.
CN201610345228.3A 2016-05-23 2016-05-23 A kind of technique carrying out bridge spraying using back-covered box beam spraying platform Active CN105970815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610345228.3A CN105970815B (en) 2016-05-23 2016-05-23 A kind of technique carrying out bridge spraying using back-covered box beam spraying platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610345228.3A CN105970815B (en) 2016-05-23 2016-05-23 A kind of technique carrying out bridge spraying using back-covered box beam spraying platform

Publications (2)

Publication Number Publication Date
CN105970815A CN105970815A (en) 2016-09-28
CN105970815B true CN105970815B (en) 2018-10-09

Family

ID=56956832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610345228.3A Active CN105970815B (en) 2016-05-23 2016-05-23 A kind of technique carrying out bridge spraying using back-covered box beam spraying platform

Country Status (1)

Country Link
CN (1) CN105970815B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107083746B (en) * 2017-04-28 2018-11-27 曹志锋 Bridge wall surface paint spraying equipment and its construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003013411A (en) * 2001-06-28 2003-01-15 Sumitomo Constr Co Ltd Method for repairing concrete bridge girder
JP4696246B2 (en) * 2006-04-19 2011-06-08 国立大学法人信州大学 Freezing prevention device for bridge road surface
CN201292512Y (en) * 2008-08-29 2009-08-19 北京公联洁达公路养护工程有限公司 Suspended cable sliding table for spraying main steel box beam of overpass
CN201823649U (en) * 2010-02-26 2011-05-11 北京航材百慕新材料技术工程股份有限公司 Automatic paint spraying apparatus of suspension bridge cable
CN104259079B (en) * 2014-10-27 2015-12-30 鞍山东方钢构桥梁有限公司 The pre-spraying coating process of steel bridge case beam cold spray zinc

Also Published As

Publication number Publication date
CN105970815A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN101514586B (en) Hanger rail type electric hanging boat and construction method thereof
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN105152032A (en) Installing method for bridge crane in enclosed environment workshop
CN105421248A (en) Swivel and closure construction method for large-span continuous beam crossing existing station
CN105648926A (en) Swivel construction method for large span continuous beam which spans existing station
CN206859068U (en) A kind of Cable-stayed Bridge Pylon sill segmental timbering structure
CN206418415U (en) A kind of bridge and facade wall maintenance device
CN104975719A (en) Novel material distribution device and floor concrete casting construction method of novel material distribution device
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN103912128A (en) Construction method of high-altitude one-piece steel truss
CN105018115B (en) Dry quenching primary deduster fragment hoisting method
CN105970815B (en) A kind of technique carrying out bridge spraying using back-covered box beam spraying platform
CN108190808B (en) Color steel plate anti-suspended ceiling high-altitude sliding device and anti-suspended ceiling construction method
CN202688879U (en) Arch steel tower coating platform running with arch
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN106351245A (en) Tower crane foundation base and construction method thereof
CN207526083U (en) A kind of detachable overhanging support construction
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN206538685U (en) Twin shaft pier and middle binder truss move integrally system
CN201714056U (en) Truss-type operating platform
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN104404883A (en) Inner working platform for rapid construction of bridge pier and construction method using inner working platform
CN110984384A (en) Installation method of lower frame column system of steel-making tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant